Exelkn. Exelon Nudear www exeloncorp com Nuclear 200 Exelon Way Kennett Square, PA 19348 April 16, 2003 Mr. Frank Froio, Chairman CCN-031-6000 Board of Supervisors 5186 Stump Rd. Plumstead Township Plumsteadville, PA 18949-0387 Subject: NPDES Permit Renewal for Bradshaw Reservoir, PA0052221 Dear Mr. Froio: Pursuant to PA Act 14, P.L. 834, we hereby notify you that the Exelon Generation, LLC. will be filing with the Pennsylvania Department of Environmental Protection (PaDEP) for renewal of an NPDES Discharge Permit at our Bradshaw Reservoir Facility. Renewal of the permit is required to continue the discharge of water from the Bradshaw Reservoir site to the East Branch Perkiomen Creek. Acts 67 and 68, which amended the Municipalities Planning Code to support sound land use practices and planning efforts, direct state agencies to consider comprehensive plans and zoning ordinances when reviewing applications for permitting of facilities or infrastructure, and specify that state agencies may rely upon comprehensive plans and zoning ordinances under certain conditions as described in Sections 619.2 and 1105 of the Municipalities Planning Code. Enclosed is a General Information Form (GIF) we have completed for this project. DEP invites you to review the attached GIF and comment on the land use aspects of this project; please be specific to DEP when identifying any areas of conflict. If you wish to submit comments for DEP to consider in a land use review of this project, you must respond within 30 days to the DEP regional office listed below. If there are no land use comments received by the end of the comment period, DEP will assume that there are no substantive land use conflicts and proceed with the normal application review process." *ODG

Upload: others

Post on 25-Feb-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NPDES Permit Renewal for Bradshaw Reservoir, PA0052221.Mr. Robert Holland, Chairman CCN-03-16001 Board of Supervisors Bedminster Township Bedminster Municipal Township Building P.O

Exelkn.Exelon Nudear www exeloncorp com Nuclear200 Exelon WayKennett Square, PA 19348

April 16, 2003

Mr. Frank Froio, Chairman CCN-031-6000Board of Supervisors5186 Stump Rd.Plumstead TownshipPlumsteadville, PA 18949-0387

Subject: NPDES Permit Renewal for Bradshaw Reservoir, PA0052221

Dear Mr. Froio:

Pursuant to PA Act 14, P.L. 834, we hereby notify you that the ExelonGeneration, LLC. will be filing with the Pennsylvania Department ofEnvironmental Protection (PaDEP) for renewal of an NPDES Discharge Permitat our Bradshaw Reservoir Facility. Renewal of the permit is required to continuethe discharge of water from the Bradshaw Reservoir site to the East BranchPerkiomen Creek.

Acts 67 and 68, which amended the Municipalities Planning Code to supportsound land use practices and planning efforts, direct state agencies to considercomprehensive plans and zoning ordinances when reviewing applications forpermitting of facilities or infrastructure, and specify that state agencies may relyupon comprehensive plans and zoning ordinances under certain conditions asdescribed in Sections 619.2 and 1105 of the Municipalities Planning Code.Enclosed is a General Information Form (GIF) we have completed for thisproject. DEP invites you to review the attached GIF and comment on the landuse aspects of this project; please be specific to DEP when identifying any areasof conflict. If you wish to submit comments for DEP to consider in a land usereview of this project, you must respond within 30 days to the DEP regional officelisted below. If there are no land use comments received by the end of thecomment period, DEP will assume that there are no substantive land useconflicts and proceed with the normal application review process."

*ODG

Page 2: NPDES Permit Renewal for Bradshaw Reservoir, PA0052221.Mr. Robert Holland, Chairman CCN-03-16001 Board of Supervisors Bedminster Township Bedminster Municipal Township Building P.O

Please submit any comments concerning this project within 30 days from date ofreceipt of this letter to the DEP Soils and Waterways Section.

For more information about this land use review process, please visitwww.dep.state.pa.us (directLINK: "Land Use Reviews").

If you have any questions concerning the application, please contact Mr. Tracy J.Siglin at (610)-765-5904.

Sincerely,

Arthur Wiley RayManager, Environmental AffairsExelon Nuclear

Bcc: Cullen, E.J.DeGregorio, R.J.Braun, R.C. GML5-1Hanson, B, GML5-1Newmaster, R.J. SSB2-1Weyhmuller, P.R. SSB4-5Branham, D.L. SSB2-1Wyler, C.B. SSB4-5Alejnikov, R.P. SSB2-1USNRC Correspondence Control Desk (Docket No's 50-352,50-353)

Page 3: NPDES Permit Renewal for Bradshaw Reservoir, PA0052221.Mr. Robert Holland, Chairman CCN-03-16001 Board of Supervisors Bedminster Township Bedminster Municipal Township Building P.O

Exelkn.Exelon Nuclear www exeloncorp coMr Nuclear200 Exelon WayKennett Square, PA 19348

April 16, 2003

Mr. Robert Holland, Chairman CCN-03-16001Board of SupervisorsBedminster TownshipBedminster Municipal Township BuildingP.O. Box 923112 Bedminster RoadBedminster, PA 18910

Subject: NPDES Permit Renewal for Bradshaw Reservoir, PA0052221

Dear Mr. Holland:

Pursuant to PA Act 14, P.L. 834, we hereby notify you that the ExelonGeneration, LLC. will be filing with the Pennsylvania Department ofEnvironmental Protection (PaDEP) for renewal of an NPDES Discharge Permitat our Bradshaw Reservoir Facility. Renewal of the permit is required to continuethe discharge of water from the Bradshaw Reservoir site to the East BranchPerkiomen Creek.

Acts 67 and 68, which amended the Municipalities Planning Code to supportsound land use practices and planning efforts, direct state agencies to considercomprehensive plans and zoning ordinances when reviewing applications forpermitting of facilities or infrastructure, and specify that state agencies may relyupon comprehensive plans and zoning ordinances under certain conditions asdescribed in Sections 619.2 and 1105 of the Municipalities Planning Code.Enclosed is a General Information Form (GIF) we have completed for thisproject. DEP invites you to review the attached GIF and comment on the landuse aspects of this project; please be specific to DEP when identifying any areasof conflict. If you wish to submit comments for DEP to consider in a land usereview of this project, you must respond within 30 days to the DEP regional officelisted below. If there are no land use comments received by the end of thecomment period, DEP will assume that there are no substantive land useconflicts and proceed with the normal application review process."

Page 4: NPDES Permit Renewal for Bradshaw Reservoir, PA0052221.Mr. Robert Holland, Chairman CCN-03-16001 Board of Supervisors Bedminster Township Bedminster Municipal Township Building P.O

Please submit any comments concerning this project within 30 days from date ofreceipt of this letter to the DEP Soils and Waterways Section.

For more information about this land use review process, please visitwww.dep.state.pa.us (directlINK: "Land Use Reviews").

If you have any questions concerning the application, please contact Mr. Tracy J.Siglin at (610)-765-5904.

Sincerely,

Arthur Wiley RayManager, Environmental AffairsExelon Nuclear

Bcc: Cullen, E.J.DeGregorio, R.J.Braun, R.C. GML5-1Hanson, B, GML5-1Newmaster, R.J. SSB2-1Weyhmuller, P.R. SSB4-5Branham, D.L. SSB2-1Wyler, C.B. SSB4-5Alejnikov, R.P. SSB2-1USNRC Correspondence Control Desk (Docket No's-50-352,50-353)

Page 5: NPDES Permit Renewal for Bradshaw Reservoir, PA0052221.Mr. Robert Holland, Chairman CCN-03-16001 Board of Supervisors Bedminster Township Bedminster Municipal Township Building P.O

ExelOn.Exelon Nuclear www exeloncorp corn N uci ear200 Exelon WayKennett Square, PA 19348

April 16, 2003

Mr. Michael G. Fitzpatrick, Chairman CCN-03-16002Bucks County Board of CommissionersBucks County CourthouseDoylestown, PA 18901

Subject: NPDES Permit Renewal for Bradshaw-Reservoir, PA0052221

Dear Mr. Fitzpatrick:

Pursuant to PA Act 14, P.L. 834, we hereby notify you that the ExelonGeneration, LLC. will be filing with the Pennsylvania Department ofEnvironmental Protection (PaDEP) for renewal of an NPDES Discharge Permitat our Bradshaw Reservoir Facility. Renewal of the permit is required to continuethe discharge of water from the Bradshaw Reservoir site to the East BranchPerkiomen Creek.

Acts 67 and 68, which amended the Municipalities Planning Code to supportsound land use practices and planning efforts, direct state agencies to considercomprehensive plans and zoning ordinances when reviewing applications forpermitting of facilities or infrastructure, and specify that state agencies may relyupon comprehensive plans and zoning ordinances under certain conditions asdescribed in Sections 619.2 and 1105 of the Municipalities Planning Code.Enclosed is a General Information Form (GIF) we have completed for thisproject. DEP invites you to review the attached GIF and comment on the landuse aspects of this project; please be specific to DEP when identifying any areasof conflict. If you wish to submit comments for DEP to consider in a land usereview of this project, you must respond within 30 days to the DEP regional officelisted below. If there are no land use comments received by the end of thecomment period, DEP will assume that there are no substantive land useconflicts and proceed with the normal application review process."

Page 6: NPDES Permit Renewal for Bradshaw Reservoir, PA0052221.Mr. Robert Holland, Chairman CCN-03-16001 Board of Supervisors Bedminster Township Bedminster Municipal Township Building P.O

If you have any questions concerning the application, please contact Mr. Tracy J.Siglin at (610)-765-5904.

Sincerely,

jA t ./Arthur Wiley RayManager, Environmental AffairsExelon Nuclear

Bcc: Cullen, E.J.DeGregorio, R.J.Braun, R.C. GML5-1Hanson, B, GML5-1Newmaster, R.J. SSB2-1Weyhmuller, P.R. SSB4-5Branham, D.L. SSB2-1Wyler, C.B. SSB4-5Alejnikov, R.P. SSB2-1USNRC Correspondence Control Desk( Docket No's 50-352,50-353)

Page 7: NPDES Permit Renewal for Bradshaw Reservoir, PA0052221.Mr. Robert Holland, Chairman CCN-03-16001 Board of Supervisors Bedminster Township Bedminster Municipal Township Building P.O

8000-PM4TOO01 Rev 06107/2002

FORM

Sep. ,,-, I COMMONWEALTH OF PENNSYLVANIADEPARTMENT OF ENVIRONMENTAL PROTECTION

GENERAL INFORMATION FORM - AUTHORIZATION APPLICATIONBefore completing this General Information Form (GIF), read the step-by-step Instructions provided In this applicationpackage. This version of the General Information Form (GIF) must be completed and returned with any program-specific application being submitted to the Department.

Related ID#s (If Known)Client 0D# 147686 APS ID# 13951 Date Received & GenemJ Notes

Site ID# 452264 Auth ID# 13333Facility ID# 479459

DEP Client ID# Client Type / Code147686 LLCOrganization Name or Registered Fictitious Name Employer ID# (EIN) Dun & Bradstreet ID#Exelon Generation Co., LLC 23-064219Individual Last Name First Name Ml Suffix SSN

Additional Individual Last Name First Name Ml Suffix SSN

Mailing Address Line 1 Mailing Address Une 2200 Exelon WayAddress Last Une - City State lP+4 CountryKennett Square PA 19348 USAClient Contact Last Name First Name Ml SuffixSiglin Tracy JClient Contact Title Phone ExtEnvironmental Specialist 610-765-5904Email Address FAXtrac .si lin~exeloncor.com 610-765-5765

DEP Site ID# Site Name452264 Exelon Generation Bradshaw ReservoirEPA ID# Estimated Number of Employees to be Present at Site Personnel

not normallystationed atreservoir

vs -8wo a IUC g % au

Bradshaw Reservoir is part of the water diversion system, which supplies water to Limerick Generating Station.Water also supplements water supply to Bucks and Montgomery Counties.County Name Municipality City Boro Twp StateBucks Bedminster 0 [l l PACounty Name Municipality City Boro Twp State

Site Location Line 1 Site Location Line 2Elephant and Central School RoadsSite Location Last Line - City State ZIP+4Bedminster PA 18944Detailed Written Directions to SiteFrom PA Turnpike - Take Rte. 611 North. Make a right at the first traffic light after the end of the bypass. Goapproximately 200 yards, and make a left onto Danboro Point Pleasant Pike. This road will take you to theReservoir (several miles), just past Moyer Road. (see attached maps)Site Contact Last Name First Name Ml SuffixBranham David L.Site Contact Title Site Contact FirmManager, Radwaste/Environmental Exelon Generation Co., LLC

Page 1 of 7

Page 8: NPDES Permit Renewal for Bradshaw Reservoir, PA0052221.Mr. Robert Holland, Chairman CCN-03-16001 Board of Supervisors Bedminster Township Bedminster Municipal Township Building P.O

II ., I I i" -," , : � I

8000-PM-ITOOO1 Rev D6/07/2002

Mailing Address Line 1 Mailing Address Line 2Evergreen and Sanatoga Roads SSB2-1Mailing Address Last Line - City State ZIP+4Pottstown PA 'go19464Phone Ext FAX Email Address610-718-2500 610-718-2721 david.branham @ exeloncorp.comNAICS Codes (Two- & Three-Digit Codes - Ust All That Apply) 6-Digit Code (Optional)22-221Client to Site RelationshipOWNOP

Modification of Existing Facility Yes No1. Will this project modify an existing facility, system, or activity? El 02. Will this project Involve an addition to an existing facility, system, or activity? E is

If "Yes", check all relevant facility types and provide DEP facility identification numbers below.Facility Type DEP Fac ID#. Facility Type DEP Fac ID#[n Air Emission Plant [J Industrial Minerals Mining Operation

E Beneficial Use (water) D Laboratory Location5 Beasting Operation _ [2 Land Recycling Cleanup Location[2 Captive Hazardous Waste Operation - [2 MineDminageTmtLandRecyPriLocationD Coal Ash Beneficial Use Operation 0_ _ [ Municipal Waste OperationO Coal Mining Operation 0 Oil & Gas Encroachrment LocationD Coal Pillar Location D Oil & Gas Locationo Commercial Hazardous Waste Operation 0 Oil & Gas Water Poll Control Facility[ Dam Location _ Public Water Supply System5 Deep Mine Safety Operation -Arntracite _ _ Radiation Facilityf] Deep Mine Safety Operation -Bituminous D Residual Waste Operationa Deep Mine Safety Operation -Ind Minerals _ Storage Tank LocationE2 Encroachment Location (water. wetland) _ _ _ Water Pollution Control Facilitya Erosion & Sediment Control Facility 0 Water Resource5 Explosive Storage Location O O&er:

Latitude/Longitude Latitude LongitudePoint of Origin Degrees Minutes Seconds Degrees Minutes Seconds

40 24 45 75 13 121Horizontal Accuracy Measure Feet -or- MetersHorizontal Reference Datum Code E] North American Datum of 1927

E North American Datum of 1983El World Geodetic System of 1984

Horizontal Collection Method CodeReference Point CodeAltitude Feet -or- MetersAltitude Datum Name DL The National Geodetic Vertical Datum of 1929

El The North American Vertical Datum of 1988 (NAVD88)Altitude (Vertical) Location Datum Collection Method CodeGeometric Type CodeData Collection DateSource Map Scale Number lnch(es) Feet -

-or- Centimeter s) Meters

Project NameBradshaw ReservoirProject DescriptionNPDES permit renewal for discharge of Delaware River water from Bradshaw Reservoir to the East BranchPerkiomen Creek.Project Consultant Last Name First Name Ml Suffix

Project Consultant Title Consulting Firm

Page 2 of 7

Page 9: NPDES Permit Renewal for Bradshaw Reservoir, PA0052221.Mr. Robert Holland, Chairman CCN-03-16001 Board of Supervisors Bedminster Township Bedminster Municipal Township Building P.O

II I

1. -f�l - .'i., - I I- I8000- PM-ITOO01 Rev 06/07/2002

Mailing Address Line 1 Mailing Address Line 2

Address Last Line - City State ZIP+4

Phone Ext FAX Email Address

Time Schedules Project Milestone (Optional)

1. Is this application for an authorization type on the list of authorizations I Yes a Noaffected by the land use policy?Note: If 'Yes', you must complete the following Land Use Information section, unless exempted by Questions 2 or 3

below.If NoM, skip Questions 2 & 3 below as well as the following Land Use Information section.For referenced list, see Appendix A attached to the GIF Instructions.

2. For an Air program authorization only. All other authorizations continue El Yes DI Nowith Question 3 below. Will the permit authorize the construction offacilities outside an existing permitted area?Note: If "Yese, you must complete the following Land Use Information section unless exempted by Question 3 below.

If NOw, skip Question 3 below as well as the following Land Use Information section.3. Have you attached or submitted municipal and county 'Early Opt Out' 0 Yes 0 No

approval letters for the project?Note: If "Yes" to Question 3, skip the following Land Use Information section. This should only be checked 'Yes, if

applicant is choosing the early opt-out option. Required approval letters described in the GIF Checklist andInstructions should be attached.If 'Now to Question 3, continue with the following Land Use Information section.

Note: Applicants are encouraged to submit copies of local land use approvals or other evidence of compliancewith local comprehensive plans and zoning ordinances.1. Is there a municipal comprehensive plan(s)? 0Y Yes Li No2. Is there a county comprehensive plan(s)? 0 Yes Li No3. Is there a multi-municipal or multi-county comprehensive plan? U Yes 0 No4. Is the proposed project consistent with these plans? If no plan(s) exists, l Yes [I No

answer "Yes".5. Is there a municipal zoning ordinance(s)? 0 Yes L No6. Is there a joint municipal zoning ordinance(s)? El Yes 0M No7. Will the proposed project require a zoning approval (e.g., special Yes

exception, conditional approval, re-zoning, variance)? If zoning approvalhas already been received, attach documentation.

8. Are any zoning ordinances that are applicable to this project currently the LI Yes 0 Nosubject of any type of legal proceeding?

9. Will the project be located on a site that has been or Is being remediated L Yes 0 Nounder DEP's Land Recycling Program?

10. Will the project result in reclamation of abandoned mine lands through re- El Yes 0 Nomining or as part of DEP's Reclaim PA Program? v

11. Will the project be located in an agricultural security area or an area El Yes 0M Noprotected under an agricultural conservation easement?

12. Will the project be located in a Keystone Opportunity Zone or Enterprise El Yes 0 NoDevelopment Area?

13. Will the project be located in a Designated Growth Area as defined by the El Yes g NoMunicipalities Planning Code?

Page 3 of 7

Page 10: NPDES Permit Renewal for Bradshaw Reservoir, PA0052221.Mr. Robert Holland, Chairman CCN-03-16001 Board of Supervisors Bedminster Township Bedminster Municipal Township Building P.O

8000-PM4TOO01 Rev 06/0712002

-, I -, I -

. , ' -'- - II - ". -- I

Note: The PA Historical and Museum Commission must be notified of proposed projects in accordance with DEPTechnical Guidance Document 012-0700-001 and the accompanying Cultural Resource Notice Form.If the activity will be a mining project (i.e., mining of coal or industrial minerals, coal refuse disposal and/or theoperation of a coal or industrial minerals preparation/processing facility), respond to questions 1.0 through 2.5below.If the activity will not be a mining project, skip questions 1.0 through 2.5 and begin with question 3.0.1.0 Is this a coal mining project? If "Yes", respond to 1.1-1.6. If "No, skip to El Yes I No

Question 2.0. (DEP Use/48yl)1.1 Will this coal mining project involve coal preparation/ processing El Yes a No

activities in which the total amount of coal prepared/processed will beequal to or greater than 200 tons/day? (DEP Use/4x7O)

1.2 Will this coal mining project involve coal preparation/ processing El Yes El Noactivities In which the total amount of coal prepared/processed will begreater than 50,000 tonslyear? (DEP Use/4x70)

1.3 Will this coal mining project Involve coal preparation/processing El Yes I[1 Noactivities In which thermal coal dryers or pneumatic coal cleaners will beused? (DEP Use/4x70)

1.4 For this coal mining project, will sewage treatment facilities be El Yes [T Noconstructed and treated waste water discharged to surface waters?(DEP Use/4x62)

1.5 Will this coal mining project Involve the construction of a permanent D Yes a NoImpoundment meeting one or more of the following criteria: (1) acontributory drainage area exceeding 100 acres; (2) a depth of watermeasured by the upstream toe of the dam at maximum storage elevationexceeding 15 feet; (3) an impounding capacity at maximum storageelevation exceeding 50 acre-feet? (DEP Use/3140)

1.6 Will this coal mining project Involve underground coal mining to be O Yes El Noconducted within 500 feet of an oil or gas well? (DEP Use/4z41)

2.0 Is this a non-coal (industrial minerals) mining project? If "Yes, respond to U Yes El No2.1-2.6. If No", skip to Question 3.0. (DEP Use/48y1)

2.1 Will this non-coal (industrial minerals) mining project involve the El Yes El Nocrushing and screening of non-coal minerals other than sand andgravel? (DEP Use/4x70)

2.2 Will this non-coal (industrial minerals) mining project involve the El Yes a Nocrushing and/or screening of sand and gravel with the exception of wetsand and gravel operations (screening only) and dry sand and graveloperations with a capacity of less than 150 tons/hour of unconsolidatedmaterials? (DEP Use14x7O)

2.3 Will this non-coal (industrial minerals) mining project Involve the D Yes El Noconstruction, operation and/or modification of a portable non-metallic(i.e., non-coal) minerals processing plant under the authority of theGeneral Permit for Portable Non-metallic Mineral Processing Plants (i.e.,BAQ-PGPA/GP-3)? (DEP UseI4x70)

2.4 For this non-coal (industrial minerals) mining project, will sewage ] Yes uE Notreatment facilities be constructed and treated waste water discharged tosurface waters? (DEP UseI4x62)

2.5 Will this non-coal (industrial minerals) mining project involve the E1 Yes El Noconstruction of a permanent impoundment meeting one or more of thefollowing criteria: (1) a contributory drainage area exceeding 100 acres;(2) a depth of water measured by the upstream toe of the dam atmaximum storage elevation exceeding 15 feet; (3) an Impoundingcapacity at maximum storage elevation exceeding 50 acre-feet? (DEPUse/3140)

Page 4 of 7

Page 11: NPDES Permit Renewal for Bradshaw Reservoir, PA0052221.Mr. Robert Holland, Chairman CCN-03-16001 Board of Supervisors Bedminster Township Bedminster Municipal Township Building P.O

r

8000-PM-ITOOOI Rev 06107/2002

1� , , , ,, . f I I I 1i

3.0 Will your project, activity, or authorization have anything to do with a li Yes 0 a Nowell related to oil or gas production, site development for such activity,or the waste from-such a well? If "Yes", respond to 3.1-3.3. If "No', skip toQuestion 4.0. (DEP Use/4z41)

3.1 Does the oil- or gas-related project Involve any of the following: 0 Yes l[1 Noplacement of fill, excavation within or placement of a structure, locatedIn, along, across or projecting Into a watercourse, floodway or body ofwater (including wetlands)? (DEP Use/4z41)

3.2 Wil! the oil- or gas-related project Involve discharge of Industrial El Yes 0 Nowastewater or stormwater to a dry swale, surface water, ground water oran existing sanitary sewer system or storm water system? If uYes',discuss in Project Description. (DEP Use/4z4l)

3.3 Will the oil- or gas-related project Involve the construction and operation Yes li Noof industrial waste treatment facilities? (DEP Use/4z41)

4.0 Will the project Involve a construction activity that results In earth El Yes 0 Nodisturbance? If "Yes', specify the total disturbed acreage. (DEP Use/4x66)4.0.1 Total Disturbed Acreage

5.0 Does the project Involve any of the following: placement of fill, Yesexcavation within or placement of a structure, located in, along, acrossor projecting into a watercourse, floodway or body of water (includingwetlands)? (DEP Use/4x66)

6.0 Will the project involve discharge of Industrial wastewater or stormwater 0 Yes Ei Noto a dry swale, surface water, ground water or an existing sanitary sewersystem or separate storm water system? If "Yes', discuss in ProjectDescription. (DEP Use/4x62)

7.0 Will the project involve the construction and operation of industrial El Yes 0 Nowaste treatment facilities? (DEP Use/4x62)

8.0 Will the project Involve construction of sewage treatment facilities, U Yes 0 Nosanitary sewers, or sewage pumping stations? If 'Yes', indicate estimatedproposed flow (galday). Also, discuss the sanitary sewer pipe sizes and thenumber of pumping stations/treatment facilities/name of downstream sewagefacilities in the Project Description, where applicable. (DEP Usef4x62)8.0.1 Estimated Proposed Flow (gaday)

9.0 Was sewage planning submitted and approved? If "'Yes' attach the U Yes 0 NoAct 537 approval letter unless the submitted application is actually requestingAct 537 approval (Approval required prior to 105/NPDES approval). (DEPUse/4x61)9.0.1 Is Act 537 Approval Letter attached? 0 Yes El No

10.0 Is this project for the beneficial use of blosolids for land application 0 Yes N Nowithin Pennsylvania? If 'Yes' indicate how much (i.e. gallons or dry tons peryear). (DEP Use/4X62)10.0.1 Gallons Per Year (residential septage)10.0.2 Dry Tons Per Year (blosolids)

11.0 Does the project involve construction, modification or removal of a dam? D Yes 0 NoIf "Yes', identify the dam. (DEP Use/3140)11.0.1 Dam Name

12.0 Will the project interfere with the flow from, or otherwise Impact, a dam? E Yes 0 NoIf 'Yes', identify the dam. (DEP Use/3140)12.0.1 Dam Name

13.0 Will the project involve operations (excluding during the construction El Yes 0 Noperiod) that produce air emissions (i.e., NOX, VOC, etc.)? If 'Yes', identifyeach type of emission followed by the amount of that emission. (DEPUse/4x70)13.0.1 Enter all types & amounts

of emissions; separateeach set with semicolons.

Page 5 of 7

Page 12: NPDES Permit Renewal for Bradshaw Reservoir, PA0052221.Mr. Robert Holland, Chairman CCN-03-16001 Board of Supervisors Bedminster Township Bedminster Municipal Township Building P.O

-

8000-oM IT0001 Rev 06107/2002

I lIl

I 'I

14.0 Is an on-site drinking water supply (well), other than individual house El Yes 0il Nowells, proposed for your project? If "Yes", indicate total number of peopleserved and/or the total number of connections served, if applicable. Also,check all proposed sub-facilities. (DEP Use/4x81)14.0.1 Number of Persons Served14.0.2 Number of Employee/Guests14.0.3 Number of Connections14.0.4 Sub-Fac: Distribution System 0 Yes 0 No14.0.5 Sub-Fac: Water Treatment Plant 0 Yes 0 No14.0.6 Sub-Fac: Source al Yes E No14.0.7 Sub-Fac: Pump Station D Yes E No14.0.8 Sub-Fac: Entry Point 0 Yes D No14.0.9 Sub-Fac: Transmission Main E Yes 0 No14.0.10 Sub-Fac: Storage Facility *l Yes El No

15.0 Will your project Involve purchasing water in bulk, excluding during the LI Yes 0 Noconstruction period? If OYes, name the provider. Also, indicate the dailynumber of employees or guests served. (DEP Use/4x81)15.0.1 Provider's Name15.0.2 Number of Employees/Guests

16.0 Is your project to be served by public water supply? If Yes, indicate E Yes CD Noname of supplier and attach letter from supplier stating that it will serve theproject. (DEP UseI4x8l)16.0.1 Supplier's Name16.0.2 Letter of Approval from Supplier Is Attached El Yes El No

17.0 Will this project Involve a new or Increased drinking water withdrawal El Yes Nofrom a stream or other water body? If "Yes, provide name of stream.(DEP Use/4x81)17.0.1 Stream Name

18.0 Will the construction or operation of this project Involve treatment, El Yes 0 Nostorage, reuse, or disposal of waste? If "Yes", indicate what type (i.e.,hazardous, municipal (including infectious & chemotherapeutic), residual) andthe amount to be treated, stored, re-used or disposed. (DEP/Use4x32)18.0.1 Type & Amount

19.0 Will your project Involve the removal of coal, minerals, etc. as part of any El Yes -Noearth disturbance activities? (DEP Use/48yl)

20.0 Does your project involve Installation of a field constructed underground El Yes 0 Nostorage tank? If wYes", list each Substance & its Capacity. Note: Applicantmay need a Storage Tank Site Specific Installation Permit. (DEP Use/2570)20.0.1 Enter all substances &

capacity of each; separateeach set with semicolons.

21.0 Does your project Involve Installation of an aboveground storage tank 0 Yes 0 Nogreater than 21,000 gallons capacity at an existing facility? If 'Yese, listeach Substance & its Capacity. Note: Applicant may need a Storage TankSite Specific Installation Permit. (DEP Use/2570)21.0.1 Enter all substances &

capacity of each; separateeach set with semicolons.

22.0 Does your project involve installation of a tank greater than 1,100 gallons 0 Yes 0 Nowhich will contain a highly hazardous substance as defined in DEP'sRegulated Substances List, 2570-BK-DEP2724? If "Yes', list eachSubstance & its Capacity. Note: Applicant may need a Storage Tank SiteSpecific Installation Permit. (DEP Use/2570)22.0.1 Enter all substances &

capacity of each; separateeach set with semicolons.

Page 6 of 7

Page 13: NPDES Permit Renewal for Bradshaw Reservoir, PA0052221.Mr. Robert Holland, Chairman CCN-03-16001 Board of Supervisors Bedminster Township Bedminster Municipal Township Building P.O

8000-PM-ITOOO1 Rev 0610712002

23.0 Does your project involve Installation of a storage tank at a new facilitywith a total AST capacity greater than 21,000 gallons? If "Yes", list eachSubstance & its Capacity. Note: Applicant may need a Storage Tank SiteSpecific Installation Permit. (DEP Use/2570)23.0.1. Enter all substances &

capacity of each; separate

El Ye-s 3 No~

I certify that I have the authority to submit this application on behalf of the applicant named herein andthat the information provided in this application Is true and correct to the best of my knowledge andinformation.Type or Print Name Robert Braun

Signature

Site Vice President, Umerick GeneratingStation

Title4 /aDate