Friday 1 April 2016 O-Bahn City Access Project | DPTI Correspondence Council Administration received notification from DPTI on Wednesday 30 March of a letter box drop they will send to Gilberton residents, key stakeholders and non- residential owners on Thursday 31 March relating to the O-Bahn City Access Project. A copy of the correspondence is provided. Attachment A – DPTI Correspondence | O-Bahn City Access Project Library Closure for inventory purposes The Library will be closed on Thursday 14 April between 9am and 1pm to enable staff to perform an inventory. The Civic Centre and Administration will be open as normal during this time. River Torrens (Willow Bend) Pest Plant Eradication Contractors will be resuming with the final stages of pest plant removal on Friday 1 April 2016. The following work forms part of the funding received from the Adelaide and Mount Lofty Natural Resources. Once the pest plants have been removed, depot staff will arrange to lightly revegetate the areas where the removal of pest plants have occurred, with the view of preventing further soil erosion. The pest plant removal is anticipated to be fully completed on the same day, with replanting to occur over the coming months. The Walkerville Society Inc. is presenting a FREE public forum: Preparedness for Emergencies and Disaster Recovery Wednesday 13 April 2016 | Walkerville Town Hall | 7:00PM – 9:00PM Light refreshments served

Upload: dohanh

Post on 15-Aug-2019

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: O-Bahn City Access Project | DPTI Correspondence Round Up - Friday, 1 April... · Friday 1 April 2016 . O-Bahn City Access Project | DPTI Correspondence Council Administration received

Friday 1 April 2016

O-Bahn City Access Project | DPTI Correspondence

Council Administration received notification from DPTI on Wednesday 30 March of a letter box drop they will send to Gilberton residents, key stakeholders and non-residential owners on Thursday 31 March relating to the O-Bahn City Access Project. A copy of the correspondence is provided.

Attachment A – DPTI Correspondence | O-Bahn City Access Project

Library Closure for inventory purposes The Library will be closed on Thursday 14 April between 9am and 1pm to enable staff to perform an inventory. The Civic Centre and Administration will be open as normal during this time.

River Torrens (Willow Bend) Pest Plant Eradication

Contractors will be resuming with the final stages of pest plant removal on Friday 1 April 2016. The following work forms part of the funding received from the Adelaide and Mount Lofty Natural Resources.

Once the pest plants have been removed, depot staff will arrange to lightly revegetate the areas where the removal of pest plants have occurred, with the view of preventing further soil erosion.

The pest plant removal is anticipated to be fully completed on the same day, with replanting to occur over the coming months.

The Walkerville Society Inc. is presenting a FREE public forum: Preparedness for Emergencies and Disaster Recovery

Wednesday 13 April 2016 | Walkerville Town Hall | 7:00PM – 9:00PM

Light refreshments served

Page 2: O-Bahn City Access Project | DPTI Correspondence Round Up - Friday, 1 April... · Friday 1 April 2016 . O-Bahn City Access Project | DPTI Correspondence Council Administration received

Free parking at rear

Opened by Raymond (Ray) Grigg, Mayor of Walkerville

Guest speakers:

• Emina Allegretti, Australian Red Cross • Jo Brooks and Fern Raintree, State Emergency Services

Followed by a Panel Session discussion and Q & A

RSVP: [email protected] or PH 08 8342 7100

Event enquiries to: Rosemary Craddock, Walkerville Society Inc. [email protected]

This event is proudly supported by Walkerville Council.

Page 3: O-Bahn City Access Project | DPTI Correspondence Round Up - Friday, 1 April... · Friday 1 April 2016 . O-Bahn City Access Project | DPTI Correspondence Council Administration received

O-Bahn City Access Project Hackney Road Intersection with Park Terrace 31 March 2016 Dear Stakeholder, The O-Bahn City Access Project builds on the State Government’s significant investment in building a stronger public transport network and its commitment to delivering the best possible outcome for our great city. Hackney Road forms part of the strategically important Inner Ring Route of Adelaide, intended to provide reliable cross-city travel without the need to pass through the City. The Department of Planning, Transport and Infrastructure (DPTI) acknowledges feedback from the community on the proposal to permanently ban the right turn from Hackney Road into Park Terrace at all times. DPTI is committed to working with key stakeholders and the local community, whilst ensuring that road safety can be improved. In response to community feedback two alternative options are currently being considered. The options being considered and illustrated in the enclosed plan, include:

• Option 1 - Maintain the existing right turn from Hackney Road into Park Terrace in off peak times only and extending the vehicle storage area within this right turn lane to accommodate at least one additional vehicle. This right turn would be banned during the morning and evening peak periods to minimise the risk of queued vehicles impacting the new northbound priority bus lane along Hackney Road.

wiltah
Typewritten Text
Attachment A
Page 4: O-Bahn City Access Project | DPTI Correspondence Round Up - Friday, 1 April... · Friday 1 April 2016 . O-Bahn City Access Project | DPTI Correspondence Council Administration received

• Option 2 - Construct a roundabout at the junction of Bundeys Road and War Memorial Drive, allowing vehicles travelling north along Hackney Road to turn left into Bundeys Road and undertake a u-turn at the new roundabout, continuing straight through the traffic lights to Park Terrace. Note: This option would require approval from the Adelaide Park Lands Authority and Adelaide City Council.

As a member of the Gilberton community, we would like to invite you to have your say. To do this, please complete the enclosed feedback form and return it to the Project Team, by Tuesday 19 April 2016. You can send your completed form to us in the post using the reply paid envelope provided or email your completed form to [email protected]. Please note that these are the only options being considered. All feedback will be taken into consideration and you will be advised which option will be progressed. The O-Bahn City Access Project Team will continue to liaise with the Town of Walkerville, Adelaide City Council and the local community as the project progresses. Further information about the O-Bahn City Access Project, can be found at: www.infrastructure.sa.gov.au/public_transport_projects/o-bahn_city_access. Kind regards, O-Bahn City Access Project Team

#10263859

Page 5: O-Bahn City Access Project | DPTI Correspondence Round Up - Friday, 1 April... · Friday 1 April 2016 . O-Bahn City Access Project | DPTI Correspondence Council Administration received

O-Bahn City Access Project Hackney Road Intersection with Park Terrace

Feedback Form

In response to community feedback on the proposal to permanently ban the existing right turn from Hackney Road into Park Terrace at all times, two alternative options are currently being considered. The Department of Planning, Transport and Infrastructure is committed to working with key stakeholders and the local community.

We would like invite you to have your say by indicating your preference below (tick preferred option).

Option 1 - Maintain the existing right turn from Hackney Road into Park Terrace in off peak times only and extend the vehicle storage area within this right turn lane to accommodate at least one additional vehicle. This right turn would be banned during the morning and evening peak periods to minimise the risk of queued vehicles impacting the new northbound priority bus lane along Hackney Road.

Option 2 - Construct a roundabout at the junction of Bundeys Road and War Memorial Drive, allowing vehicles travelling north along Hackney Road to turn left on to Bundeys Road and undertake a u-turn at the new roundabout, continuing straight through the traffic lights to Park Terrace. Note: This option would require approval from the Adelaide Park Lands Authority and Adelaide City Council.

Please return your completed form to the Project Team by COB Tuesday 19 April 2016. You can do this by using the Reply Paid envelope provided (no postage stamp required) or by emailing it to [email protected].

All feedback will be taken into consideration and you will be advised which option will be progressed.

Page 6: O-Bahn City Access Project | DPTI Correspondence Round Up - Friday, 1 April... · Friday 1 April 2016 . O-Bahn City Access Project | DPTI Correspondence Council Administration received

Register for Project Updates If you would like to register to receive project information and updates and haven’t already done so, please complete the following: First name: Surname:

Phone: (Home) Phone (Mobile):

Suburb: Post Code: Email Updates Email address: Traffic SMS Updates Ph (Mobile):

Please select you wish to receive SMS traffic movement info for (you may tick more than one). ⃝ Pedestrian and cycling access ⃝ Hackney Road / Dequetteville Terrace ⃝ East Terrace ⃝ Botanic Road ⃝ Rundle Road

Key areas of Interest

⃝ Project overall ⃝ Fauna / flora ⃝ Traffic ⃝ Walking / cycling ⃝ Urban Design ⃝ O-Bahn Bus services ⃝ Parking ⃝ Construction impacts

Your situation

⃝ Resident ⃝ Property owner ⃝ Business ⃝ Park Lands user ⃝ Cyclist ⃝ Pedestrian ⃝ Private vehicle commuter / road user ⃝ Public transport user ⃝ Local community / environmental / resident group member

Name of group:

For further information about the O-Bahn City Access Project: Call: 1300 443 198 Visit: www.infrastructure.sa.gov.au Email: [email protected]

#10264477

Page 7: O-Bahn City Access Project | DPTI Correspondence Round Up - Friday, 1 April... · Friday 1 April 2016 . O-Bahn City Access Project | DPTI Correspondence Council Administration received

A

O-BAHN CITY ACCESS PROJECTCONCEPT PLANFEBRURARY 18, 2016

Shared Pathway

Irrigated grass

Compacted rubble path

Planting

Sheltered pedestrian & cyclist crossing

Tunnel

Scope boundary

Bus stopNew tree planting

Existing Tree Planting

B

ST PETER’S

COLLEGE

FIR

ST C

REE

K

WINE CENTRE

ROSE GARDEN

UNIVERSITY OF ADELAIDE

RYMILL LAKE

HACKNEY ROAD

HACKNEY ROADB

B

B

B

ATHELN

EY AVENU

E

WYAN

DR

A LANE

BOTANIC ROAD

RUNDLE ROAD

BART

ELS

ROAD

PIRI

E ST

REET

BUN

DEYS

ROA

D

WAR MEMORIAL DRIVE

PARK TERRACE

PARK ROAD

RIVER TORRENS

RUNDLE PARK

RYMILL PARK

BOTANIC GARDENS

BOTANIC PARK

EAST TCE

HUTT STREET

NORTH

TCE

HACKNEY ROAD

HACKNEY ROAD

DEQUETTEVILLE TCE

F

RIVER TO R RE NS

Scale 1:750

RICH

MO

ND

STREET

CAMB

RID

GE STR

EET

OXFO

RD

STREET

BER

TRAM

STREET

PLAN

E TR

EE D

RIVE

BOTANIC DRIVE

VAILIMA CO

UR

T

Final carpark design in consultation with Botanic

Gardens

D

WESTB

URY STR

EET H

G

E

Indicative location of shared pedestrian bridge subject to funding & consultation with key stakeholders.

In conjunction with NPSP detailed design for the streetscape of the service road.

Wombat crossing

Option 1Restricted right turn in peak periods only with potential to extend existing slip lane

by at least one car length.

Option 2Roundabout - junction of Bundeys Road & War Memorial Drive

U-Turn facility

Bus drop off zone

Future plaza subject to consultation and discussions with ABG.

‘Kiss and Ride’ drop-off

Rundle Street & East Terrace subject to further discussion with ACC.

Service building below

C

PRECEDENT PHOTO

CLIENT DPTI/MCD

DATE 17.02.16

REVISION INFORMATION

DRAWING NO. OBP2-MCD-DRG-7304-3210O-BAHN CITY ACCESS 09

Hackney Roadcrossing

01 BOTANIC PARK CROSSING POINT

Designated crossing point

Pedestrian / cycle refuge

Shared use path

Bus stop

5700

9600

9300

3500

BOTANIC PARK

HACKNEY ROAD

SERVICE LANE

SECT

ION

03

Improvements to pedestrian and cycling facilities in consultation with Botanic Gardens & NPSP & ACC Council

B

CAR PARK CROSS SECTION

CONTINUITY OF PARKLANDS TRAIL IN CONSULTATION

WITH COUNCIL.

Hackney Road intersection with Park Terrace options for community feedback