oc harbor brook wetlands stakeholder 6 15-11 final-1

29
Onondaga County CSO Program: Gray-Green Infrastructure Harbor Brook CSO 018 Constructed Wetlands Pilot Treatment System Joanne M. Mahoney, County Executive Prepared for: Onondaga County, Syracuse, New York Prepared by: 2011 an d

Upload: onondaga-county-save-the-rain

Post on 20-Jun-2015

726 views

Category:

Documents


0 download

DESCRIPTION

The Harbor Brook CSO 018 Constructed Wetlands Pilot Treatment System Project serves the dual purposes of treating CSO 018 overflows currently discharged into Harbor Brook while also acting as a demonstration project to test the effectiveness of three types of constructed treatment wetland systems.

TRANSCRIPT

Page 1: OC harbor brook wetlands stakeholder 6 15-11 final-1

Onondaga County CSO Program:Gray-Green Infrastructure

Harbor Brook CSO 018 Constructed Wetlands Pilot Treatment SystemJoanne M. Mahoney, County Executive

Prepared for:

Onondaga County, Syracuse, New YorkPrepared by:

2011

and

Page 2: OC harbor brook wetlands stakeholder 6 15-11 final-1

History

Onondaga Lake Facts

Watershed: 285 Square

Miles

1 Mile Wide – 4.6 Miles

Long

Average Depth: 35 feet

Max Depth: 63 feet

1940 – Swimming Banned

1970 – Fishing Banned

• 1988 – Atlantic States Legal Foundation files lawsuit against County

• 1989 – Litigation settled through METRO consent judgment

• 1998 – METRO consent judgment replaced with Amended Consent Judgment (ACJ)

• 1st ACJ amendment May 1998

• 2006 ACJ Amended to include consolidation of ammonia and phosphorus treatment and Harbor Brook conveyances and RTF

• 3rd Amendment April 2008 (Extension)

• 2009 ACJ amended to authorize use of Gray and Green infrastructure

Page 3: OC harbor brook wetlands stakeholder 6 15-11 final-1
Page 4: OC harbor brook wetlands stakeholder 6 15-11 final-1

Save the Rain Program: 2009-2018

Regulatory Goals • Capture and Treat 95% of

the Annual CSO Volume via Gray & Green Infrastructure

• Achieve water quality standards in tributaries and lake

Community

Impacts/Goals• Improve quality of life

• Promote Sustainability

• Ensure cost effectiveness in compliance with ACJ milestones

Major Milestones

• 89.5% capture/elimination by 12/31/2013

• 95% capture/elimination by 12/31/2018

Page 5: OC harbor brook wetlands stakeholder 6 15-11 final-1

Gray Infrastructure Program Summary

Gray Projects

• Harbor Brook Interceptor (ARRA)

• Midland Conveyance (CSO 044)

• Clinton Storage Facility and Electrical Ductbank

• Harbor Brook Storage Facility and Conveyances

• Erie Boulevard Storage System (EBSS) Gate Chamber #3 Improvement

• Sewer separation projects

• Floatables Control Facilities

Page 6: OC harbor brook wetlands stakeholder 6 15-11 final-1

Gray Project Construction ScheduleCSO 022/045 Sewer Separation Consent Order Milestones: Complete Construction: 12/31/12Construction Period: September 2011 – June 2012 Clinton Storage FacilityConsent Order Milestones: Commence Construction: 10/1/11

Complete Construction: 12/31/13Construction Period: August 2011 – December 2013 Lower Harbor Brook Conveyances: Consent Order Milestones: Commence Construction: 12/31/11

Complete Construction: 12/31/13Construction Period: September 2011 – June 2012 Lower Harbor Brook Storage: Consent Order Milestones: Commence Construction: 12/31/11

Complete Construction: 12/31/13Construction Period: October 2011 – December 2013 Electrical Duct Bank on West Fayette Street ( Part of Clinton Storage Project)Consent Order Milestones: N/A Construction Schedule: July 2011 – October 2011

Page 7: OC harbor brook wetlands stakeholder 6 15-11 final-1

Harbor Brook Storage Project

N

Captures CSO 003, 004, 063

Designed to capture rain water for system flushing/cleaning

4.8 Million Gallons of storage (sub-surface)

Sta

te F

air

Blv

d

Page 8: OC harbor brook wetlands stakeholder 6 15-11 final-1

Green Infrastructure ProgramSave the Rain Program

Page 9: OC harbor brook wetlands stakeholder 6 15-11 final-1

6.3% Capture Using Green Infrastructure - Green 470 acres and reduce 247 MG/yr of CSO by 2018

Page 10: OC harbor brook wetlands stakeholder 6 15-11 final-1

Dept. of Transportation Parking Lot

Page 11: OC harbor brook wetlands stakeholder 6 15-11 final-1

Manages adjacent impervious areas

Page 12: OC harbor brook wetlands stakeholder 6 15-11 final-1

City Lot #3 - Before

Page 13: OC harbor brook wetlands stakeholder 6 15-11 final-1

Warren Street

Parking Lot #3

James Stre

et

Erie BoulevardW

arren Street

James Stre

et

Erie Boulevard

Porous ConcreteCaptures over 700,000 gallons of stormwater annually

Page 14: OC harbor brook wetlands stakeholder 6 15-11 final-1

Roadways - Green Streets for Road and Utility Improvement / Reconstruction

Page 15: OC harbor brook wetlands stakeholder 6 15-11 final-1

Constructed Wetland

HarborBrook

CSO 018

CSO Treatment Wetland Project

Page 16: OC harbor brook wetlands stakeholder 6 15-11 final-1

Pilot Treatment System Benefits•Pilot system will provide immediate water

quality improvements:▫Grit and floatables (onsite at-grade

structure)▫Bacteria▫Nutrients (nitrogen and phosphorus)▫Total suspended solids and BOD5

•Recommendation from pilot will result in a final permanent wetland treatment system

•Designed for 1-year, 2-hour storm event, but higher flows and volumes could be accepted

May2011

16

Page 17: OC harbor brook wetlands stakeholder 6 15-11 final-1

Existing Site

May 2011

17

Page 18: OC harbor brook wetlands stakeholder 6 15-11 final-1

Project LocationThe project is located along Harbor Brook on County property just south of Burnet Park on the west side of Syracuse near the Skunk City neighborhood.

May 2011

18

Page 19: OC harbor brook wetlands stakeholder 6 15-11 final-1

Site Enhancement Ultimate Vision

▫ Grit and floatables removal of CSO 018

▫ Wetland treatment of CSO 018

▫ Improved water quality in Harbor Brook

▫ Community park?▫ Educational

resource?

May 2011

19

Page 20: OC harbor brook wetlands stakeholder 6 15-11 final-1

Pilot Treatment Wetlands System

March 2011

20

Surface Flow Wetland▫ Most closely

resembles a natural wetland of robust native species

▫ Vegetated shelf and deep water zones to redistribute and aerate

▫ Medium to high storage volume

▫ High habitat value▫ Low mosquito

productivity▫ Relatively low cost

Page 21: OC harbor brook wetlands stakeholder 6 15-11 final-1

First Step to Site Enhancement

May 2011

21

Design and construction of a 2 acre full scale pilot treatment wetland system along Harbor Brook at Combined Sewer Overflow (CSO) 018. VELASKO ROAD

Page 22: OC harbor brook wetlands stakeholder 6 15-11 final-1

Conceptual Rendering

May 2011

22

Three types of wetlands will be constructed for pilot testing: Floating Wetland Island, Vertical Downflow, and Surface Flow.

Page 23: OC harbor brook wetlands stakeholder 6 15-11 final-1

11/18/2010

23

Conceptual Rendering

Page 24: OC harbor brook wetlands stakeholder 6 15-11 final-1

Floating Wetland Islands

May 2011

24

Page 25: OC harbor brook wetlands stakeholder 6 15-11 final-1

Vertical Downflow Wetlands

March 2011

25

Page 26: OC harbor brook wetlands stakeholder 6 15-11 final-1

Surface Flow Wetland

May 2011

26

Page 27: OC harbor brook wetlands stakeholder 6 15-11 final-1

Questions and Discussion

May 2011

27

Page 28: OC harbor brook wetlands stakeholder 6 15-11 final-1

11/18/2010

28

More information

Page 29: OC harbor brook wetlands stakeholder 6 15-11 final-1

Thank You!

Please Visit us atwww.SaveTheRain.us