  • HERVE BARON HERVE BARON Oil & Gas Engineering Training

    Welcome!

  • HERVE BARON HERVE BARON

    Dear colleague,

    I am glad to share with your this educative material on the Engineering of Oil & Gas facilities.

    I developed it for classroom training sessions which I have been conducting since 2009.

    This material will give you an overview of the work and deliverables of the different engineering disciplines.

    I also thrived to produce workflow visuals to help understand the work sequence of each discipline and how they interface.

    I wish you an enjoyable journey within Engineering

    Oil & Gas Engineering Training

  • HERVE BARON HERVE BARON Oil & Gas Engineering Training

    HSE Moment

    Project Engineering The Design Basis Discipline presentations

    Field engineering

    Quality Schedule

    Intro, scope & objectives

  • HERVE BARON HERVE BARON Oil & Gas Engineering Training

    HSE Moment

    Project Engineering The Design Basis Discipline presentations

    Field engineering

    Quality Schedule

    Intro, scope & objectives

  • HERVE BARON

    Training Objectives

    Scope

    To give a detailed knowledge of what engineering of oil and gas facilities consist of

    To describe the activities and show a sample deliverable in the various disciplines

    To explain the challenges

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON Oil & Gas Engineering Training

    HSE Moment

    Project Engineering The Design Basis Discipline presentations

    Field engineering

    Quality Schedule

    Intro, scope & objectives

  • HERVE BARON HERVE BARON Design Procurement Manufacturing Shipping

    Installation Construction & erection Inspection &

    tests Hand-over

  • HERVE BARON

    Engineering Sub-Contractor (Delhi) Detail Engineering (part)

    Shipyard (Korea) Hull Engineering & Fabrication

    Shipyards (Singapore & Malaysia) Topsides Fabrication & Integration

    Home office (Paris) Project management Detail Engineering (part) Procurement

    Satellite office (Pau) Detail Engineering (part)

    Fabrication yard (Nigeria): Fabrication (part)

    Offshore (Nigeria): Installation, commissioning, start-up

  • HERVE BARON HERVE BARON

    Project

    Engineering Procurement Construction

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

    Project

    Engineering

    Instrumentation & Control

    Layout & Piping Process Electrical Equipment Civil Safety

    Procurement Construction

  • HERVE BARON HERVE BARON Engineering document register

    Document number

    Document title Document revision

    A 1 48104 Service building instrument. rooms cables routing B

    A 2 48102 Trouble shooting diagrams D

    A 3 48134 F&G system architecture drawing E

    A 4 50100 Instrument index B

    A 7 50003 Spec for instrument installation works and service C

    A 8 50960 Instrument Data sheets for temperature switches B

    A 9 50110 Requisition for pressure relief valves B

    M 1 62059 General plot plan B

    M 2 62020 Piping details standard C

    M 2 62070 Piping general arrangement Area 1 D

    M 4 60100 Special items list D

    M 5 62250 Piping isometrics booklet C

    M 6 60000 Pipes and fittings thickness calculation A

    M 6 62351 Calculation note CN1 - piping stress analysis A

    M 7 60001 General piping specification C

    M 8 60103 Data sheets for station piping material B

    M 9 60200 Requisition for pipes F

    Discipline code

    A Instrumentation & Control

    C Civil engineering

    E Electrical

    G Project general documents

    J Mechanical

    K Safety

    M Piping & Layout

    P Processes

    S Steel Structures

    V Vessels Heat exchangers

    W Materials Welding

    Document code

    1 Installation drawings

    2 Detail drawings

    3 Diagrams

    4 Lists Bill of Quantities

    5 Isometrics

    6 Calculation notes

    7 Specifications

    8 Data sheets

    9 Requisitions

  • HERVE BARON HERVE BARON

    Key plan

    Diagram

    Drawing

  • HERVE BARON HERVE BARON

    Drawings common sizes & scales

    Scale 1m =

    1/1000 1 mm

    1/500 2 mm

    1/250 4 mm

    1/100 1 cm

    1/50 2 cm

    1/33 3 cm A0 = 840x1188

    A1 = 594x840

    A2 = 420x594

    A4 = 210x297

    A3 = 297x420

  • HERVE BARON HERVE BARON

    Engineering schedule

  • HERVE BARON HERVE BARON

    Piping 31%

    Structural 23%

    Instrumentation/ICSS/Telecom

    10%

    Commissioning 9%

    Electrical 9%

    Mechanical Equipment

    6%

    Naval 4%

    Process 2%

    Others 6%

    Engineering resources

    ~1,000,000 man-hours

  • HERVE BARON

    Engineering Documents for Purchase:

    bill of quantity & specification

    Documents for Construction:

    Construction drawings & specifications

    Documents submitted to client

    Client

    Approval/

    Comments

    Design basis:

    - Functional requirements

    - Client specifications

    - Design codes

    Vendors

    Documents submission Comments

  • HERVE BARON HERVE BARON Oil & Gas Engineering Training

    HSE Moment

    Project Engineering The Design Basis Discipline presentations

    Field engineering

    Quality Schedule

    Intro, scope & objectives

  • HERVE BARON HERVE BARON

    Process facilities:

    Feedstock and products flow

    Feedstock composition

    Battery limit conditions

    Equipment Spare

    Performance:

    Products specifications

    Energy efficiency, emissions

    Utilities:

    Electric power supply

    Other utilities

    Systems:

    Process control

    Fire/gas alarm

    Public address, LAN, PABX

    Infrastructure:

    Administrative and technical buildings

    Control room

    Access road

    Site fencing, gates, check point

    Design criteria:

    % of over design

    Environment data:

    Min/max temperature

    Rain/snow fall

    Wind

    Geological conditions

    Applicable codes and standards:

    International standards

    Local rules

    0 5

    10 15 20 25 30 35 40 45 50

    -85 -80 -75 -70 -65 -60 -55

    Pre

    ssu

    re (

    ba

    r)

    Design Basis

    Pressure (bar)

    Hydrates Curve

    Phase Envelope

    Temperature (C)

    25

    20

    15

    10

    5

    0

    -5

    -10

    -15

    -20

    -25

    -30

    -35

    -40

    -45

    -50

    -55

    -60

    -65

    -70

    -75

    -80

    -85

    80

    75

    70

    65

    60

    55

    50

    45

    40

    35

    30

    25

    20

    15

    10

    5

    0

  • HERVE BARON HERVE BARON Oil & Gas Engineering Training

    HSE Moment

    Project Engineering The Design Basis Discipline presentations

    Field engineering

    Quality Schedule

    Intro, scope & objectives

  • HERVE BARON HERVE BARON Engineering disciplines

    Process Equipment HSE Civil

    Layout

    Instrumentation Piping

    Electrical

  • HERVE BARON HERVE BARON

    Functional requirements example of a gas compression station

    Gas composition Performance

  • HERVE BARON HERVE BARON

    Process Scheme Optimization

    HP Separator 500 psig

    5500 psig

    Emul. Treater 50 psig 150 F

    3000 psig

    200 psig

    Degasser 5 psig

    5 psig

    50 psig

    1200 psig Gas Injection

    Oil Production

    From Wells 165 - 205 F

    500 psig

    HP Compression & TEG

    LP Compression

    TEG

    Cooler

    IP Compression

  • HERVE BARON HERVE BARON

    Process simulations

  • HERVE BARON HERVE BARON

    Process Flow Diagram (PFD)

  • HERVE BARON HERVE BARON Equipment list

  • HERVE BARON HERVE BARON

    Heat & Material balance

    Thermodynamic calculations

  • HERVE BARON HERVE BARON

    Equipment sizing

  • HERVE BARON HERVE BARON

    Process data sheet

  • HERVE BARON HERVE BARON

    Fluid list

  • HERVE BARON HERVE BARON Piping & Instrumentation Diagram (P&ID)

    Line List

  • HERVE BARON HERVE BARON Piping & Instrumentation Diagram (P&ID)

  • HERVE BARON P&IDs legend & symbols

  • HERVE BARON HERVE BARON Line sizing

  • HERVE BARON HERVE BARON

    Process automations: Cause & effect chart

  • HERVE BARON HERVE BARON Process control

  • HERVE BARON HERVE BARON Process safety

  • HERVE BARON HERVE BARON

    ESD logic diagram

  • HERVE BARON HERVE BARON

    ESD simplified diagram

  • HERVE BARON HERVE BARON

    Flare Report

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON Operating manual

  • HERVE BARON HERVE BARON

    Quiz: Is this a P&ID? a PFD?

  • HERVE BARON HERVE BARON Engineering

    Process Equipment HSE Civil

    Layout

    Instrumentation Piping

    Electrical

  • HERVE BARON HERVE BARON

    Process design

    PFDs

    H&M balance

    Rotating Pressure vessels Fired equipment Heat exchangers Packages etc.

    Process data sheet

    Equipment specification

  • HERVE BARON HERVE BARON Equipment list

  • HERVE BARON HERVE BARON

    Rotating machinery

  • HERVE BARON HERVE BARON Pressure vessels

  • HERVE BARON HERVE BARON

    Heat exchangers

  • HERVE BARON HERVE BARON Packages

  • HERVE BARON HERVE BARON

    Process data sheet

    Mechanical data sheet

  • HERVE BARON HERVE BARON

    Vessel guide drawing

  • HERVE BARON HERVE BARON Material Requisition

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON Bid technical evaluation

  • HERVE BARON HERVE BARON

    Vendor design

  • HERVE BARON HERVE BARON Equipment summary

  • HERVE BARON HERVE BARON Engineering

    Process Equipment HSE Civil

    Layout

    Instrumentation Piping

    Electrical

  • HERVE BARON HERVE BARON

    SEVERITY

    FREQENCY

    HAZOP Review

    RISK MATRIX

    RISK LEVEL

  • HERVE BARON HERVE BARON

    HAZOP Action sheet

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON Fire Fighting

  • HERVE BARON HERVE BARON Fire Water demand

    calculation note

  • HERVE BARON

    Fire Water P&IDs

  • HERVE BARON HERVE BARON

    Deluge system

    arrangement drawings

  • HERVE BARON HERVE BARON

    Fire fighting equipment location drawing

  • HERVE BARON Passive fire protection drawing

  • HERVE BARON Passive fire protection

  • HERVE BARON HERVE BARON Fire & Gas detection layout

  • HERVE BARON HERVE BARON

    Hazardous area classification drawing

  • HERVE BARON HERVE BARON

    Case stuy: Gas leak from random piping component rupture

    Cause: installation error, corrosion, material defect

    Possible consequence: Dispersion without ignition / jet fire / flash fire / explosion

    Section considered: Compressor building

    Quantitative Risk Analysis (QRA)

  • HERVE BARON HERVE BARON

    Step 1:

    Identification and characterisation of initiating events

    Gas leak inside compressor buidling due to component rupture

    Hole size (% of component section)

    5% 20% Full

    Frequency (event/year) 1,11E-01 5,06E-04 6,83E-05

    Outflow rate (kg/s) 5,7 90,8 2270,0

    risk components *failure rate (from statistics)

    Quantitative Risk Analysis (QRA)

  • HERVE BARON HERVE BARON

    Release Frequency Immediate ignition

    ESD & Fire Fighting

    Delayed Ignition

    Explosion/ Flash-fire

    Consequence Event Frequency (ev/y)

    0,998 Jet fire ESD & FF 7,779E-030,070

    0,002 Jet fire no ESD & FF 1,520E-05

    1,11E-01Release/yr

    0,949 Dispersion 9,827E-020,930

    0,120 Explosion 1,774E-050,028

    0,051 0,880 Flash fire 1,301E-04

    0,972 Dispersion 5,133E-03

    Yes Frequency (event/year)Jet fire ESD & FF 7,779E-03Jet fire no ESD & FF 1,520E-05Explosion 1,774E-05

    No Flash Fire 1,301E-04Dispersion 1,034E-01

    B04a/b/c/d 5%

    Step 2: Event tree analysis

    Probability of immediate ignition for 1-50 kg/s release rate is 7% (from statistical data)

    Probability of delayed ignition takes into account equipment explosion protection (Ex)

    Gas detectors are provided inside the building, that activate isolation and depressurization. It is assumed that they operate 95% of the time.

    Quantitative Risk Analysis (QRA)

    Probability of explosion vs flash fire depends on mass of gas and degree of confinement

  • HERVE BARON HERVE BARON

    Step 3:

    Consequence evalutation

    Overpresssure (bar) 0.2 0.1 0.01

    Distance (m) 96 167 1270

    CONSEQUENCE CLASS QUANTITATIVE CRITERIA EFFECTS

    MINOR 0.1 bar locally (within 10m) No effect, no damage

    SIGNIFICANT 0.1 bar locally (within 50m) Limited damage to plant and operators

    SEVERE > 0.1 bar within plant Damage to plant and operators

    MAJOR > 0.1 bar on populated areas Damage to plant, operators & public

    Quantitative Risk Analysis (QRA)

  • HERVE BARON Unacceptable risk area Design change necessary

    As Low As Reasonably Practicable Plant Management measures

    Acceptable risk area

    1.0E-02

    1.0E-03

    1.0E-04 Unlikely

    1.0E-05 Rare

    1.0E-06 Minor Significant Severe Major

    Release Frequency Immediate ignition

    ESD & Fire Fighting

    Delayed Ignition

    Explosion/ Flash-fire

    Consequence Event Frequency (ev/y)

    0,998 Jet fire ESD & FF 7,779E-030,070

    0,002 Jet fire no ESD & FF 1,520E-05

    1,11E-01Release/yr

    0,949 Dispersion 9,827E-020,930

    0,120 Explosion 1,774E-050,028

    0,051 0,880 Flash fire 1,301E-04

    0,972 Dispersion 5,133E-03

    Yes Frequency (event/year)Jet fire ESD & FF 7,779E-03Jet fire no ESD & FF 1,520E-05Explosion 1,774E-05

    No Flash Fire 1,301E-04Dispersion 1,034E-01

    B04a/b/c/d 5%

    Release Frequency Immediate ignition

    ESD & Fire Fighting

    Delayed Ignition

    Explosion/ Flash-fire

    Consequence Event Frequency (ev/y)

    0,998 Jet fire ESD & FF 7,779E-030,070

    0,002 Jet fire no ESD & FF 1,520E-05

    1,11E-01Release/yr

    0,949 Dispersion 9,827E-020,930

    0,120 Explosion 1,774E-050,028

    0,051 0,880 Flash fire 1,301E-04

    0,972 Dispersion 5,133E-03

    Yes Frequency (event/year)Jet fire ESD & FF 7,779E-03Jet fire no ESD & FF 1,520E-05Explosion 1,774E-05

    No Flash Fire 1,301E-04Dispersion 1,034E-01

    B04a/b/c/d 5%

    Damage to plant, operators & public> 0.1 bar on populated areasMAJOR

    Damage to plant and operators> 0.1 bar within plantSEVERE

    Limited damage to plant and operators0.1 bar locally (within 50m)SIGNIFICANT

    No effect, no damage0.1 bar locally (within 10m)MINOR

    EFFECTSQUANTITATIVE CRITERIACONSEQUENCE CLASS

    Damage to plant, operators & public> 0.1 bar on populated areasMAJOR

    Damage to plant and operators> 0.1 bar within plantSEVERE

    Limited damage to plant and operators0.1 bar locally (within 50m)SIGNIFICANT

    No effect, no damage0.1 bar locally (within 10m)MINOR

    EFFECTSQUANTITATIVE CRITERIACONSEQUENCE CLASS

    Final step: classification of risk

    Quantitative Risk Analysis (QRA)

  • HERVE BARON HERVE BARON

    Environmental Impact Assessment (Air quality dispersion analysis)

  • HERVE BARON HERVE BARON

    Noise Map

    dB(A)

  • HERVE BARON

  • HERVE BARON HERVE BARON Engineering

    Process Equipment HSE Civil

    Layout

    Instrumentation Piping

    Electrical

  • HERVE BARON HERVE BARON

    Process design

    PFDs

    H&M balance

    Rotating Pressure vessels Fired equipment Heat exchangers Packages etc.

    P&IDs

    Piping

    Instrumentation

    Layout

    Civil

    Electrical

    Process data sheet

    Equipment specification Vendor

    drawings

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

    Grading plan

    Native soil elevation

    Required finish level

  • HERVE BARON HERVE BARON

  • HERVE BARON

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

    Vendor information

  • HERVE BARON HERVE BARON

    Foundation Calculation

  • HERVE BARON HERVE BARON

    Foundation drawing/

    re-inforcement

  • HERVE BARON HERVE BARON

    Foundation drawing/

    Formwork

  • HERVE BARON HERVE BARON Civil works

    specification

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

    Loading data

  • HERVE BARON HERVE BARON

    Structural design

  • HERVE BARON HERVE BARON Calculation note

  • HERVE BARON HERVE BARON

    Structural drawings

  • HERVE BARON HERVE BARON

    Architectural drawings

    Equipment layout drawing

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

    Heating, Ventilation &Air Conditioning (HVAC)

  • HERVE BARON HERVE BARON

    Civil Works Installation Drawings

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

    Standard drawings

  • HERVE BARON HERVE BARON Engineering

    Process Equipment HSE Civil

    Layout

    Instrumentation Piping

    Electrical

  • HERVE BARON HERVE BARON

    Process design

    PFDs

    H&M balance

    Rotating Pressure vessels Fired equipment Heat exchangers Packages etc.

    P&IDs

    Piping

    Instrumentation

    Layout

    Civil

    Electrical

    Process data sheet

    Equipment specification Vendor

    drawings

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

    Layout/

    principles

  • HERVE BARON HERVE BARON Layout/vendor drawings

  • HERVE BARON HERVE BARON

    Layout/consideration for all networks

  • HERVE BARON HERVE BARON General Plot Plan

  • HERVE BARON HERVE BARON

    Unit Plot Plan

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

    3D modelling

  • HERVE BARON HERVE BARON

    3D model clash check

  • HERVE BARON HERVE BARON 3D model review

  • HERVE BARON HERVE BARON

    Equipment handling

  • HERVE BARON HERVE BARON Engineering

    Process Equipment HSE Civil

    Layout

    Instrumentation Piping

    Electrical

  • HERVE BARON HERVE BARON

    Process design

    PFDs

    H&M balance

    Rotating Pressure vessels Fired equipment Heat exchangers Packages etc.

    P&IDs

    Piping

    Instrumentation

    Layout

    Civil

    Electrical

    Process data sheet

    Equipment specification Vendor

    drawings

  • HERVE BARON HERVE BARON

    Line Diagram

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

    Piping Layout drawing

  • HERVE BARON

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON Isometric drawing

  • HERVE BARON HERVE BARON Piping Pre-fabrication

  • HERVE BARON HERVE BARON Post Weld Heat

    Treatment

  • HERVE BARON HERVE BARON Piping Inspection and testing

  • HERVE BARON HERVE BARON

    Piping General Arrangement drawing

  • HERVE BARON HERVE BARON

    Calculations

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON Standard Pipe Support

    drawings

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

  • HERVE BARON Piping installation work process

    Piping line diagram

    Plot Plan

    Piping studies & layout

    Piping 3D modelling

    Piping stress analysis

    Piping isometric drawing

    Stress OK?

    Piping isometric drawing IFC

    Process OK?

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON Material Selection

  • HERVE BARON HERVE BARON Material Selection Diagram

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON Process Fluids list Piping material classes

  • HERVE BARON HERVE BARON Piping material

    classes Piping material class specification

  • HERVE BARON HERVE BARON

    Piping material classes specification

  • HERVE BARON HERVE BARON

    Piping material classes specification

  • HERVE BARON HERVE BARON

    Piping material classes specification

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON Piping material requisition

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON Engineering

    Process Equipment HSE Civil

    Layout

    Instrumentation Piping

    Electrical

  • HERVE BARON HERVE BARON

    Piping & Instrumentation Diagram (P&ID)

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

    Instrument list

  • HERVE BARON HERVE BARON Level sketch

  • HERVE BARON HERVE BARON

    Instrument data sheet

  • HERVE BARON HERVE BARON

    Process Control System

  • HERVE BARON HERVE BARON

    System Architecture drawing

  • HERVE BARON HERVE BARON

    Process automations

  • HERVE BARON HERVE BARON

    Control narrative

  • HERVE BARON HERVE BARON

    Mechanical Equipment Control

  • HERVE BARON HERVE BARON Emergency shutdown

  • HERVE BARON

    PT JB

    Process line

    Marshalling

    cabinet

    Controller

    cabinet

    Instrument room Control room

    VDU

    CPU

    LAN Secondary cable

    Multi cable

    The instrument hardware

  • HERVE BARON HERVE BARON

    Junction Box drawing

  • HERVE BARON HERVE BARON

    Instrument location drawing

  • HERVE BARON HERVE BARON

    Building detail drawing/

    Telecom and PAGA layout

  • HERVE BARON HERVE BARON

    Instrument standard installation drawings

  • HERVE BARON HERVE BARON

    Junction box wiring

  • HERVE BARON HERVE BARON Cable routing drawings

    Cable list

  • HERVE BARON Instrument bulk Material Take-Off

    ITEM QUANTITY DESIGNATION

    1 195 Gauge adapter x

    2 37 Block manifold 2 valves (Gas)

    3 23 Block manifold 5 valves (Gas)

    4 0 Ball valve 12mm

    5 300m Tubing 12mm OD x 1mm

    6 200 Reducer 12mm x

    7 50 Union tee 12 x 12 x 12mm

    8 50 Female connector 12mm x

    9 350 Male connector 12mm x

    10 9 Plug NPTF

    11 8 Plug NPTM

  • HERVE BARON HERVE BARON

    Cable routing inside technical room

  • HERVE BARON HERVE BARON

    Instrumentation & control rooms layout

  • HERVE BARON HERVE BARON

    Screen displays

  • HERVE BARON HERVE BARON

    Instrument loop diagram

  • HERVE BARON HERVE BARON Engineering

    Process Equipment HSE Civil

    Layout

    Instrumentation Piping

    Electrical

  • HERVE BARON HERVE BARON

    Electrical consumer list

  • HERVE BARON HERVE BARON

    Electrical Load Summary

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

    General One Line Diagram

  • HERVE BARON HERVE BARON

    Generators

    Switchgear

    Transformer

  • HERVE BARON HERVE BARON Equipment data sheet

  • HERVE BARON HERVE BARON Switchboard

    Single Line Diagram

  • HERVE BARON HERVE BARON Switchgear Typical Diagram

  • HERVE BARON HERVE BARON

    8800

    8900

    9000

    9100

    9200

    9300

    9400

    9500

    9600

    9700

    9800

    9900

    10000

    0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0

    VOLTAGE OF MS-001 (STUDY1)Bus

    Voltage (V

    olts)

    Time (Seconds)

    47.0

    47.5

    48.0

    48.5

    49.0

    49.5

    50.0

    0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0

    FREQUENCY OF MS-001 (STUDY1)

    Bus Freq

    uency (Hz

    )

    Time (Seconds)

    Calculations

  • HERVE BARON HERVE BARON Cable routing drawing

    Cable schedule

  • HERVE BARON HERVE BARON

    Typical installation drawings

  • HERVE BARON HERVE BARON

    Block Diagram

  • HERVE BARON HERVE BARON

    Trouble shooting diagrams

  • HERVE BARON HERVE BARON

    Lighting layout

  • HERVE BARON HERVE BARON

    Lighting illumination level

    Iso lux curves

  • HERVE BARON HERVE BARON Electrical equipment layout

  • HERVE BARON

    Electrical Control System

  • HERVE BARON

    Electrical Control System

  • HERVE BARON HERVE BARON

    From emergency (diesel)

    generators

    From main power

    generators

    To normal consummers e.g. pumps in process

    and utility units

    To essential consummers e.g. fire

    water pump

    Electrical load shedding

  • HERVE BARON HERVE BARON Oil & Gas Engineering Training

    HSE Moment

    Project Engineering The Design Basis Discipline presentations

    Field engineering

    Quality Schedule

    Intro, scope & objectives

  • HERVE BARON HERVE BARON Field Engineering

  • HERVE BARON HERVE BARON Site Query

  • HERVE BARON HERVE BARON

    Site MASTER set of documents

  • HERVE BARON HERVE BARON Oil & Gas Engineering Training

    HSE Moment

    Project Engineering The Design Basis Discipline presentations

    Field engineering

    Quality Schedule

    Intro, scope & objectives

  • HERVE BARON

    7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36PLANT START-UPPIPING PRE-FABRICATION & INSTALLATION X X X X X X X X X XPIPING MATERIAL & DRAWINGS AT SITEPIPING MATERIAL MANUFACTURING & SHIPPING X X X X X XPURCHASE OF PIPING MATERIALTECHNICAL & COMMERCIAL CLARIFICATIONS X XCALL FOR TENDER FOR PIPING MATERIALPREPARE PIPING MATERIAL TAKE-OFF XPIPING ROUTING STUDIES X X XPIPING & INSTRUMENTATION DIAGRAMS (PIDs)

    PROJECT SCHEDULEMONTH

    1

    1

    2 3

    3

    4 5

    2

    4 5

    5

  • HERVE BARON HERVE BARON

    Process simulations

    Equipment selection

    & purchase

    Foundation drawings

    Process data sheet

    Vendor data

  • HERVE BARON HERVE BARON

  • HERVE BARON

    Safety valves duty & data

    sheet (Process) Safety valves inquiry and purchase

    (procurement) Safety valves

    sizing & drawings (vendor)

    Safety valves location & piping

    routing (piping/layout) Piping calcs &

    supports (piping/stress)

    Steel structure design and

    drawings (civil)

    Purchase steel (manufacturer) Fabrication

    (manufacturer) Shipping

    Structure at Site

    Size & weight estimates

    Supports & loads estimates

    Estimates must be done to meet the schedule

    Engineering schedule

  • HERVE BARON HERVE BARON

  • HERVE BARON HERVE BARON

    What Engineering designed

    What the Vendor supplied

  • HERVE BARON

  • HERVE BARON HERVE BARON Oil & Gas Engineering Training

    HSE Moment

    Project Engineering The Design Basis Discipline presentations

    Field engineering

    Quality Schedule

    Intro, scope & objectives

  • HERVE BARON HERVE BARON

    Engineering Quality Assurance:

    Engineering document register

    Document number

    Document title Document revision

    A 1 48104 Service building instrument. rooms cables routing B

    A 2 48102 Trouble shooting diagrams D

    A 3 48134 F&G system architecture drawing E

    A 4 50100 Instrument index B

    A 7 50003 Spec for instrument installation works and service C

    A 8 50960 Instrument Data sheets for temperature switches B

    A 9 50110 Requisition for pressure relief valves B

    M 1 62059 General plot plan B

    M 2 62020 Piping details standard C

    M 2 62070 Piping general arrangement Area 1 D

    M 4 60100 Special items list D

  • HERVE BARON HERVE BARON

    Engineering Quality Assurance:

    Document checking and distribution

  • HERVE BARON HERVE BARON

    Engineering Quality Assurance:

    Document revision

  • HERVE BARON HERVE BARON

    Engineering Integrity: Site Query from Construction

  • HERVE BARON

    Interface Agreement

    Section/Step 1

    Section/Step 2

  • HERVE BARON

    Interface definition

  • 2015 Herv Baron

    HERVE BARON

    The Oil & Gas Engineering Guide 2nd edition

    Do you want to know more... Much more?

  • 2015 Herv Baron

    HERVE BARON

    The Oil & Gas Engineering Guide - 2nd edition

    Table of Contents

  • 2015 Herv Baron

    HERVE BARON

    The Oil & Gas Engineering Guide - 2nd edition

    Table of Contents

    Discipline presentation: activities and deliverables

  • 2015 Herv Baron

    HERVE BARON

    The work of each

    Engineering discipline is described

  • 2015 Herv Baron

    HERVE BARON

    Design activities are explained, e.g., Plant

    Equipment layout

  • 2015 Herv Baron

    HERVE BARON

    Complex activities, such as

    QRA, are explained through a practical

    example.

  • 2015 Herv Baron

    HERVE BARON

    A sample of all common Engineering documents is

    included

  • 2015 Herv Baron

    HERVE BARON

    Difference between

    Engineering and Shop drawings

  • 2015 Herv Baron

    HERVE BARON

    Understand the main

    technical aspects, e.g., DCS vs ESD

  • 2015 Herv Baron

    HERVE BARON

    The Oil & Gas Engineering Guide - 2nd edition

    Table of Contents

    The overall process

  • 2015 Herv Baron

    HERVE BARON

    The Oil & Gas Engineering Guide - 2nd edition

    Table of Contents

  • 2015 Herv Baron

    HERVE BARON

    The Oil & Gas Engineering Guide - 2nd edition

    Table of Contents

  • 2015 Herv Baron

    HERVE BARON

    The Oil & Gas Engineering Guide - 2nd edition

    Table of Contents

  • 2015 Herv Baron

    HERVE BARON

    The Oil & Gas Engineering Guide 2nd edition

    Order direct from the publisher:

    http://www.editionstechnip.com/en/catalogue-detail/1111/oil-gas-engineering-guide-the.html

    http://www.editionstechnip.com/en/catalogue-detail/1111/oil-gas-engineering-guide-the.htmlhttp://www.editionstechnip.com/en/catalogue-detail/1111/oil-gas-engineering-guide-the.htmlhttp://www.editionstechnip.com/en/catalogue-detail/1111/oil-gas-engineering-guide-the.html

    Diapositive numro 1Diapositive numro 2Diapositive numro 3Diapositive numro 4Diapositive numro 5Diapositive numro 6Diapositive numro 7Diapositive numro 8Diapositive numro 9Diapositive numro 10Diapositive numro 11Diapositive numro 12Diapositive numro 13Diapositive numro 14Diapositive numro 15Diapositive numro 16Diapositive numro 17Diapositive numro 18Diapositive numro 19Diapositive numro 20Diapositive numro 21Diapositive numro 22Diapositive numro 23Diapositive numro 24Diapositive numro 25Diapositive numro 26Diapositive numro 27Diapositive numro 28Diapositive numro 29Diapositive numro 30Diapositive numro 31Diapositive numro 32Diapositive numro 33Diapositive numro 34Diapositive numro 35Diapositive numro 36Diapositive numro 37Diapositive numro 38Diapositive numro 39Diapositive numro 40Diapositive numro 41Diapositive numro 42Diapositive numro 43Diapositive numro 44Diapositive numro 45Diapositive numro 46Diapositive numro 47Diapositive numro 48Diapositive numro 49Diapositive numro 50Diapositive numro 51Diapositive numro 52Diapositive numro 53Diapositive numro 54Diapositive numro 55Diapositive numro 56Diapositive numro 57Diapositive numro 58Diapositive numro 59Diapositive numro 60Diapositive numro 61Diapositive numro 62Diapositive numro 63Diapositive numro 64Diapositive numro 65Diapositive numro 66Diapositive numro 67Diapositive numro 68Diapositive numro 69Diapositive numro 70Diapositive numro 71Diapositive numro 72Diapositive numro 73Diapositive numro 74Diapositive numro 75Diapositive numro 76Diapositive numro 77Diapositive numro 78Diapositive numro 79Diapositive numro 80Diapositive numro 81Diapositive numro 82Diapositive numro 83Diapositive numro 84Diapositive numro 85Diapositive numro 86Diapositive numro 87Diapositive numro 88Diapositive numro 89Diapositive numro 90Diapositive numro 91Diapositive numro 92Diapositive numro 93Diapositive numro 94Diapositive numro 95Diapositive numro 96Diapositive numro 97Diapositive numro 98Diapositive numro 99Diapositive numro 100Diapositive numro 101Diapositive numro 102Diapositive numro 103Diapositive numro 104Diapositive numro 105Diapositive numro 106Diapositive numro 107Diapositive numro 108Diapositive numro 109Diapositive numro 110Diapositive numro 111Diapositive numro 112Diapositive numro 113Diapositive numro 114Diapositive numro 115Diapositive numro 116Diapositive numro 117Diapositive numro 118Diapositive numro 119Diapositive numro 120Diapositive numro 121Diapositive numro 122Diapositive numro 123Diapositive numro 124Diapositive numro 125Diapositive numro 126Diapositive numro 127Diapositive numro 128Diapositive numro 129Diapositive numro 130Diapositive numro 131Diapositive numro 132Diapositive numro 133Diapositive numro 134Diapositive numro 135Diapositive numro 136Diapositive numro 137Diapositive numro 138Diapositive numro 139Diapositive numro 140Diapositive numro 141Piping installation work processDiapositive numro 143Diapositive numro 144Diapositive numro 145Diapositive numro 146Diapositive numro 147Diapositive numro 148Diapositive numro 149Diapositive numro 150Diapositive numro 151Diapositive numro 152Diapositive numro 153Diapositive numro 154Diapositive numro 155Diapositive numro 156Diapositive numro 157Diapositive numro 158Diapositive numro 159Diapositive numro 160Diapositive numro 161Diapositive numro 162Diapositive numro 163Diapositive numro 164Diapositive numro 165Diapositive numro 166Diapositive numro 167Diapositive numro 168Diapositive numro 169Diapositive numro 170Diapositive numro 171Diapositive numro 172Diapositive numro 173Diapositive numro 174Diapositive numro 175Diapositive numro 176Diapositive numro 177Diapositive numro 178Diapositive numro 179Diapositive numro 180Diapositive numro 181Diapositive numro 182Diapositive numro 183Diapositive numro 184Diapositive numro 185Diapositive numro 186Diapositive numro 187Diapositive numro 188Diapositive numro 189Diapositive numro 190Diapositive numro 191Diapositive numro 192Diapositive numro 193Diapositive numro 194Diapositive numro 195Diapositive numro 196Diapositive numro 197Diapositive numro 198Diapositive numro 199Diapositive numro 200Diapositive numro 201Diapositive numro 202Diapositive numro 203Diapositive numro 204Diapositive numro 205Diapositive numro 206Diapositive numro 207Diapositive numro 208Diapositive numro 209Diapositive numro 210Diapositive numro 211Diapositive numro 212Diapositive numro 213Diapositive numro 214Diapositive numro 215Diapositive numro 216Diapositive numro 217Diapositive numro 218Diapositive numro 219Diapositive numro 220Diapositive numro 221Diapositive numro 222The Oil & Gas Engineering Guide2nd editionThe Oil & Gas Engineering Guide - 2nd editionThe Oil & Gas Engineering Guide - 2nd editionDiapositive numro 226Diapositive numro 227Diapositive numro 228Diapositive numro 229Diapositive numro 230Diapositive numro 231The Oil & Gas Engineering Guide - 2nd editionThe Oil & Gas Engineering Guide - 2nd editionThe Oil & Gas Engineering Guide - 2nd editionThe Oil & Gas Engineering Guide - 2nd editionThe Oil & Gas Engineering Guide2nd edition