1 Community Board 2 – July 18, 2011

NYU 2031 – Phasing

Update to Community Board #2

July 18, 2011

2 Community Board 2 – July 18, 2011

Existing

Conditions

3 Community Board 2 – July 18, 2011

Proposed

Site Plan

4 Community Board 2 – July 18, 2011

Bird’s Eye View, 2031

5 Community Board 2 – July 18, 2011

NYU Community Goals of the

Planned Development

• Phasing should allow the grocery store to be in continual

operation on site

• WSV garage will always be available for its tenants

• New & temporary open spaces will be created before

existing spaces taken offline

• Provision of space for a new public school to be built and run

by the City

6 Community Board 2 – July 18, 2011

Zipper Mobilization

• Relocate Dog Run to

University Village

• Create new seating area

along Bleecker Street South

• Relocate WSV Playground

WSV

PG WSV

Garden

7 Community Board 2 – July 18, 2011

Zipper Mobilization - Temporary Gym

• New Temporary Gym

constructed on the previous

WSV Playground site. o Gym access will be from Mercer

Street

o 3 basketball courts + lockers

• Modify and update the

open spaces along Mercer

Street, including: o LMNOP Play Area

o New Mercer Plaza

Coles

Gym

Temp

Gym

8 Community Board 2 – July 18, 2011

Massing from Scoping Document

9 Community Board 2 – July 18, 2011

Preliminary Sketch of Temporary Gym

10 Community Board 2 – July 18, 2011

Zipper Building

• Supermarket

• Academic Space

• Greene Street Walk

• Athletic Center

• Dorms

• Hotel and Conf. Center

• New Toddler Playground on

University Village site

• Faculty Housing

Supermarket

Temp

Gym

Zipper

Bldg

11 Community Board 2 – July 18, 2011

Bleecker Street School

• The Public School o Grades Pre k – 8

o 100,000 GSF

o Rooftop play area

• NYU Program o Below-grade academic space

o Dormitory above school

Zipper

Bldg

Bleecker

School

12 Community Board 2 – July 18, 2011

New WSV Parking Garage

• Relocate the required

parking from the existing

garage to the new below-

grade structure o The existing garage will remain in

operation until the new garage is

completed

• Create a temporary

playground along

LaGuardia Place

• Create new seating areas

along West 3rd and

Bleecker Streets

New WSV

Garage

Zipper

Bldg

Bleecker

School

13 Community Board 2 – July 18, 2011

The Mercer Building

• Building Program o Academic offices

o Classrooms

• New Open Spaces o Philosophy Garden

o WSV Playground

o Tricycle Garden

o Public Lawn

o Mercer Entry Plaza

Zipper

Bldg

Bleecker

School

Mercer

Bldg

14 Community Board 2 – July 18, 2011

The LaGuardia Building

• Building Program o Academic offices

o Classrooms

• New Open Spaces o LaGuardia Entry Plaza

o LaGuardia (Adrienne’s)

Playground replacement

Zipper

Bldg

Bleecker

School

Mercer

Bldg LaGuardia

Bldg