OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
COMP1 LIGAÇÃO PROVISORIA DE AGUA UN
12769 HIDROMETRO 1,5 M3/H UN 1,000 58,70 58,70
9868
TUBO PVC SOLDAVEL EB-892 P/AGUA FRIA PREDIAL
DN 25MM M 40,000 1,92 76,80
6116 AJUDANTE DE ENCANADOR H 2,000 6,66 13,32
2696 ENCANADOR OU BOMBEIRO HIDRAULICO H 6,000 8,17 49,02
PREÇO (MATERIAL) 135,50
PREÇO (MAO-DE-OBRA) 62,34
PREÇO TOTAL + LS(SINAPI) 197,84
BDI (%) 24,96% 49,38
PREÇO TOTAL UNIT. (c/ taxa): 247,22
COMP6
TELHA METALICA TIPO SANDUICHE PRÉ-PINTADA
BRANCA 6MM M2
1610
MASSA PRONTA P/ VEDACAO TP CARBOLASTICO
CINZA DA OTTO BAUMGART CJ 0,004 14,86 0,06
4381
PARAFUSO ROSCA SOBERBA ACO ZINC CABECA
CHATA FENDA SIMPLES 8 X 100MM UN 0,082 0,66 0,05
TELHA EM ACO ZIPADA 50MM - MODELO
SANDUICHE COM TP-40 M2 1,060 203,76 215,99
6115 AJUDANTE H 0,220 6,04 1,33
12869 TELHADISTA H 0,220 8,17 1,80
PREÇO (MATERIAL) 216,10
PREÇO (MAO-DE-OBRA) 3,13
PREÇO TOTAL + LS(SINAPI) 219,23
BDI (%) 24,96% 54,72
PREÇO TOTAL UNIT. (c/ taxa): 273,95
COMPCM_191
COBERTURA MEIA CIRCUNFERENCIA EM
POLICARBONATO M2
1610
MASSA PRONTA P/ VEDACAO TP CARBOLASTICO
CINZA DA OTTO BAUMGART CJ 0,004 14,86 0,06
4381
PARAFUSO ROSCA SOBERBA ACO ZINC CABECA
CHATA FENDA SIMPLES 8 X 100MM UN 0,082 0,66 0,05
COBERTURA MEIA CIRCUNFERENCIA EM
POLICARBONATO M2 1,060 194,33 205,99
6115 AJUDANTE H 0,220 6,04 1,33
12869 TELHADISTA H 0,220 8,17 1,80
PREÇO (MATERIAL) 206,10
PREÇO (MAO-DE-OBRA) 3,13
PREÇO TOTAL + LS(SINAPI) 209,23
BDI (%) 24,96% 52,22
PREÇO TOTAL UNIT. (c/ taxa): 261,45
COMP2 DIVISORIA EM GESSO ACARTONADO M2
367
DIVISORIA DE GESSO ACARTONADO - FORN. E INS
TALAÇÃO M2 1,050 65,00 68,25
PREÇO (MATERIAL) 68,25
PREÇO (MAO-DE-OBRA) 0,00
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
PREÇO TOTAL + LS(SINAPI) 68,25
BDI (%) 24,96% 17,04
PREÇO TOTAL UNIT. (c/ taxa): 85,29
COMP106 FORRO GESSO ACARTONADO M2
1106 FORRO DE GESSO ACARTONADO FORNEC. E INSTAL. M2 1,050 36,00 37,80
PREÇO (MATERIAL) 37,80
PREÇO (MAO-DE-OBRA) 0,00
PREÇO TOTAL + LS(SINAPI) 37,80
BDI (%) 24,96% 9,43
PREÇO TOTAL UNIT. (c/ taxa): 47,23
COMP107 PISO EM CARPETE M2
10710 CARPETE DE NYLON E = 6MM COLOCADO M2 1,050 50,44 52,96
12890
CORDAO DE NYLON P/ PISO DE CARPETE -
COLOCADO M 0,700 4,69 3,28
20278
ASSENTAMENTO DE CARPETE - SOMENTE MAO DE
OBRA M2 1,300 4,11 5,34
PREÇO (MATERIAL) 56,24
PREÇO (MAO-DE-OBRA) 5,34
PREÇO TOTAL + LS(SINAPI) 61,59
BDI (%) 24,96% 15,37
PREÇO TOTAL UNIT. (c/ taxa): 76,96
COMP108
GRANITO CINZA POLIDO ESPESSURA 2CM,
ASSENTADO COM ARGAMASSA COLANTE DUPLA
COLAGEM M2
1380 CIMENTO BRANCO KG 0,211 2,32 0,49
1381
ARGAMASSA OU CIMENTO COLANTE EM PO PARA
FIXACAO DE PECAS CERAMICAS KG 8,000 0,35 2,80
25931
DISCO DE CORTE DIAMANTADO - 7", PARA
ESMERILHADEIRA, SEGMENTADO, PARA CONCRETO UN 0,010 74,46 0,74
10841 GRANITO CINZA POLIDO PARA PISO E = 2 CM M2 1,050 153,37 161,04
242 AJUDANTE ESPECIALIZADO H 0,500 10,33 5,17
4755 MARMORISTA/GRANITEIRO H 0,500 8,17 4,09
PREÇO (MATERIAL) 165,07
PREÇO (MAO-DE-OBRA) 9,25
PREÇO TOTAL + LS(SINAPI) 174,32
BDI (%) 24,96% 43,51
PREÇO TOTAL UNIT. (c/ taxa): 217,83
COMP109
PISO EM BLOCO SEXTAVADO 30X30CM, ESPESSURA
10CM, ASSENTADO SOBRE COLCHAO DE AREIA
ESPESSURA 6CM M2
367 AREIA GROSSA M3 0,060 48,12 2,91
1379 CIMENTO PORTLAND COMUM CP II- 32 KG 0,564 0,70 0,39
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
11118
BLOCO SEXTAVADO P/ PAVIMENTAÇÃO, EM
CONCRETO DE 35 MPA (TIPO BLOKRET) E = 9,0CM,
DE 30 X 30CM, DEACORDO COM NBR 9780 / 9781 UN 12,000 4,32 51,80
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,400 6,04 2,42
4750 PEDREIRO H 0,200 8,17 1,63
PREÇO (MATERIAL) 55,10
PREÇO (MAO-DE-OBRA) 4,05
PREÇO TOTAL + LS(SINAPI) 59,15
BDI (%) 24,96% 14,76
PREÇO TOTAL UNIT. (c/ taxa): 73,91
COMP110 SOLEIRA GRANITO 15 X 3CM M
20232 SOLEIRA GRANITO 15 X 3CM M 1,000 77,73 77,73
4750 PEDREIRO H 0,150 8,17 1,23
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,100 6,04 0,60
PREÇO (MATERIAL) 77,73
PREÇO (MAO-DE-OBRA) 1,83
PREÇO TOTAL + LS(SINAPI) 79,56
BDI (%) 24,96% 19,86
PREÇO TOTAL UNIT. (c/ taxa): 99,42
COMP_PAC
PINTURA EM RESINA ACRÍLICA PARA PISOS DE ALTA
RESISTENCIA - DUAS DEMÃOS M2
5318 SOLVENTE DILUENTE A BASE DE AGUARRAS L 0,100 8,00 0,80
154 RESINA ACRILICA L 0,269 17,53 4,71
12873 IMPERMEABILIZADOR H 0,200 8,17 1,63
6111 SERVENTE H 0,200 6,04 1,21
PREÇO (MATERIAL) 5,51
PREÇO (MAO-DE-OBRA) 2,84
PREÇO TOTAL + LS(SINAPI) 8,35
BDI (%) 24,96% 2,09
PREÇO TOTAL UNIT. (c/ taxa): 10,44
COMP3
PORTA EM VIDRO TEMPERADO E=10mm, COM
ACIONAMENTO AUTOMATICO, INCLUSO
FERRAGENS E INSTALAÇÃO M2
10507 VIDRO TEMPERADO INCOLOR 10MM M2 1,020 162,17 165,41
8183_ORSE
Kit de automatização de abertura de portas
deslizantes de 3,30m, incluso: mão de obra, central
eletrônica com inversor de frequencia,
motorredutor(es), kit de ferragem, UN 1,000 5.900,00 5.900,00
PREÇO (MATERIAL) 6.065,41
PREÇO (MAO-DE-OBRA) 0,00
LEIS SOCIAIS(%) 130,70% 0,00
PREÇO TOTAL + LS(SINAPI) 6.065,41
BDI (%) 24,96% 1.513,93
PREÇO TOTAL UNIT. (c/ taxa): 7.579,34
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
COMP_PCF
PORTA DE ABRIR-FECH. ANTI-PÂNICO
(60+60)X210CM UN
PORTA ANTI-PANICO COMPLETA UN 1,000 940,52 940,52
6111 SERVENTE H 3,750 6,04 22,65
1214 CARPINTEIRO H 3,750 8,17 30,64
PREÇO (MATERIAL) 940,52
PREÇO (MAO-DE-OBRA) 53,29
PREÇO TOTAL + LS(SINAPI) 993,81
BDI (%) 24,96% 248,05
PREÇO TOTAL UNIT. (c/ taxa): 1.241,86
COMP4
JANELA DE VIDRO TEMPERADO EM ALUMINIO DE
CORRER M2
10502 VIDRO TEMPERADO COR 10MM M2 1,050 202,19 212,30
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 3,500 6,04 21,14
2700 MONTADOR H 3,500 12,43 43,51
PREÇO (MATERIAL) 212,30
PREÇO (MAO-DE-OBRA) 64,65
PREÇO TOTAL + LS(SINAPI) 276,94
BDI (%) 24,96% 69,13
PREÇO TOTAL UNIT. (c/ taxa): 346,07
COMP5
JANELA DE CORRER EM ALUMÍNIO, SÉRIE 25, SEM
BANDEIRA, COM 4 FOLHAS PARA VIDRO M2
597
JANELA ALUMINIO CORRER SERIE 25 FLS P/ VIDRO S/
BANDEIRA 160CM X 110CM M2 1,000 235,72 235,72
242 AJUDANTE ESPECIALIZADO H 1,100 10,33 11,36
4750 PEDREIRO H 0,500 8,17 4,09
6110 SERRALHEIRO H 1,100 8,17 8,99
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,800 6,04 4,83
PREÇO (MATERIAL) 235,72
PREÇO (MAO-DE-OBRA) 29,27
PREÇO TOTAL + LS(SINAPI) 264,99
BDI (%) 24,96% 66,14
PREÇO TOTAL UNIT. (c/ taxa): 331,13
COMP9
ELETROCALHA TIPO LEVE PERFURADA EM "U" -
35X70X300mm M
ELETROCALHA TIPO LEVE PERFURADA EM "U" -
35X70X300mm M 1,000 33,10 33,10
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,500 12,42 6,21
6113 AJUDANTE DE ELETRICISTA H 0,565 6,62 3,74
PREÇO (MATERIAL) 33,10
PREÇO (MAO-DE-OBRA) 9,95
PREÇO TOTAL + LS(SINAPI) 43,05
BDI (%) 24,96% 10,75
PREÇO TOTAL UNIT. (c/ taxa): 53,79
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
COMP11 TOMADA 2P + T - 20A - 250V NO PISO UN
12145 TOMADA 2P + T - 20A - 250V NO PISO UN 1,000 13,60 13,60
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,320 12,42 3,97
6113 AJUDANTE DE ELETRICISTA H 0,320 6,62 2,12
PREÇO (MATERIAL) 13,60
PREÇO (MAO-DE-OBRA) 6,09
PREÇO TOTAL + LS(SINAPI) 19,69
BDI (%) 24,96% 4,92
PREÇO TOTAL UNIT. (c/ taxa): 24,61
COMP14 CURVA DE 90 GRAUS DE PVC RIGIDO DIAM. 3" UN
1877 CURVA PVC 90G P/ ELETRODUTO ROSCAVEL 3" UN 1,000 22,34 22,34
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,000 12,42 12,42
6113 AJUDANTE DE ELETRICISTA H 1,000 6,62 6,62
PREÇO (MATERIAL) 22,34
PREÇO (MAO-DE-OBRA) 19,04
PREÇO TOTAL + LS(SINAPI) 41,38
BDI (%) 24,96% 10,33
PREÇO TOTAL UNIT. (c/ taxa): 51,71
COMP_ABRAÇ ABRAÇADEIRA TIPO CHAVETA 1"
ABRAÇADEIRA TIPO CHAVETA 1" UN 1,000 1,00 1,00
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,150 12,42 1,86
PREÇO (MATERIAL) 1,00
PREÇO (MAO-DE-OBRA) 1,86
PREÇO TOTAL + LS(SINAPI) 2,86
BDI (%) 24,96% 0,71
PREÇO TOTAL UNIT. (c/ taxa): 3,58
COMPCM_236 UN
ESTAÇÃO DE TRATAMENTO DE ESGOTO COMPACTA
PARA TRATAMENTO DE EFLUENTE DOMÉSTICO COM
VAZÃO MÉDIA DE 70M3/DIA-SISTEMA AERÓBIO POR
LODOS ATIVADOS COM SISTEMA DE DESINFECÇÃO
POR CLORAÇÃO. SISTEMA COMPLETO COMPOSTO
POR GRADEAMENTO/BOMBEAMENTO/LODOS
ATIVADOS MONOBLOCO/CLORADOR/MEIDÇÃO DE
VAZÃO/SISTEMA DE AUTOMAÇÃO E EQUIPAMENTOS
RESERVA ( BOMBA SUBMERSA E BOMBA
CENTRIFUGA), FORN. E INSTALAÇÃO UN 1,000 151.847,33 151.847,33
FRETES UN 1,000 19.000,00 19.000,00
PREÇO (MATERIAL) 170.847,33
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI) 170.847,33
BDI (%) 24,96% 42.643,49
PREÇO TOTAL UNIT. (c/ taxa): 213.490,82
ESTAÇÃO DE TRATAMENTO DE ESGOTO COMPACTA PARA TRATAMENTO DE
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
COMPCM_235
PEFURAÇÃO DE POÇO CONFORME ORIENTAÇÃO DA
CPRM - COM PROFUNDIDADE DE 105 M, DIÂMETRO
DE PERFURAÇÃO 15" TUBULAÇÃO GEOMECÂNICA
DE 8", COM BOMBA SUBMERSA DE 10CV, COM
APRESENTAÇÃO DO PERFIL, MEMORIAL
DESCRITIVO, ART E REGISTRO NO IPAAM.
M
PEFURAÇÃO DE POÇO CONFORME ORIENTAÇÃO DA
CPRM - COM PROFUNDIDADE DE 105 M, DIÂMETRO
DE PERFURAÇÃO 15" TUBULAÇÃO GEOMECÂNICA DE
8", COM BOMBA SUBMERSA DE 10CV, COM
APRESENTAÇÃO DO PERFIL, MEMORIAL DESCRITIVO,
ART E REGISTRO NO IPAAM.
M 1,000 650,00 650,00
PREÇO (MATERIAL) 650,00
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI) 650,00
BDI (%) 24,96% 162,24
PREÇO TOTAL UNIT. (c/ taxa): 812,24
COMPCM_163DISJUNTOR TRIPOLAR 60A - 25KA, REF. SIEMENS,
PRIMELETRICA OU LOUSANO - FORN E INSTUN
DISJUNTOR TRIPOLAR 60A - 25KA, REF. SIEMENS,
PRIMELETRICA OU LOUSANO UN 1,000 147,23 147,23
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,400 12,42 4,97
6113 AJUDANTE DE ELETRICISTA H 0,400 6,62 2,65
PREÇO (MATERIAL) 147,23
PREÇO (MAO-DE-OBRA) 7,62
PREÇO TOTAL + LS(SINAPI) 154,85
BDI (%) 24,96% 38,65
PREÇO TOTAL UNIT. (c/ taxa): 193,50
COMPCM_164
DISJUNTOR NORMA DIN CURVA C UNIPOLAR 10 A
REF. SIEMENS, PRIMELETRICA OU LOUSANO - FORN
E INST
UN
20008
DISJUNTOR NORMA DIN CURVA C UNIPOLAR 10 A
REF. SIEMENS, PRIMELETRICA OU LOUSANO
UN 1,000 9,16 9,16
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,400 12,42 4,97
6113 AJUDANTE DE ELETRICISTA H 0,400 6,62 2,65
PREÇO (MATERIAL) 9,16
PREÇO (MAO-DE-OBRA) 7,62
PREÇO TOTAL + LS(SINAPI) 16,78
BDI (%) 24,96% 4,19
PREÇO TOTAL UNIT. (c/ taxa): 20,96
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
COMPCM_165
DISJUNTOR NORMA DIN CURVA C UNIPOLAR 25 A
REF. SIEMENS, PRIMELETRICA OU LOUSANO - FORN
E INST
UN
14544
DISJUNTOR NORMA DIN CURVA C UNIPOLAR 25 A
REF. SIEMENS, PRIMELETRICA OU LOUSANO UN 1,000 9,21 9,21
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,400 12,42 4,97
6113 AJUDANTE DE ELETRICISTA H 0,400 6,62 2,65
PREÇO (MATERIAL) 9,21
PREÇO (MAO-DE-OBRA) 7,62
PREÇO TOTAL + LS(SINAPI) 16,83
BDI (%) 24,96% 4,20
PREÇO TOTAL UNIT. (c/ taxa): 21,03
COMPCM_166
DISJUNTOR NORMA DIN CURVA C TRIPOLAR 32 A
REF. SIEMENS, PRIMELETRICA OU LOUSANO - FORN
E INST
UN
2384
DISJUNTOR NORMA DIN CURVA C TRIPOLAR 32 A
REF. SIEMENS, PRIMELETRICA OU LOUSANO UN 1,000 44,55 44,55
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,400 12,42 4,97
6113 AJUDANTE DE ELETRICISTA H 0,400 6,62 2,65
PREÇO (MATERIAL) 44,55
PREÇO (MAO-DE-OBRA) 7,62
PREÇO TOTAL + LS(SINAPI) 52,17
BDI (%) 24,96% 13,02
PREÇO TOTAL UNIT. (c/ taxa): 65,19
COMPCM_002 DISPOSITIVO DR BIPOLAR 30mA/25A - FORN E INST. UN
DISPOSITIVO DR BIPOLAR 30mA/25A UN 1,000 112,00 112,00
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,150 12,42 1,86
PREÇO (MATERIAL) 112,00
PREÇO (MAO-DE-OBRA) 1,86
PREÇO TOTAL + LS(SINAPI) 113,86
BDI (%) 24,96% 28,42
PREÇO TOTAL UNIT. (c/ taxa): 142,28
COMPCM_167
ELETRODUTO DE AÇO GALVANIZADO, PESADO,
Ø100MM (Ø4") , 6M, COM LUVAS. - FORN E INST
UN
21132
ELETRODUTO DE AÇO GALVANIZADO, PESADO,
Ø100MM (Ø4") , 6M, COM LUVAS. UN 1,000 74,31 74,31
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,000 12,42 12,42
6113 AJUDANTE DE ELETRICISTA H 1,000 6,62 6,62
PREÇO (MATERIAL) 74,31
PREÇO (MAO-DE-OBRA) 19,04
PREÇO TOTAL + LS(SINAPI) 93,35
BDI (%) 24,96% 23,30
PREÇO TOTAL UNIT. (c/ taxa): 116,65
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
COMPCM_168
ELETRODUTO PEAD, ARAME GUIA, 100MM COM
LUVAS, KANAFLEX OU EQUIVALENTE - FORN E INST
M
ELETRODUTO PEAD, ARAME GUIA, 100MM COM
LUVAS, KANAFLEX OU EQUIVALENTE M 1,000 5,39 5,39
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,150 12,42 1,86
6113 AJUDANTE DE ELETRICISTA H 0,150 6,62 0,99
PREÇO (MATERIAL) 5,39
PREÇO (MAO-DE-OBRA) 2,86
PREÇO TOTAL + LS(SINAPI) 8,25
BDI (%) 24,96% 2,06
PREÇO TOTAL UNIT. (c/ taxa): 10,30
COMPCM_169ELETRODUTO PEAD, ARAME GUIA, 25MM COM
LUVAS, KANAFLEX OU EQUIVALENTEM
ELETRODUTO PEAD, ARAME GUIA, 25MM COM
LUVAS, KANAFLEX OU EQUIVALENTE M 1,000 7,50 7,50
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,150 12,42 1,86
6113 AJUDANTE DE ELETRICISTA H 0,150 6,62 0,99
PREÇO (MATERIAL) 7,50
PREÇO (MAO-DE-OBRA) 2,86
PREÇO TOTAL + LS(SINAPI) 10,36
BDI (%) 24,96% 2,58
PREÇO TOTAL UNIT. (c/ taxa): 12,94
COMPCM_170
ELETRODUTO PEAD, ARAME GUIA, 50MM COM
LUVAS, KANAFLEX OU EQUIVALENTE - FORN E INST
M
ELETRODUTO PEAD, ARAME GUIA, 50MM COM
LUVAS, KANAFLEX OU EQUIVALENTE M 1,000 9,50 9,50
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,150 12,42 1,86
6113 AJUDANTE DE ELETRICISTA H 0,150 6,62 0,99
PREÇO (MATERIAL) 9,50
PREÇO (MAO-DE-OBRA) 2,86
PREÇO TOTAL + LS(SINAPI) 12,36
BDI (%) 24,96% 3,08
PREÇO TOTAL UNIT. (c/ taxa): 15,44
COMPCM_171
ESCAVAÇÃO MANUAL DE VALAS CAIXAS E
REATERRO M3
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 6,250 6,04 37,75
PREÇO (MATERIAL) 0,00
PREÇO (MAO-DE-OBRA) 37,75
PREÇO TOTAL + LS(SINAPI) 37,75
BDI (%) 24,96% 9,42
PREÇO TOTAL UNIT. (c/ taxa): 47,17
COMPCM_057
ROLO FITA ISOLANTE AUTO FUSÃO
7MMX19MMX10M - FORN E INST UN
404 FITA ISOLANTE AUT FUSÃO 7MMX19MMX10M M 10,000 1,16 11,60
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,050 12,42 0,62
PREÇO (MATERIAL) 11,60
PREÇO (MAO-DE-OBRA) 0,62
PREÇO TOTAL + LS(SINAPI) 12,22
BDI (%) 24,96% 3,05
PREÇO TOTAL UNIT. (c/ taxa): 15,27
COMPCM_058
ROLO
FITA ISOLANTE PLASTICA 7MMX19MMX10M -
FONR E INST UN
20110 FITA ISOLANTE PLASTICA 7MMX19MMX10M UN 1,000 2,99 2,99
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,050 12,42 0,62
PREÇO (MATERIAL) 2,99
PREÇO (MAO-DE-OBRA) 0,62
PREÇO TOTAL + LS(SINAPI) 3,61
BDI (%) 24,96% 0,90
PREÇO TOTAL UNIT. (c/ taxa): 4,51
COMPCM_17
2
LAMPADA ,VAPOR DE MERCÚRIO, ALTA PRESSÃO,
400W, 127V, 60Hz, E-27 - FORN E INST
UN
3751 LAMPADA ,VAPOR DE MERCÚRIO, ALTA PRESSÃO,
400W, 127V, 60Hz, E-27
UN 1,000 20,11
20,11
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,100 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,100 6,62 0,66
PREÇO (MATERIAL) 20,11
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 22,01
BDI (%) 24,96% 5,49
PREÇO TOTAL UNIT. (c/ taxa): 27,51
COMPCM_11
5
LÂMPADA VAPOR DE SÓDIO, 150W-127V-60HZ, E-
40, (PHILIPS, OSRAM, GE, SYLVÂNIA OU
EQUIVALENTE DE MESMO PADRÃO DE QUALIDADE)
- FORN E INST
UN
12216 LAMPADA ,VAPOR DE SÓDIO, ALTA PRESSÃO, 150W,
127V, 60Hz, E-40
UN 1,000 19,55
19,55
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,100 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,100 6,62 0,66
PREÇO (MATERIAL) 19,55
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 21,45
BDI (%) 24,96% 5,35
PREÇO TOTAL UNIT. (c/ taxa): 26,81
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
COMPCM_17
6
LUMINÁRIA FECHADA, PARA QUATRO LÂMPADAS A
VAPOR DE SÓDIO DE 150W-127V-60HZ. POSTE DE
FERRO ENGASTADO GALVANIZADO POR IMERSÃO
A QUENTE, 6m DE ALTURA TOTAL, COM JANELA DE
INSPEÇÃO. - FORN E INST
UN
LUMINÁRIA FECHADA, PARA QUATRO LÂMPADAS A
VAPOR DE SÓDIO DE 150W-127V-60HZ. POSTE DE
FERRO ENGASTADO GALVANIZADO POR IMERSÃO A
QUENTE, 6m DE ALTURA TOTAL, COM JANELA DE
INSPEÇÃO.
UN 1,000 711,80
711,80
73341
GUINDAUTO CAPAC 3,5T APROX 2M ALCANCE VERT
7M (CP) SOBRE CHASSIS DE CAMINHAO (EXCL ESTE)
EXCL OPERADOR H 1,500 20,44 30,66
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 5,000 12,42 62,10
6113 AJUDANTE DE ELETRICISTA H 5,000 6,62 33,10
PREÇO (MATERIAL) 742,46
PREÇO (MAO-DE-OBRA) 95,20
PREÇO TOTAL + LS(SINAPI) 837,66
BDI (%) 24,96% 209,08
PREÇO TOTAL UNIT. (c/ taxa): 1.046,74
COMPCM_17
3
MASSA DE CALAFETAÇÃO ISOLAÇÃO 15KV,
500GRAMAS - FORN E INST
UN
11604 MASSA DE CALAFETAÇÃO ISOLAÇÃO 15KV,
500GRAMAS
UN 1,000 10,54
10,54
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,100 12,42 1,24
PREÇO (MATERIAL) 10,54
PREÇO (MAO-DE-OBRA) 1,24
PREÇO TOTAL + LS(SINAPI) 11,78
BDI (%) 24,96% 2,94
PREÇO TOTAL UNIT. (c/ taxa): 14,72
COMP_DISP DISPOSITIVO DE PROTEÇÃO CONTRA SURTOS
(D.P.S.) 275V DE 8 A 40KA
UN
3939 DISPOSITIVO DE PROTEÇÃO CONTRA SURTOS(DPS)
275V DE 8 A 40KA
UN 1,000 110,00
110,00
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,000 12,42 12,42
6113 AJUDANTE DE ELETRICISTA H 1,000 6,62 6,62
PREÇO (MATERIAL) 110,00
PREÇO (MAO-DE-OBRA) 19,04
PREÇO TOTAL + LS(SINAPI) 129,04
BDI (%) 24,96% 32,21
PREÇO TOTAL UNIT. (c/ taxa): 161,25
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
COMPCM_175
QGD-2-FORNECIMENTO E MONTAGEM DE
ARMÁRIO DE DISTRIBUIÇÃO METÁLICO DE
SOBREPOR, 1000X800X250MM, EM CHAPA DE AÇO
14; ESPELHO EM POLICARBONATO; ISOLAÇÃO IP54 ;
TRATAMENTO: BANHO QUÍMICO DESENGRAXANTE
E FOSFOTIZAÇÃO À BASE DE FOSFATO DE FERRO;
CAIXA E TAMPA: COR BEGE (RAL 7032), PLACA DE
MONTAGEM, EM CHAPA DE AÇO 12: COR LARANJA
(RAL 2004), PINTURA ELETROSTÁTICA EPOXÍ A PÓ;
TODOS OS CIRCUITOS IDENTIFICADOS ATRAVÉS DE
ANILHAS CONFORME NUMERAÇÃO NO PROJETO;
NA PARTE EXTERNA DA PORTA, PROTETORES DE
SURTO DE TENSÃO 20KA INCLUSIVE O NEUTRO;
280V; EXCELENTE ESTÉTICA E ESPAÇO SUFICIENTE
PARA RETIRADA E COLOCAÇÃO DE COMPONENTES;
BARRAMENTO PRINCIPAL ELETROLÍTICOS
COBREADOS TRIFÁSICOS PINTADOS NAS CORES:
FASE R-VERMELHA, FASE S- BRANCA, FASE T-
MARRON, NEUTRO- AZUL CLARO, TERRA- VERDE:
BARRAMENTO DE COBRE ELETROLÍTICO PINTADO,
15X2MM(1 1/2"X1/8"), IN=155A, ICC=20KA,
CONTENDO: PLAQUETA DE POLICARBONATO NA
PORTA IDENTIFICANDO O QUADRO E A TENSÃO
220/127V, E DEMAIS ACESSÓRIOS, CEMAR,
SIEMENS OU EQUIVALENTE. DE ACORDO COM
DIAGRAMA UNIFILAR
UN
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
MATCM_171
ARMÁRIO DE DISTRIBUIÇÃO METÁLICO DE
SOBREPOR, 1000X800X250MM, EM CHAPA DE AÇO
14; ESPELHO EM POLICARBONATO; ISOLAÇÃO IP54 ;
TRATAMENTO: BANHO QUÍMICO DESENGRAXANTE
E FOSFOTIZAÇÃO À BASE DE FOSFATO DE FERRO;
CAIXA E TAMPA: COR BEGE (RAL 7032), PLACA DE
MONTAGEM, EM CHAPA DE AÇO 12: COR LARANJA
(RAL 2004), PINTURA ELETROSTÁTICA EPOXÍ A PÓ;
TODOS OS CIRCUITOS IDENTIFICADOS ATRAVÉS DE
ANILHAS CONFORME NUMERAÇÃO NO PROJETO; NA
PARTE EXTERNA DA PORTA, PROTETORES DE SURTO
DE TENSÃO 20KA INCLUSIVE O NEUTRO; 280V;
EXCELENTE ESTÉTICA E ESPAÇO SUFICIENTE PARA
RETIRADA E COLOCAÇÃO DE COMPONENTES;
BARRAMENTO PRINCIPAL ELETROLÍTICOS
COBREADOS TRIFÁSICOS PINTADOS NAS CORES:
FASE R-VERMELHA, FASE S- BRANCA, FASE T-
MARRON, NEUTRO- AZUL CLARO, TERRA- VERDE:
BARRAMENTO DE COBRE ELETROLÍTICO PINTADO,
15X2MM(1 1/2"X1/8"), IN=155A, ICC=20KA,
CONTENDO: PLAQUETA DE POLICARBONATO NA
PORTA IDENTIFICANDO O QUADRO E A TENSÃO
220/127V, E DEMAIS ACESSÓRIOS, CEMAR,
SIEMENS OU EQUIVALENTE. DE ACORDO COM
DIAGRAMA UNIFILAR
UN 1,000 1.280,00 1.280,00
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 10,000 12,42 124,20
6113 AJUDANTE DE ELETRICISTA H 10,000 6,62 66,20
PREÇO (MATERIAL) 1.280,00
PREÇO (MAO-DE-OBRA) 190,40
PREÇO TOTAL + LS(SINAPI) 1.470,40
BDI (%) 24,96% 367,01
PREÇO TOTAL UNIT. (c/ taxa): 1.837,41
COMPCM_142
ARAME DE AÇO GALVANIZADO N.º12 AWG - FORN
E INST KG
342 ARAME DE AÇO GALVANIZADO N.º12 AWG KG 1,000 9,20 9,20
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,100 12,42 1,24
PREÇO (MATERIAL) 9,20
PREÇO (MAO-DE-OBRA) 1,24
PREÇO TOTAL + LS(SINAPI) 10,44
BDI (%) 24,96% 2,61
PREÇO TOTAL UNIT. (c/ taxa): 13,05
COMP_BLT BLOCO TELEFONICO BLI-10 C/CANALETA UN
BLOCO TELEFONICO BLI-10 C/CANALETA UN 1,000 3,80 3,80
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,500 12,42 6,21
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
6113 AJUDANTE DE ELETRICISTA H 0,500 6,62 3,31
PREÇO (MATERIAL) 3,80
PREÇO (MAO-DE-OBRA) 9,52
PREÇO TOTAL + LS(SINAPI) 13,32
BDI (%) 24,96% 3,32
PREÇO TOTAL UNIT. (c/ taxa): 16,64
COMPCM_024 BOX CURVO DE ALUMINIO 50MM UN
BOX CURVO DE ALUMINIO 50MM UN 1,000 26,68 26,68
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,030 12,42 0,37
6113 AJUDANTE DE ELETRICISTA H 0,030 6,62 0,20
PREÇO (MATERIAL) 26,68
PREÇO (MAO-DE-OBRA) 0,57
PREÇO TOTAL + LS(SINAPI) 27,25
BDI (%) 24,96% 6,80
PREÇO TOTAL UNIT. (c/ taxa): 34,05
COMPCM_025 BOX RETO DE ALUMINIO 50MM UN
BOX RETO DE ALUMINIO 50MM UN 1,000 7,68 7,68
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,030 12,42 0,37
6113 AJUDANTE DE ELETRICISTA H 0,030 6,62 0,20
PREÇO (MATERIAL) 7,68
PREÇO (MAO-DE-OBRA) 0,57
PREÇO TOTAL + LS(SINAPI) 8,25
BDI (%) 24,96% 2,06
PREÇO TOTAL UNIT. (c/ taxa): 10,31
COMP_BAR1 BUCHA/ARRUELA ALUMINIO 1" UN
855
BUCHA E ARRUELA ALUMINIO FUNDIDO P/
ELETRODUTO 25MM (1'') CJ 1,000 1,03 1,03
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,040 12,42 0,50
6113 AJUDANTE DE ELETRICISTA H 0,040 6,62 0,26
PREÇO (MATERIAL) 1,03
PREÇO (MAO-DE-OBRA) 0,76
PREÇO TOTAL + LS(SINAPI) 1,79
BDI (%) 24,96% 0,45
PREÇO TOTAL UNIT. (c/ taxa): 2,24
COMP_BAR2 BUCHA/ARRUELA ALUMINIO 2" UN
843
BUCHA E ARRUELA ALUMINIO FUNDIDO P/
ELETRODUTO 50MM (2'') CJ 2,29 CJ 1,000 2,29 2,29
2436
00000856 BUCHA E ARRUELA ALUMINIO FUNDIDO
P/ ELETRODUTO 60MM (2 1/ H 0,060 12,42 0,75
6113 AJUDANTE DE ELETRICISTA H 0,060 6,62 0,40
PREÇO (MATERIAL) 2,29
PREÇO (MAO-DE-OBRA) 1,14
PREÇO TOTAL + LS(SINAPI) 3,43
BDI (%) 24,96% 0,86
PREÇO TOTAL UNIT. (c/ taxa): 4,29
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
COMPCM_177CABEÇOTE, ALUMÍNIO FUNDIDO Ø50MM (Ø2") , 135°-FORN E INST
UN
MATCM_173 CABEÇOTE, ALUMÍNIO FUNDIDO Ø50MM (Ø2") ,
135° UN 1,000 6,70 6,70
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,100 12,42 1,24
PREÇO (MATERIAL) 6,70
PREÇO (MAO-DE-OBRA) 1,24
PREÇO TOTAL + LS(SINAPI) 7,94
BDI (%) 24,96% 1,98
PREÇO TOTAL UNIT. (c/ taxa): 9,92
COMPCM_178 CABO CFTV RG-59 - FONR E INST M
MATCM_174 CABO CFTV RG-59 M 1,000 2,46 2,46
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,065 12,42 0,81
6113 AJUDANTE DE ELETRICISTA H 0,065 6,62 0,43
PREÇO (MATERIAL) 2,46
PREÇO (MAO-DE-OBRA) 1,24
PREÇO TOTAL + LS(SINAPI) 3,70
BDI (%) 24,96% 0,92
PREÇO TOTAL UNIT. (c/ taxa): 4,62
COMPCM_179 CABO COAXIAL 75OHMS - FORN E INST M
MATCM_175 CABO COAXIAL 75OHMS M 1,000 0,90 0,90
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,065 12,42 0,81
6113 AJUDANTE DE ELETRICISTA H 0,065 6,62 0,43
PREÇO (MATERIAL) 0,90
PREÇO (MAO-DE-OBRA) 1,24
PREÇO TOTAL + LS(SINAPI) 2,14
BDI (%) 24,96% 0,53
PREÇO TOTAL UNIT. (c/ taxa): 2,67
COMPCM_18
1
CABO UTP-4 PARES, 24 AWG CATEGORIA 6,
QUATRO PARES FLEXÍVEL - FORN E INST M
MATCM_177 CABO UTP-4 PARES, 24 AWG CATEGORIA 6, QUATRO
PARES FLEXÍVEL M 1,000 2,15 2,15
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,065 12,42 0,81
6113 AJUDANTE DE ELETRICISTA H 0,065 6,62 0,43
PREÇO (MATERIAL) 2,15
PREÇO (MAO-DE-OBRA) 1,24
PREÇO TOTAL + LS(SINAPI) 3,39
BDI (%) 24,96% 0,85
PREÇO TOTAL UNIT. (c/ taxa): 4,23
COMPCM_18
2
CURVA 90º PVC RÍGIDO, 32MM, COM LUVAS, TIGRE
OU EQUIVALENTE - FORN E INST UN
1884 CURVA 90º PVC RÍGIDO, 32MM, COM LUVAS, TIGRE
OU EQUIVALENTE UN 1,000 3,36 3,36
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,250 12,42 3,11
6113 AJUDANTE DE ELETRICISTA H 0,250 6,62 1,66
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
PREÇO (MATERIAL) 3,36
PREÇO (MAO-DE-OBRA) 4,76
PREÇO TOTAL + LS(SINAPI) 8,12
BDI (%) 24,96% 2,03
PREÇO TOTAL UNIT. (c/ taxa): 10,15
COMPCM_16
1
CURVA 90º PVC RÍGIDO, 50MM, COM LUVAS, TIGRE
OU EQUIVALENTE - FORN E INST UN
1875 CURVA 90º PVC RÍGIDO, 50MM, COM LUVAS, TIGRE
OU EQUIVALENTE UN 1,000 5,21 5,21
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,380 12,42 4,72
6113 AJUDANTE DE ELETRICISTA H 0,380 6,62 2,52
PREÇO (MATERIAL) 5,21
PREÇO (MAO-DE-OBRA) 7,24
PREÇO TOTAL + LS(SINAPI) 12,45
BDI (%) 24,96% 3,11
PREÇO TOTAL UNIT. (c/ taxa): 15,55
COMPCM_18
3
CURVA DE AÇO GALVANIZADO, PESADO, Ø50MM
(Ø2") , 90°, RAIO LONGO, COM LUVAS - FORN E
INST UN
2631 CURVA DE AÇO GALVANIZADO, PESADO, Ø50MM
(Ø2") , 90°, RAIO LONGO, COM LUVAS UN 1,000 6,25 6,25
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,400 12,42 4,97
6113 AJUDANTE DE ELETRICISTA H 0,400 6,62 2,65
PREÇO (MATERIAL) 6,25
PREÇO (MAO-DE-OBRA) 7,62
PREÇO TOTAL + LS(SINAPI) 13,87
BDI (%) 24,96% 3,46
PREÇO TOTAL UNIT. (c/ taxa): 17,33
COMPCM_156
CAIXA DE PASSAGEM EM ALVENARIA,
120X120X100CM COM TAMPA DE CONCRETO E
ALÇAS, COM BRITA PARA DRENAGEM UN
370 AREIA MEDIA M3 0,481 45,00 21,65
1106
CAL HIDRATADA, DE 1A. QUALIDADE, PARA
ARGAMASSA KG 18,570 1,00 18,57
1379 CIMENTO PORTLAND COMUM CP II- 32 KG 110,880 0,73 80,94
4721 PEDRA BRITADA N. 1 OU 19 MM M3 0,288 139,77 40,25
39 ACO CA-60 - 5,0MM KG 10,900 4,52 49,27
7271 TIJOLO CERAMICO FURADO 8 FUROS 10 X 20 X 20CM UN 343,000 0,50 171,50
1379 CIMENTO P/ TAMPA KG 23,184 0,73 16,92
370 AREIA P/ TAMPA M3 0,062 45,00 2,80
4734 SEIXO P/ TAMPA M3 0,060 155,61 9,37
21141 AÇO 3/16" P/ TAMPA M2 1,440 7,93 11,42
1346
CHAPA MADEIRA COMPENSADA P/ FORMA
CONCRETO M2 0,240 30,14 7,23
5064 PREGO KG 0,100 6,15 0,62
337 ARAME RECOZIDO KG 1,000 8,05 8,05
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 33,766 6,04 203,95
4750 PEDREIRO H 15,000 8,17 122,55
PREÇO (MATERIAL) 438,59
PREÇO (MAO-DE-OBRA) 326,50
PREÇO TOTAL + LS(SINAPI) 765,08
BDI (%) 24,96% 190,97
PREÇO TOTAL UNIT. (c/ taxa): 956,05
COMP_PILAR
PILARETE DE AMARRAÇÃO COMPLETO, CONCRETO,
FERRAGEM E FÔRMA M3
370 AREIA MEDIA M3 0,800 45,00 36,00
1379 CIMENTO PORTLAND COMUM CP II- 32 KG 350,000 0,70 245,00
39 ACO CA-60 - 5,0MM KG 24,850 3,93 97,66
4734 SEIXO P/ TAMPA M3 0,700 190,98 133,69
1346
CHAPA MADEIRA COMPENSADA P/ FORMA
CONCRETO M2 2,500 30,14 75,35
5064 PREGO KG 1,000 6,00 6,00
337 ARAME RECOZIDO KG 1,000 7,88 7,88
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 35,000 6,04 211,40
4750 PEDREIRO H 35,000 8,17 285,95
PREÇO (MATERIAL) 601,58
PREÇO (MAO-DE-OBRA) 497,35
PREÇO TOTAL + LS(SINAPI) 1.098,93
BDI (%) 24,96% 274,29
PREÇO TOTAL UNIT. (c/ taxa): 1.373,22
COMP_ADM1 ENGENHEIRO CIVIL MÊS
2707 ENGENHEIRO OU ARQUITETO /PLENO - DE OBRA MÊS 220,00 75,70 16.653,56
PREÇO TOTAL + LS(SINAPI) 16.653,56
BDI (%) 24,96% 4.156,73
PREÇO TOTAL UNIT. (c/ taxa): 20.810,29
COMP_ADM2 MESTRE DE OBRAS MÊS
4069 MESTRE DE OBRAS H 220,00 23,06 5.073,20
PREÇO TOTAL + LS(SINAPI) 5.073,20
BDI (%) 24,96% 1.266,27
PREÇO TOTAL UNIT. (c/ taxa): 6.339,47
COMP_ADM3 VIGIA MÊS
10508 VIGIA H 220,00 12,07 2.655,40
PREÇO (MAO-DE-OBRA) 2.655,40
PREÇO TOTAL + LS(SINAPI) 2.655,40
BDI (%) 24,96% 662,79
PREÇO TOTAL UNIT. (c/ taxa): 3.318,19
COMP_ADM4 TECNICO DE SEGURANÇA DO TRABALHO MÊS
7596 TECNICO DE SEGURANÇA DO TRABALHO H 180,00 24,78 4.459,60
PREÇO (MAO-DE-OBRA) 4.459,60
PREÇO TOTAL + LS(SINAPI) 4.459,60
BDI (%) 24,96% 1.113,12
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
PREÇO TOTAL UNIT. (c/ taxa): 5.572,72
COMP_ADM5 ALMOXARIFE MÊS
253 ALMOXARIFE H 220,00 12,01 2.642,20
PREÇO (MAO-DE-OBRA) 2.642,20
PREÇO TOTAL + LS(SINAPI) 2.642,20
BDI (%) 24,96% 659,49
PREÇO TOTAL UNIT. (c/ taxa): 3.301,69
COMP_ALIM DESPESAS COM ALIMENTAÇÃO MÊS
Nº PESSOAS UND 100,00
DIAS MÊS DIAS 24,00
QUENTINHA UND 2.400,00
PREÇO UND 2.400,00 10,00 24.000,00
BDI (%) 24,96% 5.990,40
29.990,40
COMP_TRAN DESPESAS COM TRANSPORTE DE FUNCIONÁRIOS MÊS
Nº PESSOAS UND 100,00
DIAS MÊS DIAS 24,00
VALE TRANSPORTE UND 4.800,00
PREÇO UND 4.800,00 3,00 14.400,00
BDI (%) 24,96% 3.594,24
17.994,24
COMP_EL1 ABRAÇADEIRA TIPO D 4" UN
4372 ABRAÇADEIRA TIPO D 4" UN 1,00 4,65 4,65
6113 AJUDANTE DE ELETRICISTA H 0,05 6,62 0,33
PREÇO (MATERIAL) 4,65
PREÇO (MAO-DE-OBRA) 0,33
PREÇO TOTAL + LS(SINAPI) 4,98
BDI (%) 24,96% 1,24
PREÇO TOTAL UNIT. (c/ taxa): 6,22
COMP_EL2 BANCADA TP E TC'S UN
BANCADA TP E TC'S UN 1,00 275,62 275,62
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,50 12,42 6,21
6113 AJUDANTE DE ELETRICISTA H 0,50 6,62 3,31
PREÇO (MATERIAL) 275,62
PREÇO (MAO-DE-OBRA) 3,31
PREÇO TOTAL + LS(SINAPI) 278,93
BDI (%) 24,96% 69,62
PREÇO TOTAL UNIT. (c/ taxa): 348,55
COMP_EL3 BOX GIRATÓRIO RETO 1" UN
BOX GIRATÓRIO RETO 1" UN 1,00 13,54 13,54
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 13,54
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
PREÇO (MAO-DE-OBRA) 0,66
PREÇO TOTAL + LS(SINAPI) 14,20
BDI (%) 24,96% 3,54
PREÇO TOTAL UNIT. (c/ taxa): 17,75
COMP_EL4 BUCHA PASSA-MURO INT/INT UN
BUCHA PASSA-MURO INT/INT UN 1,00 264,97 264,97
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,35 12,42 4,35
6113 AJUDANTE DE ELETRICISTA H 0,35 6,62 2,32
PREÇO (MATERIAL) 264,97
PREÇO (MAO-DE-OBRA) 2,32
PREÇO TOTAL + LS(SINAPI) 267,29
BDI (%) 24,96% 66,71
PREÇO TOTAL UNIT. (c/ taxa): 334,00
COMP_EL5 CABO ALUMINIO NÚ 2AWG KG
CABO ALUMINIO NÚ 2AWG KG 1,05 8,79 9,23
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,35 12,42 4,35
6113 AJUDANTE DE ELETRICISTA H 0,35 6,62 2,32
PREÇO (MATERIAL) 9,23
PREÇO (MAO-DE-OBRA) 6,66
PREÇO TOTAL + LS(SINAPI) 15,89
BDI (%) 24,96% 3,97
PREÇO TOTAL UNIT. (c/ taxa): 19,86
COMP_EL6 CABO MUFLA 15KV 25mm2 KG
CABO MUFLA 15KV 25mm2 M 1,05 21,99 23,09
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,15 12,42 1,86
6113 AJUDANTE DE ELETRICISTA H 0,15 6,62 0,99
PREÇO (MATERIAL) 23,09
PREÇO (MAO-DE-OBRA) 2,86
PREÇO TOTAL + LS(SINAPI) 25,95
BDI (%) 24,96% 6,48
PREÇO TOTAL UNIT. (c/ taxa): 32,42
COMP_EL7 CAIXA MEDIDOR TRIFASICO UN
1061 CAIXA MEDIDOR TRIFASICO UN 1,00 86,02 86,02
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,50 12,42 6,21
6113 AJUDANTE DE ELETRICISTA H 0,50 6,62 3,31
PREÇO (MATERIAL) 86,02
PREÇO (MAO-DE-OBRA) 9,52
PREÇO TOTAL + LS(SINAPI) 95,54
BDI (%) 24,96% 23,85
PREÇO TOTAL UNIT. (c/ taxa): 119,39
COMP_EL8 CHAPA METALICA BUCHA PASSA MURO UN
CHAPA METALICA BUCHA PASSA MURO UN 1,00 190,90 190,90
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,15 12,42 1,86
6113 AJUDANTE DE ELETRICISTA H 0,15 6,62 0,99
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
PREÇO (MATERIAL) 190,90
PREÇO (MAO-DE-OBRA) 2,86
PREÇO TOTAL + LS(SINAPI) 193,76
BDI (%) 24,96% 48,36
PREÇO TOTAL UNIT. (c/ taxa): 242,12
COMP_EL9 CHAVE SECCINADORA 15KV UN
CHAVE SECCINADORA 15KV UN 1,00 2.264,08 2.264,08
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,00 12,42 12,42
6113 AJUDANTE DE ELETRICISTA H 1,00 6,62 6,62
PREÇO (MATERIAL) 2.264,08
PREÇO (MAO-DE-OBRA) 19,04
PREÇO TOTAL + LS(SINAPI) 2.283,12
BDI (%) 24,96% 569,87
PREÇO TOTAL UNIT. (c/ taxa): 2.852,99
COMP_EL10 CHAVE XS-100A 15KV UN
CHAVE XS-100A 15KV UN 1,00 179,77 179,77
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,50 12,42 6,21
6113 AJUDANTE DE ELETRICISTA H 0,50 6,62 3,31
PREÇO (MATERIAL) 179,77
PREÇO (MAO-DE-OBRA) 9,52
PREÇO TOTAL + LS(SINAPI) 189,29
BDI (%) 24,96% 47,25
PREÇO TOTAL UNIT. (c/ taxa): 236,54
COMP_EL11 CHUMBADOR CBA 1/4" UN
11976 CHUMBADOR CBA 1/4" UN 1,00 3,65 3,65
6113 AJUDANTE DE ELETRICISTA H 0,15 6,62 0,99
PREÇO (MATERIAL) 3,65
PREÇO (MAO-DE-OBRA) 0,99
PREÇO TOTAL + LS(SINAPI) 4,64
BDI (%) 24,96% 1,16
PREÇO TOTAL UNIT. (c/ taxa): 5,80
COMP_EL12 COMANDO RA1 UN
COMANDO RA1 UN 1,00 514,40 514,40
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,50 12,42 6,21
6113 AJUDANTE DE ELETRICISTA H 0,50 6,62 3,31
PREÇO (MATERIAL) 514,40
PREÇO (MAO-DE-OBRA) 9,52
PREÇO TOTAL + LS(SINAPI) 523,92
BDI (%) 24,96% 130,77
PREÇO TOTAL UNIT. (c/ taxa): 654,69
COMP_EL13 CONECTOR ESTRIBO UN
CONECTOR ESTRIBO UN 1,00 13,44 13,44
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,20 12,42 2,48
PREÇO (MATERIAL) 13,44
PREÇO (MAO-DE-OBRA) 2,48
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
PREÇO TOTAL + LS(SINAPI) 15,92
BDI (%) 24,96% 3,97
PREÇO TOTAL UNIT. (c/ taxa): 19,89
COMP_EL14CRUZETA DE MADEIRA DE LEI, COMPRIM= 2,4M
SECAO TRANSVERSAL 90 X 115MMUN
10510
CRUZETA DE MADEIRA DE LEI, COMPRIM= 2,4M
SECAO TRANSVERSAL 90 X 115MM UN 1,00 96,28 96,28
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,00 12,42 12,42
6113 AJUDANTE DE ELETRICISTA H 1,00 6,62 6,62
PREÇO (MATERIAL) 96,28
PREÇO (MAO-DE-OBRA) 19,04
PREÇO TOTAL + LS(SINAPI) 115,32
BDI (%) 24,96% 28,78
PREÇO TOTAL UNIT. (c/ taxa): 144,10
COMP_EL15 DISJUNTOR PLB 15KV C/ BOBINA 127V UN
DISJUNTOR PLB 15KV C/ BOBINA 127V UN 1,00 16.343,03 16.343,03
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,30 12,42 3,73
6113 AJUDANTE DE ELETRICISTA H 0,30 6,62 1,99
PREÇO (MATERIAL) 16.343,03
PREÇO (MAO-DE-OBRA) 5,71
PREÇO TOTAL + LS(SINAPI) 16.348,74
BDI (%) 24,96% 4.080,65
PREÇO TOTAL UNIT. (c/ taxa): 20.429,39
COMP_EL16 DISJUNTOR SIEMENS 1600A UN
DISJUNTOR SIEMENS 1600A UN 1,00 7.680,61 7.680,61
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,00 12,42 12,42
6113 AJUDANTE DE ELETRICISTA H 1,00 6,62 6,62
PREÇO (MATERIAL) 7.680,61
PREÇO (MAO-DE-OBRA) 19,04
PREÇO TOTAL + LS(SINAPI) 7.699,65
BDI (%) 24,96% 1.921,83
PREÇO TOTAL UNIT. (c/ taxa): 9.621,48
COMP_EL17 ENVELOPAMENTO REDE SUBTERRANEA M3
79478 ESCAVACAO MANUAL M3 1,00 17,70 17,70
83441 REATERRO COMPACTADO M3 1,00 21,14 21,14
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 35,00 12,42 434,70
6113 AJUDANTE DE ELETRICISTA H 24,02 6,62 159,02
PREÇO (MATERIAL) 0,00
PREÇO (MAO-DE-OBRA) 632,56
PREÇO TOTAL + LS(SINAPI) 632,56
BDI (%) 24,96% 157,89
PREÇO TOTAL UNIT. (c/ taxa): 790,45
COMP_EL18 FIO DE COBRE DURO 16mm2 KG
FIO DE COBRE DURO 16mm2 KG 1,05 46,48 48,80
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,15 12,42 1,86
6113 AJUDANTE DE ELETRICISTA H 0,15 6,62 0,99
PREÇO (MATERIAL) 48,80
PREÇO (MAO-DE-OBRA) 2,86
PREÇO TOTAL + LS(SINAPI) 51,66
BDI (%) 24,96% 12,89
PREÇO TOTAL UNIT. (c/ taxa): 64,55
COMP_EL19 GRAMPO DE CERCA KG
5076
GRAMPO DE ACO P/ FIXACAO CERCA DE ARAME
FARPADO KG 1,05 7,47 7,84
6115 AJUDANTE H 0,15 6,04 0,91
PREÇO (MATERIAL) 7,84
PREÇO (MAO-DE-OBRA) 0,91
PREÇO TOTAL + LS(SINAPI) 8,75
BDI (%) 24,96% 2,18
PREÇO TOTAL UNIT. (c/ taxa): 10,93
COMP_EL20
GRAMPO LINHA VIVA, DE ALUMINIO CABO
PRINCIPAL ( 10 - 120MM2) DERIVACAO (10 -
70MM2)
UN
11837
GRAMPO LINHA VIVA, DE ALUMINIO CABO
PRINCIPAL ( 10 - 120MM2) DERIVACAO (10 -
70MM2) UN 1,00 21,77 21,77
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,15 12,42 1,86
6113 AJUDANTE DE ELETRICISTA H 0,15 6,62 0,99
PREÇO (MATERIAL) 21,77
PREÇO (MAO-DE-OBRA) 2,86
PREÇO TOTAL + LS(SINAPI) 24,63
BDI (%) 24,96% 6,15
PREÇO TOTAL UNIT. (c/ taxa): 30,77
COMP_EL21 ISOLADOR PEDESTAL 15KV UN
12364 ISOLADOR TENSAO P/ 15KV UN 1,00 48,47 48,47
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,15 12,42 1,86
6113 AJUDANTE DE ELETRICISTA H 0,15 6,62 0,99
PREÇO (MATERIAL) 48,47
PREÇO (MAO-DE-OBRA) 2,86
PREÇO TOTAL + LS(SINAPI) 51,33
BDI (%) 24,96% 12,81
PREÇO TOTAL UNIT. (c/ taxa): 64,14
COMP_EL22 LUMINÁRIA DE EMERGÊNCIA UN
LUMINÁRIA DE EMERGÊNCIA UN 1,00 61,89 61,89
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,15 12,42 1,86
6113 AJUDANTE DE ELETRICISTA H 0,15 6,62 0,99
PREÇO (MATERIAL) 61,89
PREÇO (MAO-DE-OBRA) 2,86
PREÇO TOTAL + LS(SINAPI) 64,75
BDI (%) 24,96% 16,16
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
PREÇO TOTAL UNIT. (c/ taxa): 80,91
COMP_EL23 MANILHA SAPATILHA UN
MANILHA SAPATILHA UN 1,00 7,36 7,36
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,15 12,42 1,86
6113 AJUDANTE DE ELETRICISTA H 0,15 6,62 0,99
PREÇO (MATERIAL) 7,36
PREÇO (MAO-DE-OBRA) 2,86
PREÇO TOTAL + LS(SINAPI) 10,22
BDI (%) 24,96% 2,55
PREÇO TOTAL UNIT. (c/ taxa): 12,77
COMP_EL24 MÃO FRANCESA CRUZETA UN
MÃO FRANCESA CRUZETA UN 1,00 2,66 2,66
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,15 12,42 1,86
6113 AJUDANTE DE ELETRICISTA H 0,15 6,62 0,99
PREÇO (MATERIAL) 2,66
PREÇO (MAO-DE-OBRA) 2,86
PREÇO TOTAL + LS(SINAPI) 5,52
BDI (%) 24,96% 1,38
PREÇO TOTAL UNIT. (c/ taxa): 6,90
COMP_EL25 MOLDE SOLDA EXOTERMICA UN
MOLDE SOLDA EXOTERMICA UN 1,00 66,77 66,77
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,15 12,42 1,86
6113 AJUDANTE DE ELETRICISTA H 0,15 6,62 0,99
PREÇO (MATERIAL) 66,77
PREÇO (MAO-DE-OBRA) 2,86
PREÇO TOTAL + LS(SINAPI) 69,63
BDI (%) 24,96% 17,38
PREÇO TOTAL UNIT. (c/ taxa): 87,00
COMP_EL26 MUFLA EXTERNA 15KV 25MM² UN
4127 MUFLA EXTERNA 15KV 25MM² UN 1,00 266,07 266,07
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,15 12,42 1,86
6113 AJUDANTE DE ELETRICISTA H 0,15 6,62 0,99
PREÇO (MATERIAL) 266,07
PREÇO (MAO-DE-OBRA) 2,86
PREÇO TOTAL + LS(SINAPI) 268,93
BDI (%) 24,96% 67,12
PREÇO TOTAL UNIT. (c/ taxa): 336,05
COMP_EL27 MUFLA INTERNA 15KV 25MM² UN
4154 MUFLA INTERNA 15KV 25MM² UN 1,00 325,08 325,08
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,15 12,42 1,86
6113 AJUDANTE DE ELETRICISTA H 0,15 6,62 0,99
PREÇO (MATERIAL) 325,08
PREÇO (MAO-DE-OBRA) 2,86
PREÇO TOTAL + LS(SINAPI) 327,94
BDI (%) 24,96% 81,85
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
PREÇO TOTAL UNIT. (c/ taxa): 409,79
COMP_EL28 PARAFUSO MAQUINA 5/8 X 300mm UN
439 PARAFUSO MAQUINA 5/8 X 300mm UN 1,00 4,13 4,13
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,15 12,42 1,86
PREÇO (MATERIAL) 4,13
PREÇO (MAO-DE-OBRA) 1,86
PREÇO TOTAL + LS(SINAPI) 5,99
BDI (%) 24,96% 1,50
PREÇO TOTAL UNIT. (c/ taxa): 7,49
COMP_EL29 PARA-RAIO POLIMERICO 15KV UN
PARA-RAIO POLIMERICO 15KV UN 1,00 137,18 137,18
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,00 12,42 12,42
6113 AJUDANTE DE ELETRICISTA H 1,00 6,62 6,62
PREÇO (MATERIAL) 137,18
PREÇO (MAO-DE-OBRA) 19,04
PREÇO TOTAL + LS(SINAPI) 156,22
BDI (%) 24,96% 38,99
PREÇO TOTAL UNIT. (c/ taxa): 195,21
COMP_EL30 PLACA DE ADVERTENCIA UN
PLACA DE ADVERTENCIA UN 1,00 40,52 40,52
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,15 12,42 1,86
PREÇO (MATERIAL) 40,52
PREÇO (MAO-DE-OBRA) 1,86
PREÇO TOTAL + LS(SINAPI) 42,38
BDI (%) 24,96% 10,58
PREÇO TOTAL UNIT. (c/ taxa): 52,96
COMP_EL31 QUADRO COMANDO 50X50X30 UN
QUADRO COMANDO 50X50X30 UN 1,00 350,32 350,32
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,00 12,42 12,42
6113 AJUDANTE DE ELETRICISTA H 1,00 6,62 6,62
PREÇO (MATERIAL) 350,32
PREÇO (MAO-DE-OBRA) 19,04
PREÇO TOTAL + LS(SINAPI) 369,36
BDI (%) 24,96% 92,19
PREÇO TOTAL UNIT. (c/ taxa): 461,55
COMP_EL32QUADRO COMANDO RELÉ PROTEÇÃO SECUNDÁRIA
50/51NUN
QUADRO COMANDO RELÉ PROTEÇÃO SECUNDÁRIA
50/51N UN 1,00 4.011,73 4.011,73
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 2,50 12,42 31,05
6113 AJUDANTE DE ELETRICISTA H 2,50 6,62 16,55
PREÇO (MATERIAL) 4.011,73
PREÇO (MAO-DE-OBRA) 47,60
PREÇO TOTAL + LS(SINAPI) 4.059,33
BDI (%) 24,96% 1.013,21
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
PREÇO TOTAL UNIT. (c/ taxa): 5.072,54
COMP_EL33 SEAL TUBO 1" M
SEAL TUBO 1" M 1,00 8,04 8,04
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,15 12,42 1,86
6113 AJUDANTE DE ELETRICISTA H 0,15 6,62 0,99
PREÇO (MATERIAL) 8,04
PREÇO (MAO-DE-OBRA) 2,86
PREÇO TOTAL + LS(SINAPI) 10,90
BDI (%) 24,96% 2,72
PREÇO TOTAL UNIT. (c/ taxa): 13,62
COMP_EL34 SOLDA EXOTERMICA 115 UN
SOLDA EXOTERMICA 115 UN 1,00 10,98 10,98
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,15 12,42 1,86
6113 AJUDANTE DE ELETRICISTA H 0,15 6,62 0,99
PREÇO (MATERIAL) 10,98
PREÇO (MAO-DE-OBRA) 2,86
PREÇO TOTAL + LS(SINAPI) 13,84
BDI (%) 24,96% 3,45
PREÇO TOTAL UNIT. (c/ taxa): 17,29
COMP_EL35 SUPORTE ISOLADOR PEDESTAL 15KV UN
7572 SUPORTE ISOLADOR PEDESTAL 15KV UN 1,00 8,61 8,61
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,50 12,42 6,21
6113 AJUDANTE DE ELETRICISTA H 0,50 6,62 3,31
PREÇO (MATERIAL) 8,61
PREÇO (MAO-DE-OBRA) 9,52
PREÇO TOTAL + LS(SINAPI) 18,13
BDI (%) 24,96% 4,53
PREÇO TOTAL UNIT. (c/ taxa): 22,66
COMP_EL36 SUPORTE MUFLA UN
SUPORTE MUFLA UN 1,00 52,24 52,24
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,50 12,42 6,21
6113 AJUDANTE DE ELETRICISTA H 0,50 6,62 3,31
PREÇO (MATERIAL) 52,24
PREÇO (MAO-DE-OBRA) 9,52
PREÇO TOTAL + LS(SINAPI) 61,76
BDI (%) 24,96% 15,42
PREÇO TOTAL UNIT. (c/ taxa): 77,18
COMP_EL37 TELA DE PROTEÇÃO 13X13 M2
10919 TELA DE PROTEÇÃO 13X13 M2 1,00 15,48 15,48
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,50 12,42 6,21
6113 AJUDANTE DE ELETRICISTA H 0,50 6,62 3,31
PREÇO (MATERIAL) 15,48
PREÇO (MAO-DE-OBRA) 9,52
PREÇO TOTAL + LS(SINAPI) 25,00
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
BDI (%) 24,96% 6,24
PREÇO TOTAL UNIT. (c/ taxa): 31,24
COMP_EL38 TELA DE PROTEÇÃO 25X25 M2
TELA DE PROTEÇÃO 25X25 M2 1,00 208,46 208,46
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,50 12,42 6,21
6113 AJUDANTE DE ELETRICISTA H 0,50 6,62 3,31
PREÇO (MATERIAL) 208,46
PREÇO (MAO-DE-OBRA) 9,52
PREÇO TOTAL + LS(SINAPI) 217,98
BDI (%) 24,96% 54,41
PREÇO TOTAL UNIT. (c/ taxa): 272,39
COMP_EL39 TERMINAL CONCENTRICO EMENDA 3/8 UN
TERMINAL CONCENTRICO EMENDA 3/8 UN 1,00 24,17 24,17
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,15 12,42 1,86
6113 AJUDANTE DE ELETRICISTA H 0,15 6,62 0,99
PREÇO (MATERIAL) 24,17
PREÇO (MAO-DE-OBRA) 2,86
PREÇO TOTAL + LS(SINAPI) 27,03
BDI (%) 24,96% 6,75
PREÇO TOTAL UNIT. (c/ taxa): 33,78
COMP_EL40 TERMINAL CONCENTRICO RETO 3/8 UN
TERMINAL CONCENTRICO RETO 3/8 UN 1,00 9,28 9,28
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,15 12,42 1,86
6113 AJUDANTE DE ELETRICISTA H 0,15 6,62 0,99
PREÇO (MATERIAL) 9,28
PREÇO (MAO-DE-OBRA) 2,86
PREÇO TOTAL + LS(SINAPI) 12,14
BDI (%) 24,96% 3,03
PREÇO TOTAL UNIT. (c/ taxa): 15,17
COMP_EL41 TRANSFORMADOR DE CORRENTE 15KV 300/5 UN
TRANSFORMADOR DE CORRENTE 15KV 300/5 UN 1,00 1.079,99 1.079,99
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,00 12,42 12,42
6113 AJUDANTE DE ELETRICISTA H 1,00 6,62 6,62
PREÇO (MATERIAL) 1.079,99
PREÇO (MAO-DE-OBRA) 19,04
PREÇO TOTAL + LS(SINAPI) 1.099,03
BDI (%) 24,96% 274,32
PREÇO TOTAL UNIT. (c/ taxa): 1.373,35
COMP_EL42 TRANSFORMADOR DE POTENCIAL 15KV 127V UN
TRANSFORMADOR DE POTENCIAL 15KV 127V UN 1,00 2.324,43 2.324,43
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,00 12,42 12,42
6113 AJUDANTE DE ELETRICISTA H 1,00 6,62 6,62
PREÇO (MATERIAL) 2.324,43
PREÇO (MAO-DE-OBRA) 19,04
PREÇO TOTAL + LS(SINAPI) 2.343,47
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
BDI (%) 24,96% 584,93
PREÇO TOTAL UNIT. (c/ taxa): 2.928,40
COMP_EL43 TUBO TIPO KANAFLEX 4" M
TUBO TIPO KANAFLEX 4" M 1,05 38,13 40,04
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,35 12,42 4,35
6113 AJUDANTE DE ELETRICISTA H 0,35 6,62 2,32
PREÇO (MATERIAL) 40,04
PREÇO (MAO-DE-OBRA) 6,66
PREÇO TOTAL + LS(SINAPI) 46,70
BDI (%) 24,96% 11,66
PREÇO TOTAL UNIT. (c/ taxa): 58,36
COMP_EL44 VENTILAÇÃO COM PAINEL TELADO 13X13 M2
568 CANTONEIRA DE FERRO M 3,30 41,56 137,22
10997 ELETRODO OK KG 1,00 12,75 12,75
10919 TELA DE AÇO SOLDADA M2 1,05 15,48 16,25
7307 APARELHAMENTO COM ZARCAO L 0,80 13,08 10,46
6160 SOLDADOR H 1,50 9,97 14,96
6115 AJUDANTE SOLDADOR H 1,50 6,04 9,06
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,00 12,42 12,42
6113 AJUDANTE DE ELETRICISTA H 1,00 6,62 6,62
PREÇO (MATERIAL) 176,69
PREÇO (MAO-DE-OBRA) 43,06
PREÇO TOTAL + LS(SINAPI) 219,75
BDI (%) 24,96% 54,85
PREÇO TOTAL UNIT. (c/ taxa): 274,60
COMP_EL45 VERGALHÃO DE COBRA NÚ 3/8" UN
VERGALHÃO DE COBRA NÚ 3/8" UN 1,05 87,23 91,59
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,00 12,42 12,42
6113 AJUDANTE DE ELETRICISTA H 1,00 6,62 6,62
PREÇO (MATERIAL) 91,59
PREÇO (MAO-DE-OBRA) 19,04
PREÇO TOTAL + LS(SINAPI) 110,63
BDI (%) 24,96% 27,61
PREÇO TOTAL UNIT. (c/ taxa): 138,25
COMP83 PAPELEIRA CROMADA - FORNECIMENTO E INSTALACAO UND
11703 PAPELEIRA CROMADA UN 1,00 22,47 22,47
4750 PEDREIRO H 0,05 8,17 0,41
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,05 6,04 0,30
PREÇO (MATERIAL) 22,47
PREÇO (MAO-DE-OBRA) 0,71
PREÇO TOTAL + LS(SINAPI) 23,18
BDI (%) 24,96% 5,79
PREÇO TOTAL UNIT. (c/ taxa): 28,97
COMP84 PORTA TOALHA EM METAL CROMADO, TIPO HASTE OU BARRA un
21102 PORTA TOALHA EM METAL CROMADO, TIPO HASTE OU BARRAUN 1,00 30,64 30,64
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
2696 ENCANADOR OU BOMBEIRO HIDRAULICO H 0,35 8,17 2,86
246 AUXILIAR DE ENCANADOR OU BOMBEIRO HIDRAULICOH 0,35 7,12 2,49
PREÇO (MATERIAL) 30,64
PREÇO (MAO-DE-OBRA) 5,35
PREÇO TOTAL + LS(SINAPI) 35,99
BDI (%) 24,96% 8,98
PREÇO TOTAL UNIT. (c/ taxa): 44,97
COMP85 BARRA P/DEFICIENTE FISICO B6 PADRAO AGETOP un
370 AREIA MEDIA M3 0,00 45,00 0,14
4721 PEDRA BRITADA N. 1 OU 19 MM M3 0,04 113,89 4,90
7568 BUCHA NYLON S-10 C/ PARAFUSO ACO ZINC ROSCA SOBERBA CAB CHATA 5,5 XUN 8,00 0,47 3,76
1379 CIMENTO PORTLAND COMUM CP II- 32 KG 1,66 0,73 1,21
2471 TUBO INDUST.S/COSTURA 1.1/4"X2,25MM m 0,90 56,48 50,83
2472 PINTURA ELETROSTATICA M2 0,11 5,09 0,56
1330 CHAPA ACO GROSSA PRETA 1/4"(6,35MM) 49,797KG/M2KG 1,15 2,70 3,09
4750 PEDREIRO H 1,02 8,17 8,35
6110 SERRALHEIRO H 4,33 8,17 35,34
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,08 6,04 0,49
PREÇO (MATERIAL) 64,50
PREÇO (MAO-DE-OBRA) 44,18
PREÇO TOTAL + LS(SINAPI) 108,68
BDI (%) 24,96% 27,13
PREÇO TOTAL UNIT. (c/ taxa): 135,80
COMP86 VALVULA DESCARGA P/MICTORIO DIAM. 3/4" - 1/2" UN
3143 FITA VEDA ROSCA EM ROLOS 18MMX25M UN 0,07 3,45 0,24
21112 VALVULA DESCARGA P/ MICTORIO UN 1,00 117,19 117,19
246 AUXILIAR DE ENCANADOR OU BOMBEIRO HIDRAULICOH 0,61 7,12 4,34
2696 ENCANADOR OU BOMBEIRO HIDRAULICO H 0,61 8,17 4,98
PREÇO (MATERIAL) 117,43
PREÇO (MAO-DE-OBRA) 9,33
PREÇO TOTAL + LS(SINAPI) 126,76
BDI (%) 24,96% 31,64
PREÇO TOTAL UNIT. (c/ taxa): 158,40
COMP87 REGISTRO PVC ESFERA VS ROSCAVEL DN 3/4" UN
3146 FITA VEDA ROSCA EM ROLOS 18MMX10M UN 0,12 1,50 0,18
6032 REGISTRO PVC ESFERA VS ROSCAVEL DN 3/4" UN 1,00 11,67 11,67
6116 AJUDANTE DE ENCANADOR H 0,60 6,66 4,00
2696 ENCANADOR OU BOMBEIRO HIDRAULICO H 0,70 8,17 5,72
PREÇO (MATERIAL) 11,85
PREÇO (MAO-DE-OBRA) 9,72
PREÇO TOTAL + LS(SINAPI) 21,57
BDI (%) 24,96% 5,38
PREÇO TOTAL UNIT. (c/ taxa): 26,95
COMP88 REGISTRO PVC ESFERA VS ROSCAVEL DN 2" UN
11671 REGISTRO PVC ESFERA VS ROSCAVEL DN 2" UN 1,00 38,92 38,92
3146 FITA VEDA ROSCA EM ROLOS 18MMX10M UN 0,18 1,50 0,27
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
6116 AJUDANTE DE ENCANADOR H 0,70 6,66 4,66
2696 ENCANADOR OU BOMBEIRO HIDRAULICO H 0,90 8,17 7,35
PREÇO (MATERIAL) 39,19
PREÇO (MAO-DE-OBRA) 12,02
PREÇO TOTAL + LS(SINAPI) 51,21
BDI (%) 24,96% 12,78
PREÇO TOTAL UNIT. (c/ taxa): 63,99
COMP89 INSTALACAO DE CHUVEIRO ELETRICO UN
3148 FITA VEDA ROSCA EM ROLOS 18MMX50M UN 0,01 6,55 0,07
1368 CHUVEIRO ELETRICO COMUM PLASTICO TP DUCHA 110/220VUN 1,00 22,83 22,83
6115 AJUDANTE H 0,30 6,04 1,81
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,45 12,42 5,59
PREÇO (MATERIAL) 22,90
PREÇO (MAO-DE-OBRA) 7,40
PREÇO TOTAL + LS(SINAPI) 30,30
BDI (%) 24,96% 7,56
PREÇO TOTAL UNIT. (c/ taxa): 37,86
COMP90 RALO SEMI-ESFERICO FOFO TP ABACAXI D = 150MM P/ LAJES, CALHAS ETC UN
11709 RALO SEMI-ESFERICO FOFO TP ABACAXI D = 150MM P/ LAJES, CALHAS ETCUN 1,00 17,50 17,50
246 AUXILIAR DE ENCANADOR OU BOMBEIRO HIDRAULICOH 0,50 7,12 3,56
2696 ENCANADOR OU BOMBEIRO HIDRAULICO H 0,50 8,17 4,09
PREÇO (MATERIAL) 17,50
PREÇO (MAO-DE-OBRA) 7,65
PREÇO TOTAL + LS(SINAPI) 25,15
BDI (%) 24,96% 6,28
PREÇO TOTAL UNIT. (c/ taxa): 31,42
COMP92 REGISTRO OU REGULADOR P/ GAS COZINHA UN
11756 REGISTRO OU REGULADOR P/ GAS COZINHA MARCA ALIANCA REF 76506/1UN 1,00 19,13 19,13
2696 ENCANADOR OU BOMBEIRO HIDRAULICO H 0,40 8,17 3,27
PREÇO (MATERIAL) 19,13
PREÇO (MAO-DE-OBRA) 3,27
PREÇO TOTAL + LS(SINAPI) 22,40
BDI (%) 24,96% 5,59
PREÇO TOTAL UNIT. (c/ taxa): 27,99
COMP93 CENTRAL DE GÁS (1+1 CILIND.45 KG) UN
370 AREIA MEDIA M3 0,71 45,00 31,95
39 ACO CA-60 - 5,0MM KG 1,90 3,93 7,47
4721 PEDRA BRITADA N. 1 OU 19 MM M3 0,11 139,77 15,37
1379 CIMENTO PORTLAND COMUM CP II- 32 KG 149,32 0,70 104,52
11161 CAL HIDRATADA P/ PINTURA KG 77,56 1,00 77,56
2692 DESMOLDANTE PARA FORMA DE MADEIRA L 0,22 7,96 1,75
3767 LIXA P/ PAREDE OU MADEIRA UN 1,54 0,31 0,48
6085 SELADOR ACRILICO L 1,85 3,81 7,05
5061 PREGO DE ACO 18 X 27 KG 0,26 6,00 1,56
20206 PECA DE MADEIRA (MASSARANDUBA) APARELHADA 2 X 10CMM 2,02 3,33 6,73
123 ADITIVO IMPERMEABILIZANTE PEGA NORMAL P/ ARGAMASSA TIPO SIKA1 OU VEDACL 0,50 3,00 1,50
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
6188 TABUA MADEIRA 3A QUALIDADE 2,5 X 30CM (1 X 12") NAO APARELHADAM2 2,86 18,26 52,22
7355 TINTA LATEX ACRILICA GL 3,70 38,70 143,19
7696 TUBO ACO GALV C/ COSTURA DIN 2440/NBR 5580 CLASSE MEDIA DN 2" (50MM) EM 11,76 37,64 442,65
10485 VIBRADOR DE IMERSAO C/ MOTOR ELETRICO 2HP MONOFASICO QUALQUER DIAM C/H 0,01 1,57 0,02
3671 JUNTA DILATACAO PLASTICA P/ PISO H=20MM E=3,0MMM 5,22 1,50 7,83
34 ACO CA-50 3/8" (9,52 MM) KG 9,49 3,45 32,74
2742 PECA DE MADEIRA ROLICA D = 15CM P/ ESCORAMENTOSM 3,96 6,92 27,40
4718 PEDRA BRITADA N. 2 OU 25 MM M3 0,02 135,00 2,70
10613 TIJOLO CERAMICO FURADO 3 FUROS 10 X 15 X 30CM UN 150,71 0,29 43,71
614 GRADE DE PROTECAO FERRO CHATO (20 KG/M2) M2 0,90 584,31 525,88
4750 PEDREIRO H 14,34 8,17 117,16
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 22,74 6,04 137,35
6115 AJUDANTE H 4,67 6,04 28,21
4783 PINTOR H 4,63 8,17 37,83
4243 OPERADOR DE BETONEIRA H 0,12 12,16 1,46
PREÇO (MATERIAL) 1.534,27
PREÇO (MAO-DE-OBRA) 322,00
PREÇO TOTAL + LS(SINAPI) 1.856,27
BDI (%) 24,96% 463,33
PREÇO TOTAL UNIT. (c/ taxa): 2.319,60
COMP94 TUBO PVC PBA 12 JE NBR 5647 P/REDE AGUA DN 65/DE 75 MM M
9845 TUBO PVC PBA 12 JE NBR 5647 P/REDE AGUA DN 65/DE 75 MMM 1,30 12,68 16,48
20083 SOLUCAO LIMPADORA FRASCO PLASTICO C/ 1000CM3UN 0,00 28,61 0,02
122 ADESIVO PVC FRASCO C/ 850G UND 0,00 24,15 0,05
2696 ENCANADOR OU BOMBEIRO HIDRAULICO H 0,40 8,17 3,27
246 AUXILIAR DE ENCANADOR OU BOMBEIRO HIDRAULICOH 0,40 7,12 2,85
PREÇO (MATERIAL) 16,56
PREÇO (MAO-DE-OBRA) 6,12
PREÇO TOTAL + LS(SINAPI) 24,16
BDI (%) 24,96% 6,03
PREÇO TOTAL UNIT. (c/ taxa): 30,19
COMP95
REDUCAO FIXA TIPO STORZ LATAO P/ INST.
PREDIAL COMBATE A INCENDIO ENGATE RAPIDO
2.1/2" X 1.1/2" UN
20972
REDUCAO FIXA TIPO STORZ LATAO P/ INST. PREDIAL
COMBATE A INCENDIO ENGATE RAPIDO 2.1/2" X
1.1/2" UN 1,00 51,82 51,82
6115 AJUDANTE H 0,32 6,04 1,95
2696 ENCANADOR OU BOMBEIRO HIDRAULICO H 0,40 8,17 3,27
PREÇO (MATERIAL) 51,82
PREÇO (MAO-DE-OBRA) 5,22
PREÇO TOTAL + LS(SINAPI) 57,04
BDI (%) 24,96% 14,24
PREÇO TOTAL UNIT. (c/ taxa): 71,28
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
COMP96
MANGUEIRA DE INCENDIO C/ CAPA SIMPLES
TECIDA FIO POLIESTER TUBO INT BORRACHA SINT
ABNT TP 1 P/ INSTPR, COMP C/ UNIOES E EMPAT
INT LATAO C/ ENG RAP E ANEIS EXP P/ EMP MANG
COBRE D = 2 1/2 L = 30M UN
21037
MANGUEIRA DE INCENDIO C/ CAPA SIMPLES TECIDA
FIO POLIESTER TUBO INT BORRACHA SINT ABNT TP 1
P/ INSTPR, COMP C/ UNIOES E EMPAT INT LATAO C/
ENG RAP E ANEIS EXP P/ EMP MANG COBRE D = 2
1/2 L = 30M UN 1,00 583,87 583,87
6115 AJUDANTE H 0,20 6,04 1,21
2696 ENCANADOR OU BOMBEIRO HIDRAULICO H 0,20 8,17 1,63
PREÇO (MATERIAL) 583,87
PREÇO (MAO-DE-OBRA) 2,84
PREÇO TOTAL + LS(SINAPI) 586,71
BDI (%) 24,96% 146,44
PREÇO TOTAL UNIT. (c/ taxa): 733,16
COMP97 TAMPAO STORZ COM CORRENTE 2. 1/2" UN
10905
TAMPAO LATAO C/ CORRENTE P/ INSTALACAO
PREDIAL COMBATE A INCENDIO ENGA UN 1,00 41,64 41,64
6115 AJUDANTE H 0,20 6,04 1,21
2696 ENCANADOR OU BOMBEIRO HIDRAULICO H 0,20 8,17 1,63
PREÇO (MATERIAL) 41,64
PREÇO (MAO-DE-OBRA) 2,84
PREÇO TOTAL + LS(SINAPI) 44,48
BDI (%) 24,96% 11,10
PREÇO TOTAL UNIT. (c/ taxa): 55,58
COMP98
ADAPTADOR EM LATAO P/ INSTALACAO PREDIAL
DE COMBATE A INCENDIO ENGATE RAPIDO 2 1/2" X
ROSCA INTERNA 5 FIOS 2 1/2" UN
10899
ADAPTADOR EM LATAO P/ INSTALACAO PREDIAL DE
COMBATE A INCENDIO ENGATE UN 1,00 33,46 33,46
6115 AJUDANTE H 0,20 6,04 1,21
2696 ENCANADOR OU BOMBEIRO HIDRAULICO H 0,20 8,17 1,63
PREÇO (MATERIAL) 33,46
PREÇO (MAO-DE-OBRA) 2,84
PREÇO TOTAL + LS(SINAPI) 36,30
BDI (%) 24,96% 9,06
PREÇO TOTAL UNIT. (c/ taxa): 45,36
COMP99
TUBO ACO PRETO C/ COSTURA DIN 2440/NBR 5580
CLASSE MEDIA DN 65MM ( 2.1/2" ) E = 3,75MM -
6,68KG/M M
21023
TUBO ACO PRETO C/ COSTURA DIN 2440/NBR 5580
CLASSE MEDIA DN 65MM ( 2.1/2" ) E = 3,75MM -
6,68KG/M M 1,40 30,41 42,57
3146 FITA VEDA ROSCA EM ROLOS 18MMX10M UN 0,14 1,50 0,21
2696 ENCANADOR OU BOMBEIRO HIDRAULICO H 1,80 8,17 14,71
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
6116 AJUDANTE DE ENCANADOR H 1,80 6,66 11,99
PREÇO (MATERIAL) 42,79
PREÇO (MAO-DE-OBRA) 26,69
PREÇO TOTAL + LS(SINAPI) 69,48
BDI (%) 24,96% 17,34
PREÇO TOTAL UNIT. (c/ taxa): 86,82
COMP100 BOMBA CENTRIFUGA 5,0 CV UN
738 BOMBA CENTRIFUGA C/ MOTOR ELETRICO TRIFASICO 5CV BOCAIS 2" X 1.1/2" X 1" DANCOR SERIE CAM MOD.618 - TJM HM/ Q = 40M / 25M3/H A 47M / 16M3/H**CAIXA**"UN 1,00 1.732,38 1.732,38
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 2,00 12,42 24,84
2696 ENCANADOR OU BOMBEIRO HIDRAULICO H 3,00 8,17 24,51
PREÇO (MATERIAL) 1.732,38
PREÇO (MAO-DE-OBRA) 49,35
PREÇO TOTAL + LS(SINAPI) 1.781,73
BDI (%) 24,96% 444,72
PREÇO TOTAL UNIT. (c/ taxa): 2.226,45
COMP111 ELEVADOR UN
ELEVADOR UN 1,00 88.624,22 88.624,22
PREÇO (MATERIAL) 88.624,22
PREÇO (MAO-DE-OBRA) 0,00
PREÇO TOTAL + LS(SINAPI) 88.624,22
BDI (%) 24,96% 22.120,61
PREÇO TOTAL UNIT. (c/ taxa): 110.744,83
COMP112
QUADRO BRANCO DE USO PROFISSIONAL
CONFECCIONADO EM MDF SOBREPOSTO POR
LAMINADO MELAMÍNICO, ACABAMENTO
BRILHOSO, MOLDURA EM ALUMNÍNIO ANODIZADO
- DIM: 300 X 120 - FORNECIMENTO E INSTALAÇÃO UN
MATCM10850 QUADRO DE FORMICA 3,00X1,20m FORN. E INSTAL. UN 1,00 438,50 438,50
11950 BUCHA NYLON S-6 C/ PARAFUSO ACO ZINC CAB CHATA ROSCA SOBERBA 4,2 X 45MUN 4,00 0,21 0,84
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,40 6,04 2,42
PREÇO (MATERIAL) 439,34
PREÇO (MAO-DE-OBRA) 2,42
PREÇO TOTAL + LS(SINAPI) 441,76
BDI (%) 24,96% 110,26
PREÇO TOTAL UNIT. (c/ taxa): 552,02
COMPCM_75
ALCA,PREFORMADA,ESTAI,CABO,ACO,3/8 POL,NTD-
02-M-2 ITEM 2-FORN E INST UN
MATCM_75
ALCA,PREFORMADA,ESTAI,CABO,ACO,3/8 POL,NTD-
02-M-2 ITEM 2 UN 1,00 5,59 5,59
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 5,59
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 7,49
BDI (%) 24,96% 1,87
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
PREÇO TOTAL UNIT. (c/ taxa): 9,36
COMPCM_188ARMACAO,SECUNDARIA,1 ESTRIBO ,COMPLETA - FORN E INST UN
MATCM_183 ARMACAO,SECUNDARIA,1 ESTRIBO ,COMPLETA UN 1,00 6,43 6,43
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 6,43
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 8,33
BDI (%) 24,96% 2,08
PREÇO TOTAL UNIT. (c/ taxa): 10,41
COMP_ARR
FORNECIMENTO DE ARRUELA QUADRADA ACO
GALV D = 38MM ESP= 3MM DFURO= 18 MM UN
379
ARRUELA QUADRADA ACO GALV D = 38MM ESP=
3MM DFURO= 18 MM UN 1,00 1,08 1,08
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,40 6,04 2,42
PREÇO (MATERIAL) 1,08
PREÇO (MAO-DE-OBRA) 2,42
PREÇO TOTAL + LS(SINAPI) 3,50
BDI (%) 24,96% 0,87
PREÇO TOTAL UNIT. (c/ taxa): 4,37
COMPCM_139
ABRACADEIRA, PLASTICA REUTILIZAVEL, 9 X 251
MM, DIAM 20 - 62 MM - FORN E INST UN
MATCM_139
ABRACADEIRA, PLASTICA REUTILIZAVEL, 9 X 251 MM,
DIAM 20 - 62 MM UN 1,00 0,11 0,11
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,06 12,42 0,70
PREÇO (MATERIAL) 0,11
PREÇO (MAO-DE-OBRA) 0,70
PREÇO TOTAL + LS(SINAPI) 0,81
BDI (%) 24,96% 0,20
PREÇO TOTAL UNIT. (c/ taxa): 1,01
COMPCM_78
BRACO, REDE COMPACTA, TIPO L, COM PRENSA-
CABO MONTADO - FORN E INST UN
MATCM_78
BRACO, REDE COMPACTA, TIPO L, COM PRENSA-
CABO MONTADO UN 1,00 53,33 53,33
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,20 12,42 2,48
6113 AJUDANTE DE ELETRICISTA H 0,20 6,62 1,32
PREÇO (MATERIAL) 53,33
PREÇO (MAO-DE-OBRA) 3,81
PREÇO TOTAL + LS(SINAPI) 57,14
BDI (%) 24,96% 14,26
PREÇO TOTAL UNIT. (c/ taxa): 71,40
COMPCM_79 BRAÇO, TIPO C, PARA REDE COMPACTA 15KV UN
MATCM_79 BRAÇO, TIPO C, PARA REDE COMPACTA 15KV UN 1,00 68,45 68,45
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,20 12,42 2,48
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
6113 AJUDANTE DE ELETRICISTA H 0,20 6,62 1,32
PREÇO (MATERIAL) 68,45
PREÇO (MAO-DE-OBRA) 3,81
PREÇO TOTAL + LS(SINAPI) 72,26
BDI (%) 24,96% 18,04
PREÇO TOTAL UNIT. (c/ taxa): 90,29
COMPCM_80
CABO ELÉTRICO, 3#50mm2+9,5mm, XLPE, CLASSE
15KV, REDE COMPACTA - FORN E INST M
955
CABO ELÉTRICO, 3#50mm2+9,5mm, XLPE, CLASSE
15KV, REDE COMPACTA M 1,00 31,37 31,37
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,19 12,42 2,32
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 31,37
PREÇO (MAO-DE-OBRA) 2,98
PREÇO TOTAL + LS(SINAPI) 34,35
BDI (%) 24,96% 8,58
PREÇO TOTAL UNIT. (c/ taxa): 42,93
COMP_81
CABO, ELETRICO, COBERTO, ALUMINIO, XLPE, 15
KV, 50 MM2 - FORN E INST M
MATCM_81
CABO, ELETRICO, COBERTO, ALUMINIO, XLPE, 15 KV,
50 MM2 M 1,00 16,50 16,50
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,15 12,42 1,86
6113 AJUDANTE DE ELETRICISTA H 0,15 6,62 0,99
PREÇO (MATERIAL) 16,50
PREÇO (MAO-DE-OBRA) 2,86
PREÇO TOTAL + LS(SINAPI) 19,36
BDI (%) 24,96% 4,83
PREÇO TOTAL UNIT. (c/ taxa): 24,19
COMPCM_84
CAPA ISOLANTE PARA CONECTOR ESTRIBO TIPO
CUNHA - FORN E INST UN
MATCM_84
CAPA ISOLANTE PARA CONECTOR ESTRIBO TIPO
CUNHA UN 1,00 0,85 0,85
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 0,85
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 2,75
BDI (%) 24,96% 0,69
PREÇO TOTAL UNIT. (c/ taxa): 3,44
COMPCM_86
CINTA,ACO GALV,POSTE CIRCULAR,160MM,
COMPLETA - FORN E INST UN
MATCM_86
CINTA,ACO GALV,POSTE CIRCULAR,160MM,
COMPLETA UN 1,00 13,61 13,61
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 13,61
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 15,51
BDI (%) 24,96% 3,87
PREÇO TOTAL UNIT. (c/ taxa): 19,39
COMPCM_87
CINTA,ACO GALV,POSTE CIRCULAR,170MM,
COMPLETA - FORN E INST UN
MATCM_87
CINTA,ACO GALV,POSTE CIRCULAR,170MM,
COMPLETA UN 1,00 14,68 14,68
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 14,68
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 16,58
BDI (%) 24,96% 4,14
PREÇO TOTAL UNIT. (c/ taxa): 20,72
COMPCM_88
CINTA,ACO GALV,POSTE CIRCULAR,180MM,
COMPLETA - FORN E INST UN
MATCM_88
CINTA,ACO GALV,POSTE CIRCULAR,180MM,
COMPLETA UN 1,00 15,00 15,00
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 15,00
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 16,90
BDI (%) 24,96% 4,22
PREÇO TOTAL UNIT. (c/ taxa): 21,12
COMPCM_89
CINTA,ACO GALV,POSTE CIRCULAR,190MM,
COMPLETA - FORN E INST UN
MATCM_89
CINTA,ACO GALV,POSTE CIRCULAR,190MM,
COMPLETA UN 1,00 14,83 14,83
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 14,83
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 16,73
BDI (%) 24,96% 4,18
PREÇO TOTAL UNIT. (c/ taxa): 20,91
COMPCM_90
CINTA,ACO GALV,POSTE CIRCULAR,200MM,
COMPLETA - FORN E INST UN
MATCM_90
CINTA,ACO GALV,POSTE CIRCULAR,200MM,
COMPLETA UN 1,00 15,47 15,47
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 15,47
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 17,37
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
BDI (%) 24,96% 4,34
PREÇO TOTAL UNIT. (c/ taxa): 21,71
COMPCM_91
CINTA,ACO GALV,POSTE CIRCULAR,210MM,
COMPLETA - FORN E INST UN
MATCM_91
CINTA,ACO GALV,POSTE CIRCULAR,210MM,
COMPLETA UN 1,00 15,65 15,65
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 15,65
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 17,55
BDI (%) 24,96% 4,38
PREÇO TOTAL UNIT. (c/ taxa): 21,94
COMPCM_92
CINTA,ACO GALV,POSTE CIRCULAR,220MM,
COMPLETA - FORN E INST UN
MATCM_92
CINTA,ACO GALV,POSTE CIRCULAR,220MM,
COMPLETA UN 1,00 15,99 15,99
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 15,99
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 17,89
BDI (%) 24,96% 4,47
PREÇO TOTAL UNIT. (c/ taxa): 22,36
COMPCM_186COMPOSTO,ANTI-OXIDO, 250G - FORN E APLIC BIS
MATCM_182 COMPOSTO,ANTI-OXIDO, 250G BIS 1,00 1,00 1,00
6113 AJUDANTE DE ELETRICISTA H 1,00 6,62 6,62
PREÇO (MATERIAL) 1,00
PREÇO (MAO-DE-OBRA) 6,62
PREÇO TOTAL + LS(SINAPI) 7,62
BDI (%) 24,96% 1,90
PREÇO TOTAL UNIT. (c/ taxa): 9,52
COMPCM_93 CONECTOR COM ESTRIBO TIPO CUNHA - FORN E INST UN
MATCM_93 CONECTOR COM ESTRIBO TIPO CUNHA UN 1,00 13,15 13,15
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 13,15
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 15,05
BDI (%) 24,96% 3,76
PREÇO TOTAL UNIT. (c/ taxa): 18,81
COMPCM_94
CONECTOR, DERIVAÇÃO DE COMPREESÃO
FORMATO H, L. 25 - 70MM2, D. 16 - 35MM2. -
FORN E INST UN
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
MATCM_94
CONECTOR, DERIVAÇÃO DE COMPREESÃO FORMATO
H, L. 25 - 70MM2, D. 16 - 35MM2. UN 1,00 1,20 1,20
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 1,20
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 3,10
BDI (%) 24,96% 0,77
PREÇO TOTAL UNIT. (c/ taxa): 3,88
COMPCM_95
CONECTOR, DERIVAÇÃO DE COMPREESÃO
FORMATO H, L. 50MM2, D. 50MM2. - FORN E INST UN
MATCM_95
CONECTOR, DERIVAÇÃO DE COMPREESÃO FORMATO
H, L. 50MM2, D. 50MM2. UN 1,00 1,20 1,20
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 1,20
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 3,10
BDI (%) 24,96% 0,77
PREÇO TOTAL UNIT. (c/ taxa): 3,88
COMPCM_98 ELO-FUSIVEL,DISTRIBUICAO,COM BOTAO, 12 K - FORN E INST UN
MATCM_98 ELO-FUSIVEL,DISTRIBUICAO,COM BOTAO, 12 K UN 1,00 2,93 2,93
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 2,93
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 4,83
BDI (%) 24,96% 1,21
PREÇO TOTAL UNIT. (c/ taxa): 6,04
COMPCM_99
ESPACADOR, ISOLANTE, PARA REDE COMPACTA, 15
KV - FORN E INST UN
MATCM_99
ESPACADOR, ISOLANTE, PARA REDE COMPACTA, 15
KV UN 1,00 12,17 12,17
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 12,17
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 14,07
BDI (%) 24,96% 3,51
PREÇO TOTAL UNIT. (c/ taxa): 17,59
COMPCM_100
ESTRIBO, PARA REDE COMPACTA 15KV - FORN E
INST UN
MATCM_100 ESTRIBO, PARA REDE COMPACTA 15KV UN 1,00 6,79 6,79
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
PREÇO (MATERIAL) 6,79
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 8,69
BDI (%) 24,96% 2,17
PREÇO TOTAL UNIT. (c/ taxa): 10,86
COMPCM_057
ROLO FITA ISOLANTE AUTO FUSÃO
7MMX19MMX10M - FORN E INST UN
MATCM_057 FITA ISOLANTE AUT FUSÃO 7MMX19MMX10M UN 1,00 13,91 13,91
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,05 12,42 0,62
PREÇO (MATERIAL) 13,91
PREÇO (MAO-DE-OBRA) 0,62
PREÇO TOTAL + LS(SINAPI) 14,53
BDI (%) 24,96% 3,63
PREÇO TOTAL UNIT. (c/ taxa): 18,16
COMPCM_058
ROLO
FITA ISOLANTE PLASTICA 7MMX19MMX10M -
FONR E INST UN
MATCM_058 FITA ISOLANTE PLASTICA 7MMX19MMX10M UN 1,00 6,18 6,18
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,05 12,42 0,62
PREÇO (MATERIAL) 6,18
PREÇO (MAO-DE-OBRA) 0,62
PREÇO TOTAL + LS(SINAPI) 6,80
BDI (%) 24,96% 1,70
PREÇO TOTAL UNIT. (c/ taxa): 8,50
COMPCM_101
GANCHO-OLHAL,ACO GALVANIZADO,ROTURA
5000KGF,NTD-02-018 - FORN E INST UN
MATCM_101
GANCHO-OLHAL,ACO GALVANIZADO,ROTURA
5000KGF,NTD-02-018 UN 1,00 7,23 7,23
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 7,23
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 9,13
BDI (%) 24,96% 2,28
PREÇO TOTAL UNIT. (c/ taxa): 11,41
COMPCM_102GRAMPO ANCORAGEM POLIMERICO - FORN E INST UN
MATCM_102 GRAMPO ANCORAGEM POLIMERICO UN 1,00 26,30 26,30
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 26,30
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 28,20
BDI (%) 24,96% 7,04
PREÇO TOTAL UNIT. (c/ taxa): 35,24
COMPCM_103GRAMPO,LINHA VIVA,BRONZE - FORN E INST UN
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
MATCM_103 GRAMPO,LINHA VIVA,BRONZE UN 1,00 19,70 19,70
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 19,70
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 21,60
BDI (%) 24,96% 5,39
PREÇO TOTAL UNIT. (c/ taxa): 27,00
COMPCM_104
HASTE,ATERRAMENTO,CANTONEIRA
ACO,ZINC,5X25X25X2400MM - FORN E INST UN
MATCM_104
HASTE,ATERRAMENTO,CANTONEIRA
ACO,ZINC,5X25X25X2400MM UN 1,00 18,47 18,47
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 18,47
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 20,37
BDI (%) 24,96% 5,09
PREÇO TOTAL UNIT. (c/ taxa): 25,46
COMPCM_105
ISOLADOR, ANCORAGEM/SUSPENSÃO,
POLIMERICO, GARFO-OLHAL, 15KV, 5000DAN -
FORN E INST UN
MATCM_105
ISOLADOR, ANCORAGEM/SUSPENSÃO, POLIMERICO,
GARFO-OLHAL, 15KV, 5000DAN UN 1,00 38,50 38,50
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 38,50
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 40,40
BDI (%) 24,96% 10,08
PREÇO TOTAL UNIT. (c/ taxa): 50,49
COMPCM_106
ISOLADOR, PINO, MONOCORPO, POLIMERICO,
15KV, DIAM 140MM ALT 135MM, ROSCA 25MM -
FORN E INST UN
MATCM_106
ISOLADOR, PINO, MONOCORPO, POLIMERICO, 15KV,
DIAM 140MM ALT 135MM, ROSCA 25MM UN 1,00 38,50 38,50
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 38,50
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 40,40
BDI (%) 24,96% 10,08
PREÇO TOTAL UNIT. (c/ taxa): 50,49
COMPCM_107
ISOLADOR,PINO,PORCELANA,15KV,102X117MM,RO
SCA 25MM,DT/PC0 - FORN E INST UN
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
MATCM_107
ISOLADOR,PINO,PORCELANA,15KV,102X117MM,ROS
CA 25MM,DT/PC0 UN 1,00 10,22 10,22
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 10,22
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 12,12
BDI (%) 24,96% 3,03
PREÇO TOTAL UNIT. (c/ taxa): 15,15
COMPCM_108
ISOLADOR,ROLDANA,PORCELANA76X79 MM,DT/PC-
02-025 - FORN E INST UN
MATCM_108
ISOLADOR,ROLDANA,PORCELANA76X79 MM,DT/PC-
02-025 UN 1,00 2,35 2,35
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 2,35
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 4,25
BDI (%) 24,96% 1,06
PREÇO TOTAL UNIT. (c/ taxa): 5,32
COMPCM_109
ISOLADOR,SUSPENSAO,VIDRO TEMPERADO,GARFO-
OLHAL,160MM, 50 - FORN E INST UN
MATCM_108
ISOLADOR,ROLDANA,PORCELANA76X79 MM,DT/PC-
02-025 UN 1,00 2,35 2,35
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 2,35
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 4,25
BDI (%) 24,96% 1,06
PREÇO TOTAL UNIT. (c/ taxa): 5,32
COMPCM_110
LACO, PREFORMADO, PARA
ESPACADOR/SEPARADOR, CABO MENSAGEIRO
9,5MM - FORN E INST UN
MATCM_110
LACO, PREFORMADO, PARA
ESPACADOR/SEPARADOR, CABO MENSAGEIRO
9,5MM UN 1,00 0,90 0,90
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 0,90
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 2,80
BDI (%) 24,96% 0,70
PREÇO TOTAL UNIT. (c/ taxa): 3,50
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
COMPCM_111
LACO, PREFORMADO, PLASTICO PARA
ESPACADOR/SEPARADOR, CABO AL. COBERTO
15KV, 50-95 MM2 UN
MATCM_111
LACO, PREFORMADO, PLASTICO PARA
ESPACADOR/SEPARADOR, CABO AL. COBERTO 15KV,
50-95 MM2 UN 1,00 2,90 2,90
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 2,90
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 4,80
BDI (%) 24,96% 1,20
PREÇO TOTAL UNIT. (c/ taxa): 6,00
COMPCM_112
LACO, PREFORMADO, ROLDANA, CABO CA, 35
MM2, ISOL 45 MM - FORN E INST UN
MATCM_112
LACO, PREFORMADO, ROLDANA, CABO CA, 35 MM2,
ISOL 45 MM UN 1,00 1,15 1,15
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 1,15
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 3,05
BDI (%) 24,96% 0,76
PREÇO TOTAL UNIT. (c/ taxa): 3,82
COMPCM_113
LACO, PREFORMADO, ROLDANA, CABO CA, 70/95
MM2, ISOL 45 MM - FORN E INST UN
MATCM_113
LACO, PREFORMADO, ROLDANA, CABO CA, 70/95
MM2, ISOL 45 MM UN 1,00 2,00 2,00
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 2,00
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 3,90
BDI (%) 24,96% 0,97
PREÇO TOTAL UNIT. (c/ taxa): 4,88
COMPCM_114
LACO,PREFORMADO,TOPO,SIMPLES,ISOL
102MM,CABO CAA 4 AWG - FORN E INST UN
MATCM_114
LACO,PREFORMADO,TOPO,SIMPLES,ISOL
102MM,CABO CAA 4 AWG UN 1,00 10,40 10,40
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
6113 AJUDANTE DE ELETRICISTA H 0,10 6,62 0,66
PREÇO (MATERIAL) 10,40
PREÇO (MAO-DE-OBRA) 1,90
PREÇO TOTAL + LS(SINAPI) 12,30
BDI (%) 24,96% 3,07
PREÇO TOTAL UNIT. (c/ taxa): 15,38
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
COMPCM_117
MANILHA-SAPATILHA,ACO GALVANIZADO,PSTC-
5247/17111 PLP - FORN E INST UN
MATCM_117
MANILHA-SAPATILHA,ACO GALVANIZADO,PSTC-
5247/17111 PLP UN 1,00 8,18 8,18
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
PREÇO (MATERIAL) 8,18
PREÇO (MAO-DE-OBRA) 1,24
PREÇO TOTAL + LS(SINAPI) 9,42
BDI (%) 24,96% 2,35
PREÇO TOTAL UNIT. (c/ taxa): 11,77
COMPCM_118
OLHAL,PARAFUSO,ACO GALVANIZADO,RUPTURA
5000KGF - FORN E INST UN
MATCM_118
OLHAL,PARAFUSO,ACO GALVANIZADO,RUPTURA
5000KGF UN 1,00 8,32 8,32
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,10 12,42 1,24
PREÇO (MATERIAL) 8,32
PREÇO (MAO-DE-OBRA) 1,24
PREÇO TOTAL + LS(SINAPI) 9,56
BDI (%) 24,96% 2,39
PREÇO TOTAL UNIT. (c/ taxa): 11,95
COMPCM_119
PARAFUSO, CABEÇA ABAULADA, AÇO ZINCADO,
M16X45X38MM - FORN E INST UN
MATCM_119
PARAFUSO, CABEÇA ABAULADA, AÇO ZINCADO,
M16X45X38MM UN 1,00 2,08 2,08
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,05 12,42 0,62
PREÇO (MATERIAL) 2,08
PREÇO (MAO-DE-OBRA) 0,62
PREÇO TOTAL + LS(SINAPI) 2,70
BDI (%) 24,96% 0,67
PREÇO TOTAL UNIT. (c/ taxa): 3,38
COMPCM_120
PARAFUSO, CABEÇA QUADRADA, AÇO ZINCADO,
M16X200x120MM - FORN E INST UN
MATCM_120
PARAFUSO, CABEÇA QUADRADA, AÇO ZINCADO,
M16X200x120MM UN 1,00 3,74 3,74
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,05 12,42 0,62
PREÇO (MATERIAL) 3,74
PREÇO (MAO-DE-OBRA) 0,62
PREÇO TOTAL + LS(SINAPI) 4,36
BDI (%) 24,96% 1,09
PREÇO TOTAL UNIT. (c/ taxa): 5,45
COMP_RED REDUCAO EXCENTRICA PVC LEVE C/ BOLSA P/ ANEL DN 150 X 100MM UN
20034 REDUCAO EXCENTRICA PVC LEVE C/ BOLSA P/ ANEL DN 150 X 100MMUN 1,00 124,24 124,24
6116 AJUDANTE DE ENCANADOR H 0,45 6,66 3,00
2696 ENCANADOR OU BOMBEIRO HIDRAULICO H 0,45 8,17 3,68
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
PREÇO (MATERIAL) 124,24
PREÇO (MAO-DE-OBRA) 6,67
PREÇO TOTAL + LS(SINAPI) 130,91
BDI (%) 24,96% 32,68
PREÇO TOTAL UNIT. (c/ taxa): 163,59
COMP16LUMINÁRIA FLUORESCENTE COMPLETA PARAEMERGÊNCIA DE 15 W
UN
LUMINÁRIA FLUORESCENTE DE EMERGÊNCIA PARA 2 LAMPADAS (POTÊNCIA: 15,00 W / TENSÃO: 120/220 V)
UN 2,0000 142,575 285,15
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,3750 12,420 17,08
6113 AJUDANTE DE ELETRICISTA H 0,9990 6,620 6,61
285,15
23,69
308,84
24,96% 77,09
385,93
COMP17LUMINARIA PLAFON SOBREPOR P/LÂMP.COMPACTAELETRÔNICA 1 X 26W
UN
LUMINARIA PLAFON SOBREPOR P/LÂMP.COMPACTA ELETRÔNICA 1 X 26W
UN 1,0000 9,330 9,33
6113 AJUDANTE DE ELETRICISTA H 1,0222 6,620 6,77
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,6000 12,420 7,45
9,33
14,22
23,55
24,96% 5,88
29,43
COMP20DISJUNTOR TERMOMAGNETICO MONOPOLAR 10 AFORNECIMENTO E INSTALACAO
UND
2390 DISJUNTOR TERMOMAGNETICO MONOPOLAR 10A UN 1,0000 6,018 6,02
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,1553 12,420 1,93
6,02
1,93
7,95
24,96% 1,98
9,93
COMP21DISJUNTOR TERMOMAGNETICO UNIPOLAR 20A 240V-FORN/COLOC
UN
2389 DISJUNTOR TERMOMAGNETICO MONOPOLAR 20A UN 1,0000 6,080 6,08
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,1610 12,420 2,00
6,08
2,00
8,08
24,96% 2,02
10,10
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
COMP22 DISJUNTOR TERMOMAGNETICO BIPOLAR 10 A,240VFORNECIMENTO E INSTALACAO
UN
DISJUNTOR TERMOMAGNETICO BIPOLAR 10A UN 1,0000 33,910 33,91
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,1867 12,420 2,32
33,91
2,32
36,23
24,96% 9,04
45,27
COMP23DISJUNTOR TERMOMAGNETICO BIPOLAR 20 A,240VFORNECIMENTO E INSTALACAO
UN
2382 DISJUNTOR TERMOMAGNETICO BIPOLAR 20A UN 1,0000 40,630 40,63
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,0300 12,420 0,37
40,63
0,37
41,00
24,96% 10,23
51,23
COMP24DISJUNTOR TERMOMAGNETICO BIPOLAR 32 A,240VFORNECIMENTO E INSTALACAO
UN
DISJUNTOR TERMOMAGNETICO BIPOLAR 32A UN 1,0000 34,366 34,37
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,2367 12,420 2,94
34,37
2,94
37,31
24,96% 9,31
46,62
COMP25DISJUNTOR TERMOMAGNETICO TRIPOLAR 25 A,240V, FORNECIMENTO E INSTALACAO
UN
DISJUNTOR TERMOMAGNETICO TRIPOLAR 20A UN 1,0000 42,145 42,15
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,4000 6,040 2,42
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,5450 12,420 6,77
42,15
9,19
51,34
24,96% 12,81
64,15
COMP26DISJUNTOR TERMOMAGNETICO TRIPOLAR 32 A,240V, FORNECIMENTO E INSTALACAO
UN
DISJUNTOR TERMOMAGNETICO TRIPOLAR 32A UN 1,0000 46,614 46,61
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,3989 6,040 2,41
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,5455 12,420 6,78
46,61
9,19
55,80
24,96% 13,93
69,73
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
COMP27DISJUNTOR TERMOMAGNETICO TRIPOLAR 40 A,240V, FORNECIMENTO E INSTALACAO
UN
2380 DISJUNTOR TERMOMAGNETICO TRIPOLAR 40A UN 1,0000 42,310 42,31
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,4290 6,040 2,59
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,5869 12,420 7,29
42,31
9,88
52,19
24,96% 13,03
65,22
COMP28DISJUNTOR TERMOMAGNETICO TRIPOLAR 100 A,240V, FORNECIMENTO E INSTALACAO
UN
2373 DISJUNTOR TERMOMAGNETICO TRIPOLAR 100A UN 1,0000 62,845 62,85
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,4018 6,040 2,43
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,5446 12,420 6,76
62,85
9,19
72,04
24,96% 17,98
90,02
COMP29 DISJUNTOR TERMOMAGNETICO TRIPOLAR 225 A,240V, FORNECIMENTO E INSTALACAO
UN
2391 DISJUNTOR TERMOMAGNETICO TRIPOLAR 225A UN 1,0000 175,330 175,33
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,3009 6,040 1,82
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,4091 12,420 5,08
175,33
6,90
182,23
24,96% 45,48
227,71
COMP30 DISJUNTOR DR 32A 4 PÓLOS UND
DISJUNTOR DR 32A 4 PÓLOS UN 1,0000 124,641 124,64
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,6000 12,420 7,45
6113 AJUDANTE DE ELETRICISTA H 1,0231 6,620 6,77
124,64
14,22
138,86
24,96% 34,66
173,52
COMP31 DISJUNTOR DR 40A 4 PÓLOS UND
DISJUNTOR DR 40A 4 PÓLOS UN 1,0000 137,590 137,59
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,4120 12,420 5,12
6113 AJUDANTE DE ELETRICISTA H 0,3000 6,620 1,99
137,59
7,11
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
144,70
24,96% 36,12
180,82
COMP32 DISJUNTOR DR 100A 4 PÓLOS UND
DISJUNTOR DR 100A 4 PÓLOS UN 1,0000 166,292 166,29
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,4124 12,420 5,12
6113 AJUDANTE DE ELETRICISTA H 0,3000 6,620 1,99
166,29
7,11
173,40
24,96% 43,28
216,68
INSTALAÇÕES TELEFONICAS
COMP35CAIXA DE TELEFONE em chapa de aço padrão Telebrás , dimensões internas 1200 x 1200 x 150 mm
UN
14055CAIXA DE PASSAGEM N 6 PADRAO TELEBRAS DIM 120 X 120 X 12CM EM CHAPA DE
UN 1,0000 466,974 466,97
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 6,8720 12,420 85,35
6113 AJUDANTE DE ELETRICISTA H 5,0000 6,620 33,10
466,97
118,45
585,42
24,96% 146,12
731,54
COMP36 CURVA DE 90 GRAUS DE PVC RIGIDO DIAM. 1" UN
1884 CURVA PVC 90G P/ ELETRODUTO ROSCAVEL 1" UN 1,0000 3,460 3,46
6113 AJUDANTE DE ELETRICISTA H 0,1287 6,620 0,85
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,1221 12,420 1,52
3,46
2,37
5,83
24,96% 1,46
7,29
COMP37 CURVA DE 90 GRAUS DE PVC RIGIDO DIAM. 1.1/2" UN
1870 CURVA PVC 90G P/ ELETRODUTO ROSCAVEL 1/2" UN 1,0000 1,280 1,28
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,3991 12,420 4,96
6113 AJUDANTE DE ELETRICISTA H 0,3990 6,620 2,64
1,28
7,60
8,88
24,96% 2,22
11,10
COMP38 CURVA DE 90 GRAUS DE PVC RIGIDO DIAM. 3" UN
1877 CURVA PVC 90G P/ ELETRODUTO ROSCAVEL 3" UN 1,0000 22,700 22,70
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,9714 12,420 12,07
6113 AJUDANTE DE ELETRICISTA H 0,9987 6,620 6,61
22,70
18,68
41,38
24,96% 10,33
51,71
COMP39 BUCHA E ARRUELA METALICA DIAM. 1" UN
855BUCHA E ARRUELA ALUMINIO FUNDIDO P/ ELETRODUTO 25MM (1'')
CJ 1,0000 1,030 1,03
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,0100 12,420 0,12
6113 AJUDANTE DE ELETRICISTA H 0,0100 6,620 0,07
1,03
0,19
1,22
24,96% 0,30
1,52
COMP40 BUCHA/ARRUELA ALUMINIO 1 1/2" CJ
853BUCHA E ARRUELA ALUMINIO FUNDIDO P/ ELETRODUTO 40MM (1 1/2'')
CJ 1,0000 1,600 1,60
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,0400 12,420 0,50
6113 AJUDANTE DE ELETRICISTA H 0,0400 6,620 0,26
1,60
0,76
2,36
24,96% 0,59
2,95
COMP41 BUCHA E ARRUELA METALICA DIAM. 3" UN
844BUCHA E ARRUELA ALUMINIO FUNDIDO P/ ELETRODUTO 75MM (3'')
UN 1,0000 4,750 4,75
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,0100 12,420 0,12
6113 AJUDANTE DE ELETRICISTA H 0,0100 6,620 0,07
4,75
0,19
4,94
24,96% 1,23
6,17
COMP42 BLOCO TELEFONICO BLI-10 C/CANALETA UN
BLOCO TELEFONICO BLI-10 C/CANALETA UN 1,0000 3,800 3,80
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,5000 12,420 6,21
6113 AJUDANTE DE ELETRICISTA H 0,5000 6,620 3,31
3,80
9,52
13,32
24,96% 3,32
16,64 PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
COMP43 ABRAÇADEIRO DE AÇO LAMINADO TIPO UNHA 6 UN
ABRAÇADEIRO DE AÇO LAMINADO TIPO UNHA 6 UN 1,0000 1,690 1,69
6113 AJUDANTE DE ELETRICISTA H 0,1000 6,620 0,66
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,1000 12,420 1,24
1,69
1,90
3,59
24,96% 0,90
4,49
COMP44 ANEL GUIA PARA TELEFONIA UN
ANEL GUIA PARA TELEFONIA UN 1,0000 2,310 2,31
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,1000 12,420 1,24
6113 AJUDANTE DE ELETRICISTA H 0,1000 6,620 0,66
2,31
1,90
4,21
24,96% 1,05
5,26
COMP45CANALETA PARA BLOCO TERMINAL DE TELEFONIAPARA CAIXA R1
UN
CANALETA PARA BLOCO TERMINAL DE TELEFONIA PARA CAIXA R1
UN 1,0000 1,530 1,53
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,0000 12,420 12,42
6113 AJUDANTE DE ELETRICISTA H 1,0000 6,620 6,62
1,53
19,04
20,57
24,96% 5,13
25,70
COMP46TAMPA FERRO FUNDIDO PADRAO TELEBRAS PARACAIXA R1
UN
6011 REGISTRO GAVETA 2.1/2" BRUTO LATAO REF 1502-B UN 0,0300 199,690 5,99
14112TAMPA FOFO TP R1 PADRAO TELEBRAS 385 X 630MM 25KG CARGA MAX 1500KG P/
UN 1,0000 110,810 110,81
4750 PEDREIRO H 2,0560 8,170 16,80
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 1,0000 6,040 6,04
116,80
22,84
139,64
24,96% 34,85
174,49
INSTALAÇÕES DE TV
COMP48 CURVA DE 90 GRAUS DE PVC RIGIDO DIAM. 3/4" UND
1879 CURVA PVC 90G P/ ELETRODUTO ROSCAVEL 3/4" UN 1,0000 2,220 2,22
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,0970 12,420 1,20
6113 AJUDANTE DE ELETRICISTA H 0,1000 6,620 0,66
PREÇO TOTAL + LS(SINAPI)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
2,22
1,86
4,08
24,96% 1,02
5,10
COMP49 CURVA DE 135 GRAUS DE PVC RIGIDO DIAM. 3/4" UND
CURVA P/ ELETRODUTO PVC 3/4" UN 1,0000 1,560 1,56
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,1000 12,420 1,24
6113 AJUDANTE DE ELETRICISTA H 0,1000 6,620 0,66
1,56
1,90
3,46
24,96% 0,86
4,32
COMP50 ANTENA PARABOLICA UN
ANTENA PARABOLICA UN 1,0000 400,000 400,00
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 4,0000 12,420 49,68
6113 AJUDANTE DE ELETRICISTA H 4,0000 6,620 26,48
400,00
76,16
476,16
24,96% 118,85
595,01
PARA-RAIOS
COMP51 CABO DE AÇO 3/16 M
CABO DE AÇO 3/16 M 1,0500 2,050 2,15
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,0000 12,420 12,42
6113 AJUDANTE DE ELETRICISTA H 1,0000 6,620 6,62
2,15
19,04
21,19
24,96% 5,29
26,48
COMP54 SUPORTE TIPO SM 22 DIAM 2" UN
SUPORTE TIPO SM 22 DIAM 2" UN 1,0000 3,000 3,00
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,0000 12,420 12,42
6113 AJUDANTE DE ELETRICISTA H 1,0000 6,620 6,62
3,00
19,04
22,04
24,96% 5,50
27,54
COMP55SUPORTE REFORÇADO COM ROLDANA COM ROSCASOBERBA
UN
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO (MAO-DE-OBRA)
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
7572SUPORTE ISOLADOR REFORCADO ROSCA SOBERBA EM FG C/ ISOLADOR
UN 1,0000 8,360 8,36
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,0197 12,420 12,66
6113 AJUDANTE DE ELETRICISTA H 1,0013 6,620 6,63
8,36
19,29
27,65
24,96% 6,90
34,55
COMP56 SUPORTE SIMPLES COM ROLDANA UN
3396SUPORTE ISOLADOR SIMPLES ROSCA SOBERBA C/ ISOLADOR
UN 1,0000 3,530 3,53
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,0091 12,420 12,53
6113 AJUDANTE DE ELETRICISTA H 1,0000 6,620 6,62
3,53
19,15
22,68
24,96% 5,66
28,34
COMP57 SUPORTE DUPLO REFORÇADO COM ROLDANA UNSUPORTE ISOLADOR REFORCADO ROSCA SOBERBA EM FG C/ ISOLADOR
UN 2,0000 6,900 13,80
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,0000 12,420 12,42
6113 AJUDANTE DE ELETRICISTA H 1,0000 6,620 6,62
13,80
19,04
32,84
24,96% 8,20
41,04
COMP58 ESTICADOR DE CABO DE COBRE LATAO TIPO GT P23 UN
ESTICADOR DE CABO DE COBRE LATAO TIPO GT P23 UN 1,0000 2,99 2,99
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,0000 12,420 12,42
6113 AJUDANTE DE ELETRICISTA H 1,0000 6,620 6,62
2,99
19,04
22,03
24,96% 5,50
27,53
COMP59 ESTICADOR PARA CABO 1/4 UN
ESTICADOR PARA CABO 1/4 UN 1,0000 4,575 4,58
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,0000 12,420 12,42
6113 AJUDANTE DE ELETRICISTA H 1,0000 6,620 6,62
4,58
19,04
23,62
24,96% 5,90
BDI (%)
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
29,52
COMP60 CANTONEIRA METALICA #4 100X050X50 UN
CANTONEIRA METALICA #4 100X050X50 UN 1,0000 25,630 25,63
6110 SERRALHEIRO H 1,6000 8,170 13,07
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,9000 6,040 5,44
25,63
18,51
44,14
24,96% 11,02
55,16
COMP61 CAPTOR DE LATAO CROMADO TIPO FRANKI UN
4274CAPTOR FRANKLIN 350MM, 1 DESCIDA DE CABO, LATAO NIQUELADO OU CROMADO
UN 1,0000 65,000 65,00
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,4610 12,420 5,73
6113 AJUDANTE DE ELETRICISTA H 0,3000 6,620 1,99
65,00
7,72
72,72
24,96% 18,15
90,87
COMP63 CONECTOR GAR BUMDY UN
1595CONECTOR DE ATERRAMENTO DE BRONZE P/ CABO 95MM2 A BARRA DE ATE 7MM2
UN 1,0000 10,680 10,68
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,3000 12,420 3,73
6113 AJUDANTE DE ELETRICISTA H 0,3000 6,620 1,99
10,68
5,72
16,40
24,96% 4,09
20,49
COMP64 HASTE DE AÇO COBREADA 1/2" - 2450MM UN
3383 HASTE ANCORAMENTO 2400MM X 16MM (5/8") UN 1,0000 19,270 19,27
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,3490 12,420 4,33
6113 AJUDANTE DE ELETRICISTA H 0,4013 6,620 2,66
19,27
6,99
26,26
24,96% 6,55
32,81
SOM
COMP65 CURVA DE 90 GRAUS DE PVC RIGIDO DIAM. 3/4" UND
1879 CURVA PVC 90G P/ ELETRODUTO ROSCAVEL 3/4" UN 1,0000 2,220 2,22
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,0970 12,420 1,20
6113 AJUDANTE DE ELETRICISTA H 0,1000 6,620 0,66
PREÇO TOTAL + LS(SINAPI)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL UNIT. (c/ taxa):
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
2,22
1,86
4,08
24,96% 1,02
5,10
COMP68 AUTO FALANTE TRIAXIAL 2,5RMS 8OHMS 6 UN
AUTO FALANTE TRIAXIAL UN 1,0000 212,5 212,5
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,0000 12,420 12,42
6113 AJUDANTE DE ELETRICISTA H 1,0000 6,620 6,62
212,50
19,04
231,54
24,96% 57,79
289,33
COMP69CAIXA DE SOM COM AMPLIFICADOR E COMPOTENCIOMETRO DE AJUSTE DE SOM
UN
CAIXA DE SOM UN 1,0000 608,000 608,00
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,0000 12,420 12,42
6113 AJUDANTE DE ELETRICISTA H 1,0000 6,620 6,62
608,00
19,04
627,04
24,96% 156,51
783,55
COMP70 MESA STANER 08 2S UN
MESA STANER UN 1,0000 690,000 690,00
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,0000 12,420 12,42
6113 AJUDANTE DE ELETRICISTA H 1,0000 6,620 6,62
690,00
19,04
709,04
24,96% 176,98
886,02
COMP71 AMPLIFICADOR STANER 200S UN
AMPLIFICADOR UN 1,0000 1.575,000 1.575,00
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,0000 12,420 12,42
6113 AJUDANTE DE ELETRICISTA H 1,0000 6,620 6,62
1.575,00
19,04
1.594,04
24,96% 397,87
1.991,91
COMP74 TOMADA HEXAGONAL 2P + T - 20A - 250V UN
7531TOMADA EMBUTIR 3P 20A/250V C/PLACA, TIPO SILENTOQUE PIAL OU EQUIV
UN 1,0000 8,780 8,78
PREÇO (MAO-DE-OBRA)
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
BDI (%)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,3255 12,420 4,04
6113 AJUDANTE DE ELETRICISTA H 0,3214 6,620 2,13
8,78
6,17
14,95
24,96% 3,73
18,68
COMP75 TOMADA HEXAGONAL 2P + T - 20A - 250V NO PISO UNTOMADA EMBUTIR 3P 20A/250V C/PLACA, TIPO SILENTOQUE PIAL OU EQUIV
UN 1,0000 9,540 9,54
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,3200 12,420 3,97
6113 AJUDANTE DE ELETRICISTA H 0,3200 6,620 2,12
9,54
6,09
15,63
24,96% 3,90
19,53
COMP76 PATCH PAINEL E HUB PARA 48 POSIÇOES UND
PATCH PANEL 48 PORTAS CAT.6 UND 1,0000 1.969,000 1.969,00
2439 ELETRICISTA INDUSTRIAL H 0,5000 24,900 12,45
242 AJUDANTE ESPECIALIZADO H 0,6378 10,330 6,59
1.969,00
19,04
1.988,04
24,96% 496,21
2.484,25
COMP77 CABO UTP-4P, CAT.5E, 24 AWG M
CABO UTP-4P, CAT.5E, 24 AWG M 1,0000 8,290 8,29
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,0650 6,040 0,39
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,0650 12,420 0,81
8,29
1,20
9,49
24,96% 2,37
11,86
DADOS, VOZ E CFTV
COMP77 CABO UTP-4P, CAT.5E, 24 AWG M
CABO UTP-4P, CAT.5E, 24 AWG M 1,0000 8,290 8,29
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 0,0650 6,040 0,39
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,0650 12,420 0,81
8,29
1,20
9,49
24,96% 2,37
11,86
PREÇO TOTAL + LS(SINAPI)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
COMP79 ELETROCALHA LEVE PERFURADA EM U 35X70X300 M
ELETROCALHA LEVE PERFURADA EM U 35X70X300 M 1,0000 30,670 30,67
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,6500 12,420 8,07
6113 AJUDANTE DE ELETRICISTA H 0,6500 6,620 4,30
30,67
12,37
43,04
24,96% 10,74
53,78
COMP82 TOMADA HEXAGONAL 2P + T - 20A - 250V UN
7531TOMADA EMBUTIR 3P 20A/250V C/PLACA, TIPO SILENTOQUE PIAL OU EQUIV
UN 1,0000 8,780 8,78
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,3265 12,420 4,06
6113 AJUDANTE DE ELETRICISTA H 0,3200 6,620 2,12
8,78
6,18
14,96
24,96% 3,73
18,69
COMPCM_121PARAFUSO, CABEÇA QUADRADA, AÇO ZINCADO,M16X250X170MM - FORN E INST
UN
432PARAFUSO M16 (ROSCA MAQUINA D=16MM) X 250MM CAB QUADRADA - ZINCAGEM A FOGO
UN 1,000 4,130 4,13
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,050 12,420 0,62
PREÇO (MATERIAL) 4,13
PREÇO (MAO-DE-OBRA) 0,62
PREÇO TOTAL + LS(SINAPI) 4,75
BDI (%) 24,96% 1,19
PREÇO TOTAL UNIT. (c/ taxa): 5,94
COMPCM_122PARAFUSO, CABEÇA QUADRADA, AÇO ZINCADO,M16X50X35MM - FORN E INST
UN
PARAFUSO, CABEÇA QUADRADA, AÇO ZINCADO, M16X50X35MM
UN 1,000 1,950 1,95
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,050 12,420 0,62
PREÇO (MATERIAL) 1,95
PREÇO (MAO-DE-OBRA) 0,62
PREÇO TOTAL + LS(SINAPI) 2,57
BDI (%) 24,96% 0,64
PREÇO TOTAL UNIT. (c/ taxa): 3,21
COMPCM_123PARAFUSO,CABEÇA ABAULADA,ACO ZINCADO,M16X150MMX 75MM - FORN E INST
UN
441PARAFUSO M16 (ROSCA MAQUINA D=16MM) X 150MM CAB QUADRADA - ZINCAGEM A FOGO
UN 1,000 2,680 2,68
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,050 12,420 0,62
PREÇO (MATERIAL) 2,68
PREÇO (MAO-DE-OBRA) 0,62
PREÇO TOTAL + LS(SINAPI) 3,30
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
BDI (%) 24,96% 0,82
PREÇO TOTAL UNIT. (c/ taxa): 4,12
COMPCM_124PARAFUSO,CABEÇA ABAULADA,ACOZINCADO,M16X70MMX 60MM - FORN E INST
UN
PARAFUSO,CABEÇA ABAULADA,ACO ZINCADO,M16X70MMX 60MM
UN 1,000 1,950 1,95
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,050 12,420 0,62
PREÇO (MATERIAL) 1,95
PREÇO (MAO-DE-OBRA) 0,62
PREÇO TOTAL + LS(SINAPI) 2,57
BDI (%) 24,96% 0,64
PREÇO TOTAL UNIT. (c/ taxa): 3,21
COMPCM_126PINO, ISOLADOR, PARA CRUZETA DE ACO, CLASSE15 KV, ROSCA 25 MM - FORN E INST
UN
PINO, ISOLADOR, PARA CRUZETA DE ACO, CLASSE 15 KV, ROSCA 25 MM
UN 1,000 6,600 6,60
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,050 12,420 0,62
PREÇO (MATERIAL) 6,60
PREÇO (MAO-DE-OBRA) 0,62
PREÇO TOTAL + LS(SINAPI) 7,22
BDI (%) 24,96% 1,80
PREÇO TOTAL UNIT. (c/ taxa): 9,02
COMPCM_127PORCA-OLHAL,ACO GALVANIZADO,ROSCA M16X2 -FORN E INST
UN
421PORCA OLHAL ACO P/ PARAFUSO C/ DIAM NOMINAL DE 16MM
UN 1,000 6,750 6,75
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,050 12,420 0,62
PREÇO (MATERIAL) 6,75
PREÇO (MAO-DE-OBRA) 0,62
PREÇO TOTAL + LS(SINAPI) 7,37
BDI (%) 24,96% 1,84
PREÇO TOTAL UNIT. (c/ taxa): 9,21
COMPCM_130PROTECOR PARA ESTRIBO E GRAMPO DE LINHAVIVA - FORN E INST
UN
PROTECOR PARA ESTRIBO E GRAMPO DE LINHA VIVA UN 1,000 0,850 0,85
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,050 12,420 0,62
PREÇO (MATERIAL) 0,85
PREÇO (MAO-DE-OBRA) 0,62
PREÇO TOTAL + LS(SINAPI) 1,47
BDI (%) 24,96% 0,37
PREÇO TOTAL UNIT. (c/ taxa): 1,84
COMPCM_131PROTETOR, EQUIPAMENTO, BUCHA, 15 KV - FORN EINST
UN
PROTETOR, EQUIPAMENTO, BUCHA, 15 KV UN 1,000 17,900 17,90
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,050 12,420 0,62
PREÇO (MATERIAL) 17,90
PREÇO (MAO-DE-OBRA) 0,62
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
PREÇO TOTAL + LS(SINAPI) 18,52
BDI (%) 24,96% 4,62
PREÇO TOTAL UNIT. (c/ taxa): 23,14
COMPCM_132 PROTETOR, EQUIPAMENTO, PARA-RAIOS, 15 KV UN
PROTETOR, EQUIPAMENTO, PARA-RAIOS, 15 KV UN 1,000 17,900 17,90
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,100 12,420 1,24
PREÇO (MATERIAL) 17,90
PREÇO (MAO-DE-OBRA) 1,24
PREÇO TOTAL + LS(SINAPI) 19,14
BDI (%) 24,96% 4,78
PREÇO TOTAL UNIT. (c/ taxa): 23,92
COMPCM_134SAPATILHA,ACO GALVANIZADO, DIAMETRO, COLO,12MM - FORN E INST
UN
7581 SAPATILHA EM ACO GALV P/ CABOS DN ATE 5/8" UN 1,000 1,120 1,12
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,050 12,420 0,62
PREÇO (MATERIAL) 1,12
PREÇO (MAO-DE-OBRA) 0,62
PREÇO TOTAL + LS(SINAPI) 1,74
BDI (%) 24,96% 0,43
PREÇO TOTAL UNIT. (c/ taxa): 2,17
COMPCM_136SUPORTE "Z", CHAVE FUSÍVEL E PARA-RAIO, AÇOCARBONO, ZINCADO A QUENTE - FORN E INST
UN
SUPORTE "Z", CHAVE FUSÍVEL E PARA-RAIO, AÇO CARBONO, ZINCADO A QUENTE
UN 1,000 7,150 7,15
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,050 12,420 0,62
PREÇO (MATERIAL) 7,15
PREÇO (MAO-DE-OBRA) 0,62
PREÇO TOTAL + LS(SINAPI) 7,77
BDI (%) 24,96% 1,94
PREÇO TOTAL UNIT. (c/ taxa): 9,71
COMPCM_137TERMINAL COMPRESSAO CABO 50MM2 COBREESTANHADO - FORN E INST
UN
1578TERMINAL A COMPRESSAO EM COBRE ESTANHADO P/ CABO 50MM2
UN 1,000 1,570 1,57
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,050 12,420 0,62
PREÇO (MATERIAL) 1,57
PREÇO (MAO-DE-OBRA) 0,62
PREÇO TOTAL + LS(SINAPI) 2,19
BDI (%) 24,96% 0,55
PREÇO TOTAL UNIT. (c/ taxa): 2,74
COMPCM_138TERMINAL, COMPRESSAO, BRONZE, 50 MM2, 1 FURO,14 MM - FORN E INST
UN
1538TERMINAL A PRESSAO DE BRONZE P/ CABO A BARRA, CABO 50 A 70MM2, C/ 1 FURO DE FIXACAO
UN 1,000 3,770 3,77
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,050 12,420 0,62
PREÇO (MATERIAL) 3,77
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
PREÇO (MAO-DE-OBRA) 0,62
PREÇO TOTAL + LS(SINAPI) 4,39
BDI (%) 24,96% 1,10
PREÇO TOTAL UNIT. (c/ taxa): 5,49
4.2 IMPLANTAÇÃO
COMPCM_141ABRAÇADEIRA PLÁSTICA TAMANHO GRANDE TIPOHELLMANN, PACOTE 10 UNIDADES - FORN E INST
UN
ABRAÇADEIRA PLÁSTICA TAMANHO GRANDE TIPO HELLMANN, PACOTE 10 UNIDADES
UN 1,000 120,000 120,00
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,100 12,420 1,24
PREÇO (MATERIAL) 120,00
PREÇO (MAO-DE-OBRA) 1,24
PREÇO TOTAL + LS(SINAPI) 121,24
BDI (%) 24,96% 30,26
PREÇO TOTAL UNIT. (c/ taxa): 151,50
COMPCM_142ARAME DE AÇO GALVANIZADO N.º12 BWG - FORN EINST
KG
MATCM_142 ARAME GALVANIZADO 12 BWG - 2,60MM - 48,00 G/M KG 1,000 8,670 8,67
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,100 12,420 1,24
PREÇO (MATERIAL) 8,67
PREÇO (MAO-DE-OBRA) 1,24
PREÇO TOTAL + LS(SINAPI) 9,91
BDI (%) 24,96% 2,47
PREÇO TOTAL UNIT. (c/ taxa): 12,38
COMPCM_076BASE PARA RELÉ FOTOELETRÔNICO 1800-1000-5A-220V - FOR E INST
UN
BASE PARA RELÉ FOTOELETRÔNICO 1800-1000-5A-220V
UN 1,000 7,500 7,50
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,040 12,420 0,50
6113 AJUDANTE DE ELETRICISTA H 0,040 6,620 0,26
PREÇO (MATERIAL) 7,50
PREÇO (MAO-DE-OBRA) 0,76
PREÇO TOTAL + LS(SINAPI) 8,26
BDI (%) 24,96% 2,06
PREÇO TOTAL UNIT. (c/ taxa): 10,32
COMPCM_053 BOX RETO ALUMINIO 4" (100MM) FORN. E INST. UN
BOX RETO ALUMINIO, 4" ( 100 MM) UN 1,000 49,240 49,24
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,060 12,420 0,75
6113 AJUDANTE DE ELETRICISTA H 0,060 6,620 0,40
PREÇO (MATERIAL) 49,24
PREÇO (MAO-DE-OBRA) 1,15
PREÇO TOTAL + LS(SINAPI) 50,39
BDI (%) 24,96% 12,58
PREÇO TOTAL UNIT. (c/ taxa): 62,97
COMP_BOX BOX RETO ALUMINIO FUNDIDO 25MM (3/4") UN
BOX RETO ALUMINIO FUNDIDO 25MM 3/4" UN 1,000 2,160 2,16
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
6115 AJUDANTE H 0,020 6,040 0,12
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,020 12,420 0,25
PREÇO (MATERIAL) 2,16
PREÇO (MAO-DE-OBRA) 0,37
PREÇO TOTAL + LS(SINAPI) 2,53
BDI (%) 24,96% 0,63
PREÇO TOTAL UNIT. (c/ taxa): 3,16
COMPCM_025 BOX RETO DE ALUMINIO 50MM UN
BOX RETO DE ALUMINIO 50MM UN 1,000 7,680 7,68
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,030 12,420 0,37
6113 AJUDANTE DE ELETRICISTA H 0,030 6,620 0,20
PREÇO (MATERIAL) 7,68
PREÇO (MAO-DE-OBRA) 0,57
PREÇO TOTAL + LS(SINAPI) 8,25
BDI (%) 24,96% 2,06
PREÇO TOTAL UNIT. (c/ taxa): 10,31
COMP_BAR4 BUCHA/ARRUELA ALUMINIO 4" CJ
845BUCHA E ARRUELA ALUMINIO FUNDIDO P/ ELETRODUTO 100MM (4'')
CJ 1,000 8,360 8,36
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,250 12,420 3,11
6113 AJUDANTE DE ELETRICISTA H 0,250 6,620 1,66
PREÇO (MATERIAL) 8,36
PREÇO (MAO-DE-OBRA) 4,77
PREÇO TOTAL + LS(SINAPI) 13,13
BDI (%) 24,96% 3,28
PREÇO TOTAL UNIT. (c/ taxa): 16,41
COMP_BAR2 BUCHA/ARRUELA ALUMINIO 2" UN
843BUCHA E ARRUELA ALUMINIO FUNDIDO P/ ELETRODUTO 50MM (2'')
CJ 1,000 2,290 2,29
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,067 12,420 0,83
6113 AJUDANTE DE ELETRICISTA H 0,060 6,620 0,40
PREÇO (MATERIAL) 2,29
PREÇO (MAO-DE-OBRA) 1,23
PREÇO TOTAL + LS(SINAPI) 3,52
BDI (%) 24,96% 0,88
PREÇO TOTAL UNIT. (c/ taxa): 4,40
COMPCM_155CABO DE COBRE ISOLACAO COMPOSTOTERMOPLASTICO 0,6/1KV, TIPO PP, 3x2,5MM2 - FORNE INST
M
CABO DE COBRE ISOLACAO COMPOSTO TERMOPLASTICO 0,6/1KV, TIPO PP, 3x2,5MM2
M 1,000 3,700 3,70
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,050 12,420 0,62
6113 AJUDANTE DE ELETRICISTA H 0,050 6,620 0,33
PREÇO (MATERIAL) 3,70
PREÇO (MAO-DE-OBRA) 0,95
PREÇO TOTAL + LS(SINAPI) 4,65
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
BDI (%) 24,96% 1,16
PREÇO TOTAL UNIT. (c/ taxa): 5,81
COMPCM_159CURVA 90º PVC RÍGIDO, 100MM, COM LUVAS, TIGREOU EQUIVALENTE - FORN E INST
UN
1878 CURVA PVC 90G P/ ELETRODUTO ROSCAVEL 4" UN 1,000 42,630 42,63
1895 LUVA PVC ROSCAVEL P/ ELETRODUTO 4'' UN 1,000 34,900 34,90
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,200 12,420 14,90
6113 AJUDANTE DE ELETRICISTA H 1,200 6,620 7,94
PREÇO (MATERIAL) 77,53
PREÇO (MAO-DE-OBRA) 22,84
PREÇO TOTAL + LS(SINAPI) 100,37
BDI (%) 24,96% 25,05
PREÇO TOTAL UNIT. (c/ taxa): 125,42
COMPCM_160CURVA 90º PVC RÍGIDO, 25MM, COM LUVAS, TIGREOU EQUIVALENTE - FORN E INST
UN
1884 CURVA PVC 90G P/ ELETRODUTO ROSCAVEL 1" UN 1,000 3,360 3,36
1892 LUVA PVC ROSCAVEL P/ ELETRODUTO 1" UN 1,000 1,600 1,60
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,210 12,420 2,61
6113 AJUDANTE DE ELETRICISTA H 0,210 6,620 1,39
PREÇO (MATERIAL) 4,96
PREÇO (MAO-DE-OBRA) 4,00
PREÇO TOTAL + LS(SINAPI) 8,96
BDI (%) 24,96% 2,24
PREÇO TOTAL UNIT. (c/ taxa): 11,20
COMPCM_161CURVA 90º PVC RÍGIDO, 50MM, COM LUVAS, TIGREOU EQUIVALENTE - FORN E INST
UN
1876 CURVA PVC 90G P/ ELETRODUTO ROSCAVEL 2" UN 1,000 7,810 7,81
1894 LUVA PVC ROSCAVEL P/ ELETRODUTO 2'' UN 1,000 5,420 5,42
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,118 12,420 1,47
6113 AJUDANTE DE ELETRICISTA H 0,200 6,620 1,32
PREÇO (MATERIAL) 13,23
PREÇO (MAO-DE-OBRA) 2,79
PREÇO TOTAL + LS(SINAPI) 16,02
BDI (%) 24,96% 4,00
PREÇO TOTAL UNIT. (c/ taxa): 20,02
COMPCM_162CURVA DE AÇO GALVANIZADO, PESADO, Ø100MM(Ø4") , 90°, RAIO LONGO, COM LUVAS - FORN E INST
UN
2621CURVA 90G FERRO GALV ELETROLITICO 4" P/ ELETRODUTO
UN 1,000 32,560 32,56
2641 LUVA FERRO GALV ELETROLITICO 4" P/ ELETRODUTO UN 1,000 8,750 8,75
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,200 12,420 14,90
6113 AJUDANTE DE ELETRICISTA H 1,200 6,620 7,94
PREÇO (MATERIAL) 41,31
PREÇO (MAO-DE-OBRA) 22,84
PREÇO TOTAL + LS(SINAPI) 64,15
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
BDI (%) 24,96% 16,01
PREÇO TOTAL UNIT. (c/ taxa): 80,16
COMPCM_184ELETRODUTO DE AÇO GALVANIZADO, PESADO,Ø50MM (Ø2") , 6M, COM LUVAS. - FORN E INST
UN
21134ELETRODUTO FERRO GALV OU ZINCADO ELETROLIT SEMI-PESADO 2" NBR 13057
UN 1,000 10,230 10,23
3912 LUVA FERRO GALV ROSCA 2" UN 1,000 17,530 17,53
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,000 12,420 12,42
6113 AJUDANTE DE ELETRICISTA H 1,000 6,620 6,62
PREÇO (MATERIAL) 27,76
PREÇO (MAO-DE-OBRA) 19,04
PREÇO TOTAL + LS(SINAPI) 46,80
BDI (%) 24,96% 11,68
PREÇO TOTAL UNIT. (c/ taxa): 58,48
COMPCM_185ELETRODUTO PEAD, 32MM COM LUVAS, KANAFLEXOU EQUIVALENTE - FORN E INST
M
2690 ELETRODUTO PVC FLEXIVEL CORRUGADO 32MM TIPO TIGREFLEX OU EQUIVM 1,000 2,500 2,50
1900 LUVA PVC DE PRESSAO P/ ELETRODUTO TIGREFLEX 32 UN 1,000 1,260 1,26
2436 PAREDE, P/LIGAÇÃO PREDIAL DE AGUA H 0,150 12,420 1,86
6113 AJUDANTE DE ELETRICISTA H 0,150 6,620 0,99
PREÇO (MATERIAL) 2,50
PREÇO (MAO-DE-OBRA) 2,85
PREÇO TOTAL + LS(SINAPI) 5,35
BDI (%) 24,96% 1,34
PREÇO TOTAL UNIT. (c/ taxa): 6,69
COMPCM_027ELETRODUTO PEAD, 50MM, COM LUVAS, KANAFLEXOU EQUIVALENTE
M
2446 ELETRODUTO 2" TIPO KANALEX OU EQUIV M 1,050 7,660 8,04
1900LUVA PVC DE PRESSAO P/ ELETRODUTO TIGREFLEX 32
UN 1,000 1,260 1,26
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,150 12,420 1,86
6113 AJUDANTE DE ELETRICISTA H 0,150 6,620 0,99
PREÇO (MATERIAL) 8,04
PREÇO (MAO-DE-OBRA) 2,85
PREÇO TOTAL + LS(SINAPI) 10,89
BDI (%) 24,96% 2,72
PREÇO TOTAL UNIT. (c/ taxa): 13,61
COMP_TAMPTAMPAO FF P/CX R1 PADRAO TELEBRAS ASSENTC/ARG CIM/AREIA 1:4.
UN
14112TAMPA FOFO TP R1 PADRAO TELEBRAS 385 X 630MM 25KG CARGA MAX 1500KG P/ CAIXA TELEFONE
UN 1,000 110,810 110,81
13891BETONEIRA 320 LITROS, SEM CARREGADOR, MOTOR A GASOLINA
UN 0,012 5.199,340 62,39
4229 GRAXA KG 0,003 11,200 0,03
4227ÓLEO LUBRIFICANTE PARA MOTORES DE EQUIPAMENTOS PESADOS (CAMINHÕES, TRATORES, RETROS E ETC...)
L 0,001 9,350 0,01
4222 GASOLINA COMUM L 0,044 3,900 0,17
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
1379 CIMENTO PORTLAND COMUM CP I- 32 KG 16,965 0,730 12,38
367 AREIA GROSSA M3 0,057 47,120 2,69
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 1,625 6,040 9,82
4750 PEDREIRO H 1,500 8,170 12,26
4230 OPERADOR DE MAQUINAS E EQUIPAMENTOS H 0,029 13,290 0,39
PREÇO (MATERIAL) 188,48
PREÇO (MAO-DE-OBRA) 22,47
PREÇO TOTAL + LS(SINAPI) 210,95
BDI (%) 24,96% 52,65
PREÇO TOTAL UNIT. (c/ taxa): 263,60
4.4SISTEMA DE PROTEÇÃO CONTRA DESCARGAS ATMOSFÉRICAS-SPDA
COMPCM_034 CADINHO CABO HASTE 50MM X 5/8" UN
CADINHO CABO HASTE 50MM X 5/8" UN 1,000 149,000 149,00
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,050 12,420 0,62
6113 AJUDANTE DE ELETRICISTA H 0,050 6,620 0,33
PREÇO (MATERIAL) 149,00
PREÇO (MAO-DE-OBRA) 0,95
PREÇO TOTAL + LS(SINAPI) 149,95
BDI (%) 24,96% 37,43
PREÇO TOTAL UNIT. (c/ taxa): 187,38
COMPCM_035CADINHO PARA SOLDA EXOTÉRMICA TIPOCABO/CABO 35MM² , TIPO "X"
UN
CADINHO PARA SOLDA EXOTÉRMICA TIPO CABO/CABO 35MM² , TIPO "X"
UN 1,000 178,000 178,00
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,100 12,420 1,24
PREÇO (MATERIAL) 178,00
PREÇO (MAO-DE-OBRA) 1,24
PREÇO TOTAL + LS(SINAPI) 179,24
BDI (%) 24,96% 44,74
PREÇO TOTAL UNIT. (c/ taxa): 223,98
COMPCM_036CADINHO PARA SOLDA EXOTÉRMICA TIPOCABO/CABO 35MM², TIPO "T"
UN
CADINHO PARA SOLDA EXOTÉRMICA TIPO CABO/CABO 35MM², TIPO "T"
UN 1,000 198,000 198,00
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,100 12,420 1,24
PREÇO (MATERIAL) 198,00
PREÇO (MAO-DE-OBRA) 1,24
PREÇO TOTAL + LS(SINAPI) 199,24
BDI (%) 24,96% 49,73
PREÇO TOTAL UNIT. (c/ taxa): 248,97
COMPCM_037CAIXA DE INSPEÇÃO DE ATERRAMENTO TIPO SOLOEM PVC Ø40X50CM C/ TAMPA DE FERRO FUNDIDO
UN
CAIXA DE INSPEÇÃO DE ATERRAMENTO TIPO SOLO EM PVC Ø40X50CM C/ TAMPA DE FERRO FUNDIDO
UN 1,000 260,000 260,00
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,010 12,420 0,12
6113 AJUDANTE DE ELETRICISTA H 0,100 6,620 0,66
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
PREÇO (MATERIAL) 260,00
PREÇO (MAO-DE-OBRA) 0,78
PREÇO TOTAL + LS(SINAPI) 260,78
BDI (%) 24,96% 65,09
PREÇO TOTAL UNIT. (c/ taxa): 325,87
COMPCM_160CURVA 90º PVC RÍGIDO, 25MM, COM LUVAS, TIGREOU EQUIVALENTE - FORN E INST
UN
1884 CURVA PVC 90G P/ ELETRODUTO ROSCAVEL 1" UN 1,000 3,360 3,36
1892 LUVA PVC ROSCAVEL P/ ELETRODUTO 1" UN 1,000 1,600 1,60
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 0,260 12,420 3,23
6113 AJUDANTE DE ELETRICISTA H 0,275 6,620 1,82
PREÇO (MATERIAL) 4,96
PREÇO (MAO-DE-OBRA) 5,05
PREÇO TOTAL + LS(SINAPI) 10,01
BDI (%) 24,96% 2,50
PREÇO TOTAL UNIT. (c/ taxa): 12,51
COMPCM_169ELETRODUTO PEAD, ARAME GUIA, 25MM COMLUVAS, KANAFLEX OU EQUIVALENTE
M
2688ELETRODUTO PVC FLEXIVEL CORRUGADO 25MM TIPO TIGREFLEX OU EQUIV
M 1,000 46,164 46,16
1899LUVA PVC DE PRESSAO P/ ELETRODUTO TIGREFLEX 25
UN 1,000 0,800 0,80
342 ARAME GALVANIZADO 12 BWG - 2,60MM - 48,00 G/M KG 8,670 0,200 1,73
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 2,000 12,420 24,84
6113 AJUDANTE DE ELETRICISTA H 2,000 6,620 13,24
PREÇO (MATERIAL) 48,69
PREÇO (MAO-DE-OBRA) 38,08
PREÇO TOTAL + LS(SINAPI) 86,77
BDI (%) 24,96% 21,66
PREÇO TOTAL UNIT. (c/ taxa): 108,43
COMPCM_171ESCAVAÇÃO MANUAL DE VALAS CAIXAS EREATERRO
M3
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 6,250 6,040 37,75
PREÇO (MATERIAL) -
PREÇO (MAO-DE-OBRA) 37,75
PREÇO TOTAL + LS(SINAPI) 37,75
BDI (%) 24,96% 9,42
PREÇO TOTAL UNIT. (c/ taxa): 47,17
COMPCM_043 PÓ DE SOLDA EXOTÉRMICO Nº90 UN
PÓ DE SOLDA EXOTÉRMICO Nº90 UN 1,000 8,550 8,55
2436 ELETRICISTA OU OFICIAL ELETRICISTA H 1,000 12,420 12,42
PREÇO (MATERIAL) 8,55
PREÇO (MAO-DE-OBRA) 12,42
PREÇO TOTAL + LS(SINAPI) 20,97
BDI (%) 24,96% 5,23
PREÇO TOTAL UNIT. (c/ taxa): 26,20
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
INSTALAÇÕES HIDRAULICAS/SANITARIAS/ PLUVIAIS
COMP116TAMPA QUADRADA FOFO C/ BASE 600 X 600MMCARGA MAX 2000KG P/ CAIXA INSPECAO, ESGOTO,AGUA,ELETRICA ETC
UN
1379 CIMENTO PORTLAND COMUM CP I- 32 KG 1,1310 0,700 0,79
367 AREIA GROSSA M3 0,0008 48,120 0,04
21072TAMPA QUADRADA FOFO C/ BASE 600 X 600MM CARGA MAX 2000KG P/ CAIXA INSPECAO, ESGOTO, AGUA,ELETRICA ETC
UN 1,0000 172,520 172,52
6111 SERVENTE OU OPERARIO NAO QUALIFICADO H 1,0000 6,040 6,04
4750 PEDREIRO H 1,0000 8,170 8,17
4230 OPERADOR DE MAQUINAS E EQUIPAMENTOS H 0,0087 13,290 0,12
173,35
14,33
187,68
24,96% 46,84
234,52
COMP117 CAIXA D'AUGA TUBULAR METALICA 60.000M3 M
CAIXA D'AUGA TUBULAR METALICA 60.000M3 UN 1,0000 121.814,000 121.814,00
121.814,00
-
121.814,00
24,96% 30.404,77
152.218,77
COMP_TB6 TUBO CONCRETO ARMADO CA-1 DN-600MM M3
7762TUBO CONCRETO ARMADO CLASSE PA-2 PB NBR-8890/2007 DN 600 MM PARA ÁGUAS PLUVIAIS
M 1,0000 154,830 154,83
73879/004ASSENTAMENTO DE TUBO DE CONCRETO DIAMETRO 600 MM, JUNTAS COM ANEL DE BORRACHA, MONTAGEM COM AUXÍLIO DE EQUIPAMENTOS
M 1,0000 37,860 37,86
154,83
37,86
192,69
24,96% 48,10
240,79
COMP_TB8 TUBO CONCRETO ARMADO CA-1 DN-800MM M3
7763TUBO CONCRETO ARMADO CLASSE PA-2 PB NBR-8890/2007 DN 800 MM PARA ÁGUAS PLUVIAIS
M 1,0000 235,660 235,66
73879/006ASSENTAMENTO DE TUBO DE CONCRETO DIAMETRO 800 MM, JUNTAS COM ANEL DE BORRACHA, MONTAGEM COM AUXÍLIO DE EQUIPAMENTOS
M 1,0000 61,260 61,26
235,66
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
61,26
296,92
24,96% 74,11
371,03
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
COMP_TE TAXAS E EMOLUMENTOS UN
001 ART DE EXECUÇÃO TX 1,000 158,08 158,08
002 ART DO POÇO TX 1,000 158,08 158,08
003 ART ETE TX 1,000 158,08 158,08
004 ART CONSULTORIA TX 1,000 60,00 60,00
005 ART'S (FONTE: CREA-AM) TX 1,000 158,08 158,08
006 ALVARÁ DE CONSTRUÇÃO (3.240,70 m2) TX 1,000 6.319,37 3.954,75
007 HABITE-SE TX 1,000 6.319,37 3.954,75
008 ELETROBRÁS - AMAZONAS ENERGIA TX 1,000 158,08 158,08
PREÇO (MATERIAL) 8.759,90
PREÇO TOTAL + LS(SINAPI) 8.759,90
BDI (%) 24,96% 2.186,47
PREÇO TOTAL UNIT. (c/ taxa): 10.946,37
COMP_LP LIMPEZA PERMANENTE DA OBRA MÊS
6111 SERVENTE H 192,0008 6,040 1.159,68
1.159,68
-
1.159,68
24,96% 289,46
1.449,14
COMP_TRAFOINSTALAÇÃO DE TRANSFORMADOR DE 500 KVA ASECO
CJ
MERCADOTRANSFORMADOR DE DISTRIBUIÇÃO DE 500 KVA A SECO, 13,8 KV/220/127 V, REGULAÇÃO DE 600 EM 600 V
UND 1,0000 29.488,000 29.488,00
00002436 ELETRICISTA OU OFICIAL ELETRICISTA H 16,0000 12,420 198,72
00006113 AJUDANTE DE ELETRICISTA H 32,0000 6,620 211,84
29.488,00
410,56
29.898,56
24,96% 7.462,68
37.361,24
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
OBRA: Construção do Campus Itacoatiara
Endereço: Rod. AM-010, km 08, s/n - Itacoatiara/AM.
COMPOSIÇÕES UNITÁRIAS
LEIS SOCIAIS0:85,34%
DATA BASE: ABRIL/2013
CODIGO DESCRIÇÃO UN COEF. P. UNIT. P. TOTAL
COMP_MD MOBILIZAÇÃO/DESMOBILIZAÇÃO DA OBRA CJ
73875/001TRANSPORTE, MOBILIZAÇÃO E DESMOBILIZAÇÃO DE MATERIAIS E EQUIPAMENTOS
TON 1,0000 50,000 50,00
73875/001LOCACAO DE ANDAIME METALICO TUBULAR TIPO TORRE
M/MES 50,0000 12,760 638,00
00020193ANDAIME METALICO TIPO FACHADEIRO LARG=1,20M ALTURA = 2,0M
M2/MES 49,0000 2,570 125,93
00006111 SERVENTE H 0,6770 6,040 4,09
813,93
4,09
818,02
24,96% 204,18
1.022,20
PREÇO (MATERIAL)
PREÇO (MAO-DE-OBRA)
PREÇO TOTAL + LS(SINAPI)
BDI (%)
PREÇO TOTAL UNIT. (c/ taxa):