Page 1: North Carolina CTS  Committee Meeting #9

North Carolina CTS North Carolina CTS Committee Meeting #9Committee Meeting #9

June 19, 2001

Page 2: North Carolina CTS  Committee Meeting #9

Introduction and Welcome Introduction and Welcome

Page 3: North Carolina CTS  Committee Meeting #9

Scoping/Basin Plans

Status Updates:Status Updates:

Page 4: North Carolina CTS  Committee Meeting #9

Phase I Scoping Phase I Scoping ScheduleSchedule

Page 5: North Carolina CTS  Committee Meeting #9

Proposed Phase II Proposed Phase II Scoping PlanScoping Plan

Scoping in 5 central river basins planned to start October 1, 2001: First emphasis on Chowan, Roanoke,

and Yadkin River Basins 36 counties 3 scoping teams

Catawba and New River Basins to follow 15 counties scoping teams tbd

Page 6: North Carolina CTS  Committee Meeting #9

Flood Data andMapping Development

Status Updates:Status Updates:

Page 7: North Carolina CTS  Committee Meeting #9

G&O StatusG&O Status

Page 8: North Carolina CTS  Committee Meeting #9

Watershed Concepts Watershed Concepts StatusStatus

White Oak Basin Tar Pamlico Basin

Page 9: North Carolina CTS  Committee Meeting #9

White Oak River White Oak River BasinBasin

Terrain: 100% Complete Survey: 100% Complete Hydrology: 50% Complete Hydraulics: 33% Complete Floodplain Mapping: 25% Complete Sample DFIRMs presented at ASFPM

Page 10: North Carolina CTS  Committee Meeting #9

White Oak River BasinWhite Oak River Basin

Page 11: North Carolina CTS  Committee Meeting #9

Onslow County – Preliminary Onslow County – Preliminary DFIRMsDFIRMs

Page 12: North Carolina CTS  Committee Meeting #9

Tar-Pamlico River Tar-Pamlico River BasinBasin

Field Survey: Structure Surveys: 100% Complete Cross Section Surveys: 50%

Complete High Water Mark Surveys: 15%

Complete H&H:

Hydrology: 10% Complete

Page 13: North Carolina CTS  Committee Meeting #9

Revised ScheduleRevised Schedule

White Oak River Basin DFIRM: August 30, 2001

Page 14: North Carolina CTS  Committee Meeting #9

LIDAR Surveys andDEM Development

Status Updates:Status Updates:

Page 15: North Carolina CTS  Committee Meeting #9

Watershed Concepts — LIDARWatershed Concepts — LIDARPre-Processing Status 6/08/01Pre-Processing Status 6/08/01

Page 16: North Carolina CTS  Committee Meeting #9

Watershed Concepts — Watershed Concepts — Vegetation Removal Status Vegetation Removal Status

6/08/016/08/01

Page 17: North Carolina CTS  Committee Meeting #9

G&O — Automated LIDAR G&O — Automated LIDAR Processing Status 6/08/01Processing Status 6/08/01

Page 18: North Carolina CTS  Committee Meeting #9

G&O — Bare Earth DEM G&O — Bare Earth DEM Generation Status 6/08/01Generation Status 6/08/01

Page 19: North Carolina CTS  Committee Meeting #9

G&O — TIN GenerationG&O — TIN GenerationStatus 6/08/01Status 6/08/01

Page 20: North Carolina CTS  Committee Meeting #9

LIDAR Quality Control Surveys

Status Updates:Status Updates:

Page 21: North Carolina CTS  Committee Meeting #9

Quality Control Quality Control SurveysSurveys

Page 22: North Carolina CTS  Committee Meeting #9

DFIRM Specifications

Status Updates:Status Updates:

Page 23: North Carolina CTS  Committee Meeting #9

DFIRM Graphic DFIRM Graphic SpecificationsSpecifications

State has received FEMA’s comments on latest prototype

New prototype that incorporates final comments will be generated for inclusion in DFIRM Delivery Order

Page 24: North Carolina CTS  Committee Meeting #9

DFIRM Database DFIRM Database SpecificationsSpecifications

Draft DFIRM database tables conceptualized for inventory, base mapping, and DFIRM mapping

Engineering judgement tables under discussion

Additional table definitions and documentation needed

Page 25: North Carolina CTS  Committee Meeting #9

Program Funding/Partnering

Status Updates:Status Updates:

Page 26: North Carolina CTS  Committee Meeting #9

Information Technology Information Technology Requirements Analysis, Requirements Analysis,

Preliminary System Design, Preliminary System Design, Work Plan, and Delivery Work Plan, and Delivery

OrderOrder

Page 27: North Carolina CTS  Committee Meeting #9

Higher Standards Draft Higher Standards Draft DocumentDocument

Page 28: North Carolina CTS  Committee Meeting #9

Policy & Procedures Policy & Procedures ManualManual

Page 29: North Carolina CTS  Committee Meeting #9

Purpose of the Purpose of the ManualManual

Consolidate information about the NC Flood Mapping Program in one location

Inform new staff about the program

Serve as a resource for future CTS projects

Page 30: North Carolina CTS  Committee Meeting #9

Contents of the Contents of the ManualManual

Two major units Policies Procedures

Appendices to include Mapping Activity Statements, a template for the basin plans, and templates for the Delivery Orders

Page 31: North Carolina CTS  Committee Meeting #9

Policies UnitPolicies Unit

Explanation of the process for raising and resolving programmatic issues and for establishing new policies

Flowchart depiction of the process Policy establishment

Page 32: North Carolina CTS  Committee Meeting #9

Procedures for Mapping Procedures for Mapping UnitUnit

Overview of the flood mapping process for North Carolina

Sections to describe the mapping components: Scoping Leveraging Existing Geospatial Data

Resources Production

Topographic Data Development Flood Data Development DFIRM Production Quality Control Reviews

Page 33: North Carolina CTS  Committee Meeting #9

Procedures for Mapping Procedures for Mapping UnitUnit

(continued)(continued) Post-Preliminary Processing Data Dissemination and Archiving Map Maintenance Education/Outreach Contracting Approach Higher Standards Flood Warning System Post-Flood Verification Partnerships Funding

Page 34: North Carolina CTS  Committee Meeting #9

Procedures for Mapping Procedures for Mapping UnitUnit

(continued)(continued) Where applicable, each of the

sections will have two subsections for (1) Procedures and (2) Standards and Specifications

Page 35: North Carolina CTS  Committee Meeting #9

Partnering/MOAPartnering/MOA

Page 36: North Carolina CTS  Committee Meeting #9

Community Community PartneringPartnering

Cooperating Technical Partner MOA

GIS Data Sharing MOA

Page 37: North Carolina CTS  Committee Meeting #9

Issue Discussion:Issue Discussion:Surface Water Mapping for

DFIRMs

Page 38: North Carolina CTS  Committee Meeting #9

PurposePurpose

This issue paper is a discussion of the mapping and handling of surface water features and names as part of the DFIRM production for North Carolina.

Page 39: North Carolina CTS  Committee Meeting #9

BackgroundBackground

The mapping of surface waters is desired to be comprehensive, accurate, and complementary of the other data layers that are part of the FMP and the Corporate Geographic Database.

Page 40: North Carolina CTS  Committee Meeting #9

Existing Data Existing Data ResourcesResources

Statewide 24k by River Basin Statewide NHD24k by Cataloging Unit FMP Breaklines 12k Locally derived surface The US Geographic Names

Information System (GNIS) Existing FIRMs and FIS contain surface

water feature names

Page 41: North Carolina CTS  Committee Meeting #9

BreaklinesBreaklines

It contains single, double, and centerlines for units 1 square mile and larger.

It does NOT contain all of the same linework as USGS Topo.

It is more accurate (1:12,000 and 1:4,800). It is hydrologically corrected (dendritic

network, flowing downhill). It is topologically corrected (no dangles,

except at network inputs and outfalls).

Page 42: North Carolina CTS  Committee Meeting #9

Issue Discussion:Issue Discussion:

Panel Numbering

Page 43: North Carolina CTS  Committee Meeting #9

DFIRM Map Numbering DFIRM Map Numbering SystemSystem

SS = State FIPs code (37)

X

MM = EN 1,000,000-ft coordinates

LLLL = LRMP map numbers to include EN 100,000-ft coordinates and the EN 10,000-ft coordinates

PP = place holders for additional EN 1,000-ft coordinates (00 for panels printed at 1"=500')

X = panel suffix (“A” for initial edition)

SSMMLLLLPP

Page 44: North Carolina CTS  Committee Meeting #9

DFIRM Map Numbering DFIRM Map Numbering System (Continued)System (Continued)

New DFIRM panels in North Carolina could either be compiled at 1”=1,000’, covering an area of 20,000 ft x 20,000 ft (20” x 20” maps); or the DFIRM panels could be compiled at 1”=500’, covering an area of 10,000 ft x 10,000 ft (20” x 20” maps). 

An additional 2-digits (both zeros) are held in reserve as a “place holder” in the event that future DFIRM panels may be printed at a larger scale, e.g., 1” = 250’, covering an area of 5,000 ft x 5,000 ft for which the 1,000 ft coordinates would either be 0” or 5."

Page 45: North Carolina CTS  Committee Meeting #9

Issue Discussion:Issue Discussion:

Potential Delegation of LOMCs

Page 46: North Carolina CTS  Committee Meeting #9

Potential Delegation of Potential Delegation of LOMCsLOMCs

On Friday June 15, 2001, the following individuals from NC visited D&D for a LOMC Introduction / Workshop Gary Thompson (NCGS) Kurt Sumner (Executive Director ACSM, National) Tom Morgan (NCSS Representative on CTS) Johnie Garrason (NCSS Member and Board

Examiner for NC Engineers and Surveyors)

Richard Bennett (NCSS President) Benji Brown (NCSS Member and City of

Wilmington Representative) Matt Miller (FEMA HQ) Teleconferenced in for a

portion of the afternoon discussion

Page 47: North Carolina CTS  Committee Meeting #9

Potential Delegation of Potential Delegation of LOMCsLOMCs

The following topics were covered during the LOMC Introduction/Workshop General LOMC Requirements New LOMR-F Rule Processing Cases with Special Considerations Call Center Support LOMA 2000 Processing Workshop Other Related Processing Issues Where do we go from here?

Page 48: North Carolina CTS  Committee Meeting #9

Action Items/Wrap UpAction Items/Wrap Up