nsgic statewide geospatial maturity assessment (gma) model

14
NSGIC Statewide Geospatial Maturity Assessment (GMA) Model Danielle Ayan

Upload: beth

Post on 19-Mar-2016

67 views

Category:

Documents


11 download

DESCRIPTION

NSGIC Statewide Geospatial Maturity Assessment (GMA) Model. Danielle Ayan. Problems a GMA Solves. How well is the state doing vs what is the state doing State to state comparisons; national compilation Objective reporting Platform for communication and planning. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: NSGIC Statewide Geospatial Maturity Assessment (GMA) Model

NSGIC Statewide Geospatial Maturity

Assessment (GMA) Model

Danielle Ayan

Page 2: NSGIC Statewide Geospatial Maturity Assessment (GMA) Model

Problems a GMA Solves

• How well is the state doing vs what is the state doing

• State to state comparisons; national compilation

• Objective reporting• Platform for communication and planning

Page 3: NSGIC Statewide Geospatial Maturity Assessment (GMA) Model

What Are We Talking About?

• Measures maturity of 7 sections and related sub-items:– People (e.g., GIO, etc.)– Data (e.g., elevation status)– Processes (e.g., enterprise GIS)– Policy (e.g., intergovernmental coordination)– Strategy (e.g., portfolio mgmt)– Technology (e.g., maps for critical issues)– Legal (e.g., public record laws)

Page 4: NSGIC Statewide Geospatial Maturity Assessment (GMA) Model

What are we talking about?

• Enhance existing NSGIC State Summaries …

FABRICATED results; For conceptual purposes only.

Page 5: NSGIC Statewide Geospatial Maturity Assessment (GMA) Model

What are we talking about?

• … into national compilation + metric cards

FABRICATED results; For conceptual purposes only.

Page 6: NSGIC Statewide Geospatial Maturity Assessment (GMA) Model

GMA Mission/Vision

• Mission:– To create a common, credible assessment

methodology to routinely and continuously monitor and validate statewide geospatial capabilities

• Vision:– The results of the Annual state Geospatial Maturity

Assessments will guide state geospatial investment prioritizations. National compilations are created for national context, visualization and prioritization

Page 7: NSGIC Statewide Geospatial Maturity Assessment (GMA) Model

What is a Maturity Model?

• A structured collection of elements that describe certain aspects of evolution in an organization

• A maturity model can be used as a benchmark for assessing different organizations for equivalent comparison*

* Wikipedia

Page 8: NSGIC Statewide Geospatial Maturity Assessment (GMA) Model

Other “Assessment” Initiatives

• The NSGIC Statewide GMA (included herein)• FGDC Lifecycle Management Work Group • COGO NSDI Report Card• URISA International GIS Capabilities Maturity

Model (GISCMM)

Page 9: NSGIC Statewide Geospatial Maturity Assessment (GMA) Model

GMA Intentions

• Model for all states (next generation State Summaries)– Supports NSDI– Integrates with State Summaries (Next Gen)– Can be adaptable

• Base for scorecard and/or actionable items for each item or category

• Framework for regional/local governments to leverage

• National compilation

Page 10: NSGIC Statewide Geospatial Maturity Assessment (GMA) Model

History & Evolution of NSGIC State Summaries

• 1992-2003: State written reports• 2004-2005: Reports based on coordination

criteria• 2006: Online survey (SurveyMonkey)• 2007-2009: Online survey (GISInventory)• 2010: Beta GMA (still evolving)

Page 11: NSGIC Statewide Geospatial Maturity Assessment (GMA) Model

Future Vision

• Statewide GMA becomes compilation of URISA GISCMMs

• “Nest” COGO NSDI Report Card within GMA Data section or visa-versa

• GMAs inform GeoLOB Life Cycle Metrics or visa-versa• Variety of outputs:– (Defensible) Dashboard that can be viewed from National

to Local level– Reports that categorize information as needed

Page 12: NSGIC Statewide Geospatial Maturity Assessment (GMA) Model

Possibilities for Grant Option Year 2

• Documentation/Training on GMA items• “Metric Cards” to support pertinent GMA item(s)

Page 13: NSGIC Statewide Geospatial Maturity Assessment (GMA) Model

Questions/Comments/Concerns• USGS Grant Principal Investigator (PI)• NSGIC GMA Work Group Chair + Board Member

• Acknowledgements– DOI/USGS/FGDC– Work Group Co-Chairs: Michael Ouimet, BAH | Ed Arabas, OR– Former 2-term Governor of Wyoming, Jim Geringer | Pat Cummens, ESRI– 2008 – 2010 NSGIC Technical Issues Committee + GMA Work Group members– 2007 - 2010 NSGIC Members and Executives including William Burgess, Zsolt Nagy, Shelby Johnson, Cy Smith, Ed

Arabas– Friends and members of the Georgia GIS Coordinating Committee (GISCC)– Robert Woodruff and Charlie Sasser of the Georgia Technology Authority (GTA)– Bruce Oswald, Sewell & Associates– Dr. Rich Clark, UGA

Page 14: NSGIC Statewide Geospatial Maturity Assessment (GMA) Model

• The National States Geographic Information Council (NSGIC) is an organization committed to efficient and effective government through the prudent adoption of geospatial information technologies.

• http://www.nsgic.org

NSGIC