Nov-1st 2004, MICE TV Conf.
Plans for absorber tests at KEKShigeru Ishimoto KEK
![Page 2: Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK](https://reader035.vdocuments.net/reader035/viewer/2022062804/56649d4e5503460f94a2d0af/html5/thumbnails/2.jpg)
Absorber test plan
KEK Absorber body *Pressure test at 20K with dummy
windows
US/FNAL Windows
*Pressure test at R.T.
RAL
*Pressure test at R.T.
*Cooling test at 20K
KEK
*Pressure test at R.T. with windows
*Pressure test at 20K with windows
KEK Absorber test cryostat
- Absorber body test- Windows test- Cryocooler cooling test
at 20K and 4.2K- Sensor calibration
![Page 3: Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK](https://reader035.vdocuments.net/reader035/viewer/2022062804/56649d4e5503460f94a2d0af/html5/thumbnails/3.jpg)
Cooling power with full radiation shield Radiation heating from 300K
KEK/RIKEN Cryocooler RDK415D
for solid hydrogen target
WARNING; Operation & extraction of full cooling power from Cryocooler is not always easy.
![Page 4: Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK](https://reader035.vdocuments.net/reader035/viewer/2022062804/56649d4e5503460f94a2d0af/html5/thumbnails/4.jpg)
CryocoolerRDK-415D
LH2
LH2
MICE absorber system with Cryocooler
He refrigerator
Exit to cool the transfer tube
G-H2 cylinders/H2 tank/ Metal hydride
G-H2 safety exit and reservoir tank
He, N2 gas exit/return
H2 leak monitor
L-He Dewar
L-N2 Dewar
G-He cylinders
Absorber vacuum system
Safety exit for H2
![Page 5: Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK](https://reader035.vdocuments.net/reader035/viewer/2022062804/56649d4e5503460f94a2d0af/html5/thumbnails/5.jpg)
CryocoolerRDK-415D
LH2
LH2
MICE absorber system with Cryocooler for L-He absorber
G-He exit and recovery
He, N2 gas exit/return
H2 leak monitor
L-N2/He Dewar
G-He cylinders
Absorber vacuum system
Safety exit for H2
L-He Dewar
L-He
1 + q W 35 x 2 x q L/day
Exit to cool the transfer tube
![Page 6: Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK](https://reader035.vdocuments.net/reader035/viewer/2022062804/56649d4e5503460f94a2d0af/html5/thumbnails/6.jpg)
MICE absorber
system with
Cryocooler
![Page 7: Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK](https://reader035.vdocuments.net/reader035/viewer/2022062804/56649d4e5503460f94a2d0af/html5/thumbnails/7.jpg)
MICE absorber system with Cryocooler
H2 In Pipe
![Page 8: Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK](https://reader035.vdocuments.net/reader035/viewer/2022062804/56649d4e5503460f94a2d0af/html5/thumbnails/8.jpg)
Absorber test cryostat ATC-002 (dimensions)
MICE
(needs larger Cryocooler flange for pips)
D2; Cryocooler flange
W W
H2
H1
D1
![Page 9: Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK](https://reader035.vdocuments.net/reader035/viewer/2022062804/56649d4e5503460f94a2d0af/html5/thumbnails/9.jpg)
Absorber test cryostat ATC-002 (absorber support)
Inside diameter of MICE magnet bore
S-S tube for absorber support at room temp.
top flange
![Page 10: Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK](https://reader035.vdocuments.net/reader035/viewer/2022062804/56649d4e5503460f94a2d0af/html5/thumbnails/10.jpg)
CryocoolerRDK-415D
KF25KF40
KF16
Absorber test cryostat ATC-002 (top view)
Top flange Absorber
needs modify
![Page 11: Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK](https://reader035.vdocuments.net/reader035/viewer/2022062804/56649d4e5503460f94a2d0af/html5/thumbnails/11.jpg)
Absorber test cryostat ATC-002 (Mirapro)
Ordered; Nov ’04
Arrive; Mar ’05
![Page 12: Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK](https://reader035.vdocuments.net/reader035/viewer/2022062804/56649d4e5503460f94a2d0af/html5/thumbnails/12.jpg)
Thermometers & level sensor
4 wires measurement
use standard read-outs
required wide are in LH2 pipe
![Page 13: Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK](https://reader035.vdocuments.net/reader035/viewer/2022062804/56649d4e5503460f94a2d0af/html5/thumbnails/13.jpg)
CX-1050-SD 10 sensors ware calibrated at FNAL.
LH2 level sensor and thermometers
![Page 14: Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK](https://reader035.vdocuments.net/reader035/viewer/2022062804/56649d4e5503460f94a2d0af/html5/thumbnails/14.jpg)
Calibration of LH2 level sensor
x5
Cryocooler
+ LH2 condenser
![Page 15: Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK](https://reader035.vdocuments.net/reader035/viewer/2022062804/56649d4e5503460f94a2d0af/html5/thumbnails/15.jpg)
Test area (KEK-east counter hall)
H2 gas exhaust duct to fan
Nov-26, ‘04
H2 gas tank (2m3)LH2 target (~ 0.5 L)
for E559
LHe-II target for E549
![Page 16: Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK](https://reader035.vdocuments.net/reader035/viewer/2022062804/56649d4e5503460f94a2d0af/html5/thumbnails/16.jpg)
Summary 1/2 (Test Item)
(I) Cooling test by LH2 (Cryocooler) ; H2 ABSORBER
1) Pre-cooling test to 20K ---- LH2 < 1 L
2) Absorber pressure/leak test at 20K ---- P=2.0 bar, leak < 10-10 Torr*L/s
3) Heat leak test at 20K measure the H2 evaporation rate
(II) Cooling test by LHe (Dewar + Cryocooler) ; He ABSORBER
1) Pre-cooling test to 4.2K ---- LHe ~ full
2) Absorber pressure/leak test at 4.2K ---- P=2.0 bar, leak < 10-10 Torr*L/s
3) Heat leak test at 4.2K measure the He evaporation rate
(III) Windows test
1) Windows pressure/leak test at 20K ---- if required
(IV) Sensor test (without absorber)
1) Thermometer calibration
2) LH2 level sensor calibration
![Page 17: Nov-1st 2004, MICE TV Conf. Plans for absorber tests at KEK Shigeru Ishimoto KEK](https://reader035.vdocuments.net/reader035/viewer/2022062804/56649d4e5503460f94a2d0af/html5/thumbnails/17.jpg)
Summary 2/2 (status/schedule)
(1) Test Cryostat ---- ordered to MIRAPRO Nov, ‘04
will arrive by the end of March
(2) Cryocooler --- ready, will arrive soon
have to share with the VLPC test at KEK?
(3) Absorber body ; ready, needs modification and piping
(4) LH2 Reservoir and piping around Cryocooler
needs design and fabrication --- fabrication start from March?
needs detail MICE design
(5) Thermometers --- 10 calibrated CX-1050; ready
(6) LH2 Level sensor and housing --- AMI capacitance sensor ; ready
needs copper block to fit Cryocooler
(7) LH2 Level resistance sensor --- 5 uncalibrated CX-1050; ready