norte de carcara and sul de gato do mato · 2017. 8. 17. · conclusions the 2nd pre-salt bidding...
TRANSCRIPT
![Page 1: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/1.jpg)
Norte de Carcara
and
Sul de Gato do Mato
André L. Ferreira
Superintendency of Delimitation of Blocks
![Page 2: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/2.jpg)
Introduction 1
Carcara Geological Analysis2
Gato do Mato Geological Analysis3
Conclusions4
Outline
![Page 3: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/3.jpg)
Introduction 1
Carcara Geological Analysis2
Gato do Mato Geological Analysis3
Conclusions4
Outline
![Page 4: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/4.jpg)
Santos Basin
Pre-Salt Play
Exploration Phase Areas
Norte de Carcará
Sul de Gato do Mato
Location
Onshore Basin
Offshore Basin
Basement
Block on Offer
Pre-Salt Polygon
Oil/Gas Field
Legend
Round 1 Pre-Salt
Round 2
Round 3
Round 7
![Page 5: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/5.jpg)
Infrastructure
Norte de Carcará
Sul de Gato do Mato
Terminal
Plataform
Refinery
Oil Pipeline
Gas Pipeline
Onshore Basin
Offshore Basin
Basement
Block on Offer
Pre-Salt Polygon
Oil/Gas Field
Legend
Round 1 Pre-Salt
Round 2
Round 3
Round 7
![Page 6: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/6.jpg)
2D Confidential Seismic Data
2D Public Seismic Data
Seismic Data
Legend
Onshore Basin
Offshore Basin
Basement
Block on Offer
Pre-Salt Polygon
Oil/Gas Field
Round 1 Pre-Salt
Round 2
Round 3
Round 7
![Page 7: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/7.jpg)
Legend
Onshore Basin
Offshore Basin
Basement
Block on Offer
Pre-Salt Polygon
Oil/Gas Field
Round 1 Pre-Salt
Round 2
Round 3
Round 7
3D Confidential Seismic Data
3D Public Seismic Data
Seismic Data
![Page 8: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/8.jpg)
Introduction 1
Carcara Geological Analysis2
Gato do Mato Geological Analysis3
Conclusions4
Outline
![Page 9: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/9.jpg)
BM-S-8
Carcara
3-BRSA-1216DA-SPS
4-BRSA-971B-SPS
3-BRSA-1290-SPS
Confidential
Public
Well Wells
4-BRSA-971B-SPS
3-BRSA-1216DA-SPS
3-BRSA-1290-SPS
Fluid
Oil 310 API
Absence of H2S and CO2
Reservoir
Fractured aptian microbial carbonates
![Page 10: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/10.jpg)
Top of Rift
Top of Salt
Fonte: Moreira et. al., 2007
MAPPED
HORIZONS
Base of Salt
Top of
Basement
Geological Analysis
![Page 11: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/11.jpg)
Base do Sal em Profundidade
Carcará
Carcara
![Page 12: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/12.jpg)
Inline 47945
0 5 km
-8,0
00
-10
,00
0-6
,00
0-4
,00
0-2
,00
0
Constellation Survey Fast Track – Courtesy of CGG
low frequency emphasize attribute
Carcara
![Page 13: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/13.jpg)
-8,0
00
-10
,00
0-6
,00
0-4
,00
0-2
,00
0
Inline 47945
Constellation Survey Fast Track – Courtesy of CGG
low frequency emphasize attribute
Carcara
0 5 km
![Page 14: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/14.jpg)
-7,5
00
-9,0
00
-6,0
00
-4,5
00
-3,0
00
0 2 km
Constellation Survey Fast Track – Courtesy of CGG
low frequency emphasize attribute
Arbirtrary Line
Carcara3-BRSA-1216DA-SPS 4-BRSA-971B-SPS
![Page 15: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/15.jpg)
-7,5
00
-9,0
00
-6,0
00
-4,5
00
-3,0
00
0 2 km
Arbirtrary Line
Carcará3-BRSA-1216DA-SPS 4-BRSA-971B-SPS
Constellation Survey Fast Track – Courtesy of CGG
low frequency emphasize attribute
![Page 16: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/16.jpg)
-7,5
00
-9,0
00
-6,0
00
-4,5
00
-3,0
00
0 2 km
Arbirtrary Line
Carcará3-BRSA-1216DA-SPS 4-BRSA-971B-SPS
Constellation Survey Fast Track – Courtesy of CGG
low frequency emphasize attribute
Intrasag
6100
5900
MD
(m
)
90 0
GR RESM
10610
5700
Up
pe
rS
ag
Lo
we
rS
ag
4-BRSA-971B-SPS
![Page 17: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/17.jpg)
Reservoir Model
Depth (m)
5900
5950
6000
6050
6100
6150
6200
6250
6300
6350
6400
6450
6500
![Page 18: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/18.jpg)
Rock Volume (m3)
Sag Superior Sag Inferior
Rock Volume
225000
200000
175000
150000
125000
100000
75000
50000
25000
Upper Sag Lower Sag
![Page 19: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/19.jpg)
Sag SuperiorSag Inferior
Porosity
Upper Sag Lower Sag
Porosity
0.145
0.140
0.135
0.130
0.125
0.120
0.115
0.110
0.105
![Page 20: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/20.jpg)
Net/Gross
Sag Superior Sag Inferior
Net/Gross
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
Upper Sag Lower Sag
![Page 21: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/21.jpg)
EstimatedVolumes
BM-S-8
Depth (m)
5900
5950
6000
6050
6100
6150
6200
6250
6300
6350
6400
6450
6500
Volume of oil in place
~2.2 Billion barrels(for the non-contracted area)
![Page 22: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/22.jpg)
Introduction 1
Carcara Geological Analysis2
Gato do Mato Geological Analysis3
Conclusions4
Outline
![Page 23: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/23.jpg)
Wells1-SHEL-023-RJS3-SHEL-027-RJS
FluidOil 420 API >> gas/oil ratio<< H2S and CO2
Reservoir FaciesMicrobial carbonates, high energyfacies (grainstones, packstones)
BM-S-54
Lula
1-SHEL-023-RJS
3-SHEL-027-RJS
Gato do Mato
Public Well
![Page 24: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/24.jpg)
Top of Rift
Top of Salt
Fonte: Moreira et. al., 2007
MAPPED
HORIZONS
Base of Salt
Top of
Basement
Geological Analysis
![Page 25: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/25.jpg)
Gato do Mato
Constellation Survey Fast Track – Courtesy of CGG
low frequency emphasize attribute
0 5 km
-8,0
00
-6,0
00
-4,0
00
-2000 Inline 62175
![Page 26: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/26.jpg)
Constellation Survey Fast Track – Courtesy of CGG
low frequency emphasize attribute
Inline 62175
-8,0
00
-6,0
00
-4,0
00
-2000
Constellation Survey Fast Track – Courtesy of CGG
low frequency emphasize attribute
Inline 62175
Gato do Mato
0 5 km
![Page 27: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/27.jpg)
Gato do Mato
Arbitrary Line
0 4 km
Constellation Survey Fast Track – Courtesy of CGG
low frequency emphasize attribute
1-SHEL-023-RJS Area on Offer
-8,0
00
-6,0
00
-4,0
00
-2000
![Page 28: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/28.jpg)
-8,0
00
-6,0
00
-4,0
00
-2000
Gato do Mato
Arbitrary Line
Constellation Survey Fast Track – Courtesy of CGG
low frequency emphasize attribute
1-SHEL-023-RJS Area on Offer
0 4 km
![Page 29: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/29.jpg)
-8,0
00
-6,0
00
-4,0
00
-2000
Gato do Mato
Arbitrary Line
Constellation Survey Fast Track – Courtesy of CGG
low frequency emphasize attribute
1-SHEL-023-RJS Area on Offer
0 4 km
![Page 30: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/30.jpg)
-8,0
00
-6,0
00
-4,0
00
-2000
Constellation Survey Fast Track – Courtesy of CGG
low frequency emphasize attribute
Inline 59355
Gato do Mato
0 2 km
Area on Offer
![Page 31: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/31.jpg)
Gato do Mato-8
,00
0-6
,00
0-4
,00
0-2
,00
0
Constellation Survey Fast Track – Courtesy of CGG
low frequency emphasize attribute
Inline 59355
Area on Offer
0 2 km
![Page 32: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/32.jpg)
Reservoir Model
Oil/Water Contact
-5.261,5 m
Depth (m)
-5100
-5200
-5300
-5400
-5500
-5600
-5700
-5800
-5900
-6000
-6100
-6200
![Page 33: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/33.jpg)
Rock Volume
70000
60000
50000
40000
30000
20000
10000
Volume (m3)
Reservoir Model
![Page 34: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/34.jpg)
Net/GrossPorosity
0.18
0.16
0.14
0.12
0.10
0.06
0.02
0.04
0.08
Porosity
1.0
0.9
0.8
0.7
0.6
0.4
0.1
0.3
0.5
Net/Gross
0.2
Reservoir Model
![Page 35: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/35.jpg)
BM-S-54
Depth (m)
-5100
-5200
-5300
-5400
-5500
-5600
-5700
-5800
-5900
-6000
-6100
-6200
EstimatedVolumes
Volume of oil in place
~203 Million barrels(for the non-contracted area)
![Page 36: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/36.jpg)
Introduction 1
Carcara Geological Analysis2
Gato do Mato Geological Analysis3
Conclusions4
Outline
![Page 37: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/37.jpg)
Conclusions
The 2nd Pre-Salt Bidding Round incudes unitizable áreas
under exploration phase: Carcara and Gato do Mato;
Carcara and Gato do Mato are oil and gas accumulations on
the Pre-Salt play of Santos Basin;
Volume of oil in place estimated for Carcara are about 2.2
billion barrels of oil (only for the non-contracted area);
Volume in place estimated for Gato do mato are about 203
million boe (only for the non-contracted area).
![Page 38: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/38.jpg)
Carcara Geologica Analysis – Superintendecy of Delimitation of Blocks
Marina Abelha
Vanderlei Sartori
André L. Ferreira
Eliane Petersohn
Gabriel Bastos
Gato do Mato Geological Analysis – Superintendecy of Exploration
Rafael Bastos
Arnaldo WarszarwskiGabriela Salomão Martins
![Page 39: Norte de Carcara and Sul de Gato do Mato · 2017. 8. 17. · Conclusions The 2nd Pre-Salt Bidding Round incudes unitizable áreas under exploration phase: Carcara and Gato do Mato;](https://reader035.vdocuments.net/reader035/viewer/2022063013/5fccea61b23fdc7925002b09/html5/thumbnails/39.jpg)
National Agency of Petroleum, Natural Gas and Biofuels - ANP
www.anp.gov.br
Av. Rio Branco, 65 – Centro – Rio de Janeiro – Brazil
12th to 22nd floor
Tel: +55 (21) 2112-8100