NVF Annual Bridge Conference 2014

Unique bridges in Qatar

Jesber Rasmussen, Chief Project Manager, COWI A/S

Agenda: • Client's Expectations • COWI's design • Contractors

construction sequence • Photos from the

construction

3 AEPTEMBER 2014

COWI POWERPOINT PRESENTATION 2

Client's expectations

› New township in Doha in Qatar to 200.000 residents

› Marinas

› Business center

› Entertainment

› Beaches

› Hotels

› 5 billion dollar projects

› 9 marine bridges

› Two of the bridges needed to be very unique

Project description

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 3

Client's expectations

› Cable Stayed landmark

› Arch bridge landmark

› Suspension bridge landmark

Client chose the suspension bridge

Because:

› First of its kind in the world

› A true landmark for Lusail

› Circle could resemble the Q in Qutar

› Circle represent the sun as the source of life

Concepts developed together with

Dissing+Weitling

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 4

Design concept

› Form and functionality unique

› Fantasy concept

› Like art

› Lighting and illustration to become landmark for Lusail in Qatar

= The challenge was set

3 SEPYEMBER 2014

COWI POWERPOINT PRESENTATION 5

Design

› Suspension bridge concept with app. 200m bridge lengths

› Self anchored suspension bridges with one cable plan

› Cross girders and hangers per 6m

› Ring diameter of 50m produced in high strength steel over the deck and high strength concrete under the deck

Self anchored suspension bridges

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 6

Design

› Composite bridge deck with closed steel box

› Steel box and main cable corrosion protected by dehumidification system

Self anchored suspension bridges

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 7

Design

› Mono cable

› Cable anchored at ring and at bridge ends and down to the anchor block

› Like a two tower suspension bridge with double length

Main cable

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 8

Design

› Main cable 7 locked coil strands Ø140, 13900mm^2, min 18,7MN

› Main cable Ø424 dehumidification system

Cable system

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 9

Design

› Bridge self anchored partly

› Main span fully anchored for main span

› Side span anchored at bridge deck and at the anchor block

Anchor of Main cable at bridge ends

Anchored down due to uplift

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 10

Design

› Cables are anchored at pylon ring.

› Anchor saddle would be long is not anchored individual

Anchor of Main cable at pylon

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 11

Design

› Hangers pre-fabricated locked coil strands Ø70, 3390mm^2 and min. strength of 4.8MN

› Hangers protected by HDPE pipe

Hangers

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 12

Design

› Cable clamps design very compact and unique visual from the road.

Cable clamps

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 13

Design

› Composite bridge deck with 250mm concrete deck for weight and stiffness for cable system

› Max deformation 1/400*span

› Single cable plan require torsion stiffness = closed box girder

› Pre-fab + insitu deck

Bridge deck

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 14

Design

› Two precast elements used

› Between the pylon legs insitu concrete steel plate under for strengthening

› At bridge end in situ concrete because of joints and steel plate under the deck for strengthening

Bridge deck

side span abutment

Pylon leg Pylon leg

main span abutment

insitu insitu pre-fab

pre-fab insitu

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 15

Design

› Box girder closed

› small cross girders per 6m max height 2,74m and width 1.0m

Steel girder

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 16

Design

› Utilities running in the girders

› hence relative large opening

Steel girder

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 17

Design

› Cross girder per 6m for the hangers

› No cross girders between the pylon legs

Cross girder

no cross girders

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 18

Design

› Hammerhead in concrete

› Connecting bridge deck with pylon legs and with the pylon ring

Connection bridge deck and pylon

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 19

Design

› Pylon ring 50m dia.

› Pylon in high strength steel above bridge deck and pre stressing high strength concrete below bridge deck

› Foundation on bored piles

Pylon ring

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 20

Design

› Pylon steel strengthened with stiffeners

Pylon ring

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 21

Design

› 6+8 cables between the pylon steel ring and pylon pier

Concrete part of pylon ring

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 22

Design

› Post-tensioned anchor block

› 5 strands from main anchored in anchor block 2 strands anchored in the superstructure girder

› 7 strands anchored in the superstructure at the abutment

Anchor block and abutment

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 23

Design

› All closed steel areas will corrosion protected by dehumidification

› One system for bridge girder, pylon and main cable

Dehumidification system

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 24

Construction sequence

1. Widen earth bridge/excavation

2. Piling and pile cap construction

3. Substructure construction

4. Backfill and gantry crane installation

5. Bent system-side span construction

6. Pylon & main span erection

7. CIP deck cast

8. Cable Erection

Construction

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 25

Photos

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 26

Photos

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 27

Photos

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 28

Photos

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 29

Photos

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 30

Photos

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 31

Photos

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 32

Photos

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 33

Photos

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 34

Photos

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 35

Photos

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 36

Photos

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 37

Photos

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 38

Photos

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 39

Photos

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 40

Photos

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 41

Photos

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 42

Photos

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 43

Photos

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 44

Photos

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 45

Photos

30 AUGUST 2014

COWI POWERPOINT PRESENTATION 46

Completed bridge

3 SEPTEMBER 2014

COWI POWERPOINT PRESENTATION 47

Thank you