nswc crane battery risk reduction assessment process€¦ · nswc crane background • indiana’s...

13
CAPT JT Elder, USN Commanding Officer NSWC Crane Dr. Adam Razavian, SES Technical Director NSWC Crane NSWC CRANE Battery Risk Reduction Assessment Process Presented By: Mike Chatelain Date 27 August 2015 1

Upload: others

Post on 16-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NSWC CRANE Battery Risk Reduction Assessment Process€¦ · NSWC Crane Background • Indiana’s Navy Base • 100 square miles • Unique facilities • 140 People dedicated to

CAPT JT Elder, USN

Commanding Officer

NSWC Crane

Dr. Adam Razavian, SES

Technical Director

NSWC Crane

NSWC CRANE Battery Risk Reduction

Assessment Process Presented By: Mike Chatelain

Date 27 August 2015

1

Page 2: NSWC CRANE Battery Risk Reduction Assessment Process€¦ · NSWC Crane Background • Indiana’s Navy Base • 100 square miles • Unique facilities • 140 People dedicated to

NSWC Crane Background

• Indiana’s Navy Base

• 100 square miles

• Unique facilities

• 140 People dedicated to battery operations

• Test/Evaluate milliwatt cells to 1.3MW batteries

• Technical Agent for Navy Lithium Battery Safety Program

• Several ISEA, TDA, EA positions

• Abuse testing to life cycle testing

• Battery RDT&E, Engineering, Qualification, Lot

Acceptance Test, Surveillance, Proto-types, DPA

• Over 50 years of supporting Navy batteries and battery

systems

2

Page 3: NSWC CRANE Battery Risk Reduction Assessment Process€¦ · NSWC Crane Background • Indiana’s Navy Base • 100 square miles • Unique facilities • 140 People dedicated to

NSWC Crane Risk Assessment Drivers

• 23 October 2012 Battery Fire

• Navy Class A Mishap

• NAVSEA SIB Directed

Investigation

3

Page 4: NSWC CRANE Battery Risk Reduction Assessment Process€¦ · NSWC Crane Background • Indiana’s Navy Base • 100 square miles • Unique facilities • 140 People dedicated to

NSWC Crane Risk Assessment Drivers

4

• SIB Findings/Issues

− Not following

documentation

− Non-documented key

decisions

− Incomplete setup/

training

− Improper separation

of duties causing

conflicts of interest

− Inadequate validation/

certification

processes

− Poor Housekeeping

− Under-estimated

risks/hazards

− Inadequate

emergency planning

Page 5: NSWC CRANE Battery Risk Reduction Assessment Process€¦ · NSWC Crane Background • Indiana’s Navy Base • 100 square miles • Unique facilities • 140 People dedicated to

5

Became Complacent and Comfortable

NSWC Crane Risk Assessment Drivers

Page 6: NSWC CRANE Battery Risk Reduction Assessment Process€¦ · NSWC Crane Background • Indiana’s Navy Base • 100 square miles • Unique facilities • 140 People dedicated to

Risk Assessment Plan

6

Develop Plan • Recover

• Improve/Change Culture

• Actively Address Risk

• Complete/Holistic Risk

Coverage

• Reduce Risk Level To As

Low As Reasonably

Achievable

• Sustain

Actions • Research/Select Structure

• Define Risk Plan

• Develop Risk Assessment

Board

• Establish Standards

• Document Everything

• Develop Sustainment

Page 7: NSWC CRANE Battery Risk Reduction Assessment Process€¦ · NSWC Crane Background • Indiana’s Navy Base • 100 square miles • Unique facilities • 140 People dedicated to

Base Structure for Risk Assessment

7

• SSP Risk Management Plan − Planned Risk Management

− Continuous (timeless) risk assessment

− Emphasize technical risk

− Document everything thoroughly

− Continually re-evaluate process and risk

• Provides Foundation for Risk Assessment Culture

SSP Risk Management Plan,

Risk Management Guide for DOD Acquisition,

Certification of Process Category Subject Matter Experts,

NSWC Crane Lithium Battery Safety Instruction

Page 8: NSWC CRANE Battery Risk Reduction Assessment Process€¦ · NSWC Crane Background • Indiana’s Navy Base • 100 square miles • Unique facilities • 140 People dedicated to

• Gather program information

• ROMB meeting with minutes

• Procedure / HA Table development

• Appropriate procedure review

• Validations/Certifications/Hazard Briefings/Training

• Readiness Review

• Change Verification/Evaluation

• Follow up evaluation / lessons learned

8

Risk Assessment Process

Page 9: NSWC CRANE Battery Risk Reduction Assessment Process€¦ · NSWC Crane Background • Indiana’s Navy Base • 100 square miles • Unique facilities • 140 People dedicated to

• Compile program information & initial risk

assessment

• Hold Risk Oversight Management Board Meeting – Chair Person Directed

– Assess Vulnerable areas; Human Factors, Facilities/Location,

Environment, Co-located Ops, Chemical, Equipment, Assets

– Drill-down until risk levels are as low as achievable and acceptable

– Generate minutes and 100% voting member approval

• Generate Procedures/HA Table w/ appropriate review

• Process Category SMEs – Operator training and certifications

– Procedure Validation / Setups / Simulations

– Hazard briefing

9

Risk Assessment Process

Page 10: NSWC CRANE Battery Risk Reduction Assessment Process€¦ · NSWC Crane Background • Indiana’s Navy Base • 100 square miles • Unique facilities • 140 People dedicated to

• Operation Execution and Evaluation

– Process Changes with ROMB Chair Person oversight

• Project post operation review

– Lessons learned

– Finalize documentation

– Maintain records

10

Risk Assessment Process

Page 11: NSWC CRANE Battery Risk Reduction Assessment Process€¦ · NSWC Crane Background • Indiana’s Navy Base • 100 square miles • Unique facilities • 140 People dedicated to

Risk Culture Change

11

• Documented Process

• Establishment of two Cultural changing

positions − Board Chair Person

− Process Category SMEs

• These positions drive cultural change

throughout Division − Maintain the rigor

Page 12: NSWC CRANE Battery Risk Reduction Assessment Process€¦ · NSWC Crane Background • Indiana’s Navy Base • 100 square miles • Unique facilities • 140 People dedicated to

Questions

Mike Chatelain – NSWC Crane LBSO

812-854-5977

812-296-1476 (cell)

12

Page 13: NSWC CRANE Battery Risk Reduction Assessment Process€¦ · NSWC Crane Background • Indiana’s Navy Base • 100 square miles • Unique facilities • 140 People dedicated to

13

Backup Slide

• Not simple single point hazard

– Electrical

– Toxicity

– Corrosive

– Respiratory

– Explosive gas generator

– Deflagration

• Potential for self driven

• Easy to stimulate without knowing

Battery Hazards