ocean park tai shue wan water world project · 4 construction noise monitoring 12 4.1 monitoring...

71
Ocean Park Tai Shue Wan Water World Project Quarterly EM&A Report for December 2018 February 2019 March 2019 Gammon Engineering & Construction Company Limited

Upload: others

Post on 19-Jan-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Ocean Park Tai Shue Wan Water World Project

Quarterly EM&A Report for December 2018 – February 2019

March 2019

Gammon Engineering & Construction Company Limited

375203 05/02/07 A

P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

Mott MacDonald

3/F Mapletree Bay Point 348 Kwun Tong Road Kowloon Hong Kong T +852 2828 5757 F +852 2827 1823 mottmac.hk

Ocean Park Tai Shue Wan

Water World Project

Quarterly EM&A Report for December 2018 – February 2019

March 2019

Gammon Engineering & Construction Company Limited

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

Information class: Standard

This document is issued for the party which commissioned it and for specific purposes connected with the above-

captioned project only. It should not be relied upon by any other party or used for any other purpose.

We accept no responsibility for the consequences of this document being relied upon by any other party, or being used

for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by

other parties.

This document contains confidential information and proprietary intellectual property. It should not be shown to other

parties without consent from us and from the party which commissioned it.

This r epo rt h as b een pre par ed s olely fo r us e by the par ty which co mmissio ned i t (t he ‘Clien t’) in conn ectio n with t he c aptio ned pr oject. I t sho uld not b e us ed f or a ny o the r pu rpos e. No pe rson oth er t han the Clie nt o r a ny pa rty w ho h as ex pres sly ag ree d te rms of r elianc e with us (t he ‘Re cipien t(s)’ ) m ay r ely on the cont ent, i nfo rma tion or a ny views exp resse d in t he rep ort. W e acc ept no d uty o f ca re, resp onsibility or lia bility to any oth er recipie nt of this docu men t. This r epo rt is c onfid ential and cont ains p rop riet ary in tellect ual p rop erty .

No re pres enta tion, w ar ranty or und ert aking, exp ress or i mplied, is m ade and no resp onsibility or li ability is accept ed by us to a ny p arty othe r th an t he Clie nt o r an y Recipi ent( s), as to the accu racy or co mpl eten ess of the info rma tion c ontai ned in this re port . For t he a voida nce of d oubt this repo rt d oes not i n any way p urp ort to incl ude any l egal, i nsu ranc e or fina ncial a dvice or o pinio n.

We disclaim all a nd a ny liability whet her arisi ng in tort or cont ract or othe rwise w hich it might oth erwise hav e to any par ty ot her tha n the Client or t he R ecipien t(s) , in resp ect of this rep ort, or any in for matio n at trib uted to it.

We acce pt no res ponsi bility fo r a ny er ro r or omissi on in the re port which is due to an e rro r o r o mission i n d ata, i nfor mati on o r sta tem ents suppli ed t o us by ot her pa rties in cludin g th e client (‘Dat a’). W e hav e n ot ind epe nde ntly ve rified such Data and hav e ass ume d it t o be accu rat e, co mplet e, r eliable an d cu rre nt as of t he d ate of suc h inf orm ation .

For ecasts pre sent ed in this d ocu ment wer e p repa red usin g Dat a an d th e re po rt is d epe nde nt o r bas ed on Dat a. I nevita bly, so me of th e ass um ptions use d to devel op t he fo rec asts will n ot b e re alised and un anticip ated eve nts a nd cir cums tanc es m ay occ ur. C onse que ntly Mott MacDo nald doe s no t gu ara ntee or w ar rant the conclu sions c ont ained in th e r epo rt as the re are lik ely to be differ enc es be twee n the for ecast s an d th e act ual r esults and thos e diff ere nces may be mat erial. W hile we consid er t hat the i nfor mati on a nd opinio ns giv en in this r epo rt a re s o und all par ties must rely o n th eir own skill a nd ju dge me nt whe n m aking use of it.

Under no ci rcu mstan ces may t his re por t or any extr act o r su mm ary t he reof be used i n co nnecti on wit h any pu blic or priv ate s ecuriti es of ferin g incl uding any rela ted me mor and um or p rosp ectus for any secu rities offe ring or st ock ex chan ge listi ng o r a nno unce ment .

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

Contents

Executive Summary 1

1 Introduction 3

1.1 Project Background 3

2 Project Organization 4

2.1 Project Organization 4

2.2 Construction Progress 6

2.3 Summary of Environmental Submissions 7

3 Summary of Environmental Monitoring and Audit Requirements 9

3.1 General 9

3.2 Monitoring Locations 10

3.3 Derivation of Action/Limit Levels 10

3.4 Meteorological Information 11

4 Construction Noise Monitoring 12

4.1 Monitoring Results 12

5 Ecology Monitoring 14

5.1 Inspection Findings 14

5.2 Conclusion 15

6 Landscape and Visual Monitoring 16

6.1 Inspection Findings 16

7 Waste Management 17

7.1 Record of Waste Quantities 17

8 Site Inspection 18

8.1 Inspection Findings 18

9 Summary of Environmental Quality Performance Limits 19

9.1 Record on Non-compliance of Action and Limit Levels 19

9.2 Record on Environmental Complaints Received 19

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

10 Implementation Status of Mitigation Measures 20

10.1 General Requirements 20

11 Conclusions and Recommendations 22

11.1 Conclusions 22

11.2 Recommendations 22

Appendices 23

A. Layout Plan of the Project 24

B. Project Organization 25

C. Designated Monitoring Locations as Recommended in the Approved

EM&A Manual 26

D. Actual Locations of Impact Monitoring 27

E. Meteorological Data 28

F. Noise Monitoring Data 29

G. Graphical Plots of Noise Monitoring Data 30

H. Implementation Schedule for Environmental Mitigation Measures 31

Tables

Table 1: Status of Environmental Licenses and Permits of the Project 7

Table 2: Summary of Impact EM&A Requirements 9

Table 3: Impact Monitoring Stations for Construction Noise 10

Table 4: Action and Limit Levels for Construction Noise 10

Table 5: Summary of Construction Noise Monitoring Results (Noise level for 30 minutes) 12

Table 6: Summary of Quantities of Inert C&D Materials 17

Table 7: Summary of Quantities of Non-inert C&D Materials 17

Table 8: Site Observations of the Project 18

Table 9: Environmental Mitigation Measures 20

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 1

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

Executive Summary

Mott MacDonald Hong Kong Ltd. (“MMHK”) has been commissioned by the Gammon

Engineering & Construction Company Limited, to undertake the Environmental Team (ET)

services to carry out environmental monitoring and audit (EM&A) for Ocean Park Tai Shue Wan

Development Water World.

This is the 7th Quarterly EM&A Summary report for the Tai Shue Wan Development Water

World under Section 11.4 of the EM&A Manual (Register No.: AEIAR-184/2014). This report

summarises the findings on EM&A during the period from 1 December 2018 to 28 February

2019.

Environmental Monitoring and Audit Activities

Environmental monitoring activities under the EM&A programme in the Reporting Period are

summarized in the following table:

Environmental Aspect Environmental Monitoring Parameters / Inspection Total Occasions

Construction Noise Leq(30min) Daytime 28

Leq(15min) Additional monitoring 0

Ecology Site Inspection 3

Landscape and Visual Inspection of the mitigation measures implementation situation 6

Site Inspection / Audit Environmental Team (ET), the Contractor and Project Management Representative (PMR) joint site inspection and

auditing

12

Independent Environmental Checker (IEC) joint site inspection

and auditing

3

Breaches of Action/Limit Levels

No exceedance of construction noise measurement and no Notifications of Exceedances

(NOEs) were issued to the PMR, IEC and the Contractor. The statistics of environmental

exceedance, NOE issued and investigation of exceedance are summarized in the following

table:

Environmental Aspect

Monitoring Parameter

Action Level

Limit Level

Event & Action

NOE Issued Investigation Corrective Actions

Construction Noise Leq(30min) Daytime 0 0 0 0 0

Environmental Complaints

There was no record of complaints received in the Reporting Period.

Notification of Summons and Successful Prosecutions

There was no record of notification of summons and successful prosecution in the Reporting

Period.

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 2

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

Reporting Changes

There are no reporting changes.

Future Key Issues

The contractor should pay attention to the following environmental issues and maintain relevant

mitigation measures:

● Site formation for ride footing construction

● Cut soil slope and soil nail installation for Ride P1 to P5

● Rock breaking and slope stabilization works for Ride P1 to P5

● Utilities diversion at A4

● Rising Main installation and Water Meter Room Construction at A4

● Rising Main construction (PJD & slope portions)

● Footing construction at P3 and P5

● Backfilling for ride footing

● Main Building: B1 water tank and drainage. Block works and ABWF in B1, L1 and L2. L2

and L3 Secondary structure construction; area Pool B, C, D; ETFE net installation;

Waterproofing and Soil backfill at roof. L2, Lift Shift works, L2 hillside, core 3 staircase

● South Transformer Room: ABWF

● South Plant Room: E&M

● North Plant Room: E&M and ABWF

● External Area: Laying of underground utilities, backfilling, on-grade slab and concrete

carriageway

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 3

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

1 Introduction

1.1 Project Background

On 27 August 2014, the Environment Impact Assessment (EIA) Report and Environmental

Monitoring and Audit (EM&A) Manual (Register No.: AEIAR-184/2014) for the “Tai Shue Wan

Development at Ocean Park” (the Project) was approved and an Environmental Permit (EP)

(Permit No.: EP-487/2014) was issued to the Ocean Park Corporation (Project Proponent).

The current valid EP (Permit No.: EP-487/2014/A) was issued on 10 January 2018 based on the

Variation of Environmental Permit No. VEP-539/2017 which comprise variation of project

boundary, location of sump pit and size of rising main. The layout plan of the Project is indicated

in Appendix A.

Mott MacDonald Hong Kong Ltd. (“MMHK”) has been commissioned by Gammon Engineering &

Construction Company Limited to undertake the Environmental Team (ET) services to carry out

environmental monitoring and audit for the Ocean Park Tai Shue Wan Water World Project.

As part of the EM&A program, baseline monitoring for the required parameters including

background noise, landscape & visual baseline review and baseline ardeid inspection were

carried out between 24 October 2014 and 10 December 2014 by the environmental consultants

of Ocean Park Corporation. Furthermore, the baseline monitoring report which was verified by

the previous IEC was submitted to EPD and endorsed in December 2014.

The previous contract (Contract No.: TSW-C004) of Site Formation and Foundation Works has

been completed since 31 May 2017 and the next construction phase (Contract No.: TSW-C006)

for the Ocean Park Tai Shue Wan Development was handed over to Gammon Engineering &

Construction Company Limited on 31 May 2017.

This report summarizes the findings during the Reporting Period from 1 December 2018 to 28

February 2019.

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 4

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

2 Project Organization

2.1 Project Organization

The project organization is shown in Appendix B. The responsibilities of respective parties are

as follows:

Ocean Park Corporation

Ocean Park Corporation is the Project Proponent and the Permit Holder of the EP for the

development of the Project and will assume overall responsibility for the project. An

Independent Environmental Checker (IEC) shall be employed by Ocean Park Corporation to

audit the results of the EM&A works carried out by the ET.

Environmental Protection Department (EPD)

EPD is the statutory enforcement body for environmental protection matters in Hong Kong.

Project Management Representative (PMR) of Ocean Park Corporation

The PMR is responsible for overseeing the construction works and for ensuring that the works

are undertaken by the Contractor in accordance with the specification and contract

requirements. The duties and responsibilities of the ER with respect to EM&A are:

● Monitor the Contractors’ compliance with contract specifications, including the

implementation and operation of the environmental mitigation measures and their

effectiveness

● Monitor Contractor’s, ET’s and IEC’s compliance with the requirements in the Environmental

Permit (EP) and EM&A Manual

● Facilitate ET’s implementation of the EM&A programme

● Participate in joint site inspection by the ET and IEC

● Oversee the implementation of the agreed Event / Action Plan in the event of any

exceedance

● Adhere to the procedures for carrying out complaint investigation

● Liaison with the related government departments, ET, IEC, the Contractor and the other

● Contractors of the Project discussing regarding the cumulative impact issues.

The Contractor

The duties and responsibilities of the Contractor are:

● Comply with the relevant contract conditions and specifications on environmental protection

● Employ an Environmental Team (ET) to undertake monitoring, and reporting of EM&A

Facilitate ET’s monitoring and site inspection activities

● Participate in the site inspections by the ET and IEC, and undertake any corrective actions

● Provide information / advice to the ET regarding works programme and activities which may

contribute to the generation of adverse environmental impacts

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 5

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

● Submit proposals on mitigation measures in case of exceedances of Action and Limit levels

in accordance with the Event / Action Plans

● Implement measures to reduce impact where Action and Limit levels are exceeded

● Adhere to the procedures for carrying out complaint investigation

Environmental Team (ET)

The ET should be employed by the Contractor to conduct the EM&A programme. The ET

should be managed by the ET Leader. ET Leader should have relevant professional

qualifications in environmental control and possess at least 7 years’ experience in EM&A.

Suitably qualified professional and technical staff should be included in the ET, and resources

for the implementation of the EM&A programme should be allocated in the time under the

Contract, to enable fulfilment of the Project’s EM&A requirements as specified in the EM&A

Manual during construction of the Project. The ET shall include qualified botanist/ecologist for

the ecological service and a Registered Landscape Architect for review of implementation of

landscape and visual mitigation measures. The ET should report to the OPC and the duties

should include:

● to monitor and audit various environmental parameters as required in the Approved EM&A

Manual;

● to analyze the EM&A data, review the success of EM&A programme and the adequacy of

mitigation measures implemented, confirm the validity of the EIA predictions and identify any

adverse environmental impacts arising;

● to monitor compliance with conditions in the EP, environmental protection, pollution

prevention and control regulations and contract specifications;

● to audit environmental conditions on site;

● to report on the EM&A results to EPD, the ER, the IEC and Contractor or their delegated

representatives;

● to recommend suitable mitigation measures to the Contractor in the case of exceedance of

Action and Limit levels in accordance with the Event and Action Plans;

● to liaise with the IEC on all environmental performance matters, and ensure timely

submission of all relevant EM&A pro forma for IEC’s approval;

● to provide advice to the Contractor on environmental improvement, awareness and

enhancement matters etc. on site;

● to adhere to the procedures for carrying out complaint investigation;

● to prepare reports on the environmental monitoring data and the site environmental

conditions;

● to submit the EM&A report to Director of Environmental Protection (DEP) timely;

● to review proposals of mitigation measures from the Contractor in case of exceedance of

Action and Limit levels, in accordance with the Event and Action Plan; and

● to carry out site inspection to investigate and audit the Contractor’s site practice, equipment

and work methodologies with respect to pollution control and mitigation measures.

Independent Environmental Checker (IEC)

● The IEC is empowered to audit the environmental performance of construction, but is

independent from the management of construction works. As such, the IEC should not be in

any way an associated body of the Contractor or the ET for the Project. The IEC should be

employed by OPC prior to the commencement of the construction of the Project. The IEC

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 6

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

should be a person who has relevant professional qualifications in environmental control and

at least 7 years’ experience in EM&A and environmental management. The duties and

responsibilities of the IEC are:

● to provide proactive advice to the ER and OPC on EM&A matters related to the project;

● to review and verify the monitoring data and all submissions in connection with the EP and

EM&A Manual submitted by the ET;

● to arrange and conduct regular, at least monthly site inspections of the works during the

construction phase, and to carry out ad hoc inspections if significant environmental problems

are identified;

● to check compliance with the agreed Event and Action Plan in the event of any exceedance;

● to check compliance with the procedures for carrying out complaint investigation;

● to check the effectiveness of corrective measures;

● to feedback audit results to the ET by signing off relevant EM&A pro forma;

● to check that mitigation measures are effectively implemented;

● to report the works conducted, and the findings, recommendations and improvements of the

site inspections, after reviewing ET’s and Contractor’s works, the ER and OPC on a monthly

basis;

● to verify the investigation result of the environmental complaint cases and the effectiveness

of corrective measures;

● to verify EM&A report that has been certified by ET leader; and

● to audit EIA recommendations and requirements against the status of implementation of

environmental mitigation measures on site.

2.2 Construction Progress

During the Reporting Period, works of the Project undertaken include:

● Site formation for ride footing construction

● Cut soil slope and soil nail installation for Ride P1 and P3

● Rock breaking and slope stabilization works for Ride P1 to P5

● Utilities diversion at A4

● Drainage works at A4

● Rising Main construction (PJD & slope portions)

● Footing construction at P3

● Backfilling for ride footing

● Main Building: B1 water tank, drainage and on grade slab. Block works and ABWF in B1,

L1, L2 and L3 Secondary structure construction; area Pool B, C, D; Roof construction. L2,

Lift Shift works, L2 hillside, core 3 staircase

● South Transformer Room: ABWF

● South Plant Room: E&M

● External Area: Laying of underground utilities, removal of concrete paving, manholes and

watermain construction, trench exaction for cables & pipes, backfilling

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 7

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

2.3 Summary of Environmental Submissions

Summaries of validity permits, licenses, and/or notifications on environmental protection for the

Project are presented in Table 1.

Table 1: Status of Environmental Licenses and Permits of the Project

Type of Permit/ License

Submission Date

Reference/

License No.

Date of Issue

Date of Expiry

Status

Environmental Permit / EP-487/2014/A 10-Jan-18 N/A Valid

Variation of

Environmental Permit

18-Dec-17 Application No.

VEP-539/2017

10-Jan-18 N/A Valid

Environmental Permit / EP-487/2014 27-Aug-14 N/A Superseded

Notification pursuant to

Air Pollution Control

(Construction Dust)

Regulation

15-Mar-17 414651 N/A N/A Valid

Application for a Billing

Account for Disposal of

Construction Waste

14-Dec-16 Account No.

7026786

28-Dec-16 N/A Valid

Discharge Licence

under WPCO

WT00028196-2017

15-Mar-17 414650 29-May-17 31-May-22

Valid

Registration as a

Chemical Waste

Producer

(WPN: 5213-176-

G2785-01)

21-Apr-17 415966 31-May-17 N/A Completed

Construction Noise

Permit under NCO

GW-RS0439-17

26-Apr-17 416080 15-May-17 29-Dec-17 Superseded

Construction Noise

Permit under NCO

GW-RS0825-17

8-Sep-17 420985 22-Sep-17 21-Mar-18 Superseded

Renew Construction

Noise Permit under

NCO

GW-RS1024-17

3-Nov-17 422922 21-Nov-17 16-May-18 Superseded

Renew Construction

Noise Permit under

NCO

GW-RS0356-18

16-Apr-18 432628 30-Apr-18 16-Nov-18 Superseded

Renew Construction

Noise Permit under

NCO

GW-RS0469-18

18-May-18 433713 04-Jun-18 30-Nov-18 Superseded

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 8

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

Type of Permit/ License

Submission Date

Reference/

License No.

Date of Issue

Date of Expiry

Status

Construction Noise

Permit under NCO

GW-RS1151-18

23-Nov-18 439700 07-Dec-18 06-Jun-19 Valid

According to the EP stipulation, the required documents have been submitted to EPD for

retention as listed below:

● Project Layout Plans

● Management Organization of Main Construction Companies

● Detailed Vegetation Survey Report

● Woodland Compensation Plan

● Ardeid Inspection Report

● Short-nosed Fruit Bat Inspection Report

● Baseline Monitoring Report Revision A of the Project

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 9

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

3 Summary of Environmental Monitoring

and Audit Requirements

3.1 General

As specified in the approved EM&A Manual, environmental monitoring of construction noise,

ecology, landscape and visual impacts as well as waste management are required. A summary

of the monitoring parameters is presented in Table 2.

Table 2: Summary of Impact EM&A Requirements

Parameters Description Locations Frequency

Construction Noise ● Leq (30min) on normal

working days

● 3 sets of consecutive

Leq(5min) during restricted

hours if construction is

necessary

● Supplementary

information for data

auditing, statistical results

such as L10 and L90 shall

also be obtained for

reference

NM1A and NM2 Weekly

Normal working days: (07:00-19:00 except public

holiday)

Restricted hours: 19:00 to 07:00 next day, and whole

day of public holiday or Sunday only when

construction is necessary

Ecology ● Monitoring of in-situ preservation of

Platycodon grandifloras

● Inspection of ardeids nest during breeding season

(April to July)

● Monitoring for ardeid night roost (November to

March)

Project area and preservation area for

Platycodon grandifloras

Once per month

● Inspection of enhancement area for

ardeid roosting

An enhancement area provided as an alternative

roosting site for ardeids should be developed during the first phase of the

construction.

● Monitoring on woodland

compensation

Mitigation measures recommended in the approved Woodland

Compensation Plan should be fully and properly implemented, including but

not limited to the creation of 0.84 ha woodland compensation on-site and

0.78 ha on-site woodland reinstatement, to mitigate for permanent loss of

woodland habitat.

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 10

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

Parameters Description Locations Frequency

Landscape & Visual Impact ● Ensure no construction

activities / storage are undertaken outside the

project boundary

● Ensure landscaping works are carried out in accordance with the

specifications

● Ensure new planting is carried out properly and

during the right season

● Review progress of engineering works on site to identify the earliest practical opportunities for

landscape works

Project site Bi-weekly

Regular Site Inspection Air, water, waste

management

To review the environmental situation, and monitor the implementation of proper environmental protection

and pollution control

measures for the Project

Project site Weekly

3.2 Monitoring Locations

Two designated noise monitoring locations as established in the EM&A Manual are shown in

Appendix C. After the baseline monitoring, alternative location NM1A was proposed by MMHK

due to the rejection of the monitoring location set up at NM1. The proposal was verified and

agreed by EPD in the Baseline Monitoring Report. The construction noise monitoring locations

for the Project are shown in Table 3 and Appendix D.

Table 3: Impact Monitoring Stations for Construction Noise

Monitoring location Descriptions Type of measurement

NM1A Slope near Victoria Shanghai Academy (VSA) to replace NM1 of the

VSA

Free field

NM2 Hong Kong Juvenile Care Centre

(HKJCC)

Facade

3.3 Derivation of Action/Limit Levels

The baseline results formed the basis for determining the environmental acceptance criteria for

impact monitoring. According to the approved EM&A Manual and baseline monitoring results,

the following construction noise criterion, namely Action and Limit levels listed in Table 4 were

proposed:

Table 4: Action and Limit Levels for Construction Noise

Monitoring Location Action Level Limit Level in dB(A)

Time Period: 0700-1900 hours on normal weekdays

NM1A and NM2 When one or more documented

complaints are received 70 dB(A)*

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 11

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

Note: Acceptable Noise Levels for school should be reduced to 65 dB(A) during examination period. If works are to be carried out during restricted hours, the conditions stipulated in the construction noise permit issued by the NCA must be followed.

3.4 Meteorological Information

Meteorological information including humidity, wind speed, wind direction, temperature and

total rainfall was extracted from “the Hong Kong Observatory Wong Chuk Hang Station” to

provide background weather information. The meteorological data for the Reporting Period is

summarized in Appendix E.

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 12

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

4 Construction Noise Monitoring

4.1 Monitoring Results

Construction noise monitoring was conducted 28 times at the two designated locations in the

Reporting Period. As shown in the summary of noise monitoring results in Table 5, no noise

complaints were received in this Reporting Period and no exceedance of Action or Limit level in

relation to construction noise was recorded.

Table 5: Summary of Construction Noise Monitoring Results (Noise level for 30 minutes)

Monitoring Date

Time Mean and range of noise levels, dB(A)

Limit Level for Leq

(30min)/dB(A)2 Start Finish Leq (30min) Corrected

Leq(30min)1

NM1A

06-Dec-18 10:00 10:30 56.3 59.3 70

12-Dec-18 11:00 11:30 56.7 59.7 70

18-Dec-18 10:00 10:30 58.9 61.9 70

24-Dec-18 13:40 14:10 56.3 59.3 70

27-Dec-18 14:40 15:10 55.9 58.9 70

04-Jan-19 10:30 11:00 57.8 60.8 70

10-Jan-19 09:30 10:00 58.0 61.0 70

16-Jan-19 10:00 10:30 58.3 61.3 70

22-Jan-19 09:30 10:00 58.6 61.6 70

28-Jan-19 09:35 10:05 56.4 59.4 70

08-Feb-19 09:57 10:27 55.9 58.9 70

14-Feb-19 10:00 10:30 56.9 59.9 70

20-Feb-19 10:10 10:40 56.8 59.8 70

26-Feb-19 14:30 15:00 56.0 59.0 70

NM2

06-Dec-18 09:20 09:50 52.4 -

70

12-Dec-18 10:20 10:50 52.3 -

70

18-Dec-18 09:20 09:50 52.2 -

70

24-Dec-18 13:10 13:40 50.7 -

70

27-Dec-18 14:00 14:30 51.1 -

70

04-Jan-19 09:50 10:20 50.7 -

70

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 13

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

Monitoring Date

Time Mean and range of noise levels, dB(A)

Limit Level for Leq

(30min)/dB(A)2 Start Finish Leq (30min) Corrected

Leq(30min)1

10-Jan-19 08:50 09:20 50.2 -

70

16-Jan-19 09:20 09:50 52.2 -

70

22-Jan-19 08:50 09:20 52.1 - 70

28-Jan-19 08:55 09:25 50.4 - 70

08-Feb-19 09:15 09:45 47.1 - 70

14-Feb-19 09:20 09:50 52.7 - 70

20-Feb-19 09:30 10:00 52.4 - 70

26-Feb-19 13:50 14:20 50.1 - 70

Note: 1. A correction of +3 dB(A) was made to the free field measurement at monitoring station NM1A. 2. Acceptable Noise Levels for school should be reduced to 65 dB(A) during examination period.

A summary of data and the supplementary data auditing information are shown in Appendix F.

Graphical plots of the monitoring data are shown in Appendix G.

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 14

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

5 Ecology Monitoring

5.1 Inspection Findings

The ecological inspections were undertaken on 14 December 2018, 18 January and 15

February 2019 by the qualified ecologist. The inspection findings are presented below.

Plants of Conservation Interest (Platycondon grandiflorus)

Platycodon grandiflorus is a perennial herb up to 120 cm high. Stems erect and scarcely any

branches. It is often found on sunny grassy hillslopes in brushes. Two groups of Platycodon

grandiflorus were recorded in 2015’s growing season within the fenced area.

In December 2018, the two groups of Platycodon grandiflorus within the fenced area were found

to be vigorous and all new branches were in healthy condition.

In both January and February 2019, it was observed that Group 2 of Platycodon grandiflorus

was found to be vigorous and was in health condition. However, Group 1 of Platycodon

grandiflorus could not be found within the fenced area due to natural life cycle of this perennial

herbaceous species, and new shoots would be expected to emerge from the underground part

in the next growing season.

On the other hand, the preventive mitigation measures, i.e., erecting of temporary protective

fencing and sign post, were found to be effectively implemented to protect from human

disturbance, and there was no signs or evidence (e.g. dust coating of plant) suggesting the on-

going construction activities within the Project Area has affected the health condition of the

Platycodon grandiflorus.

Nesting Activities of Ardeids in Breeding Season

This monitoring parameter is only required during the breeding season of ardeids, i.e., from April

to July, and the last monitoring event for nesting activities of Ardeids in the 2018’s breeding

season was undertaken on 20 July 2018, and such monitoring would not be required for the

reporting period.

Roosting Activities of Ardeids in Peak Wintering Season

According to the Approved EM&A Manual, monitoring of roosting activities of Ardeids within the

Project Area should be performed once a month during peak wintering season (November to

March) during the construction phase.

Monitoring of roosting activities of Ardeids has been carried out by direct observation at vantage

point on 14 December 2018, 18 January 2019 and 15 February 2019 including the evening time

from an hour before sunset until nightfall.

No ardeids were noted within or in the vicinity of the Project Area during the monitoring period.

Compensation for Ardeid roosting Site

To be implemented.

Compensation of Woodland Habitat

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 15

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

To be implemented.

5.2 Conclusion

The implementation of the mitigation measures for the plant species of conservation interest,

i.e., erecting temporary protective fencing and sign post during the Reporting Period was noted.

Both groups were found to be vigorous and all new branches were in healthy condition in

December 2018. However, in both January and February 2019, Group 2 of Platycodon

grandiflorus was found to be vigorous and was in health condition. On the other hand, Group 1

of Platycodon grandiflorus could not be found within the fenced area due to natural life cycle of

this perennial herbaceous species, and new shoots would be expected to emerge from the

underground part in the next growing season.

Roosting activities of ardeids have not been observed within the Project Area during the

monitoring.

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 16

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

6 Landscape and Visual Monitoring

6.1 Inspection Findings

In the Reporting Period, bi-weekly landscape and visual site inspection were conducted on 7

December 2018, 21 December 2018, 4 January 2019, 18 January 2019, 1 February 2019 and

15 February 2019.

According to the bi-weekly site inspections, it was observed that the Contractor complied with

the intended aims of the mitigation measures, for example, neither construction activities nor

materials storage were conducted and placed outside of the working site boundary.

Dead Royal Palms due to super typhoon Mangkhut battered Hong Kong on 16 September 2018

were removed. Tree replacement for dead Royal Palms and regular weeding in the tree

protection zone are recommended.

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 17

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

7 Waste Management

7.1 Record of Waste Quantities

The quantity of waste for disposal in this Reporting Period is summarized in Table 6 and Table

7.

Table 6: Summary of Quantities of Inert C&D Materials

Type of Waste Quantity (tonne)

Total Generated C&D Materials

Total Disposal as Public Fill

Total Reused

December 2018 3110.19 2100.19 1010.00

January 2019 3178.28 2778.28 400.00

February 2019 2095.76 1095.76 1000.00

Total 8384.23 5974.23 2410.00

Table 7: Summary of Quantities of Non-inert C&D Materials

Type of Waste Quantity (tonne)

Recycled Metal

Recycled Paper / Cardboard Packing

Recycled Plastic

Disposed Chemical Wastes

Disposed General Refuses

December 2018 0.00 210.00 0.00 0.00 287.69

January 2019 0.00 0.00 0.00 0.00 311.84

February 2019 0.00 0.00 0.00 0.00 196.96

Total 0.00 210.00 0.00 0.00 796.49

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 18

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

8 Site Inspection

8.1 Inspection Findings

In the Reporting Period, joint site inspections were undertaken by the PMR, ET and the

Contractor on 7, 14, 21 and 28 December 2018, 4, 11, 18 and 25 January 2019 as well as 1, 8,

15 and 22 February 2019. Furthermore, site inspection and audit were performed by the IEC on

14 December 2018, 18 January 2019 and 15 February 2019. During the site inspections, non-

compliance was not observed by ET and IEC. The site observations for the Reporting Period is

summarized in Table 8.

Table 8: Site Observations of the Project

Reporting Period Findings / Deficiencies

December 2018

● Chemical waste should be stored in suitable chemical

container.

● High standard of housekeeping should be enhanced in

zone B, 2/F.

● Idle stockpile should be covered to prevent emission of

fugitive dust.

● Water in drip tray shall be cleared and the chemical

container shall be placed in a drip tray at L2 Pool A.

January 2019 ● Stagnant water at slope 93 shall be removed.

● Cement materials should be covered or enclosed in an

area sheltered on the top and the 3 sides.

● Stagnant water with oil stain should be cleared in the

drainage channel near the slope of Intake 3.

February 2019 ● Stagnant water at Zone B, 1/F shall be removed.

● Stagnant water at platform shall be removed.

● Chemical and oil containers should be placed on proper

drip tray.

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 19

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

9 Summary of Environmental Quality

Performance Limits

9.1 Record on Non-compliance of Action and Limit Levels

No exceedances of Action level or Limit levels were observed for construction noise during the

Reporting Period.

9.2 Record on Environmental Complaints Received

No environmental complaints were received during the reporting period.

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 20

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

10 Implementation Status of Mitigation

Measures

10.1 General Requirements

The environmental mitigation measures that were recommended in the Implementation

Schedule for Environmental Mitigation Measures in the approved EM&A Manual covered the

issues of dust, noise, water and waste and are presented in Appendix H.

Environmental mitigation measures generally implemented by the contractor are listed in Table

9.

Table 9: Environmental Mitigation Measures

Issues Environmental Mitigation Measures

Construction

Noise ● Construction equipment is shut down when not in use

Ecology ● Wire fencing was provided for temporary protection of

the identified flora species of conservation concern

● Site inspection of the flora species of conservation and

the Ardeid breeding and nesting activities was

undertaken

Landscape & Visual ● Good site management

Air Quality ● Good site management to reduce air quality impact

● Main temporary access road paved with concrete

● Prior to any loading or transfer operation, all dusty

materials were sprayed with water to keep them wet

● All debris had been covered entirely by impervious

sheeting

● Before debris was dumped into a chute, water was

sprayed onto the debris to make them wet

● Vehicles were covered with tarpaulin during transport of

dusty materials

● When vehicles were leaving the construction site, any

vehicles loaded with dusty materials were covered with

clean impervious sheeting to prevent fugitive dusty

material emission

● The speed of the trucks passing site areas was

controlled to below 10 km/hour

● Water spraying was provided for soil-nailing work

Water Quality ● Portable chemical toilets were provided on site

● A licensed collector has been employed to collect

effluent and off-site dispose.

Waste and Chemical Management ● A temporary container located far away from sea shore

and drainage channel was provided for chemical

materials and waste storage

● Drip tray was provided for chemical materials at the

working areas

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 21

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

Issues Environmental Mitigation Measures

● Waste skip was provided for general refuse disposal

General ● The site was generally kept tidy and clean

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 22

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

11 Conclusions and Recommendations

11.1 Conclusions

The EM&A programme as recommended in the EM&A manual has been undertaken in the

Reporting Period.

Monitoring of construction noise, ecology, landscape and visual, as well as waste management

for the Project were conducted as scheduled in the Reporting Period. Data collected during

construction noise monitoring were checked against the established Action and Limit levels and

no exceedances was recorded.

For ecological monitoring, the implementation of the mitigation measures for the plant species of

conservation interest, i.e., erecting temporary protective fencing and sign post during the

Reporting Period was noted. Both groups were found to be vigorous and all new branches were

in healthy condition in December 2018. However, in both January and February 2019, Group 2

of Platycodon grandiflorus was found to be vigorous and was in health condition. On the other

hand, Group 1 of Platycodon grandiflorus could not be found within the fenced area due to

natural life cycle of this perennial herbaceous species, and new shoots would be expected to

emerge from the underground part in the next growing season.

Roosting activities of ardeids were not observed within the Project Area during the monitoring.

For landscape and visual monitoring, dead Royal Palms due to super typhoon Mangkhut

battered Hong Kong on 16 September 2018 were removed. Tree replacement for dead Royal

Palms and regular weeding in the tree protection zone are recommended.

11.2 Recommendations

With considerations on the construction activities and environment, the following reminders and

recommendations were provided:

● All drainage facilities, erosion and sedimentation control structures (including the

sedimentation tanks installed on site) should be regularly inspected and maintained in good

condition, especially during the wet season.

● Appropriate label should be provided in specific machine.

● Noise mitigation measures, including the use of quiet plants, should be implemented in

accordance with the EM&A requirement.

● Cleanliness and tidiness in construction site should be enhanced.

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 23

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

Appendices

A. Layout Plan of the Project 24

B. Project Organization 25

C. Designated Monitoring Locations as Recommended in the Approved EM&A Manual 26

D. Actual Locations of Impact Monitoring 27

E. Meteorological Data 28

F. Noise Monitoring Data 29

G. Graphical Plots of Noise Monitoring Data 30

H. Implementation Schedule for Environmental Mitigation Measures 31

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 24

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

A. Layout Plan of the Project

TAI SHUE WAN DEVELOPMENTAT OCEAN PARK

PROJECT LOCATION

APPENDIX A

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 25

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

B. Project Organization

Contact information:

Company / Department Position Name Telephone / Mobile

Fax No.

Ocean Park Corporation Project Management

Representative Mr Augustine Li 2870 6130 2814 0179

Ove Arup & Partners Hong Kong

Ltd.

Independent Environmental

Checker

Mr Gerald Kam 2268 3915 2268 3950

Mott MacDonald Hong Kong Ltd. Environmental Team Leader Mr Gary Chow 2828 5874 2827 1823

Mott MacDonald Hong Kong Ltd. Qualified Ecologist Mr Roy Hung 2828 5965 2827 1823

Gammon Engineering &

Construction Company Limited Construction Manager Mr Paul Leaver 3690 9229 2148 2890

Gammon Engineering &

Construction Company Limited

Environmental Officer Ms Sammie Chan 3690 9233 2148 2890

Project Proponent

Ocean Park Corporation

Project Management Representative

The Contractor

Gammon Engineering &

Construction Company Limited

Environmental Team

Mott MacDonald Hong Kong

Limited

Independent

Environmental Checker

Ove Arup & Partners Hong

Kong Limtied

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 26

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

C. Designated Monitoring Locations as

Recommended in the Approved EM&A

Manual

APPENDIX C

DESIGNATED MONITORINGLOCATIONS AS RECOMMENDEDIN THE APPROVED EM&A MANUAL

NM 1

NM2

NOISE MONITORING STATION

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 27

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

D. Actual Locations of Impact Monitoring

NM 1LOCATION IN EM&A MANUAL

NM 1AALTERNATIVE LOCATION

NM2

APPENDIX D

ACTUAL LOCATION OFIMPACT MONITORING

NOISE MONITORING STATION

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 28

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

E. Meteorological Data

Weather Conditions - December 2018

Date Mean Air

Temperature (°C)

Mean Relative Humidity (%)

Prevailing Wind Direction (degrees)

Mean Wind Speed (km/h)

Sat 01-Dec-18 22.5 76 50 8.3

Sun 02-Dec-18 22.7 81 40 6

Mon 03-Dec-18 23.9 80 310 4.2

Tue 04-Dec-18 24.5 81 100 4

Wed 05-Dec-18 23.3 83 60 12.3

Thu 06-Dec-18 23.4 84 50 6.3

Fri 07-Dec-18 21 89 60 8.1

Sat 08-Dec-18 17.9 76 40 6.5

Sun 09-Dec-18 17.1 76 290 5

Mon 10-Dec-18 17.6 76 290 5.1

Tue 11-Dec-18 18.4 66 280 9.1

Wed 12-Dec-18 15.1 67 290 7.6

Thu 13-Dec-18 16 68 40 6.4

Fri 14-Dec-18 16.9 72 40 5.4

Sat 15-Dec-18 19.1 75 20 5.4

Sun 16-Dec-18 19.6 75 290 5.6

Mon 17-Dec-18 17.9 57 40 5.3

Tue 18-Dec-18 17.4 64 60 7.3

Wed 19-Dec-18 20.4 78 20 6.3

Thu 20-Dec-18 22.4 84 30 4.6

Fri 21-Dec-18 22.7 84 50 6.8

Sat 22-Dec-18 22.5 75 40 5.9

Sun 23-Dec-18 20.1 89 320 6.1

Mon 24-Dec-18 18.1 86 50 5.4

Tue 25-Dec-18 19.4 82 70 5.8

Wed 26-Dec-18 19.5 90 120 2.6

Thu 27-Dec-18 19.6 82 40 6.6

Fri 28-Dec-18 17.9 70 40 9.9

Sat 29-Dec-18 13.9 68 320 8.2

Sun 30-Dec-18 12.9 67 300 8.7

Mon 31-Dec-18 13.5 67 290 6.8

# Incomplete data

Weather Conditions - January 2019

Date Mean Air

Temperature (°C)

Mean Relative Humidity

(%)

Prevailing Wind

Direction (degrees)

Mean Wind Speed (km/h)

Tue 01-Jan-19 14.3 67 340 5.9

Wed 02-Jan-19 14.9 68 300 5.3

Thu 03-Jan-19 16.3 83 280 6.8

Fri 04-Jan-19 19.1 81 60 7.9

Sat 05-Jan-19 20.5 87 90 3

Sun 06-Jan-19 18.6 84 110 4.5

Mon 07-Jan-19 18.7 81 30 6.2

Tue 08-Jan-19 18.8 88 110# 3.6#

Wed 09-Jan-19 17.8 84 40 8.2

Thu 10-Jan-19 19.5 80 50 6.2

Fri 11-Jan-19 20.6 85 220 3.3

Sat 12-Jan-19 20.7 87 90 4

Sun 13-Jan-19 18.4 90 100 6.8

Mon 14-Jan-19 18.4 86 110 6.7

Tue 15-Jan-19 18.8 89 100 4

Wed 16-Jan-19 17.4 72 280 5.3

Thu 17-Jan-19 16.3 72 100 4.2

Fri 18-Jan-19 16.6 75 40 6.4

Sat 19-Jan-19 19 72 110 5.5

Sun 20-Jan-19 20.9 69 100 4.9

Mon 21-Jan-19 17.5 67 350 5.3

Tue 22-Jan-19 15.4 57 110 5.2

Wed 23-Jan-19 15.1 65 140 4

Thu 24-Jan-19 16.3 71 100 6.2

Fri 25-Jan-19 18 66 210 4.7

Sat 26-Jan-19 17.6 73 40 7

Sun 27-Jan-19 16.6 69 70 8.8

Mon 28-Jan-19 17.2 67 30 7.3

Tue 29-Jan-19 17.7 78 50 7.3

Wed 30-Jan-19 19.5 75 80 6.3

Thu 31-Jan-19 21 82 90 4

# Incomplete data

Weather Conditions - February 2019

Date Mean Air

Temperature (°C)

Mean Relative

Humidity (%)

Prevailing Wind

Direction (degrees)

Mean Wind Speed (km/h)

Fri 01-Feb-19 18.4 71 60 6.8

Sat 02-Feb-19 18.9 82 50 8.9

Sun 03-Feb-19 21.2 86 100 2.8

Mon 04-Feb-19 20.5 89 70 4.7

Tue 05-Feb-19 20.4 84 100 6

Wed 06-Feb-19 22.1 88 90 4.7

Thu 07-Feb-19 22.2 88 100 4.8

Fri 08-Feb-19 21.4 89 60 8.8

Sat 09-Feb-19 20 89 50 10.5

Sun 10-Feb-19 18.1 91 50 10

Mon 11-Feb-19 18.4 85 30 6.7

Tue 12-Feb-19 19.2 80 30 7.3

Wed 13-Feb-19 20.9 80 130 3.5

Thu 14-Feb-19 20.7 82 40 8.7

Fri 15-Feb-19 20.8 83 50 7

Sat 16-Feb-19 22.4 81 120 6.3

Sun 17-Feb-19 18.9 87 60 12.2

Mon 18-Feb-19 18 90 60 13.4

Tue 19-Feb-19 21.4 89 30 5.2

Wed 20-Feb-19 23.3 92 90 6.6

Thu 21-Feb-19 22.6 88 40 6

Fri 22-Feb-19 20.8 82 290 5.5

Sat 23-Feb-19 18.3 86 50 9.9

Sun 24-Feb-19 16.9 83 290 3.8

Mon 25-Feb-19 18 86 30 3.8

Tue 26-Feb-19 19.1 87 50 9.1

Wed 27-Feb-19 21.3 83 50 6.6

Thu 28-Feb-19 22.3 86 110 3.5

# Incomplete data

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 29

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

F. Noise Monitoring Data

Noise Monitoring Data - Summary of Construction Noise Monitoring Results, dB(A)

Start Finish

Corrected

Leq(30min) (1)

Corrected

L90 (1)

Corrected

L10 (1)

6-Dec-18 10:00 10:30 59.3 55.2 61.6 70

12-Dec-18 11:00 11:30 59.7 58.4 61.1 70

18-Dec-18 10:00 10:30 61.9 59.9 64.0 70

24-Dec-18 13:40 14:10 59.3 57.9 61.0 70

27-Dec-18 14:40 15:10 58.9 57.7 60.3 70

4-Jan-19 10:30 11:00 60.8 57.4 62.5 70

10-Jan-19 9:30 10:00 61.0 58.1 62.8 70

16-Jan-19 10:00 10:30 61.3 59.0 63.1 70

22-Jan-19 9:30 10:00 61.6 59.5 63.4 70

28-Jan-19 9:35 10:05 59.4 58.1 60.9 70

8-Feb-19 9:57 10:27 58.9 56.8 60.9 70

14-Feb-19 10:00 10:30 59.9 57.8 61.9 70

20-Feb-19 10:10 10:40 59.8 58.4 61.3 70

26-Feb-19 14:30 15:00 59.0 57.8 60.5 70

Start Finish Leq(30min) L90 L10

6-Dec-18 9:20 9:50 52.4 48.9 54.8 70

12-Dec-18 10:20 10:50 52.3 50.9 53.9 70

18-Dec-18 9:20 9:50 52.2 50.9 53.7 70

24-Dec-18 13:10 13:40 50.7 49.5 52.3 70

27-Dec-18 14:00 14:30 51.1 49.8 52.3 70

4-Jan-19 9:50 10:20 50.7 49.4 52.1 70

10-Jan-19 8:50 9:20 50.2 47.0 52.0 70

16-Jan-19 9:20 9:50 52.2 50.3 53.8 70

22-Jan-19 8:50 9:20 52.1 50.9 53.5 70

28-Jan-19 8:55 9:25 50.4 49.0 51.9 70

8-Feb-19 9:15 9:45 47.1 44.5 49.4 70

14-Feb-19 9:20 9:50 52.7 51.0 55.0 70

20-Feb-19 9:30 10:00 52.4 50.1 53.8 70

26-Feb-19 13:50 14:20 50.1 48.6 51.4 70

Notes:

(1) A free field correction of +3dB(A) has been made to these measurements as specified

in the EM&A Manual and EPD guidelines.

(2) Acceptable Noise Levels for school should be reduced to 65 dB(A) during examination

period.

Date

Time Noise Levels, dB(A) Limit Level for

Leq

(30min)/dB(A)(2)

NM2 - Hong Kong Juvenile Care Centre

NM1A - Slope near the Victoria Shanghai Academy

Date

Time Noise Levels, dB(A)

Limit Level for

Leq

(30min)/dB(A)(2)

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 30

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

G. Graphical Plots of Noise Monitoring Data

Graphical Plot for Noise Monitoring Data (December 2018 to February 2019)

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

dB(A

)

Date

Noise Level for 30 min, dB(A), at NM1A

Corrected (Leq30min) (Leq30min) Limit Level for Leq (dB(A))

Limit Level = 70dB(A)*

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

dB(A

)

Date

Noise Level for 30 min, dB(A), at NM2

(Leq30min) Limit Level

Limit Level = 70dB(A)*

Mott MacDonald | Ocean Park Tai Shue Wan Water World Project 31

375203 | 05/02/07 | A | March 2019 P:\Hong Kong\ENL\PROJECTS\367445_Ocean Park Tai Shue Wan waterpark ET service\05 Deliverables\02 Quarterly EM&A Report\(7) December 2018 - February 2019\Quarterly EM&A Summary Report December 2018 - February 2019.docx

H. Implementation Schedule for

Environmental Mitigation Measures

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

1

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l

Impl

emen

tatio

n St

age1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

Cat

.1 K

ey/s

peci

fic p

ropo

sed

miti

gatio

n m

easu

re

Noi

se Im

pact

(Con

stru

ctio

n)

5.7

3.2

Sele

ctin

g Q

uiet

Pla

ntTh

e ac

tual

SW

L of

qui

et p

lant

is le

ss th

an th

e va

lue

spec

ified

in

GW

-TM

for t

he s

ame

piec

e of

equ

ipm

ent.

It sh

ould

be

note

d th

at

the

sile

nced

PM

E ta

ken

from

EPD

’s Q

ualit

y Po

wer

ed

Mec

hani

cal E

quip

men

t (Q

PME)

Inve

ntor

y.

With

in P

roje

ct a

rea

/ D

urat

ion

of th

e co

nstru

ctio

n ph

ase

/ Pr

ior t

o co

mm

ence

men

t of

ope

ratio

n

Con

tract

or

appo

inte

d by

OPC

EI

AO a

nd N

oise

C

ontro

l Ord

inan

ce

5.7

3.2

Use

of M

ovab

le B

arrie

rsM

ovab

le n

oise

bar

riers

can

be

very

effe

ctiv

e in

scr

eeni

ng n

oise

fro

m p

artic

ular

item

s of

pla

nt w

hen

cons

truct

ing

the

Proj

ect.

Noi

se b

arrie

rs lo

cate

d al

ong

the

activ

e w

orks

are

a cl

ose

to th

e no

ise

gene

ratin

g co

mpo

nent

of a

PM

E co

uld

prod

uce

at le

ast 1

0 dB

(A) s

cree

ning

for s

tatio

nary

pla

nt a

nd 5

dB(

A) fo

r mob

ile p

lant

pr

ovid

ed th

at th

e di

rect

line

of s

ight

bet

wee

n th

e PM

E an

d th

e N

SRs

is b

lock

ed.

With

in P

roje

ct a

rea

/ D

urat

ion

of th

e co

nstru

ctio

n ph

ase

/ Pr

ior t

o co

mm

ence

men

t of

ope

ratio

n

Con

tract

or

appo

inte

d by

OPC

EI

AO a

nd N

oise

C

ontro

l Ord

inan

ce

Ecol

ogic

al Im

pact

10

.7

8.3

Insp

ectio

n of

Act

ive

Arde

id N

est

Prio

r to

site

cle

aran

ce w

orks

at t

he p

lant

ing

area

aba

ndon

ed fo

r ar

deid

bre

edin

g, th

e ar

ea a

roun

d th

e bo

unda

ry o

f the

ard

eids

ro

ostin

g si

te a

s in

dica

tivel

y sh

own

in F

igur

e 8.

1 sh

ould

be

insp

ecte

d to

con

firm

no

activ

e ar

deid

nes

t is

pres

ent.

If an

y ac

tive

arde

id n

est i

s ob

serv

ed, s

uita

bly

size

d bu

ffer a

rea

shou

ld

be e

stab

lishe

d to

avo

id h

uman

or m

achi

nery

dis

turb

ance

unt

il th

e ne

st is

aba

ndon

ed.

Indi

cativ

e bo

unda

ry o

f th

e ar

deid

s ro

ostin

g si

te

with

in P

roje

ct

cons

truct

ion

site

(loca

tion

indi

cate

d in

Fi

gure

8.1

) / F

or o

nce

/ Be

fore

site

cle

aran

ce

Qua

lifie

d ec

olog

ist

appo

inte

d by

OPC

EIAO

-TM

; HK

O

rdin

ance

Cap

. 17

0

10.7

8.

3In

spec

tion

of S

hort

-nos

ed F

ruit

Bat

As

pre

caut

iona

ry m

easu

re, p

rior t

o an

y pr

opos

ed a

rbor

icul

tura

l w

orks

of t

he tr

ees

(par

ticul

arly

the

Chi

nese

Fan

-pal

ms)

, day

time

Proj

ect c

onst

ruct

ion

site

/ Fo

r onc

e / B

efor

e ar

boric

ultu

ral w

orks

of

ETap

poin

ted

by

OPC

��

EIAO

-TM

; HK

O

rdin

ance

Cap

. 17

0

App

endi

x C

. Im

plem

enta

tion

Sch

edul

e fo

r Env

ironm

enta

l Miti

gatio

n M

easu

res

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

2

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

insp

ectio

n sh

ould

be

carr

ied

out t

o co

nfirm

no

Shor

t-nos

ed F

ruit

Bat i

s pr

esen

t. If

any

Shor

t-nos

ed F

ruit

Bat i

s ob

serv

ed ro

ostin

g,

suita

bly

size

d bu

ffer a

rea

shou

ld b

e es

tabl

ishe

d ar

ound

the

tree

to m

inim

ise

hum

an o

r mac

hine

ry d

istu

rban

ce u

ntil

the

bat h

as

left.

the

trees

10.7

8.

3In

-situ

Pre

serv

atio

n of

Pla

nt S

peci

es o

f Con

serv

atio

n In

tere

stD

urin

g co

nstru

ctio

n ph

ase,

pro

tect

ive

fenc

e fo

r the

iden

tifie

d flo

ra s

peci

es o

f con

serv

atio

n co

ncer

n sh

all b

e er

ecte

d an

d m

aint

aine

d.

Proj

ect c

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

all

cons

truct

ion

activ

ities

Con

tract

or

appo

inte

d by

OPC

EIAO

-TM

10.7

8.

3In

spec

tion

of A

rdei

d N

est d

urin

g br

eedi

ng s

easo

n Af

ter c

omm

ence

men

t of c

onst

ruct

ion

phas

e, th

e Si

te s

houl

d be

m

onito

red

mon

thly

in b

reed

ing

seas

on (A

pril

to J

uly)

to c

heck

for

any

pote

ntia

l bre

edin

g an

d ne

stin

g ac

tiviti

es.

Proj

ect c

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

all

cons

truct

ion

activ

ities

Qua

lifie

d ec

olog

ist

appo

inte

d by

OPC

EIAO

-TM

10.7

8.

2Ti

min

g of

site

cle

aran

ce a

nd tr

ee fe

lling

wor

ks

Site

cle

aran

ce a

nd tr

ee fe

lling

wor

ks a

t the

exi

stin

g ar

deid

nig

ht

roos

t loc

atio

n as

sho

wn

in F

igur

e 8.

1 sh

ould

be

avoi

ded

durin

g th

e pe

ak w

inte

ring

seas

on o

f ard

eids

, i.e

. bet

wee

n N

ovem

ber

and

Mar

ch.

Indi

cativ

e bo

unda

ry o

f th

e ar

deid

s ro

ostin

g si

te

with

in P

roje

ct

cons

truct

ion

site

(loca

tion

indi

cate

d in

Fi

gure

8.1

) / T

hrou

ghou

t co

nstru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

site

cl

eara

nce

and

tree

fellin

g w

orks

with

in th

e bo

unda

ry

Con

tract

or

appo

inte

d by

OPC

EIAO

-TM

10.7

8.

3C

ompe

nsat

ion

for A

rdei

d R

oost

ing

Site

An e

nhan

cem

ent a

rea

with

follo

win

g fe

atur

es s

houl

d be

pro

vide

d as

an

alte

rnat

ive

roos

ting

site

for a

rdei

ds.

�Th

e lo

catio

n is

at s

outh

ern

part

of th

e Pr

ojec

t are

a (lo

catio

n in

dica

ted

in F

igur

e 8.

1)

�Th

e en

hanc

emen

t are

a sh

all i

nclu

de a

Fla

min

go P

ond

�N

ativ

e tre

e sp

ecie

s M

acar

anga

tana

rius

and

Cel

tis s

inen

sis

and

tree

spec

ies

whi

ch w

as u

sed

by a

rdei

ds fo

r roo

stin

g M

allo

tus

pani

cula

tus,

Fic

us h

ispi

da a

nd C

rato

xylu

m

coch

inch

inen

se s

hall

be c

onsi

dere

d in

the

plan

. �

Hea

vy s

tand

ard

size

d tre

es s

hall

be c

onsi

dere

d fo

r pla

ntin

g to

al

low

ear

ly e

stab

lishm

ent o

f the

tree

s ar

ound

the

Flam

ingo

Sout

hern

par

t of P

roje

ct

cons

truct

ion

site

(loca

tion

indi

cate

d in

Fi

gure

8.1

) / B

efor

e an

d th

roug

hout

con

stru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

Fla

min

go P

ond

cons

truct

ion

and

tree

plan

ting

activ

ities

at t

hat

area

Qua

lifie

d ec

olog

ist

and

Con

tract

or

appo

inte

d by

OPC

��

�EI

AO-T

M

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

3

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

Pond

.

10.7

8.

3C

ompe

nsat

ion

for W

oodl

and

Hab

itat

�Pr

ovis

ion

of a

Woo

dlan

d Ar

ea o

f abo

ut 1

.62

ha, w

hich

in

clud

es 0

.84

ha w

oodl

and

com

pens

atio

n on

-site

and

0.7

8 ha

on

-site

woo

dlan

d re

inst

atem

ent,

to m

itiga

te fo

r per

man

ent l

oss

of w

oodl

and

habi

tat.

�In

the

woo

dlan

d co

mpe

nsat

ion

area

, whi

ps s

houl

d be

pla

nted

w

ith p

redo

min

atel

y na

tive

tree

spec

ies

sim

ilar t

o th

e af

fect

ed

woo

dlan

d, s

uch

as C

eltis

sin

ensi

s,C

rato

xylu

m

coch

inch

inen

se,P

olys

pora

axi

llaris

and

Ste

rcul

ia la

nceo

lata

.

Loca

tion

of W

oodl

and

Com

pens

atio

n Ar

ea

indi

cate

d in

Fig

ure

8.2/

Befo

re a

nd th

roug

hout

co

nstru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

all

cons

truct

ion

activ

ities

Con

tract

or

appo

inte

d by

OPC

��

EIAO

-TM

Land

scap

e an

d Vi

sual

Impa

ct (C

onst

ruct

ion)

Tabl

e 12

.13

(CP0

7)

Tabl

e 9.

1 (C

P07)

Tem

pora

ry T

ree

Nur

serie

s Te

mpo

rary

tree

nur

serie

s m

ay b

e se

t up

with

in th

e Pr

ojec

t are

a at

an

early

sta

ge to

allo

w s

mal

l tre

es to

gro

w d

urin

g th

e co

nstru

ctio

n pe

riod.

By

the

time

thes

e tre

es a

re n

eede

d fo

r la

ndsc

ape

plan

ting

at th

een

d of

the

cons

truct

ion

phas

e, th

ey w

ill ha

ve g

row

n la

rger

, req

uire

min

imal

pru

ning

and

suf

fer m

uch

less

da

mag

e du

ring

trans

plan

ting,

as

the

mov

ing

dist

ance

from

an

on-s

ite ra

ther

than

off-

site

nur

sery

will

be m

uch

smal

ler.

The

te

mpo

rary

tree

nur

serie

s ca

n al

so te

mpo

raril

y ho

ld th

e ex

istin

g tre

es to

be

trans

plan

ted

if di

rect

tran

spla

ntat

ion

from

thei

r or

igin

al lo

catio

ns to

the

final

reci

pien

t loc

atio

n is

impr

actic

able

. Th

e lo

catio

ns o

f the

tem

pora

ry tr

ee n

urse

ries

shou

ld b

e ca

refu

lly

sele

cted

so

that

the

trees

can

als

o ac

t as

scre

en p

lant

ing

to

bloc

k th

e vi

ews

of th

e Pr

ojec

t are

a fro

m th

e VS

Rs

durin

g th

e co

nstru

ctio

n ph

ase,

if p

ract

icab

le.

Proj

ectc

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

all

cons

truct

ion

activ

ities

Con

tract

orap

poin

ted

by O

PC

��

EIAO

-TM

Tabl

e 12

.13

(CP0

8)

Tabl

e 9.

1 (C

P08)

Adv

ance

Pla

ntin

g Ad

vanc

epl

antin

g sh

ould

be

unde

rtake

n at

the

earli

est p

ossi

ble

stag

e of

the

cons

truct

ion

phas

e of

the

proj

ect.

Pla

nt s

peci

es,

pref

erab

ly n

ativ

e on

es, s

houl

d be

car

eful

ly s

elec

ted

to b

lend

in

with

the

exis

ting

pres

erve

d ve

geta

tion.

Lan

dsca

pe p

lant

ing

in

mov

able

pla

nter

s sh

ould

als

o be

con

side

red

as a

tem

pora

ry

gree

ning

mea

sure

for t

he P

roje

ct a

rea.

Proj

ectc

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

all

cons

truct

ion

activ

ities

Con

tract

or

appo

inte

d by

OPC

�EI

AO-T

M

Land

scap

e an

d Vi

sual

Impa

ct (O

pera

tion)

Tabl

e 12

.14

(OP0

4)

Tabl

e 9.

2 (O

P04)

Gre

en R

oofs

and

Ver

tical

Gre

enin

gG

reen

Roo

fs a

nd V

ertic

al G

reen

ing

shou

ld b

e pr

ovid

ed w

here

fe

asib

le a

nd a

ppro

pria

te to

scr

een

and

softe

n th

e ha

rd e

dges

of

Proj

ect b

uild

ing

roof

tops

/ D

urin

g de

sign

sta

ge /

Thro

ugho

ut o

pera

tion

Des

ign

Arch

itect

/ C

ontra

ctor

ap

poin

ted

by O

PC

��

EIAO

-TM

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

4

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

build

ing

stru

ctur

es.

phas

e

Tabl

e 12

.14

(OP0

5)

Tabl

e 9.

2 (O

P05)

Rep

rovi

sion

of F

lam

ingo

Pon

dA

pond

is re

com

men

ded

to re

plac

e th

e de

mol

ishe

d Fl

amin

go

Pond

as

com

pens

atio

n fo

r the

loss

of s

emi-n

atur

al p

onds

, whe

re

wild

life,

suc

h as

bird

s, c

an u

tilis

e.

Proj

ect a

rea

/ Dur

ing

desi

gn s

tage

/ Th

roug

hout

ope

ratio

n ph

ase

Des

ign

Arch

itect

/ C

ontra

ctor

ap

poin

ted

by O

PC

��

EIAO

-TM

Tabl

e 12

.14

(OP0

7)

Tabl

e 9.

2 (O

P07)

Woo

dlan

d C

ompe

nsat

ion

1.53

ha o

f affe

cted

woo

dlan

d is

reco

mm

ende

d to

be

rein

stat

ed /

com

pens

ated

by

1.62

ha o

f whi

p tre

e pl

antin

g ad

jace

nt to

the

exis

ting

unaf

fect

ed w

oodl

and

and

tall

shru

blan

d. N

ativ

e sp

ecie

s sh

ould

be

prop

osed

as

far a

s pr

actic

able

to re

-cre

ate

a na

tive

land

scap

e, re

stor

e th

e ec

olog

ical

hab

itats

and

ble

nd in

with

the

exis

ting

nativ

e ve

geta

tion.

Proj

ect a

rea

/ Dur

ing

desi

gn s

tage

/ Th

roug

hout

ope

ratio

n ph

ase

Des

ign

Arch

itect

/ C

ontra

ctor

ap

poin

ted

by O

PC

��

EIAO

-TM

Cat

. 2 S

ubm

issi

on re

quire

d po

st E

IA s

tage

Se

wer

age

and

Sew

age

Trea

tmen

t Im

plic

atio

ns7.

75.

2D

etai

led

Sew

erag

e D

esig

n R

epor

tIn

ord

er to

pre

vent

sep

ticity

pro

blem

s du

ring

oper

atio

n ph

ase,

a

deta

iled

sew

erag

e de

sign

repo

rt sh

ould

be

subm

itted

to D

SD fo

r ap

prov

al p

rior t

o in

stal

latio

n of

the

risin

g m

ains

.

Ris

ing

mai

ns s

ite /

Dur

ing

desi

gn s

tage

D

esig

n En

gine

er

�Se

wer

age

Man

ual

Part

1

Ecol

ogic

al Im

pact

(Con

stru

ctio

n)

10.7

8.3

Vege

tatio

n Su

rvey

for P

lant

Spe

cies

of C

onse

rvat

ion

Inte

rest

For p

reca

utio

nary

pur

pose

s an

d to

furth

er e

nsur

e no

flor

a sp

ecie

s of

con

serv

atio

n in

tere

st to

be

affe

cted

, a d

etai

led

vege

tatio

n su

rvey

nee

d to

con

duct

to th

e ex

act l

ocat

ions

, nu

mbe

r and

con

ditio

n of

indi

vidu

als

of P

laty

codo

n gr

andi

floru

s.

Proj

ect c

onst

ruct

ion

site

/ Fo

r onc

e / B

efor

e si

te

clea

ranc

e

Qua

lifie

d bo

tani

st/e

colo

gist

of

the

ET

appo

inte

d by

OPC

�EI

AO-T

M; H

ong

Kong

Ord

inan

ce

Cap

. 96

10.7

8.

3W

oodl

and

Com

pens

atio

n Pl

anA

Woo

dlan

d C

ompe

nsat

ion

Plan

sha

ll be

pre

pare

d an

d su

bmitt

ed to

AFC

D fo

r app

rova

l no

late

r tha

n on

e m

onth

prio

r to

com

men

cem

ent o

f si

te c

lear

ance

. Th

e pl

an s

hall

incl

ude

but n

ot li

mite

d to

the

follo

win

g:�

Tim

ing

of p

lant

ing

wor

ks

�Pl

antin

g lo

catio

n �

Spec

ies,

siz

e an

d nu

mbe

r of t

rees

Mon

itorin

g m

etho

dolo

gy

Loca

tion

of W

oodl

and

Com

pens

atio

n Ar

ea

indi

cate

d in

Fig

ure

8.2/

Befo

re c

onst

ruct

ion

stag

e / N

o la

ter t

han

one

mon

th p

rior t

o co

mm

ence

men

t of

site

cl

eara

nce

Qua

lifie

d bo

tani

st/e

colo

gist

of

the

ET

appo

inte

d by

OPC

�EI

AO-T

M

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

5

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

�Ac

tion

Plan

Land

scap

e an

d Vi

sual

Impa

ct (C

onst

ruct

ion)

Tabl

e 12

.13

(CP0

5)

Tabl

e 9.

1 (C

P05)

Tran

spla

ntat

ion

of E

xist

ing

Tree

sTr

ees

whi

ch a

re in

dire

ct c

onfli

ct w

ith th

e de

velo

pmen

t pro

posa

ls

and

suita

ble

for t

rans

plan

tatio

n sh

ould

be

trans

plan

ted

as fa

r as

prac

ticab

le.

A tre

e tra

nspl

anta

tion

prop

osal

sho

uld

be s

ubm

itted

to

geth

er w

ith th

e tre

e re

mov

al a

pplic

atio

n. T

rees

pro

pose

d to

be

trans

plan

ted

shou

ld p

refe

rabl

y be

tran

spla

nted

from

thei

r orig

inal

lo

catio

ns d

irect

ly to

thei

r fin

al re

cipi

ent l

ocat

ions

in o

ne g

o. I

f th

is is

infe

asib

le, t

he tr

ees

shou

ld b

e he

ld in

a te

mpo

rary

tree

nu

rser

y, p

refe

rabl

y w

ithin

the

Proj

ect a

rea,

whe

re th

e tre

es w

ill be

pro

perly

mai

ntai

ned.

Proj

ectc

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

all

cons

truct

ion

activ

ities

Con

tract

or

appo

inte

d by

OPC

�EI

AO-T

M;

LAO

PN

No.

07

/200

7

Land

scap

e an

d Vi

sual

Impa

ct (O

pera

tion)

Tabl

e 12

.14

(OP0

2)

Tabl

e 9.

2 (O

P02)

Com

pens

ator

y Tr

ee P

lant

ing

Exi

stin

g tre

es to

be

felle

d sh

ould

be

com

pens

ated

as

far a

s pr

actic

able

. N

ativ

e sp

ecie

s sh

ould

be

prop

osed

as

far a

s pr

actic

able

to re

-cre

ate

a na

tive

land

scap

e, re

stor

e th

e ec

olog

ical

hab

itats

and

ble

nd in

with

the

exis

ting

nativ

e ve

geta

tion.

A c

ompe

nsat

ory

tree

plan

ting

prop

osal

sho

uld

be

subm

itted

toge

ther

with

the

tree

rem

oval

app

licat

ion

for a

ppro

val

by re

leva

nt a

utho

ritie

s in

acc

orda

nce

with

LAO

Pra

ctic

e N

ote

No.

7/2

007.

It is

reco

mm

ende

d th

at a

ppro

xim

atel

y 60

8 he

avy

stan

dard

tree

s an

d ap

prox

imat

ely

18,2

02 w

hip

trees

cou

ld b

e pl

ante

d on

-site

. The

ava

ilabi

lity

of o

ff-si

te c

ompe

nsat

ory

tree

plan

ting

area

is s

till s

ubje

ct to

furth

er in

vest

igat

ion

and

agre

emen

t with

rele

vant

aut

horit

ies.

Proj

ect a

rea

/ Dur

ing

desi

gn s

tage

/ Th

roug

hout

ope

ratio

n ph

ase

Des

ign

Arch

itect

/ C

ontra

ctor

ap

poin

ted

by O

PC

��

EIAO

-TM

;LA

O P

N N

o.

07/2

007

Cat

. 3 G

ood

site

pra

ctic

e/ho

usek

eepi

ng m

easu

res

unde

r EM

&A

mec

hani

sm

Air

Qua

lity

Impa

ct (C

onst

ruct

ion)

3.

9.1

2.2

Dus

t Con

trol

Mea

sure

sTo

ach

ieve

com

plia

nce

with

the

FSP,

RSP

and

TSP

crit

eria

du

ring

the

cons

truct

ion

phas

e, g

ood

prac

tices

for d

ust c

ontro

l sh

ould

be

impl

emen

ted

to re

duce

dus

t im

pact

s. T

he d

ust c

ontro

l m

easu

res

are

deta

iled

as fo

llow

s:�

Use

of r

egul

ar w

ater

spr

ayin

g (o

nce

ever

y 2.

5 ho

urs

or 4

tim

es

per

day)

to

redu

ce d

ust

emis

sion

s fro

m h

eavy

con

stru

ctio

n ac

tiviti

es (

incl

udin

g gr

ound

exc

avat

ion,

ear

th m

ovin

g, e

tc.)

at

all

activ

e w

orks

are

a ex

pose

d si

te s

urfa

ces

and

unpa

ved

Proj

ect c

onst

ruct

ion

site

/ D

urat

ion

of th

e co

nstru

ctio

n ph

ase

/ Pr

ior t

o co

mm

ence

men

t of

ope

ratio

n

Con

tract

or

appo

inte

d by

OPC

EI

A R

ecom

men

datio

n an

d Ai

r Pol

lutio

n C

ontro

l (C

onst

ruct

ion

Dus

t) R

egul

atio

n

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

6

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

road

s, p

artic

ular

ly d

urin

g dr

y w

eath

er.

�C

over

ing

80%

of

stoc

kpilin

g ar

ea b

y im

perv

ious

she

ets

and

spra

ying

all

dust

y m

ater

ial w

ith w

ater

imm

edia

tely

prio

r to

any

lo

adin

g tra

nsfe

r op

erat

ions

to

keep

the

dus

ty m

ater

ials

wet

du

ring

mat

eria

l han

dlin

g at

the

stoc

kpile

are

as

Rel

evan

t dus

t con

trol p

ract

ices

as

stip

ulat

ed in

the

Air

Pollu

tion

Con

trol (

Con

stru

ctio

n D

ust)

Reg

ulat

ion

shou

ld b

e ad

opte

d:

Goo

d Si

te M

anag

emen

t�

Goo

d si

te m

anag

emen

t is

impo

rtant

to

help

red

uce

pote

ntia

l ai

r qu

ality

impa

ct d

own

to a

n ac

cept

able

leve

l. As

a g

ener

al

guid

e,

the

Con

tract

or

shou

ld

mai

ntai

n hi

gh

stan

dard

s of

ho

usek

eepi

ng t

o pr

even

t em

issi

ons

of f

ugiti

ve d

ust.

Load

ing,

un

load

ing,

han

dlin

g an

d st

orag

e of

raw

mat

eria

ls,

was

tes

or

by-p

rodu

cts

shou

ld b

e ca

rrie

d ou

t in

a m

anne

r so

as

to

min

imis

e th

e re

leas

e of

vis

ible

dus

t em

issi

on.

Any

pile

s of

m

ater

ials

acc

umul

ated

on

or a

roun

d th

e w

ork

area

s sh

ould

be

clea

ned

up r

egul

arly

. Cle

anin

g, r

epai

r an

d m

aint

enan

ce o

f all

plan

t fac

ilitie

s w

ithin

the

wor

k ar

eas

shou

ld b

e ca

rrie

d ou

t in

a m

anne

r m

inim

isin

g ge

nera

tion

of fu

gitiv

e du

st e

mis

sion

s. T

he

mat

eria

l sh

ould

be

hand

led

prop

erly

to

prev

ent

fugi

tive

dust

em

issi

on b

efor

e cl

eani

ng.

Dis

turb

ed P

arts

of t

he R

oads

�M

ain

tem

pora

ry a

cces

s po

ints

sho

uld

be p

aved

with

con

cret

e,

bitu

min

ous

hard

core

mat

eria

ls o

r m

etal

pla

tes

and

be k

ept

clea

r of d

usty

mat

eria

ls; o

r �

Unp

aved

par

ts o

f the

roa

d sh

ould

be

spra

yed

with

wat

er o

r a

dust

sup

pres

sion

che

mic

al s

o as

to

keep

the

ent

ire r

oad

surfa

ce w

et.

Exp

osed

Ear

th�

Exp

osed

ear

th s

houl

d be

pro

perly

tre

ated

by

com

pact

ion,

hy

dros

eedi

ng,

vege

tatio

n pl

antin

g or

se

atin

g w

ith

late

x,

viny

l, bi

tum

en w

ithin

six

mon

ths

afte

r th

e la

st c

onst

ruct

ion

activ

ity o

n th

e si

te o

r pa

rt of

the

site

whe

re t

he e

xpos

ed

earth

lies

.

Load

ing,

Unl

oadi

ng o

r Tra

nsfe

r of D

usty

Mat

eria

ls

�Al

l du

sty

mat

eria

ls

shou

ld

be

spra

yed

with

w

ater

im

med

iate

ly p

rior

to a

ny lo

adin

g or

tran

sfer

ope

ratio

n so

as

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

7

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

to k

eep

the

dust

y m

ater

ial w

et.

Deb

ris H

andl

ing

�An

y de

bris

sh

ould

be

co

vere

d en

tirel

y by

im

perv

ious

sh

eetin

g or

sto

red

in a

deb

ris c

olle

ctio

n ar

ea s

helte

red

on

the

top

and

the

thre

e si

des.

Befo

re d

ebris

is

dum

ped

into

a c

hute

, w

ater

sho

uld

be

spra

yed

onto

the

deb

ris s

o th

at i

t re

mai

ns w

et w

hen

it is

du

mpe

d.

Tran

spor

t of D

usty

Mat

eria

ls

�Ve

hicl

es u

sed

for

trans

porti

ng d

usty

mat

eria

ls/s

poils

sho

uld

be c

over

ed w

ith t

arpa

ulin

or

sim

ilar

mat

eria

l. Th

e co

ver

shou

ld e

xten

d ov

er th

e ed

ges

of th

e si

des

and

tailb

oard

s.

Whe

el w

ashi

ng�

Vehi

cle

whe

el w

ashi

ng fa

cilit

ies

shou

ld b

e pr

ovid

ed a

t eac

h co

nstru

ctio

n si

te

exit.

Im

med

iate

ly

befo

re

leav

ing

the

cons

truct

ion

site

, eve

ry v

ehic

le s

houl

d be

was

hed

to re

mov

e an

y du

sty

mat

eria

ls fr

om it

s bo

dy a

nd w

heel

s.

Use

of v

ehic

les

� Th

e sp

eed

of th

e tru

cks

with

in th

e si

te s

houl

d be

con

trolle

d to

abo

ut 1

0 km

/hou

r in

orde

r to

redu

ce a

dver

se d

ust i

mpa

cts

and

secu

re th

e sa

fe m

ovem

ent a

roun

d th

e si

te.

�Im

med

iate

ly

befo

re

leav

ing

the

cons

truct

ion

site

, ev

ery

vehi

cle

shou

ld b

e w

ashe

d to

rem

ove

any

dust

y m

ater

ials

fro

m it

s bo

dy a

nd w

heel

s.

�W

here

a v

ehic

le le

avin

g th

e co

nstru

ctio

n si

te is

car

ryin

g a

load

of d

usty

mat

eria

ls, t

he lo

ad s

houl

d be

cov

ered

ent

irely

by

cl

ean

impe

rvio

us

shee

ting

to

ensu

re

that

th

e du

sty

mat

eria

ls d

o no

t lea

k fro

m th

e ve

hicl

e.

Site

hoa

rdin

g �

Whe

re a

site

bou

ndar

y ad

join

s a

road

, stre

et, s

ervi

ce la

ne o

r ot

her

area

acc

essi

ble

to th

e pu

blic

, hoa

rdin

g of

not

less

than

2.

4 m

hig

h fro

m g

roun

d le

vel

shou

ld b

e pr

ovid

ed a

long

the

en

tire

leng

th o

f th

at p

ortio

n of

the

site

bou

ndar

y ex

cept

for

a

site

ent

ranc

e or

exi

t N

oise

Impa

ct (C

onst

ruct

ion)

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

8

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

5.7

3.2

Goo

d Si

te P

ract

ice

Goo

d si

te p

ract

ice

and

nois

e m

anag

emen

t can

sig

nific

antly

re

duce

the

impa

ct o

f con

stru

ctio

n si

te a

ctiv

ities

on

near

by N

SR

s.

�on

ly w

ell-m

aint

aine

d pl

ant

to b

e op

erat

ed o

n-si

te a

nd p

lant

sh

ould

be

serv

iced

regu

larly

dur

ing

the

cons

truct

ion

wor

ks;

�m

achi

nes

and

plan

t tha

t may

be

in in

term

itten

t use

to b

e sh

ut

dow

n be

twee

n w

ork

perio

ds o

r sh

ould

be

thro

ttled

dow

n to

a

min

imum

; �

plan

t kn

own

to e

mit

nois

e st

rong

ly i

n on

e di

rect

ion,

sho

uld,

w

here

pos

sibl

e, b

e or

ient

ated

to

dire

ct n

oise

aw

ay f

rom

the

N

SRs;

mob

ile p

lant

sho

uld

be s

ited

as f

ar a

way

fro

m N

SRs

as

poss

ible

; and

�m

ater

ial

stoc

kpile

s an

d ot

her

stru

ctur

es

to

be

effe

ctiv

ely

utilis

ed,

whe

re

prac

ticab

le,

to

scre

en

nois

e fro

m

on-s

ite

cons

truct

ion

activ

ities

.

Proj

ect c

onst

ruct

ion

site

/ D

urat

ion

of th

e co

nstru

ctio

n ph

ase

/ Pr

ior t

o co

mm

ence

men

t of

ope

ratio

n

Con

tract

or

appo

inte

d by

OPC

EI

AO a

nd N

oise

C

ontro

l Ord

inan

ce

Noi

se Im

pact

(Ope

ratio

n)

5.7

3.3.

2 Fi

xed

Plan

t Noi

se

With

the

adop

tion

of th

e pr

opos

ed m

axim

um a

llow

able

SW

Ls, a

ll re

pres

enta

tive

NSR

s is

exp

ecte

d to

com

ply

with

the

rele

vant

no

ise

crite

ria fo

r the

day

time

and

even

ing

time

perio

ds. N

o ad

vers

e fix

ed p

lant

noi

se im

pact

is a

ntic

ipat

ed.

It is

al

so

reco

mm

ende

d th

at

the

follo

win

g no

ise

redu

ctio

n m

easu

res

shou

ld b

e co

nsid

ered

as

far

as p

ract

icab

le d

urin

g de

sign

sta

ge:

�ch

oose

qui

et p

lant

suc

h as

thos

e w

hich

hav

e be

en e

ffect

ivel

y si

lenc

ed;

�in

clud

e no

ise

leve

ls s

peci

ficat

ion

whe

n or

derin

g ne

w p

lant

(in

clud

ing

chille

r and

E&M

equ

ipm

ent);

loca

te f

ixed

pla

nt /

lou

vre

away

fro

m a

ny N

SRs

as f

ar a

s pr

actic

able

; �

loca

te

fixed

pl

ant

in

wal

led

plan

t ro

oms

or

in

spec

ially

de

sign

ed e

nclo

sure

s;

�lo

cate

noi

sy m

achi

ne in

a b

asem

ent o

r a

com

plet

ely

sepa

rate

bu

ildin

g;

With

in P

roje

ct a

rea

/ Pr

ior t

o op

erat

ion

phas

e /

Dur

atio

n of

the

oper

atio

n ph

ase

/ Thr

ough

out

oper

atio

n ph

ase

Des

ign

Arch

itect

/ C

ontra

ctor

ap

poin

ted

by O

PC

EIAO

and

Noi

se

Con

trol O

rdin

ance

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

9

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

�in

stal

l di

rect

noi

se m

itiga

tion

mea

sure

s in

clud

ing

sile

ncer

s,

acou

stic

lou

vres

and

aco

ustic

enc

losu

re w

here

nec

essa

ry;

and

�de

velo

p an

d im

plem

ent

a re

gula

rly

sche

dule

d pl

ant

mai

nten

ance

pr

ogra

mm

e so

th

at

equi

pmen

t is

pr

oper

ly

oper

ated

and

ser

vice

d in

ord

er to

mai

ntai

n a

cont

rolle

d le

vel o

f no

ise.

Prio

rto

the

oper

atio

n of

the

Pro

ject

, no

ise

com

mis

sion

ing

test

s fo

r all

maj

or fi

xed

nois

e so

urce

s sh

ould

be

cond

ucte

d.

5.7

3.3.

2 O

pen

Air

Ente

rtai

nmen

t Noi

seW

ith th

e ad

optio

n of

the

prop

osed

max

imum

allo

wab

le S

WLs

, all

repr

esen

tativ

e N

SRs

is e

xpec

ted

to c

ompl

y w

ith th

e re

leva

nt

nois

e cr

iteria

for t

he d

aytim

e an

d ev

enin

g pe

riods

, the

follo

win

g m

easu

res

shou

ld b

e co

nsid

ered

as

far a

s pr

actic

able

dur

ing

stag

e:�

use

smal

l clu

ster

s of

sm

all p

ower

loud

spea

kers

rat

her

than

a

few

larg

e po

wer

loud

spea

kers

; and

�lo

udsp

eake

rs s

houl

d be

poi

nted

aw

ay fr

om n

earb

y N

SRs.

With

in P

roje

ct a

rea

/ D

urat

ion

of th

e op

erat

ion

phas

e / T

hrou

ghou

t op

erat

ion

phas

e

Des

ign

Arch

itect

/ C

ontra

ctor

ap

poin

ted

by O

PC

EIAO

and

Noi

se

Con

trol O

rdin

ance

Wat

er Q

ualit

y Im

pact

(Con

stru

ctio

n)

6.7

4.2

Con

stru

ctio

n Si

te R

unof

fTh

e si

te p

ract

ices

out

lined

in P

roPE

CC

Not

e PN

1/9

4 sh

ould

be

follo

wed

as

far a

s pr

actic

able

in o

rder

to m

inim

ise

surfa

ce ru

noff

and

eros

ion.

Th

e fo

llow

ing

mea

sure

s ar

e re

com

men

ded

to

prot

ect w

ater

qua

lity

of th

e in

land

are

as:

�At

the

star

t of s

ite e

stab

lishm

ent,

perim

eter

cut

-off

drai

ns to

di

rect

off-

site

wat

er a

roun

d th

e si

te s

houl

d be

con

stru

cted

w

ith in

tern

al d

rain

age

wor

ks a

nd e

rosi

on a

nd s

edim

enta

tion

cont

rol

faci

litie

s im

plem

ente

d. C

hann

els,

ear

th b

unds

or

sand

bag

bar

riers

sho

uld

be p

rovi

ded

on s

ite to

dire

ct s

torm

w

ater

to

silt

rem

oval

fac

ilitie

s. T

he d

esig

n of

the

tem

pora

ry

on-s

ite

drai

nage

sy

stem

sh

ould

be

un

derta

ken

by

the

Con

tract

ors

prio

r to

the

com

men

cem

ent o

f con

stru

ctio

n;

�Sa

nd/

silt

rem

oval

fac

ilitie

s su

ch a

s sa

nd/s

ilt t

raps

and

se

dim

ent

basi

ns s

houl

d be

pro

vide

d to

rem

ove

sand

/silt

pa

rticl

es f

rom

run

off

to m

eet

the

requ

irem

ents

of

the

TM

stan

dard

s un

der

the

WPC

O.

The

des

ign

of e

ffici

ent

silt

rem

oval

fac

ilitie

s sh

ould

be

base

d on

the

gui

delin

es i

n

Proj

ect c

onst

ruct

ion

site

/ D

urat

ion

of th

e co

nstru

ctio

n ph

ase

Con

tract

or

appo

inte

d by

OPC

EIAO

-TM

;Pr

oPEC

C N

ote

PN 1

/94;

WPC

O;

TM-D

SS

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

10

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

Appe

ndix

A1

of P

roPE

CC

Not

e PN

1/9

4.

Size

s m

ay v

ary

depe

ndin

g up

on t

he f

low

rat

e. T

he d

etai

led

desi

gn o

f th

e sa

nd/s

ilt tr

aps

shou

ld b

e un

derta

ken

by th

e C

ontra

ctor

s pr

ior

to th

e co

mm

ence

men

t of c

onst

ruct

ion;

All

drai

nage

fac

ilitie

s an

d er

osio

n an

d se

dim

ent

cont

rol

stru

ctur

es s

houl

d be

reg

ular

ly in

spec

ted

and

mai

ntai

ned

to

ensu

re

prop

er

and

effic

ient

op

erat

ion

at

all

times

an

d pa

rticu

larly

dur

ing

rain

stor

ms.

Dep

osite

d si

lt an

d gr

it sh

ould

be

re

gula

rly

rem

oved

, at

th

e on

set

of

and

afte

r ea

ch

rain

stor

m

to

ensu

re

that

th

ese

faci

litie

s ar

e fu

nctio

ning

pr

oper

ly a

t all

times

; �

Mea

sure

s sh

ould

be

take

n to

min

imis

e th

e in

gres

s of

site

dr

aina

ge in

to e

xcav

atio

ns.

If ex

cava

tion

of t

renc

hes

in w

et

perio

ds is

nec

essa

ry,

they

sho

uld

be d

ug a

nd b

ackf

illed

in

shor

t sec

tions

whe

reve

r pra

ctic

able

. Wat

er p

umpe

d ou

t fro

m

site

for

mat

ion

exca

vatio

ns s

houl

d be

dis

char

ged

into

sto

rm

drai

ns v

ia s

ilt re

mov

al fa

cilit

ies;

All

vehi

cles

and

pla

nt s

houl

d be

cle

aned

bef

ore

leav

ing

a co

nstru

ctio

n si

te to

ens

ure

no e

arth

, mud

, deb

ris a

nd th

e lik

e is

dep

osite

d by

them

on

road

s. A

n ad

equa

tely

des

igne

d an

d si

ted

whe

el

was

hing

fa

cilit

y sh

ould

be

pr

ovid

ed

at

cons

truct

ion

site

exi

t whe

re p

ract

icab

le. W

ash-

wat

er s

houl

d ha

ve s

and

and

silt

settl

ed o

ut a

nd r

emov

ed r

egul

arly

to

ensu

re th

e co

ntin

ued

effic

ienc

y of

the

proc

ess.

The

sec

tion

of a

cces

s ro

ad le

adin

g to

, and

exi

ting

from

, the

whe

el-w

ash

bay

to t

he p

ublic

roa

d sh

ould

be

pave

d w

ith s

uffic

ient

ba

ckfa

ll to

war

d th

e w

heel

-was

h ba

y to

pr

even

t ve

hicl

e tra

ckin

g of

soi

l and

silt

y w

ater

to p

ublic

road

s an

d dr

ains

; �

Ope

n st

ockp

iles

of c

onst

ruct

ion

mat

eria

ls o

r co

nstru

ctio

n w

aste

s on

-site

sho

uld

be c

over

ed w

ith t

arpa

ulin

or

sim

ilar

fabr

ic

durin

g ra

inst

orm

s.

Mea

sure

s sh

ould

be

ta

ken

to

prev

ent t

he w

ashi

ng a

way

of c

onst

ruct

ion

mat

eria

ls, s

oil,

silt

or d

ebris

into

any

dra

inag

e sy

stem

; �

Man

hole

s (in

clud

ing

new

ly c

onst

ruct

ed o

nes)

sho

uld

be

adeq

uate

ly c

over

ed a

nd te

mpo

raril

y se

aled

so

as to

pre

vent

si

lt, c

onst

ruct

ion

mat

eria

ls o

r de

bris

bei

ng w

ashe

d in

to t

he

drai

nage

sys

tem

and

sto

rmw

ater

run

off

bein

g di

rect

ed in

to

foul

sew

ers;

Prec

autio

ns s

houl

d be

tak

en a

t an

y tim

e of

the

yea

r w

hen

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

11

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

rain

stor

ms

are

likel

y.

Actio

ns

shou

ld

be

take

n w

hen

a ra

inst

orm

is im

min

ent o

r fo

reca

sted

and

act

ions

to b

e ta

ken

durin

g or

afte

r rai

nsto

rms

are

sum

mar

ised

in A

ppen

dix

A2

of

ProP

ECC

Not

e PN

1/9

4. P

artic

ular

atte

ntio

n sh

ould

be

paid

to

the

con

trol

of s

ilty

surfa

ce r

unof

f du

ring

stor

m e

vent

s,

espe

cial

ly fo

r are

as lo

cate

d ne

ar s

teep

slo

pes;

and

, �

Bent

onite

slu

rries

use

d on

site

sho

uld

be r

econ

ditio

ned

and

reus

ed w

here

ver

prac

ticab

le.

Tem

pora

ry e

nclo

sed

stor

age

loca

tions

sh

ould

be

pr

ovid

ed

on

site

fo

r an

y un

used

be

nton

ite t

hat

need

s to

be

trans

porte

d aw

ay a

fter

all

the

rela

ted

cons

truct

ion

activ

ities

ar

e co

mpl

eted

. Th

e re

quire

men

ts in

Pro

PEC

C N

ote

PN 1

/94

shou

ld b

e ad

here

d to

in th

e ha

ndlin

g an

d di

spos

al o

f ben

toni

te s

lurr

ies.

Th

e C

ontra

ctor

wou

ld b

e re

quire

d to

obt

ain

a lic

ense

from

EPD

un

der t

he W

PCO

for d

isch

arge

to th

e pu

blic

dra

inag

e sy

stem

or

the

mar

ine

envi

ronm

ent.

Con

stru

ctio

n si

te d

isch

arge

sho

uld

be

colle

cted

by

the

tem

pora

ry d

rain

age

syst

em i

nsta

lled

by t

he

Con

tract

or a

nd t

reat

ed o

r de

silte

d on

-site

to

fulfi

l th

e W

PCO

di

scha

rge

licen

se re

quire

men

ts b

efor

e di

scha

rge.

6.7

4.2

Gen

eral

Con

stru

ctio

n Ac

tiviti

esBe

st M

anag

emen

t Pr

actic

es (

BMPs

) sh

ould

be

impl

emen

ted

at

the

cons

truct

ion

site

, in

clud

ing

prop

er h

andl

ing,

sor

ting

and

stor

age

of c

onst

ruct

ion

solid

was

te, d

ebris

and

refu

se g

ener

ated

on

-site

pr

ior

to

disp

osal

. St

ockp

iles

of

cem

ent

and

othe

r co

nstru

ctio

n m

ater

ials

sho

uld

be k

ept

cove

red

whe

n no

t be

ing

used

. Th

e C

ontra

ctor

sho

uld

also

follo

w th

e gu

idel

ines

set

in th

e “P

estic

ides

Use

d fo

r O

utdo

or M

osqu

ito C

ontro

l”, p

ublis

hed

by

AFC

D in

201

0, fo

r mos

quito

con

trol o

n si

te.

Proj

ect c

onst

ruct

ion

site

/ D

urat

ion

of th

e co

nstru

ctio

n ph

ase

Con

tract

or

appo

inte

d by

OPC

EIAO

-TM

;Pr

oPEC

C N

ote

PN 1

/94

6.7

4.2

Expa

nsio

n of

Exi

stin

g St

orm

U-C

hann

el

Gui

delin

es a

nd m

easu

res

sum

mar

ised

in P

roPE

CC

PN

1/9

4 fo

r tre

nchi

ng a

ctiv

ities

sho

uld

be im

plem

ente

d.

Proj

ect c

onst

ruct

ion

site

/ D

urat

ion

of th

e co

nstru

ctio

n ph

ase

Con

tract

or

appo

inte

d by

OPC

ProP

ECC

Not

e PN

1/9

4

6.7

4.2

Inte

rcep

tion

of N

atur

al S

trea

ms

Gui

delin

es a

nd m

easu

res

sum

mar

ised

in P

roPE

CC

PN

1/9

4 fo

r ex

cava

tion

and

stoc

kpilin

g ac

tiviti

es s

houl

d be

impl

emen

ted.

Proj

ect c

onst

ruct

ion

site

/ D

urat

ion

of th

e co

nstru

ctio

n ph

ase

Con

tract

or

appo

inte

d by

OPC

ProP

ECC

Not

e PN

1/9

4

6.7

4.2

Site

For

mat

ion

Wor

ksTh

e co

nstru

ctio

n pr

ogra

mm

e sh

ould

be

prop

erly

pla

nned

to

min

imis

e ex

cava

tion

wor

ks d

urin

g th

e w

et s

easo

n (A

pril

to

Sept

embe

r),

tem

pora

rily

expo

sed

slop

e/so

il su

rface

s sh

ould

be

Proj

ect c

onst

ruct

ion

site

/ D

urat

ion

of th

e co

nstru

ctio

n ph

ase

Con

tract

or

appo

inte

d by

OPC

ProP

ECC

Not

e PN

1/9

4

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

12

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

cove

red

by

a ta

rpau

lin

or

othe

r m

eans

, as

fa

r as

pr

actic

able

. In

terc

eptio

n ch

anne

ls

shou

ld

be

prov

ided

(e

.g.

alon

g th

e cr

est/e

dge

of t

he e

xcav

atio

n) t

o pr

even

t st

orm

run

off

from

w

ashi

ng

acro

ss

expo

sed

soil

surfa

ces.

Arra

ngem

ents

sh

ould

be

in p

lace

to

ensu

re t

hat

adeq

uate

sur

face

pro

tect

ion

mea

sure

s ca

n be

saf

ely

carr

ied

out

wel

l bef

ore

the

arriv

al o

f a

rain

stor

m.

Mea

sure

s w

ill be

take

n to

min

imis

e w

ater

ingr

ess

into

th

e ex

cava

tion.

Div

ertin

g an

y w

ater

from

the

exca

vate

d ar

eas

to

on-s

ite

was

tew

ater

tre

atm

ent

faci

litie

s fo

r tre

atm

ent

prio

r to

di

scha

rge

shou

ld a

lso

be p

erfo

rmed

. O

ther

mea

sure

s th

at n

eed

to

be

impl

emen

ted

befo

re,

durin

g an

d af

ter

rain

stor

ms

are

sum

mar

ised

in P

roPE

CC

PN

1/9

4.

6.7

4.2

Con

stru

ctio

n of

Sew

age

Sum

p Pi

t and

Ris

ing

Mai

nsM

easu

res

for

exca

vatio

n w

orks

sum

mar

ised

for

site

for

mat

ion

wor

ks s

houl

d al

so b

e im

plem

ente

d du

ring

cons

truct

ion

of t

he

sew

age

sum

p pi

t.D

urin

g th

e la

ying

of

risin

g m

ains

, gu

idel

ines

and

mea

sure

s su

mm

aris

ed in

Pro

PEC

C P

N 1

/94

for

trenc

hing

act

iviti

es s

houl

d be

per

form

ed.

Con

cret

e w

ater

gen

erat

ed fr

om th

e co

nstru

ctio

n of

the

conc

rete

sup

port

shou

ld b

e co

llect

ed a

nd tr

eate

d w

ith th

e w

aste

wat

er tr

eatm

ent f

acilit

ies

prio

r to

disc

harg

e.

Proj

ect c

onst

ruct

ion

site

/ D

urat

ion

of th

e co

nstru

ctio

n ph

ase

Con

tract

or

appo

inte

d by

OPC

ProP

ECC

Not

e PN

1/9

4

6.7

4.2

Acc

iden

tal S

pilla

geTh

e C

ontra

ctor

sho

uld

regi

ster

as

a ch

emic

al w

aste

pro

duce

r if

chem

ical

was

tes

are

prod

uced

from

con

stru

ctio

n ac

tiviti

es.

The

Was

te

Dis

posa

l O

rdin

ance

(C

ap

354)

an

d its

su

bsid

iary

re

gula

tions

in

parti

cula

r th

e W

aste

Dis

posa

l (C

hem

ical

Was

te)

(Gen

eral

) R

egul

atio

n sh

ould

be

obse

rved

and

com

plie

d w

ith fo

r co

ntro

l of

che

mic

al w

aste

s. T

his

will

prev

ent

cont

amin

atio

n of

to

p so

il an

d w

ater

pol

lutio

n du

e to

con

stru

ctio

n si

te ru

noff.

M

aint

enan

ce o

f veh

icle

s an

d eq

uipm

ent,

invo

lvin

g ac

tiviti

es w

ith

pote

ntia

l fo

r le

akag

e an

d sp

illage

, sh

ould

onl

y be

und

erta

ken

with

in a

reas

app

ropr

iate

ly e

quip

ped

to c

ontro

l the

se d

isch

arge

s.

Oils

and

fuel

s sh

ould

only

be

stor

ed in

des

igna

ted

area

s w

hich

ha

ve p

ollu

tion

prev

entio

n fa

cilit

ies.

To

prev

ent

spill

age

of f

uels

an

d so

lven

ts to

any

nea

rby

stor

m w

ater

dra

in, a

ll fu

el ta

nks

and

stor

age

area

s sh

ould

be

prov

ided

with

loc

ksan

d be

site

d on

se

aled

are

as,

with

in b

unds

of

a ca

paci

ty e

qual

to

110%

of

the

stor

age

capa

city

of t

he la

rges

t tan

k. T

he b

und

shou

ld b

e dr

aine

d of

rain

wat

er a

fter a

rain

eve

nt.

Proj

ect c

onst

ruct

ion

site

/ D

urat

ion

of th

e co

nstru

ctio

n ph

ase

Con

tract

or

appo

inte

d by

OPC

ProP

ECC

Not

e PN

1/9

4;W

aste

Dis

posa

l O

rdin

ance

(Cap

35

4);

Was

te D

ispo

sal

(Che

mic

al W

aste

) (G

ener

al)

Reg

ulat

ion

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

13

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

Dis

posa

l of c

hem

ical

was

tes

shou

ld b

e ca

rrie

d ou

t in

com

plia

nce

with

the

Was

te D

ispo

sal

Ord

inan

ce.

The

Cod

e of

Pra

ctic

e on

th

e Pa

ckag

ing,

La

bellin

g an

d St

orag

e of

C

hem

ical

W

aste

s pu

blis

hed

unde

r th

e W

aste

D

ispo

sal

Ord

inan

ce

deta

ils

the

requ

irem

ents

to

de

al

with

ch

emic

al

was

tes.

Gen

eral

re

quire

men

ts a

re g

iven

as

follo

ws:

�Su

itabl

e co

ntai

ners

sho

uld

be u

sed

to h

old

the

chem

ical

w

aste

s to

avo

id le

akag

e or

spi

llage

dur

ing

stor

age,

han

dlin

g an

d tra

nspo

rt.

�C

hem

ical

was

te c

onta

iner

s sh

ould

be

suita

bly

labe

lled,

to

notif

y an

d w

arn

the

pers

onne

l who

are

han

dlin

g th

e w

aste

s,

to a

void

acc

iden

ts.

�St

orag

e ar

ea s

houl

d be

sel

ecte

d at

a s

afe

loca

tion

on s

ite

and

adeq

uate

spa

ce s

houl

d be

allo

cate

d to

the

sto

rage

ar

ea.

6.7

4.2

Sew

age

Efflu

ent f

rom

the

Con

stru

ctio

n W

orkf

orce

The

Con

tract

or s

houl

d pr

ovid

e te

mpo

rary

san

itary

faci

litie

s, s

uch

as p

orta

ble

chem

ical

toile

ts w

ithin

the

cons

truct

ion

site

to h

andl

e se

wag

e fro

m

the

wor

kfor

ce.

The

Con

tract

or

has

the

resp

onsi

bilit

y to

en

sure

th

at

chem

ical

to

ilets

ar

e us

ed

and

prop

erly

mai

ntai

ned,

and

that

lice

nsed

Con

tract

ors

are

empl

oyed

to

col

lect

and

dis

pose

of t

he w

aste

off-

site

at a

ppro

ved

loca

tions

.

Proj

ect c

onst

ruct

ion

site

/ D

urat

ion

of th

e co

nstru

ctio

n ph

ase

Con

tract

or

appo

inte

d by

OPC

ProP

ECC

Not

e PN

1/9

4

Wat

er Q

ualit

y Im

pact

(Ope

ratio

n)

6.7

4.2

Run

off f

rom

Roa

d Su

rfac

esR

oad

drai

nage

sys

tem

des

ign

has

alre

ady

incl

uded

silt

trap

s in

th

e gu

lly in

lets

to re

mov

e si

lt an

d gr

it be

fore

the

runo

ff en

ters

the

publ

ic

stor

m

wat

er

drai

nage

sy

stem

.Si

lt tra

ps

shou

ld

be

regu

larly

che

cked

and

mai

ntai

ned

to e

nsur

e ef

ficie

nt o

pera

tion.

With

in P

roje

ct a

rea

/ D

urin

g op

erat

ion

phas

e O

PC/O

pera

tor

appo

inte

d by

OPC

EIAO

-TM

;W

PCO

6.7

4.2

Run

off f

rom

On-

site

Pla

ntin

g A

rea

Wat

erin

g of

pla

nts

on s

ite s

houl

d al

way

s be

per

form

ed b

efor

e ap

plic

atio

n of

pes

ticid

es,

herb

icid

es a

nd f

ertil

izer

s.

Reg

ular

tra

inin

g sh

ould

al

so

be

prov

ided

to

fro

ntlin

e st

aff

on

the

appr

opria

te tr

eatm

ent a

nd d

ispo

sal o

f pes

ticid

es, h

erbi

cide

s an

d fe

rtiliz

ers.

With

in P

roje

ct a

rea

/ D

urin

g op

erat

ion

phas

e O

PC/O

pera

tor

appo

inte

d by

OPC

EIAO

-TM

;W

PCO

;TM

-DSS

Was

te M

anag

emen

t Im

plic

atio

ns (C

onst

ruct

ion)

8.5.

1.1

6.2

Goo

d Si

te P

ract

ice

Proj

ectc

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n C

ontra

ctor

Was

te D

ispo

sal

Ord

inan

ce; W

aste

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

14

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

Rec

omm

enda

tions

for g

ood

site

pra

ctic

es d

urin

g th

e co

nstru

ctio

n ac

tiviti

es in

clud

e:�

Nom

inat

ion

of a

n ap

prov

ed p

erso

n, s

uch

as a

site

man

ager

, to

be

resp

onsi

ble

for

good

site

pra

ctic

es,

arra

ngem

ents

for

co

llect

ion

and

effe

ctiv

e di

spos

al to

an

appr

opria

te fa

cilit

y, o

f al

l was

tes

gene

rate

d at

the

site

Trai

ning

of s

ite p

erso

nnel

in p

rope

r w

aste

man

agem

ent a

nd

chem

ical

han

dlin

g pr

oced

ures

Prov

isio

n of

suf

ficie

nt w

aste

dis

posa

l poi

nts

and

regu

lar

colle

ctio

n of

was

te

�Ap

prop

riate

mea

sure

s to

min

imis

e w

indb

low

n lit

ter

and

dust

/ od

our

durin

g tra

nspo

rtatio

n of

w

aste

by

ei

ther

co

verin

g tru

cks

or b

y tra

nspo

rting

was

tes

in e

nclo

sed

cont

aine

rs

�St

ockp

iles

of C

&D m

ater

ials

sho

uld

be k

ept c

over

ed b

y im

perv

ious

she

ets

to a

void

win

d-bl

own

dust

All d

usty

mat

eria

ls in

clud

ing

C&D

mat

eria

ls s

houl

d be

sp

raye

d w

ith w

ater

imm

edia

tely

prio

r to

any

load

ing

trans

fer

oper

atio

n so

as

to k

eep

the

dust

y m

ater

ial w

et d

urin

g m

ater

ial h

andl

ing

at th

e st

ockp

ile a

reas

�Pr

ovis

ion

of

whe

el

was

hing

fa

cilit

ies

befo

re

the

truck

s le

avin

g th

e w

orks

are

a so

as

to m

inim

ise

dust

intro

duct

ion

to

publ

ic ro

ads

�W

ell

plan

ned

deliv

ery

prog

ram

me

for

offs

ite d

ispo

sal

such

th

at a

dver

se e

nviro

nmen

tal i

mpa

ct fr

om tr

ansp

ortin

g th

e in

ert

or n

on-in

ert C

&D m

ater

ials

is

not a

ntic

ipat

ed

stag

e / U

ntil

com

plet

ion

of a

ll co

nstru

ctio

n ac

tiviti

es

appo

inte

d by

OPC

D

ispo

sal

(Che

mic

al

Was

tes)

(Gen

eral

) R

egul

atio

n; a

nd

ETW

B Te

chni

cal

Circ

ular

(Wor

ks)

No.

19/

2005

En

viro

nmen

tal

Man

agem

ent o

n C

onst

ruct

ion

Site

8.5.

1.2

6.2

Was

te R

educ

tion

Mea

sure

s G

ood

man

agem

ent a

nd c

ontro

l can

pre

vent

the

gene

ratio

n of

a

sign

ifica

nt a

mou

nt o

f was

te. W

aste

redu

ctio

n is

bes

t ach

ieve

d at

th

e pl

anni

ng a

nd d

esig

n st

age,

as

wel

l as

by e

nsur

ing

the

impl

emen

tatio

n of

goo

d si

te p

ract

ices

. Rec

omm

enda

tions

to

achi

eve

was

te re

duct

ion

incl

ude:

Sort

iner

t C

&D m

ater

ials

to

reco

ver

any

recy

clab

le p

ortio

ns

such

as

met

als

Segr

egat

ion

and

stor

age

of

diffe

rent

ty

pes

of

was

te

in

diffe

rent

con

tain

ers

or s

kips

to e

nhan

ce re

use

or re

cycl

ing

of

Proj

ectc

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

all

cons

truct

ion

activ

ities

Con

tract

or

appo

inte

d by

OPC

Was

te D

ispo

sal

Ord

inan

ce

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

15

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

mat

eria

ls a

nd th

eir p

rope

r dis

posa

l �

Enco

urag

e co

llect

ion

of r

ecyc

labl

e w

aste

suc

h as

was

te

pape

r an

d al

umin

ium

can

s by

pro

vidi

ng s

epar

ate

labe

lled

bins

to

enab

le s

uch

was

te t

o be

seg

rega

ted

from

oth

er

gene

ral r

efus

e ge

nera

ted

by th

e w

ork

forc

e �

Prop

er s

ite p

ract

ices

to m

inim

ise

the

pote

ntia

l for

dam

age

or

cont

amin

atio

n of

iner

t C&D

mat

eria

ls

�Pl

an t

he u

se o

f co

nstru

ctio

n m

ater

ials

car

eful

ly t

o m

inim

ise

amou

nt

of

was

te

gene

rate

d an

d av

oid

unne

cess

ary

gene

ratio

n of

was

te

8.5.

1.3

6.2

Iner

t and

Non

-iner

t C&

D m

ater

ials

In

or

der

to

min

imis

e im

pact

s re

sulti

ng

from

co

llect

ion

and

trans

porta

tion

of i

nert

C&D

mat

eria

ls f

or o

ff-si

te d

ispo

sal,

the

iner

t C

&D m

ater

ials

sho

uld

be r

euse

d on

-site

as

fill m

ater

ial a

s fa

r as

pra

ctic

able

. In

add

ition

, in

ert

C&D

mat

eria

ls g

ener

ated

fro

m e

xcav

atio

n w

orks

cou

ld b

e re

used

as

fill m

ater

ials

in lo

cal

proj

ects

that

requ

ire p

ublic

fill

for r

ecla

mat

ion.

The

surp

lus

iner

t C

&D m

ater

ials

will

be d

ispo

sed

of a

t th

e G

over

nmen

t’s P

FRFs

for

ben

efic

ial

use

by o

ther

pro

ject

s in

H

ong

Kon

g.Th

e C

&D

mat

eria

ls

gene

rate

d fro

m

gene

ral

site

cl

eara

nce

shou

ld b

e so

rted

on s

ite t

o se

greg

ate

any

iner

t m

ater

ials

for

re

use

or d

ispo

sal o

f at

PFR

Fs w

here

as t

he n

on-in

ert

mat

eria

ls

will

be

disp

osed

of a

t the

des

igna

ted

land

fill s

ite.

In o

rder

to

mon

itor

the

disp

osal

of

iner

t an

d no

n-in

ert

C&D

mat

eria

ls a

t res

pect

ivel

y PF

RFs

and

the

desi

gnat

ed la

ndfil

l site

, an

d to

con

trol f

ly-ti

ppin

g, it

is r

ecom

men

ded

that

the

Con

tract

or

shou

ld f

ollo

w t

he D

EVB

Tech

nica

l C

ircul

ar (

Wor

ks)

No.

6/20

10

for

Trip

Tic

ket S

yste

m fo

r D

ispo

sal o

f Con

stru

ctio

n &

Dem

oliti

on

Mat

eria

ls is

sued

by

Dev

elop

men

t Bu

reau

.In

add

ition

, it

is a

lso

reco

mm

ende

d th

at

the

Con

tract

or

shou

ld

prep

are

and

impl

emen

t a

Was

te M

anag

emen

t Pl

an d

etai

ling

thei

r va

rious

w

aste

aris

ing

and

was

te m

anag

emen

t pr

actic

es in

acc

orda

nce

with

the

rel

evan

t re

quire

men

ts o

f th

e ET

WB

Tech

nica

l Circ

ular

(W

orks

) N

o.

19/2

005

Envi

ronm

enta

l M

anag

emen

t on

C

onst

ruct

ion

Site

.

Proj

ect c

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

all

cons

truct

ion

activ

ities

Con

tract

or

appo

inte

d by

OPC

Was

te D

ispo

sal

Ord

inan

ce ;

DEV

BTe

chni

cal C

ircul

ar

(Wor

ks)

No.

6/20

10 fo

r Trip

Ti

cket

Sys

tem

for

Dis

posa

l of

Con

stru

ctio

n &

Dem

oliti

on

Mat

eria

ls; a

nd

ETW

B Te

chni

cal

Circ

ular

(Wor

ks)

No.

19/

2005

En

viro

nmen

tal

Man

agem

ent o

n C

onst

ruct

ion

Site

8.5.

1.4

6.2

Che

mic

al W

aste

If ch

emic

al w

aste

s ar

e pr

oduc

ed a

t th

e co

nstru

ctio

n si

te,

the

Proj

ect c

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n C

ontra

ctor

ap

poin

ted

by O

PC

�C

ode

of P

ract

ice

on th

e Pa

ckag

ing

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

16

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

Con

tract

or

will

be

re

quire

d to

re

gist

er

with

th

e EP

D

as

a ch

emic

al w

aste

pro

duce

r an

d to

fol

low

the

gui

delin

es s

tate

d in

th

e “C

ode

of P

ract

ice

on th

e Pa

ckag

ing

Labe

lling

and

Stor

age

of

Che

mic

al W

aste

s”. G

ood

qual

ity c

onta

iner

s co

mpa

tible

with

the

chem

ical

was

tes

shou

ld b

e us

ed,

and

inco

mpa

tible

che

mic

als

shou

ld

be

stor

ed

sepa

rate

ly.

Appr

opria

te

labe

ls

shou

ld

be

secu

rely

atta

ched

on

each

che

mic

al w

aste

con

tain

er in

dica

ting

the

corr

espo

ndin

g ch

emic

al

char

acte

ristic

s of

th

e ch

emic

al

was

te,

such

as

expl

osiv

e, f

lam

mab

le,

oxid

isin

g, i

rrita

nt,

toxi

c,

harm

ful,

corro

sive

, et

c. T

he C

ontra

ctor

sho

uld

use

a lic

ense

d co

llect

or to

tran

spor

t and

dis

pose

of t

he c

hem

ical

was

tes

at th

e ap

prov

ed C

hem

ical

Was

te T

reat

men

t C

entre

or

othe

r lic

ense

d re

cycl

ing

faci

litie

s,

in

acco

rdan

ce

with

th

e W

aste

D

ispo

sal

(Che

mic

al W

aste

) (G

ener

al) R

egul

atio

n.Po

tent

ial e

nviro

nmen

tal i

mpa

cts

aris

ing

from

the

hand

ling

activ

ities

(inc

ludi

ng s

tora

ge, c

olle

ctio

n, tr

ansp

orta

tion

and

disp

osal

of c

hem

ical

was

te) a

re e

xpec

ted

to b

e m

inim

al w

ith th

e im

plem

enta

tion

of a

ppro

pria

te m

itiga

tion

mea

sure

s as

re

com

men

ded.

stag

e / U

ntil

com

plet

ion

of a

ll co

nstru

ctio

n ac

tiviti

es

Labe

lling

and

St

orag

e of

C

hem

ical

Was

tes;

W

aste

Dis

posa

l (C

hem

ical

Was

te)

(Gen

eral

) R

egul

atio

n

8.5.

1.5

6.2

Gen

eral

Ref

use

Gen

eral

refu

se s

houl

d be

sto

red

in e

nclo

sed

bins

or c

ompa

ctio

n un

its s

epar

ated

fro

m i

nert

C&D

mat

eria

ls.

A re

puta

ble

was

te

colle

ctor

sho

uld

be

empl

oyed

by

th

e C

ontra

ctor

to

re

mov

e ge

nera

l re

fuse

fro

m

the

site

, se

para

tely

fro

m

iner

t C

&D

mat

eria

ls.

Pref

erab

ly a

n en

clos

ed a

nd c

over

ed a

rea

shou

ld b

e pr

ovid

ed to

redu

ce th

e oc

curr

ence

of '

win

d bl

own'

ligh

t mat

eria

l.

Proj

ect c

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

all

cons

truct

ion

activ

ities

Con

tract

or

appo

inte

d by

OPC

Was

te D

ispo

sal

Ord

inan

ce a

nd

Publ

ic H

ealth

and

M

unic

ipal

Ser

vice

s O

rdin

ance

-Pu

blic

C

lean

sing

and

Pr

even

tion

of

Nui

sanc

es

Reg

ulat

ion

8.5.

1.6

6.2

Floa

ting

Ref

use

Prov

ide

gene

ral r

efus

e co

llect

ion

poin

ts o

n si

te c

an m

inim

ise

the

refu

se c

onta

min

ate

the

mar

ine

envi

ronm

ent.

The

cons

truct

ion

cont

ract

ors

will

be r

equi

red

to r

egul

arly

che

ck a

nd c

lean

any

re

fuse

trap

ped

or a

ccum

ulat

ed a

long

the

artif

icia

l sea

wal

l. S

uch

refu

se w

ill th

en b

e st

ored

and

dis

pose

d of

tog

ethe

r w

ith t

he

gene

ral r

efus

e.

Proj

ect c

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

all

cons

truct

ion

activ

ities

Con

tract

or

appo

inte

d by

OPC

Was

te D

ispo

sal

Ord

inan

ce

Was

te M

anag

emen

t Im

plic

atio

ns (O

pera

tion)

8.5.

2.1

6.2

Gen

eral

Ref

use

Gen

eral

ref

use

shou

ld b

e co

llect

ed o

n da

ily b

asis

and

del

iver

ed

Proj

ect a

rea

/ On

a re

gula

r bas

is /

Con

tract

or

appo

inte

d by

OPC

Was

te D

ispo

sal

Ord

inan

ce

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

17

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

to t

he r

efus

e co

llect

ion

poin

t ac

cord

ingl

y. A

rep

utab

le w

aste

co

llect

or s

houl

d be

em

ploy

ed to

rem

ove

gene

ral r

efus

e re

gula

rly

to

avoi

d od

our

nuis

ance

or

pe

st/v

erm

in

prob

lem

. Su

ffici

ent

recy

clin

g co

ntai

ners

are

reco

mm

ende

d to

be

prov

ided

at s

uita

ble

loca

tions

of t

he P

roje

ct to

enc

oura

ge r

ecyc

ling

of s

uch

was

te a

s al

umin

ium

can

s, p

last

ics

and

was

te p

aper

.

Thro

ugho

ut o

pera

tion

stag

e

8.5.

2.2

6.2

Che

mic

al W

aste

If

chem

ical

was

tes

are

expe

cted

to

be p

rodu

ced

durin

g th

e op

erat

ion

phas

e, th

e Pr

ojec

t Pro

pone

nt s

houl

d re

gist

er w

ith th

e EP

D a

s a

chem

ical

was

te p

rodu

cer

and

follo

w t

he g

uide

lines

st

ated

in th

e “C

ode

of P

ract

ice

on th

e Pa

ckag

ing,

Lab

ellin

g an

d St

orag

e of

C

hem

ical

W

aste

s”.

Goo

d qu

ality

co

ntai

ners

co

mpa

tible

w

ith

the

chem

ical

w

aste

s sh

ould

be

us

ed,

and

inco

mpa

tible

ch

emic

als

shou

ld

be

stor

ed

sepa

rate

ly.

Appr

opria

tela

bels

sh

ould

be

se

cure

ly

atta

ched

on

ea

ch

chem

ical

was

te c

onta

iner

indi

catin

g th

e co

rres

pond

ing

chem

ical

ch

arac

teris

tics

of

the

chem

ical

w

aste

, su

ch

as

expl

osiv

e,

flam

mab

le,

oxid

isin

g,

irrita

nt,

toxi

c,

harm

ful,

corr

osiv

e,

etc.

Li

cens

ed c

olle

ctor

sho

uld

be d

eplo

yed

to tr

ansp

ort a

nd d

ispo

se

of

the

chem

ical

w

aste

s at

th

e ap

prov

ed

Che

mic

al

Was

te

Trea

tmen

t C

entre

or

ot

her

licen

sed

recy

clin

g fa

cilit

ies,

in

ac

cord

ance

w

ith

the

Was

te

Dis

posa

l (C

hem

ical

W

aste

) (G

ener

al) R

egul

atio

n.

Proj

ect a

rea

/ On

a re

gula

r bas

is /

Thro

ugho

ut o

pera

tion

stag

e

Con

tract

or

appo

inte

d by

OPC

Cod

e of

Pra

ctic

e on

the

Pack

agin

g La

belli

ng a

nd

Stor

age

of

Che

mic

al W

aste

s;

Was

te D

ispo

sal

(Che

mic

al W

aste

) (G

ener

al)

Reg

ulat

ion

8.5.

2.3

6.2

Floa

ting

Ref

use

Reg

ular

ins

pect

ion

shou

ld b

e ca

rrie

d ou

t al

ong

the

artif

icia

l se

awal

l of

th

e Pr

ojec

t bo

unda

ry

for

any

entra

pmen

t or

ac

cum

ulat

ion

of fl

oatin

g re

fuse

. Whe

re a

n ap

prec

iabl

e am

ount

of

float

ing

refu

se

is

foun

d on

th

e ar

tific

ial

seaw

all

durin

g th

e in

spec

tion,

the

loc

atio

ns o

f su

ch r

efus

e w

ill be

rec

orde

d an

d ar

rang

emen

ts w

ith t

he p

roje

ct p

ropo

nent

will

im

med

iate

ly b

e m

ade

to c

olle

ct a

nd c

lear

the

refu

se fr

om th

e se

awal

l.

Proj

ect a

rea

/ On

a re

gula

r bas

is /

Thro

ugho

ut o

pera

tion

stag

e

Con

tract

or

appo

inte

d by

OPC

Was

te D

ispo

sal

Ord

inan

ce

Land

Con

tam

inat

ion

(Con

stru

ctio

n)9.

67.

2In

any

cas

e w

here

con

tam

inat

ed s

oil

is i

dent

ified

afte

r th

e co

mm

ence

men

t of

wor

ks,

a C

onta

min

atio

n As

sess

men

t Pl

an

(CAP

) is

requ

ired

to b

e pr

epar

ed fo

r EPD

's e

ndor

sem

ent p

rior t

o

Proj

ect c

onst

ruct

ion

site

/ Be

fore

con

stru

ctio

n st

age

Con

tract

or

appo

inte

d by

OPC

Gui

danc

e N

ote

for

Con

tam

inat

ed

Land

Ass

essm

ent

and

Rem

edia

tion

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

18

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

the

site

inv

estig

atio

n. T

he C

onta

min

atio

n As

sess

men

t R

epor

t (C

AR)

and/

or

R

emed

iatio

n Ac

tion

Plan

(R

AP)

shou

ld

be

prep

ared

for

EPD

's a

ppro

val a

fter

the

site

inve

stig

atio

n.

If la

nd

cont

amin

atio

n is

con

firm

ed, r

emed

iatio

n w

orks

sho

uld

be c

arrie

d ou

t acc

ordi

ng to

the

appr

oved

RAP

. A R

emed

iatio

n R

epor

t (R

R)

shou

ld a

lso

be p

repa

red

for

EPD

's e

ndor

sem

ent t

o de

mon

stra

te

that

the

cle

an-u

p of

the

con

tam

inat

ed l

and

is c

ompl

eted

. N

o co

nstru

ctio

n w

ork

or d

evel

opm

ent

of s

ite s

houl

d be

car

ried

out

befo

re th

e ap

prov

al o

f the

RR

.

Gui

danc

e M

anua

l fo

r Use

of R

isk-

base

d R

emed

iatio

n G

oals

for

Con

tam

inat

ed

Land

Man

agem

ent

Prac

tice

Gui

de fo

r In

vest

igat

ion

and

Rem

edia

tion

of

Con

tam

inat

ed

Land

9.6

7.2

If co

ntam

inat

ed

soil

is

iden

tifie

d,

the

follo

win

g m

itiga

tion

mea

sure

s ar

e fo

r th

e ex

cava

tion

and

trans

porta

tion

ofco

ntam

inat

ed m

ater

ials

(if a

ny):

�To

min

imis

e th

e in

cide

nts

of c

onst

ruct

ion

wor

kers

com

ing

in

cont

act

with

any

con

tam

inat

ed m

ater

ials

, bu

lk e

arth

-mov

ing

exca

vatio

n eq

uipm

ent s

houl

d be

em

ploy

ed;

�C

onta

ct w

ith c

onta

min

ated

mat

eria

ls c

an b

e m

inim

ised

by

wea

ring

appr

opria

te

clot

hing

an

d pe

rson

al

prot

ectiv

e eq

uipm

ent

such

as

gl

oves

an

d m

asks

(es

peci

ally

w

hen

wor

king

dire

ctly

with

con

tam

inat

ed m

ater

ial),

pro

visi

on o

f w

ashi

ng f

acilit

ies

and

proh

ibiti

on o

f sm

okin

g an

d ea

ting

on

site

; �

Stoc

kpili

ng

of

cont

amin

ated

ex

cava

ted

mat

eria

ls

on

site

sh

ould

be

avoi

ded

as fa

r as

poss

ible

; �

The

use

of a

ny c

onta

min

ated

soi

l fo

r la

ndsc

apin

g pu

rpos

e sh

ould

be

avoi

ded

unle

ss p

re-tr

eatm

ent w

as c

arrie

d ou

t; �

Vehi

cles

co

ntai

ning

an

y ex

cava

ted

mat

eria

ls

shou

ld

be

suita

bly

cove

red

to r

educ

e du

st e

mis

sion

s an

d/or

rel

ease

of

cont

amin

ated

was

tew

ater

; �

Truc

k bo

dies

and

tailg

ates

sho

uld

be s

eale

d to

pre

vent

any

di

scha

rge;

Onl

y lic

ense

d w

aste

hau

lers

sho

uld

be u

sed

to c

olle

ct a

nd

trans

port

cont

amin

ated

mat

eria

l to

tre

atm

ent/d

ispo

sal

site

an

d sh

ould

be

equi

pped

with

trac

king

sys

tem

to

avoi

d fly

Proj

ect c

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

all

cons

truct

ion

activ

ities

Con

tract

or

appo

inte

d by

OPC

Was

te D

ispo

sal

Ord

inan

ce (C

ap

354)

W

aste

Dis

posa

l (C

hem

ical

Was

te)

(Gen

eral

) R

egul

atio

n (C

ap

354)

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

19

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

tippi

ng;

�Sp

eed

cont

rol

for

truck

s ca

rryi

ng c

onta

min

ated

mat

eria

ls

shou

ld b

e ex

erci

sed.

Obs

erve

all

rele

vant

regu

latio

ns in

rela

tion

to w

aste

han

dlin

g,

such

as

W

aste

D

ispo

sal

Ord

inan

ce

(Cap

35

4),

Was

te

Dis

posa

l (C

hem

ical

Was

te)

(Gen

eral

) R

egul

atio

n (C

ap 3

54)

and

obta

in a

ll ne

cess

ary

perm

its w

here

requ

ired;

and

Mai

ntai

n re

cord

s of

was

te g

ener

atio

n an

d di

spos

al q

uant

ities

an

d di

spos

al a

rran

gem

ents

.

Land

scap

e an

d Vi

sual

Impa

ct (C

onst

ruct

ion)

Tabl

e 12

.13

(CP0

1)

Tabl

e 9.

1 (C

P01)

Min

imis

atio

n of

Con

stru

ctio

n Pe

riod

Th

e co

nstru

ctio

n pr

ogra

mm

e sh

ould

be

care

fully

des

igne

d to

m

inim

ise

the

leng

th o

f the

con

stru

ctio

n pe

riod.

Proj

ect c

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

all

cons

truct

ion

activ

ities

Con

tract

or

appo

inte

d by

OPC

�EI

AO-T

M

Tabl

e 12

.13

(CP0

2)

Tabl

e 9.

1 (C

P02)

Min

imis

atio

n of

Wor

ks A

reas

The

foot

prin

t of t

he p

ropo

sed

hard

stru

ctur

es a

s w

ell a

s th

e ex

tent

of t

empo

rary

wor

ks a

reas

sho

uld

be m

inim

ised

as

far a

s pr

actic

able

.

Proj

ect c

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

all

cons

truct

ion

activ

ities

Con

tract

or

appo

inte

d by

OPC

�EI

AO-T

M

Tabl

e 12

.13

(CP0

3)

Tabl

e 9.

1 (C

P03)

Con

stru

ctio

n Si

te C

ontr

ols

Con

stru

ctio

n si

te c

ontro

ls s

houl

d be

enf

orce

d, w

here

pos

sibl

e, to

en

sure

that

the

land

scap

e an

d vi

sual

impa

cts

aris

ing

from

the

cons

truct

ion

phas

e ac

tiviti

es, s

uch

as th

e st

orag

e of

mat

eria

ls,

the

loca

tion

and

appe

aran

ce o

f site

acc

omm

odat

ion,

etc

. are

m

inim

ised

.

Proj

ect c

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

all

cons

truct

ion

activ

ities

Con

tract

or

appo

inte

d by

OPC

�EI

AO-T

M

Tabl

e 12

.13

(CP0

4)

Tabl

e 9.

1 (C

P04)

Pres

erva

tion

of E

xist

ing

Vege

tatio

n Th

e de

velo

pmen

t pro

posa

l sho

uld

avoi

d di

stur

banc

e to

exi

stin

g ve

geta

tion

as fa

r as

prac

ticab

le.

A fo

rmal

tree

rem

oval

ap

plic

atio

n sh

ould

be

subm

itted

for a

ppro

val b

y re

leva

nt

auth

oriti

es in

acc

orda

nce

with

LAO

PN

No.

07/

2007

“Tre

e Pr

eser

vatio

n an

d Tr

ee R

emov

al A

pplic

atio

n fo

r Bui

ldin

g D

evel

opm

ent i

n Pr

ivat

e Pr

ojec

ts” d

urin

g th

e de

taile

d de

sign

ph

ase

of th

e Pr

ojec

t. W

here

pos

sibl

e, a

ll tre

es w

hich

are

not

in

dire

ct c

onfli

ct w

ith th

e de

velo

pmen

t pro

posa

ls s

houl

d be

reta

ined

in

situ

.

Proj

ect c

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

all

cons

truct

ion

activ

ities

Con

tract

or

appo

inte

d by

OPC

�EI

AO-T

M;

LAO

PN

No.

07

/200

7

Tabl

e Ta

ble

No

Intr

usio

n Zo

nes

Proj

ect c

onst

ruct

ion

site

/ C

ontra

ctor

�EI

AO-T

M

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

20

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

12.1

3 (C

P06)

9.

1 (C

P06)

W

here

pra

ctic

able

, “no

intru

sion

zon

es” s

houl

d be

des

igna

ted

with

in th

e Pr

ojec

t are

a fo

r pro

tect

ion

of e

xist

ing

vege

tatio

n.

Dur

able

bou

ndar

y fe

nces

sho

uld

be e

rect

ed to

cle

arly

dem

arca

te

thes

e “n

o in

trusi

on z

ones

”. N

o co

nstru

ctio

n ac

tiviti

es, s

tora

ge o

f m

ater

ials

and

veh

icul

ar a

cces

s w

ill b

e al

low

ed w

ithin

the

“no

intru

sion

zon

es” t

o pr

even

t pot

entia

l dam

age

to c

anop

ies

and

root

zon

es o

f veg

etat

ion.

Thro

ugho

ut c

onst

ruct

ion

stag

e / U

ntil

com

plet

ion

of a

ll co

nstru

ctio

n ac

tiviti

es

appo

inte

d by

OPC

Tabl

e 12

.13

(CP0

9)

Tabl

e 9.

1 (C

P09)

Con

stru

ctio

n Si

te H

oard

ings

Two

type

s of

hoa

rdin

gs s

houl

d be

con

side

red.

One

is u

sed

for

area

s in

clo

se c

onta

ct w

ith v

isito

rs a

nd fo

r are

as w

here

vis

ual

intru

sion

is a

key

con

cern

. It

shou

ld b

e gr

aphi

cal a

nd th

emat

ic,

and

visu

ally

‘im

perm

eabl

e’ to

blo

ck th

e vi

ews

of c

onst

ruct

ion

activ

ities

from

the

VSR

s. T

he o

ther

is u

sed

for a

reas

to b

e vi

ewed

at a

dis

tanc

e. It

sho

uld

be s

ubtle

and

cam

oufla

ged

so

that

it b

lend

s in

with

the

surr

ound

ing

land

scap

e.

Proj

ect c

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

all

cons

truct

ion

activ

ities

Con

tract

or

appo

inte

d by

OPC

�EI

AO-T

M

Tabl

e 12

.13

(CP1

0)

Tabl

e 9.

1 (C

P10)

Dus

t and

Ero

sion

Con

trol

for E

xpos

ed S

oil

Exp

osed

soi

l sha

ll be

cov

ered

or “

cam

oufla

ged”

and

wat

ered

fre

quen

tly.

Area

s th

at a

re e

xpec

ted

to b

e le

ft w

ith b

are

soil

for a

lo

ng p

erio

d of

tim

e sh

ould

be

hydr

osee

ded

and

/ or c

over

ed w

ith

suita

ble

prot

ectiv

e fa

bric

s.

Proj

ect c

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

all

cons

truct

ion

activ

ities

Con

tract

or

appo

inte

d by

OPC

EIAO

-TM

Tabl

e 12

.13

(CP1

1)

Tabl

e 9.

1 (C

P11)

App

eara

nce

of C

onst

ruct

ion

Plan

t / M

achi

nery

To

min

imis

e th

e vi

sual

intru

sion

of c

onst

ruct

ion

activ

ities

to

visi

tors

and

oth

er V

SRs,

a s

uita

ble

colo

ur s

chem

e of

co

nstru

ctio

n m

achi

nes

and

plan

ts s

houl

d be

ado

pted

whe

re

poss

ible

.

Proj

ect c

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

all

cons

truct

ion

activ

ities

Con

tract

or

appo

inte

d by

OPC

EIAO

-TM

Tabl

e 12

.13

(CP1

2)

Tabl

e 9.

1 (C

P12)

Con

stru

ctio

n Li

ghtin

g C

ontr

ol

All s

ecur

ity fl

oodl

ight

s fo

r con

stru

ctio

n si

tes

shou

ld b

e eq

uipp

ed

with

adj

usta

ble

shie

ld, f

rost

ed d

iffus

ers

and

refle

ctiv

e co

vers

, an

d be

car

eful

ly c

ontro

lled

to m

inim

ise

light

pol

lutio

n an

d ni

ght-

time

glar

e to

the

VSR

s.

Proj

ect c

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

all

cons

truct

ion

activ

ities

Con

tract

or

appo

inte

d by

OPC

EIAO

-TM

Tabl

e 12

.13

(CP1

3)

Tabl

e 9.

1 (C

P13)

App

eara

nce

of C

onst

ruct

ion

Wor

kers

To

pro

tect

Oce

an P

ark’

s im

age,

con

stru

ctio

n w

orke

rs s

houl

d be

re

quire

d to

ent

er th

e pa

rk a

reas

with

thei

r hel

met

s an

d sa

fety

ve

sts

prop

erly

sto

red

or c

arrie

d in

non

-tran

spar

ent b

ags.

The

ysh

ould

als

o dr

ess

prop

erly

and

cle

anly

.

Proj

ect c

onst

ruct

ion

site

/ Th

roug

hout

con

stru

ctio

n st

age

/ Unt

il co

mpl

etio

n of

all

cons

truct

ion

activ

ities

Con

tract

or

appo

inte

d by

OPC

EIAO

-TM

Land

scap

e an

d Vi

sual

Impa

ct (O

pera

tion)

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

21

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

Tabl

e 12

.14

(OP0

1)

Tabl

e 9.

2 (O

P01)

Sens

itive

Des

ign

and

Dis

posi

tion

All p

ropo

sed

hard

stru

ctur

es s

houl

d be

sen

sitiv

ely

desi

gned

in a

m

anne

r tha

t res

pond

s to

the

exis

ting

and

plan

ned

land

scap

e co

ntex

t, an

d m

inim

ises

pot

entia

l adv

erse

land

scap

e an

d vi

sual

im

pact

s. T

he s

truct

ural

des

ign

shou

ld s

eek

to re

duce

the

appa

rent

vis

ual m

ass

thro

ugh

the

use

of n

atur

al m

ater

ials

suc

h as

woo

den

fram

e an

d se

mi-t

rans

pare

nt p

anel

s. S

ubdu

ed to

nes

shou

ld b

e co

nsid

ered

for t

he c

olou

r pal

ette

with

non

-ref

lect

ive

finis

hes

to re

duce

gla

re e

ffect

.Site

spe

cific

mea

sure

s, s

uch

as

the

disp

ositi

on o

f the

key

stru

ctur

es c

lose

r to

the

north

ern

slop

es, t

he d

esig

n of

bui

ldin

g fo

rms

as e

xten

sion

alo

ng th

e ex

istin

g sl

ope

topo

grap

hy, t

he u

se o

f con

cave

roof

form

and

the

loca

tion

of ri

de p

latfo

rms

on o

r nea

r the

slo

pes

to m

inim

ise

stru

ctur

al s

uppo

rt, s

houl

d al

so b

e co

nsid

ered

for b

ette

r in

tegr

atio

n w

ith th

e su

rrou

ndin

gs a

nd m

inim

isat

ion

of p

oten

tial

visu

al im

pact

s.

Proj

ect b

uild

ings

/ D

urin

g de

sign

sta

ge /

Thro

ugho

ut o

pera

tion

phas

e

Des

ign

Arch

itect

/ C

ontra

ctor

appo

inte

d by

OPC

��

EIAO

-TM

Tabl

e 12

.14

(OP0

3)

Tabl

e 9.

2 (O

P03)

Enha

ncem

ent P

lant

ing

Oth

er th

an c

ompe

nsat

ory

tree

plan

ting,

add

ition

al tr

ees,

shr

ubs,

gr

ound

cove

rs a

nd la

wn

shou

ld a

lso

be c

onsi

dere

d to

max

imis

egr

eeni

ng w

ithin

the

rede

velo

pmen

t are

a.

Proj

ect a

rea

/ Dur

ing

desi

gn s

tage

/ Th

roug

hout

ope

ratio

n ph

ase

Des

ign

Arch

itect

/ C

ontra

ctor

ap

poin

ted

by O

PC

��

EIAO

-TM

Tabl

e 12

.14

(OP0

6)

Tabl

e 9.

2 (O

P06)

Res

pons

ive

Ligh

ting

Des

ign

Ove

rall

light

ing

desi

gn w

ould

car

eful

ly c

onsi

der a

reas

onab

le

leve

l of f

unct

iona

l and

them

atic

ligh

ting

with

due

con

side

ratio

n of

po

ssib

le li

ght p

ollu

tion

and

nigh

t-tim

e gl

are

to th

e su

rroun

ding

s.

Con

side

ratio

n sh

all b

e m

ade

by th

e lig

htin

g de

sign

ers

to th

e fo

llow

ing

mea

sure

s:�

Ligh

ting

shal

l be

desi

gned

with

due

con

side

ratio

n of

m

ount

ing

heig

ht a

nd d

irect

ion

of li

ght f

ixtu

res

so a

s no

t to

poin

t dire

ctly

tow

ards

any

sen

sitiv

e re

ceiv

er.

�Li

ghtin

g sh

all b

e ar

rang

ed w

ith d

ue c

onsi

dera

tion

of

refle

ctan

ce s

o as

to a

void

gla

re e

ffect

. �

Ligh

ting

shal

l be

regu

larly

mon

itore

d du

ring

oper

atio

n.

�Li

ghts

loca

ted

adja

cent

or i

n pr

oxim

ity to

nei

ghbo

urs

shal

l be

care

fully

des

igne

d to

pre

vent

pos

sibl

e lig

ht in

trusi

on.

�Li

ghtin

g op

erat

ion

sche

dule

sha

ll sp

ecify

onl

y lig

hts

nece

ssar

y fo

r sec

urity

to b

e le

ft on

afte

r bus

ines

s ho

urs.

Pavi

ng m

ater

ials

sho

uld

be s

elec

ted

as n

eces

sary

to re

duce

Proj

ect a

rea

/ Dur

ing

desi

gn s

tage

/ Th

roug

hout

ope

ratio

n ph

ase

Des

ign

Arch

itect

/ C

ontra

ctor

ap

poin

ted

by O

PC

��

EIAO

-TM

3280

11/E

NL/

03/0

2/D

May

201

4 P

:\Hon

g K

ong\

EN

L\P

RO

JEC

TS\3

2801

1_O

cean

Par

k Ta

i Shu

e W

an E

IA\0

3 D

eliv

erab

les\

02 E

M&A

Man

ual\W

orki

ng\R

ev D

- re

vise

d fin

al\A

ppen

dice

s\W

orki

ng\A

ppen

dix

C -

Imp

Sch.

doc

22

Tai S

hue

Wan

Dev

elop

men

t at O

cean

Par

k E

nviro

nmen

tal M

onito

ring

and

Aud

it M

anua

l Im

plem

enta

tion

Stag

e1

EIA

Ref

.EM

&A

Log

Ref

.

Envi

ronm

enta

l Pro

tect

ion

Mea

sure

sLo

catio

n / D

urat

ion

of

mea

sure

s / T

imin

g of

co

mpl

etio

n of

m

easu

res

Impl

emen

tatio

n A

gent

Des

C

on

Op

Dec

R

elev

ant

Legi

slat

ion

&

Gui

delin

es

pote

ntia

l gla

re fr

om s

urfa

ce re

flect

ance

. �

Parti

cula

r atte

ntio

n sh

ould

be

paid

to th

e us

e of

ligh

ting

havi

ng a

hig

h in

tens

ity o

r har

sher

tone

(e.g

. met

al h

alid

e la

mps

). �

Ligh

ts s

hall

gene

rally

be

mod

els

havi

ng p

reci

se c

ut-o

ff ra

nge

(suc

h as

full

cut-o

ff op

tics

whe

re a

vaila

ble

and

prac

ticab

le)

and

if ne

cess

ary

be fi

tted

with

adj

usta

ble

anti-

glar

e sh

ield

s.

Rem

arks

: 1.

Des

– D

esig

n S

tage

, Con

– C

onst

ruct

ion

Sta

ge, O

p –

Ope

ratio

n, D

ec -

Dec

omm

issi

onin

g