‘‘We shape our buildings;thereafter they shape us’’Sir Winston Churchill
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLPPAGE 2
The OD Group was founded in 2004 by Jon Kearney to work within the construction industry alongside many of the professional bodies in the interiors market to deliver high quality interior projects across commercial, residential, and leisure sectors.
Over the past decade, steady growth and the consistent delivery of projects through some of the UK’s most exciting and challenging times has resulted in OD gaining respect from not only the professional bodies that we work with but also our peers and the wider business community.
OD is one of the Capital’s leading integrated design, project management and construction companies. With our partners we undertake various different projects in terms of scale and complexity for a diverse client base.
We provide the very best specialist expertise in all facets of the construction process, from project initiation to completion. Our talented and experienced team has been hand picked, trained and supported so that they can achieve the very best results. The team is made up of like-minded individuals who understand the importance of attention to detail and the essential need for a high quality end product. We do not consider ourselves to be builders or contractors, but craftsmen who can be proud of what we produce from conception to completion.
We genuinely enjoy working with a diverse range of companies from large multinationals to small privately owned businesses, taking care that each solution we design and implement reflects the individual needs of the client.
OD enjoys a high level of repeat business from many of our clients; a testament indeed to the professionalism and dedication of all our staff, which is something we believe that sets us apart in the market. Our trademark is combining high quality interior design and commercial acumen with best practice delivery in the market place.
The OD Management team is extremely passionate about what we do and supports all the staff within our business who enable us to deliver beyond our client’s expectations. What each client has in common, is a desire that their project is undertaken with complete attention to detail, is within budget, and delivered on time by a professional team. They also wish for the project, which can often be the cause of great stress within an organisation, to be as pleasurable an experience as possible.
At OD, we believe we can exceed all of our client’s needs and expectations.
FOREWORD
Steve CherryConstruction Director
Jon Kearney Managing Director
Greg PinchinCommercial Director
OdCOMPANY
• ODProjectsclientlistincludesArsenalFC,ScottBrownrigg,AYH,andPrice&Myers.
• RecruitmentofCommercialDirector(Managing Surveyor of top fit out company)
• RecruitmentofConstructionDirector(BCO&FXQualityAwardWinner)
• AIBframeworkcontractor.
• ODProjectscurrentlyemploy25staff.
• AchieveBritishCouncilforofficescorporatememberstatus.
• Sign5yearleaseandfitoutMoorgateHQ.
• JonKearneyfinalistforG4_NewGenerationAwards–EntrepreneurshipAward.
• RollsRoyceFrameworkcontractor• GreenAppleAwardforDigitas
Saatchi&Saatchi
• InstututeofCharteredAccountants Frameworkcontractor
• AwardedVogue/CondenastHQfitout
• EducationsectorexpansionwithsuccessfulfitoutprojectsforPartnershipsForSchoolsandNorthHertsCollege
• Savillsapprovedcontractor
• Highendresidentialteamacknowledgedasleading contractor within sector
• AwardedrefurbishmentforRoyalAlbertHall
2004 2005 2006 2007 2008 2009 2010 2011 2012
InJanuaryJonKearneyfoundsODProjects.
• ClientbaseexpandedtoincludeRoyal&SunAlliance,O2,AIB,MorleyFund,andGISInterpublic.
• ConsultantsincludeGensler,Cushman&Wakefield,BarrGazetas,andLeslieClark.
• Royal&SunAllianceapproved contractor status.
• ODProjectscomplete£4million,107Leadenhall,fitout.
• ODProjectsachieveISO9001status.
• Forecastrecordturnoverofcirca£20minwithBusinessPlan.
• Officiallaunchofaftercareteam‘ZEROdEFECTS’.
• SuccessfulcompletionoffirstIrishprojectforMarcusEvansHQinDublin.
• NotableprojectwinsforclientssuchasFinchatton,BMBProperty,UnitedContinentalAirlines,SafestayandRoyalLondonAssetManagement.
• Commitment to sustainability – BREEAM ‘Excellent’ achieved on refurbishment of RLAM property in Crawley,LEEDsilvercertificationachievedforHarrisWilliamsfitoutinMayfair,SKAsilvercertificateachievedforParadigmHousinginHighWycombe.
• RebrandofOdwhichdefinesourfocusanddisciplined approach to achieving quality.
• OdappointedonSavillsEstateAgencyofficefitout framework
• Repeatbusinesslevelsat70%ofturnoverand growing
• NotableprojectwinsforDowJones,RoyalLondonAssetManagement,Fendi,NationalAustraliaGroupandBerkeleyGroupMarketing Suites
• Odcompletesitsfirsthotelrefurbishmentforlaunch of exciting new venture for Safestay in London
• Odworkingonover50000sqftofLondonssuperprimeresidentialprojectsinKnightsbridge,Kensington&Hampstead
• OdGroupformed,divisionsfocusedonCommercialFitout,SuperprimeResidentialandCommercialDesign&Build
• ODExpandofficespacetotakeanotherflooratSunStHQ
HISTORY
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLPPAGE 4
OD HOLDINGS
OD INTERIORSOD PROJECTS OD SOLUTIONS
Specialising in interior fit out and construction to the professional construction industry.
WorkingcloselywithArchitects,ProjectManagers,QuantitySurveyorsanddirectforenduserclients.
Coveringall sectors includingCommercial,RetailandLeisure
Specialist high end residential refurbishment and construction company working closely with high net worth clients, developers and architects to deliver unique boutique interiors
Set up to cater for direct End User clients requiring a‘onestopshop’turnkeysolution.Workingwithinterior design and architecture companies Od are procurement specialist to take a client from concept to completion under one roof.
OD INTERIORS
Jon KearneyManaging Director
Steve CherryConstruction Director
Greg PinchinCommercial Director
Andy TorlotDirector
Graham CannDirector
Andrew WrightDirector
OdCOMPANY
TURNOVER
182 8 10 12 14 164 60
(Turnover£mApril-April)
2011/2012
20 2422 26
2012/2013
Secured2013/2014 (Projected)
(Turnover£mApril-April)
OD Solutions
Secured
Secured OD Interiors
OD Projects
2013/2014 (Projected)
2 8 10 12 144 60
OD GROUP TURNOVER
Secured
Secured2014/2015 (Projected)
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLPPAGE 6
OdCOMPANY
OD SOLUTIONS: INTERIORDESIGN&ARCHITECTPARTNERS
� Master planning
� Due diligence and building evaluation
� Design team leader
� Feasibilitystudies
� Condition surveys
� Leasesupport
� Development and base build monitoring
� Brief gathering
� Workplace strategy and change management
� Space planning
� ArchitecturalandinteriordesignthroughallRIBAworkstages
� Building refurbishment to the following standards:
� - Shell andCore -CatA - Cat B
� Building extensions
� Core reconfigurations and other major structural interventions
� Planningapplicationsandlocalauthorityliaison
� Contract administration
� Postoccupancyevaluation
� Furnitureaudits,selectionandprocurement
� Assistancewithartworkselection
� Computergeneratedimagery–animationandstills
� Graphicdesign � Signage and way finding
At OD we select the very best UK and International design partners to work on all projects. The scope of professional services that we offer includes:
We also have associations with a number of other specialist consultancies and can offer the following additional services fully integrated into our overall offer:
� Catering design and specification
� Acoustics
� Fireengineering
� Measured surveys
� Specialistlighting–internalandexternal
� Externallandscaping–hardandsoft
� Audiovisualdesignandspecification
� Relocationmanagement
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLPPAGE 8
DESIGN & BUILD: ODCONSTRUCTIVEDESIGN
PROJECTLIFECYCLE
STAGE 1 DESIGN•Feasibility–TestFits•ConceptDesign•DetailedDesign•TechnicalDesign•SpecialistDesign•ConstructionSupervision
STAGE 4 CONSTRUCTION•Settingupofsite&Logistics•Coordinationofworks•ConstructionProgrammemanagement•Reportingstructure•Financialcontrol•Close-out•ZerOdefects
STAGE 2 PRE CONSTRUCTION•InitialScopeofProject•Budgetsetting&development•Programmemanagement•TechnicalCoordination•Services&SystemsIntegration•ApprovalCoordination•Contractnegotiation
STAGE 3 PROCUREMENT•Identificationofpackages•LongleadItems•SpecialistPackages•Placingofallorders•Coordinationof
project deliverables
OdCOMPANY
OD SOLUTIONS:INTERIORDESIGN&ARCHITECTURE
PRE CONSTRUCTION CONSTRUCTION
DESIGN
COORDINATION COLLABORATION QUANTIFICATION EXECUTION COMPLETION
UK PROJECT MANAGERS & BUILDING CONSULTANCY
PROFESSIONAL ACCOUNTABLE RESPONSIBLE
SOLUTIONSOd SOLUTIONSOd
STAGE 1 DESIGN•Feasibility–TestFits•ConceptDesign•DetailedDesign•TechnicalDesign•SpecialistDesign•ConstructionSupervision
SPECIALIST PARTNERS•IT&AV•FURNITURE
STAGE 2 PRE CONSTRUCTION•InitialScopeofProject•Budgetsetting&development•Programmemanagement•TechnicalCoordination•Services&SystemsIntegration•ApprovalCoordination•Contractnegotiation
DESIGN
LEADING INTERIOR DESIGN&
ARCHITECTURE
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLPPAGE 10
OdPROJECT PROFILES
› Architect: Gensler
› ProjectManager: Gensler
› QuantitySurveyor: MontieAssociates
› M&E: ChapmanBathurst
› Value £600,000
› Size: 7,000sqft
› Duration: 8 weeks
CATBfitoutofoccupiedbuildingcomprising:
• NewBenedoubleglazedpartitions,
• Highspecbespokejoinerytoreceptionandmeetingrooms/boardroom,
• Modificationstomechanicalservicestosuitnewlayout,
• Highclassfinishesincludingstonefloortoreception,
• Supportareasincludingcommsroom,
• Bespokekitchen/breakoutarea.
MCCARTHY TETRAULTGRAYSINNROAD,WC1
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLPPAGE 12
OdPROJECT PROFILES
› ProjectManager: MurraySymonds
› QuantitySurveyor: Currie&Browns
› M&E: TB&A
› Duration: 8 weeks
SIMPSON THATCHER BARTLETTCITYPOINT
• Stripout;• Newceilingsfittedthroughout;• Installationofanewkitchen;•Newlighting,wallandfloorcoverings;
• Newtimberflooring;• Finishesincludingceramictilesandcarpet;• Newstateoftheartequipmentwith
complimenting units.
Thefitoutofthekitchen/staffdiningareasconsistingoftheremovaloftheoldkitchenandinstallationofacomplete new updated catering facility. The works comprised
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLPPAGE 14
OdPROJECT PROFILES
› Procurement: Design&Build
› Architect Gensler
› ProjectManager Gensler
› QuantitySurveyor Montie
› Duration 11 Weeks
› Value £600,000
› Size 3000sqft
Strip out and new fit out of existing occupied offices in two separate phases. The works undertaken comprised:
•NewCellularizedOffices,
•NewMeetingandBoardrooms,
•Highspecstonereception,
•Stoneflooring,
•Specialistjoinery,
•NewLightinginclusiveoffeaturelightinginstalledthroughout
SAPINDALEVEL5,25PARKLANE,W1
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLPPAGE 16
OdPROJECT PROFILES
› ProjectManager: Gensler
› Architect: Gensler
› Duration: 14weeks
› Size: 10,000sqft
› Value: £535,000
CATBfitoutofthefirstfloornewlyrefurbishedoccupiedbuildingtoprovideahighqualityoffice.
The works comprised:
•Highqualitybespokejoinery,
•Mechanical&electricalmodifications,
•DoubleglazedBENEpartitions&doors,
•Handmadecarpetflooring,
•Audiovisualinstallations.
HARRIS WILLIAMSLEVEL2,63BROOKSTREET,MAYFAIR,W1
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLPPAGE 18
OdPROJECT PROFILES
› Procurement: Design&Build
› Architect: BarrettLloydDavisAssociates
› Duration: 12Weeks
› Value: £700,000
› Size 9000sqft
CatBcommercialofficefitoutatSimmonscourtHouseinDublin,Worksincluded:
•NewOffices,
•NewMeetingandBoardrooms,
•Highspecreception,
•Staffbreakoutareas,
•NewcommsRoom,
MARCUS EVANSSIMMONSCOURTHOUSE
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLPPAGE 20
OdPROJECT PROFILES
› Procurement: Design&Build
› Architect Edge
› QuantitySurveyor Arcadis
› Duration 12Weeks
› Value £1,000,000
› Size 30,000sqft
Refurbishmentofofficefloorwhilstthebuildingremainedinfulloccupation,worksincluded:
•Stripout
•Installationofnewelectrical&mechanicalservices
•Glasspartitions
•FitOutofnewtoilets
•TeaPoints
•Highspecificationrestaurant
•Floorcoverings
DOW JONESGRAYSINNROAD,WC1
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLPPAGE 22
OdPROJECT PROFILES
› QuantitySurveyor: Gleeds
› Architect: DEGW
› ServicesConsultant: ARUP
› ProjectValue £2,000,000
› Duration 21weeks
› Size: 60,000sqft
UnderthedesignandbuildcontractthefitoutandrefurbishmentoftwofloorsofG-Wingevolvedto a negotiated second phase involving a further three floors of similar works comprising, new suspendedceilings,newpartitionlayoutswithglazedwalls,airconditioningmodifications,newelectrical installations, toilet fit out and specialist joinery.
ROLLS ROYCEPRIDEPARK,DERBY
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLPPAGE 24
CERTIFICATION
OdCERTIFICATION
Fit‐out Sustainability AssessmentThis is to certify that
Paradigm Housing GroupBuilding A1 Glory Park
High Wycombe Bucks HP10
has achieved the Ska rating of
Silver
Accredited Assessor
Pringle Brandon LLP
On behalf of
Paradigm Housing Group
Project Manager
Savills Commercial Ltd
Architect
Mansfield Monk
Contractor
OD Projects
Building Services Engineer
Capita Symonds
Certificate Reference
Glory Park, High Wycombe
Date
29/06/2010
This certificate has been produced using Ska Rating Offices version 1.0
SUSTAINABLE CREDENTIALS
PREPARED BY OD SOLUTIONS FOR SHULTE ROTH & ZABEL LLPPAGE 26
OdOD SOLUTIONS 1 SUN STREET LONDON EC2A 2EP
WHY OD?
InappointingODSolutionspotentialclientswillbetakingfulladvantageofthefollowingkeyareas that we believe differentiate us from our competitors:
• NO LEARNING CURVE-AprovenunderstandingofLondon’sfit-outmarket,standardsandqualityexpectations.
•LOCAL&INTERNATIONAL–AdedicatedteamofprofessionalsbasedinbothLondonandSingapore
•DESIGN–Apartnershipwith“BESTINCLASS”leadinginteriordesign&architectpracticeMCMwithextensiveexperienceoffinancialclientsanduptodateknowledgeoftrendsandregulations.AdesignwithIntegrity
•COST CERTAINTY–commercialcompetitivenessandunderstandingofclients’valueaspirations
•COMMUNICATION–Openandhonestcommunication;wewon’tmakepromisesweknowwecan’tkeep
•COORDINATION–Athoroughunderstandingofalltheapprovalsprocessandassociatedrequirements
•DEDICATED–ProjectManager&SiteManagerassignedtoprojectforthedurationoftheproject
•QUALITY–Ateamwhocareabouttheendproduct,serviceanddelivery
•DETAIL-AdesignwithIntegrityandhighfinishedproduct–NotDesign&Dump
•EXPERIENCE-Anextensiveprovensub-contractorandsupplierbase
•ENGINEERED-Acohesiveapplicationofthebuildingenvironmentand“Inhouse”MEPcoordination
•TRANSPARENCY-Aclearlythoughtoutprocesswithinanopenandhonestculture
Od OD SOLUTIONS 1 SUN STREET LONDON EC2A 2EP