northwest power pool reliability through cooperation
DESCRIPTION
NORTHWEST POWER POOL Reliability through Cooperation. 2013. NORTHWEST POWER POOL Cooperation. Mission. The Northwest Power Pool Corporate mission is to support electric reliability through cooperation. Vision. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/1.jpg)
NORTHWEST POWER POOLNORTHWEST POWER POOL
Reliability through CooperationReliability through Cooperation
2013
![Page 2: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/2.jpg)
NORTHWEST POWER POOLNORTHWEST POWER POOL
CooperationCooperation
![Page 3: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/3.jpg)
3
Mission
The Northwest Power Pool Corporate mission is to support electric reliability through cooperation
![Page 4: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/4.jpg)
4
Vision
Helping the Northwest Power Pool members work together to maintain a reliable and secure interconnection – today and in the future
![Page 5: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/5.jpg)
5
Values
• Member Driven• Relationship Based• Independent• Respect• Integrity• Trust• Competence
![Page 6: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/6.jpg)
6
Work Environment• We support each other and create “safe” environment• Team concept• Merit-based compensation is satisfactory, i.e.,
comparable to industry• Openness• Trust• Respect • Integrity• Quality of work – pride in doing a good job• Job Security – to do the right thing at the right time
![Page 7: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/7.jpg)
7
History
• First pooling of resources occurred in1917 in the Northwest
• NWPP formed in 1941 by 6 investor-owned utilities 3 staff engineers
• An impetus from the War Production Board in 1942 Ten major private utility systems and Bonneville Power
Administration Pooled resources to provide power to the war industries
• Maintained after WWII for reliability and coordination
![Page 8: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/8.jpg)
8
Chronology1941 – Operating Committee (OR, WA, MT, UT, ID)1942 – BPA joined (superpool)1949 – British Columbia Hydro & Power Authority joined1961 – Columbia River Treaty with Canada1964 – Pacific Northwest Coordination Agreement (PNCA) signed – Coordinating Group1970 – Contingency Reserve Sharing1990 – Transmission Planning Committee 1995 – Formalized Membership Agreement1997 – New PNCA 1999 – NWPP Incorporated as a non-profit corporation2002 – Automation of the Contingency Reserve Sharing –AGC driven, 20 Balancing Authorities 2005 – NERC Certified Trainer2008 – Agreement Appointing Agent and Establishing Responsibilities Related to Reserve Sharing Group Compliance with BAL-0022008 – General Services Agreement
![Page 9: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/9.jpg)
9
Northwest Power Pool Corporation
• Non profit corporation• Nine full-time positions• Primary focus on the NWPP members and their
requirements
![Page 10: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/10.jpg)
10
• Compliance Report and Record KeepingCompliance Report and Record Keeping• Compliance Self-CertificationsCompliance Self-Certifications• Respond to Enforcement AuthorityRespond to Enforcement Authority
Notice Audit Investigation
• Maintain and update Policies and ProceduresMaintain and update Policies and Procedures
NWPP Corporation as Agent
![Page 11: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/11.jpg)
11
• Determine Group Compliance MatterDetermine Group Compliance Matter Operational Noncompliance Event
Identify and proportion responsibility Administrative Noncompliance Event
Acts or omission of one or moreo Identify and proportion responsibility
Group Issueo Apply formula
Report to Enforcement Authority Identify and proportion responsibility
NWPP Corporation as Agent
![Page 12: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/12.jpg)
12
NWPP Corporation Training
• NWPP is a NERC qualified provider of continuing NWPP is a NERC qualified provider of continuing education hourseducation hours
• CoursesCourses Reserve Sharing (4 CEH) Energy Emergency Plan (1CEH) Underfrequency Load Shedding (2 CEH) Time Error Control (1 CEH) Frequency Response (1 CEH) Voltage Issues (2 CEH) Reserve Sharing simulation (1CEH)
![Page 13: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/13.jpg)
NORTHWEST POWER POOLNORTHWEST POWER POOL
MembershipMembership
![Page 14: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/14.jpg)
14
NERC/WECC BAs by Sub-regions
Northwest Power Pool (NWPP RSG)Alberta Electric System OperatorAvista CorporationBonneville Power AdministrationBritish Columbia Hydro AssociationChelan County PUDDouglas County PUDGrant County PUDIdaho Power CompanyNaturEner Power Watch – Wind EnergyNorthwestern EnergyPacifiCorp-EastPacifiCorp-WestPortland General Electric CompanyPuget Sound EnergySacramento Municipal Utility BoardSeattle City LightSierra Pacific Power CompanyTacoma PowerTurlock Irrigation DistrictWestern Area Power Administration – UGP
CAMX
AZNM
RMPP
NWPP
Rocky Mountain Power Pool (RMRG)Public Service Company of ColoradoWestern Area Power Administration – CM
Arizona-New Mexico (SRSG)Arizona Public Service CompanyCECD – Arlington ValleyCECD – GriffithCECD – HarquahalaCECD – Panda Gila River El Paso Electric CompanyImperial Irrigation DistrictNevada Power CompanyPublic Service Company of New MexicoSalt River ProjectTucson Electric Power CompanyWestern Area Power Administration – LCR California-MexicoCalifornia Independent System OperatorComision Federal de ElecticidadLos Angeles Dept. of Water and Power
![Page 15: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/15.jpg)
15
Demographics in NWPPElectrical/Geographic Area
8 U.S. States 2 Canadian Provinces Federal, Public, Private, Provincial Ownership International Border (Treaties associated with water) Non-Jurisdictional as well as Jurisdictional Preference Act – Public Law 88-552 160 Consumer-owned electric utilities 20 Control Areas (37 in the Western Interconnection (WI)). ~ 90,000 Megawatts Total Resources (44% WI) ~ 50% Peak load of the WI ~ 50% Energy load of the WI Automated Reserve Sharing Procedures Hydro Coordination Hydro Thermal Integration
Hydro located on the West (BC, ID, OR, WA) Thermal located on the East (AB, MT, NV, UT, WY)
![Page 16: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/16.jpg)
16
Participant’s Vision
The Northwest Power Pool Membership Agreement serves as a forum for reliability and operational adequacy issues in the area for both transmission and generation.
![Page 17: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/17.jpg)
17
Four Main Membership Committees
• Operating CommitteeOperating Committee Foster coordination and communication.
• Coordinating Group Coordinating Group Administer the Pacific Northwest Coordination Agreement,
optimizing Columbia Basin hydro generation.
• Transmission Planning CommitteeTransmission Planning Committee Provide a forum for reliable transmission planning.
• Reserve Sharing CommitteeReserve Sharing Committee Administer and address Contingency Reserve.
![Page 18: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/18.jpg)
18
Operating Committee
• Adequacy Assessments - to assess the NWPP ability to meet and sustain load demands at all times including extreme load conditions as a result of weather or loss of generation
• Under-frequency Load Shedding - to arrest frequency decline in the event of a contingency such as severe generation/load imbalance.
![Page 19: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/19.jpg)
19
• Outage Coordination - to coordinate the schedule of transmission outages enhancing system reliability and reducing the number of hours under constrained conditions
• Emergency Response Team - the ability to respond to current reliability issues such as extreme temperature conditions creating extreme load
Operating Committee
![Page 20: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/20.jpg)
20
• Next Day Operating Studies Curtailment studies are performed by the individual path
operators based on the outage schedule developed through the COS process.
COS process – studies are performed at least 15 days prior to the outage
Includes all facilities 100 KV or greater Includes all generators 50 MVA or greater
Operating Committee
![Page 21: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/21.jpg)
21
• NERC Active participation Coordinated information, discussions, interpretations and
responses
• WECC Coordinated discussions concerning new criterion,
interpretations and responses
Other OC Services
![Page 22: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/22.jpg)
22
PNCA Coordination
• Critical Period Planning: That period in the historical water record that meets the least amount of firm load
• Previously the Critical Period was 4 years, but now 7 months
• Output of planning process are operating curves for reservoirs and FELCCs the systems
![Page 23: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/23.jpg)
23
Coordinated Reservoir Operations
• Actual Energy Regulation FELCCs and curves from the planning process Actual and estimated streamflows
• Proportional draft• Energy in lieu of water• Provisional energy
![Page 24: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/24.jpg)
24
Transmission Planning Committee
• Serve as a Forum for open discussion• Sub-Regional Studies to identify
Transmission options within a Sub-Region Multi Subregional Studies (requested by governmental agencies) Connections to Regional Transmission Parities with similar interests and goals – local stakeholder involvement Local costs and reliability benefits
• Assist in Regional Transmission Dispute Resolution Process• Collection and coordination of TPC members’ data including submittals
to WECC• Subregional collection and coordination for the NWPP area for WECC
submittals• Develop guidelines for assessing the reliability and efficient
development of the transmission system in the NWPP area
![Page 25: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/25.jpg)
25
Reserve Sharing Committee
• Contingency Reserve Sharing to provide 60-minute recovery assistance on a “flow base” Concept – one very large area operating as a single BA
for contingency reserve
![Page 26: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/26.jpg)
26
• Northwest Operational Planning Study Group (NOPSG) Closed process (OC and TPC members) Seasonal path operating studies
• UFLS studies • Seasonal Assessments
Summer and Winter Long-Term Resource Assessments
Transmission Planning Committee and Operating Committee
![Page 27: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/27.jpg)
27
• Long-term Significant Outage Planning (LTSOP) Share outage information with all parties affected by outages
of significant equipment (i.e., equipment that affects the transfer capability of rated paths). Information is shared two times each year for a minimum of a six-month period. The first meeting each year coordinates outages for July through December. The second meeting coordinates outages for January through June.
Review the outage schedules to insure that needed outages can be reliably accomplished with minimal impact on critical transmission use.
Outage coordinators are to post the outages on the Coordinated Outages System within the applicable timeframes.
Transmission Planning Committee and Operating Committee
![Page 28: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/28.jpg)
28
• Local Load Voltage Protection Facilitate the process to comply with the WECC criteria
and guidelines as applicable.
Participate in studies determining minimum requirements for compliance with the criteria and guidelines when more than one Transmission Operator is involved.
Develop and publish final reports
Complete the necessary documentation and provide copies all involved entities.
Transmission Planning Committee and Operating Committee
![Page 29: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/29.jpg)
29
• Under Frequency Load Shedding Process Facilitate the process to comply with the NERC
Reliability Standard and WECC criteria and guidelines as applicable.
Participate in studies determining minimum requirements for compliance with the criteria and guidelines for the NWPP Area
Develop and publish final reports
Complete the necessary documentation and provide copies all involved entities.
Transmission Planning Committee and Operating Committee
![Page 30: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/30.jpg)
QUESTIONS?
![Page 32: NORTHWEST POWER POOL Reliability through Cooperation](https://reader030.vdocuments.net/reader030/viewer/2022013004/568159df550346895dc72bcd/html5/thumbnails/32.jpg)