  • 7/31/2019 OJT Daily Log CWC FROM 1-7.Doc and Weekly Logs 1-2

    1/19

    PUP-CAFA BS Interior DesignOJT Summer 2012

    OJT Daily Log Page 1 of 2

    POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

    COLLEGE OF ARCHITECTURE AND FINE ARTS

    DEPARTMENT OF INTERIOR DESIGNPUP Engineering and Architecture BuildingNDC Compound,

    Anonas cor. Pureza Sts., Sta. Mesa, ManilaTel: (632) 713 9304

    BS INTERIOR DESIGN OJT REPORTDaily Log of Training Experience

    Date: APRIL 16 , 2012

    Name of Student: MARTER , MARK BONI RAMOSFamily Name First Name Middle Name

    Office/Company Name: CWC INDUSTRIES INC.

    Address: #2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITYProject Title: ASANTEKS Project Description:

    Project Location:

    Assigned Work Task: PREPARING THE SWATCH BRDS. Office Site Others,

    pls. specify

    Time In : 8:00 AM

    Time Out : 5:00 PM Total No. of Hour/s Spent: 8 HRS.

    Weather Condition: SUNNY Site Condition:

    Work Activities Performed:

    - PREPARING THE SWATCH BOARDS

    Personal Observations at the Project Site:

  • 7/31/2019 OJT Daily Log CWC FROM 1-7.Doc and Weekly Logs 1-2

    2/19

    PUP-CAFA BS Interior DesignOJT Summer 2012

    OJT Daily Log Page 2 of 2

    Report/s Submitted, if any:

    Lesson/s Learned:

    - I LEARN THE TEXTILES TECHNICAL SPECIFICATION

    Picture/s Taken, if any:

    Certified True and Correct by: Noted by:

    Mentor IDr. Billie Jean Dumlao-Dela Cruz, piid(Signature above Printed Name) Faculty OJT Coordinator

    Date: _______APRIL 16_________, 2012 Date: ________________ , 2012

  • 7/31/2019 OJT Daily Log CWC FROM 1-7.Doc and Weekly Logs 1-2

    3/19

    PUP-CAFA BS Interior DesignOJT Summer 2012

    OJT Daily Log Page 3 of 2

    POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

    COLLEGE OF ARCHITECTURE AND FINE ARTS

    DEPARTMENT OF INTERIOR DESIGNPUP Engineering and Architecture BuildingNDC Compound,

    Anonas cor. Pureza Sts., Sta. Mesa, ManilaTel: (632) 713 9304

    BS INTERIOR DESIGN OJT REPORT

    Daily Log of Training Experience

    Date: APRIL 17 , 2012

    Name of Student: MARTER , MARK BONI RAMOSFamily Name First Name Middle Name

    Office/Company Name: CWC INDUSTRIES INC.

    Address: #2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITY

    Project Title: SYMPHONY MILLS Project Description:

    Project Location:

    Assigned Work Task: PREPARING THE SWATCH BRDS. Office Site Others,

    pls. specify

    Time In : 8:00 AM

    Time Out : 5:00 PM Total No. of Hour/s Spent: 8 HRS.Weather Condition: SUNNY Site Condition:

    Work Activities Performed:

    - PREPARING THE SWATCH BOARDS

    Personal Observations at the Project Site:

  • 7/31/2019 OJT Daily Log CWC FROM 1-7.Doc and Weekly Logs 1-2

    4/19

    PUP-CAFA BS Interior DesignOJT Summer 2012

    OJT Daily Log Page 4 of 2

    Report/s Submitted, if any:

    Lesson/s Learned:

    I LEARN HOW MANY YARDS OF FABRICS DO YOU NEED FOR UPHOLSTERYBASED IN FABRIC WIDTH, FABRIC REPEAT, RAILROADING, AND THE RIGHT WAY.

    Picture/s Taken, if any:

    Certified True and Correct by: Noted by:

    Mentor IDr. Billie Jean Dumlao-Dela Cruz, piid(Signature above Printed Name) Faculty OJT Coordinator

    Date: _______APRIL 17_________ , 2012 Date: ________________ , 2012

  • 7/31/2019 OJT Daily Log CWC FROM 1-7.Doc and Weekly Logs 1-2

    5/19

    PUP-CAFA BS Interior DesignOJT Summer 2012

    OJT Daily Log Page 5 of 2

    POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

    COLLEGE OF ARCHITECTURE AND FINE ARTS

    DEPARTMENT OF INTERIOR DESIGNPUP Engineering and Architecture BuildingNDC Compound,

    Anonas cor. Pureza Sts., Sta. Mesa, ManilaTel: (632) 713 9304

    BS INTERIOR DESIGN OJT REPORT

    Daily Log of Training Experience

    Date: APRIL 18 , 2012

    Name of Student: MARTER , MARK BONI RAMOSFamily Name First Name Middle Name

    Office/Company Name: CWC INDUSTRIES INC.

    Address: #2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITY

    Project Title: SOLAIRE MANILA Project Description:

    Project Location:

    Assigned Work Task: FABRIC MATCHING . Office Site Others,

    pls. specify

    Time In : 8:00 AM

    Time Out : 5:00 PM Total No. of Hour/s Spent: 8 HRS.

    Weather Condition: SUNNY Site Condition:

    Work Activities Performed:

    SOLAIRE MANILA

    - FABRIC MATCHING

    INSPIRATIONS

    - PREPARING THE SWATCH BOARDS

    Personal Observations at the Project Site:

  • 7/31/2019 OJT Daily Log CWC FROM 1-7.Doc and Weekly Logs 1-2

    6/19

    PUP-CAFA BS Interior DesignOJT Summer 2012

    OJT Daily Log Page 6 of 2

    Report/s Submitted, if any:

    Lesson/s Learned:

    I LEARN THE DIFFERENT TYPES OF ARMS AND OTHER FURNITUREHARDWARE.

    Picture/s Taken, if any:

    Certified True and Correct by: Noted by:

    Mentor IDr. Billie Jean Dumlao-Dela Cruz, piid(Signature above Printed Name) Faculty OJT Coordinator

    Date: _______APRIL 18_________ , 2012 Date: ________________ , 2012

  • 7/31/2019 OJT Daily Log CWC FROM 1-7.Doc and Weekly Logs 1-2

    7/19

    PUP-CAFA BS Interior DesignOJT Summer 2012

    OJT Daily Log Page 7 of 2

    POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

    COLLEGE OF ARCHITECTURE AND FINE ARTS

    DEPARTMENT OF INTERIOR DESIGNPUP Engineering and Architecture BuildingNDC Compound,

    Anonas cor. Pureza Sts., Sta. Mesa, ManilaTel: (632) 713 9304

    BS INTERIOR DESIGN OJT REPORT

    Daily Log of Training Experience

    Date: APRIL 19 , 2012

    Name of Student: MARTER , MARK BONI RAMOSFamily Name First Name Middle Name

    Office/Company Name: CWC INDUSTRIES INC.

    Address: #2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITY

    Project Title: INSPIRATION Project Description:

    Project Location:

    Assigned Work Task: PREPARING THE SWATCH BRDS. Office Site Others,

    pls. specify

    Time In : 8:00 AM

    Time Out : 5:00 PM Total No. of Hour/s Spent: 8 HRS.

    Weather Condition: SUNNY Site Condition:

    Work Activities Performed:

    PREPARING THE SWATCH BOARDS

    UART

    - PREPARING THE SWATCH BOARDS

    Personal Observations at the Project Site:

  • 7/31/2019 OJT Daily Log CWC FROM 1-7.Doc and Weekly Logs 1-2

    8/19

    PUP-CAFA BS Interior DesignOJT Summer 2012

    OJT Daily Log Page 8 of 2

    Report/s Submitted, if any:

    Lesson/s Learned:

    I LEARN THE DIFFERENT TYPES AND VARIETY OF FABRICS IN THE MARKET

    Picture/s Taken, if any:

    Certified True and Correct by: Noted by:

    Mentor IDr. Billie Jean Dumlao-Dela Cruz, piid(Signature above Printed Name) Faculty OJT Coordinator

    Date: _____APRIL 19___________ , 2012 Date: ________________ , 2012

  • 7/31/2019 OJT Daily Log CWC FROM 1-7.Doc and Weekly Logs 1-2

    9/19

    PUP-CAFA BS Interior DesignOJT Summer 2012

    OJT Daily Log Page 9 of 2

    POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

    COLLEGE OF ARCHITECTURE AND FINE ARTS

    DEPARTMENT OF INTERIOR DESIGNPUP Engineering and Architecture BuildingNDC Compound,

    Anonas cor. Pureza Sts., Sta. Mesa, Manila

    Tel: (632) 713 9304

    BS INTERIOR DESIGN OJT REPORT

    Daily Log of Training Experience

    Date: APRIL 20 , 2012

    Name of Student: MARTER , MARK BONI RAMOSFamily Name First Name Middle Name

    Office/Company Name: CWC INDUSTRIES INC.

    Address: #2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITY

    Project Title: SOLAIRE MANILA Project Description:

    Project Location:

    Assigned Work Task: PRODUCT LISTING Office Site Others,

    pls. specify

    Time In : 8:00 AM

    Time Out : 5:00 PM Total No. of Hour/s Spent: 8 HRS.

    Weather Condition: SUNNY Site Condition:

    Work Activities Performed:

    - SOLAIRE MANILA, PRODUCT LISTING

    INSPIRATION

    - PREPARATION OF SWATCH BOARDS

    UART

    - PREPARATION OF SWATCH BOARDS

    Personal Observations at the Project Site:

  • 7/31/2019 OJT Daily Log CWC FROM 1-7.Doc and Weekly Logs 1-2

    10/19

    PUP-CAFA BS Interior DesignOJT Summer 2012

    OJT Daily Log Page 10 of 2

    Report/s Submitted, if any:

    Lesson/s Learned:

    I LEARN HOW MANY FABRICS ARE USE IN VARIOUS FURNITURES.

    Picture/s Taken, if any:

    Certified True and Correct by: Noted by:

    Mentor IDr. Billie Jean Dumlao-Dela Cruz, piid(Signature above Printed Name) Faculty OJT Coordinator

    Date: APRIL 20 , 2012 Date: ________________ , 2012

  • 7/31/2019 OJT Daily Log CWC FROM 1-7.Doc and Weekly Logs 1-2

    11/19

    PUP-CAFA BS Interior DesignOJT Summer 2012

    OJT Daily Log Page 11 of 2

    POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

    COLLEGE OF ARCHITECTURE AND FINE ARTS

    DEPARTMENT OF INTERIOR DESIGNPUP Engineering and Architecture BuildingNDC Compound,

    Anonas cor. Pureza Sts., Sta. Mesa, ManilaTel: (632) 713 9304

    BS INTERIOR DESIGN OJT REPORT

    Daily Log of Training Experience

    Date: APRIL 23 , 2012

    Name of Student: MARTER , MARK BONI RAMOSFamily Name First Name Middle Name

    Office/Company Name: CWC INDUSTRIES INC.

    Address: #2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITY

    Project Title: UARTS Project Description:

    Project Location:

    Assigned Work Task: PREPARING THE SWATCH BRDS. Office Site Others,

    pls. specify

    Time In : 8:00 AM

    Time Out : 5:00 PM Total No. of Hour/s Spent: 8 HRS.

    Weather Condition: SUNNY Site Condition:

    Work Activities Performed:

    PREPARING THE SWATCH BOARDS FOR

    - UART

    - SYMPHONY MILLS NV

    SOLAIRE PRODUCT LISTING FOR SUBMISSION

    Personal Observations at the Project Site:

  • 7/31/2019 OJT Daily Log CWC FROM 1-7.Doc and Weekly Logs 1-2

    12/19

    PUP-CAFA BS Interior DesignOJT Summer 2012

    OJT Daily Log Page 12 of 2

    Report/s Submitted, if any:

    Lesson/s Learned:

    I LEARN THE NATURE OF LEATHERS IN WHERE IT CAME FROM?, MADE OF?,THE PROCESSES, HOW IT SOLDS AND HOW TO MAINTAIN IT.

    Picture/s Taken, if any:

    Certified True and Correct by: Noted by:

    Mentor IDr. Billie Jean Dumlao-Dela Cruz, piid(Signature above Printed Name) Faculty OJT Coordinator

    Date: APRIL 23 , 2012 Date: ________________ , 2012

  • 7/31/2019 OJT Daily Log CWC FROM 1-7.Doc and Weekly Logs 1-2

    13/19

    PUP-CAFA BS Interior DesignOJT Summer 2012

    OJT Daily Log Page 13 of 2

    POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

    COLLEGE OF ARCHITECTURE AND FINE ARTS

    DEPARTMENT OF INTERIOR DESIGNPUP Engineering and Architecture BuildingNDC Compound,

    Anonas cor. Pureza Sts., Sta. Mesa, ManilaTel: (632) 713 9304

    BS INTERIOR DESIGN OJT REPORT

    Daily Log of Training Experience

    Date: APRIL 24 , 2012

    Name of Student: MARTER , MARK BONI RAMOSFamily Name First Name Middle Name

    Office/Company Name: CWC INDUSTRIES INC.

    Address: #2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITY

    Project Title: MODERN LIVING SPACE Project Description:

    Project Location:

    Assigned Work Task: PREPARING THE SWATCH BRDS. Office Site Others,

    pls. specify

    Time In : 8:00 AM

    Time Out : 5:00 PM Total No. of Hour/s Spent: 8 HRS.

    Weather Condition: SUNNY Site Condition:

    Work Activities Performed:

    PREPARATION OF SWATCHES FOR MODERN LIVING SPACE

    Personal Observations at the Project Site:

  • 7/31/2019 OJT Daily Log CWC FROM 1-7.Doc and Weekly Logs 1-2

    14/19

    PUP-CAFA BS Interior DesignOJT Summer 2012

    OJT Daily Log Page 14 of 2

    Report/s Submitted, if any:

    Lesson/s Learned:

    I LEARN TO MAKE SWATCH BOADRD IN SPECIFIC TIME ALLOTED

    Picture/s Taken, if any:

    Certified True and Correct by: Noted by:

    Mentor IDr. Billie Jean Dumlao-Dela Cruz, piid

    (Signature above Printed Name) Faculty OJT Coordinator

    Date: APRIL 24 , 2012 Date: ________________, 2012

  • 7/31/2019 OJT Daily Log CWC FROM 1-7.Doc and Weekly Logs 1-2

    15/19

    PUP-CAFA BS Interior DesignOJT Summer 2012

    OJT Daily Log Page 15 of 2

    POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

    COLLEGE OF ARCHITECTURE AND FINE ARTS

    DEPARTMENT OF INTERIOR DESIGN

    PUP Engineering and Architecture BuildingNDC Compound,

    Anonas cor. Pureza Sts., Sta. Mesa, Manila

    Tel: (632) 713 9304

    BS Interior Design On-the-Job Training

    ON-THE-JOB TRAINING WEEKLY ACCOMPLISHMENT REPORT

    Name of Student: MARTER, MARK BONI RAMOS

    Family Name, First Name MiddleName

    Student No. 2009-05309-MN-0 Employed by: CWC INDUSTRIES INC.

    Address: #2 CWC BLD., PALANZA ST. COR ZARAGOZA ST., QUEZON CITY

    Reporting Period from: 16 APRIL 2012 to 20 APRIL 2012Day Month Day Month

    ItemNo.

    Project Title/Description/LocationField of Practice

    (Brief Description)No. ofHours

    Percentage ofAssigned Work

    Completed

    100% = FullCompletion

    1 INTERWALL COVERING PREPARING SWATCHBOARDS

    3 HRS 90%

    2 ASANTEK LEATHERETTES PREPARING SWATCHBOARDS

    8 HRS 100%

    3 SYMPHONY MILLS NV PREPARING SWATCHBOARDS

    5 HRS 98%

    4 INSPIRATIONS PREPARING SWATCHBOARDS

    9 HRS 100%

    5 SOLAIRE MANILA FABRIC MATCHINGAND PRODUCT LISTING

    7 HRS 100%

    6 UART PREPARING SWATCHBOARDS

    8 HRS 98%

  • 7/31/2019 OJT Daily Log CWC FROM 1-7.Doc and Weekly Logs 1-2

    16/19

    PUP-CAFA BS Interior DesignOJT Summer 2012

    OJT Daily Log Page 16 of 2

    ItemNo.

    Project Title/Description/LocationField of Practice

    (Brief Description)No. ofHours

    Percentage ofAssigned Work

    Completed

    100% = FullCompletion

    TOTAL NO. OF HOURS 40 HRS 97.6%

    Recommendations for the Trainees further growth and development:

    Checked and Approved by: Conforme:

    OJT Faculty Coordinator Student Trainee(Signature above printed name) (Signature above printed name

  • 7/31/2019 OJT Daily Log CWC FROM 1-7.Doc and Weekly Logs 1-2

    17/19

    PUP-CAFA BS Interior DesignOJT Summer 2012

    OJT Daily Log Page 17 of 2

    POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

    COLLEGE OF ARCHITECTURE AND FINE ARTS

    DEPARTMENT OF INTERIOR DESIGN

    PUP Engineering and Architecture BuildingNDC Compound,

    Anonas cor. Pureza Sts., Sta. Mesa, Manila

    Tel: (632) 713 9304

    BS Interior Design On-the-Job Training

    ON-THE-JOB TRAINING WEEKLY ACCOMPLISHMENT REPORT

    Name of Student: MARTER, MARK BONI RAMOS

    Family Name, First Name MiddleName

    Student No. 2009-05309-MN-0 Employed by: CWC INDUSTRIES INC.

    Address: #2 CWC BLD., PALANZA ST. COR ZARAGOZA ST., QUEZON CITY

    Reporting Period from: 23 APRIL 2012 to 24 APRIL 2012Day Month Day Month

    ItemNo.

    Project Title/Description/LocationField of Practice

    (Brief Description)No. ofHours

    Percentage ofAssigned Work

    Completed

    100% = FullCompletion

    1 UART LEATHERETTES PREPARING SWATCHBOARDS

    2HRS 100%

    2 SYMPHONY MILLS NV PREPARING SWATCHBOARDS

    2HRS 100%

    3 SOLAIRE MANILA PRODUCT LISTING 3 HRS 100%

    4 MODERN LIVING ROOM PREPARING SWATCHBOARDS

    8 HRS 100%

  • 7/31/2019 OJT Daily Log CWC FROM 1-7.Doc and Weekly Logs 1-2

    18/19

    PUP-CAFA BS Interior DesignOJT Summer 2012

    OJT Daily Log Page 18 of 2

    ItemNo.

    Project Title/Description/LocationField of Practice

    (Brief Description)No. ofHours

    Percentage ofAssigned Work

    Completed

    100% = FullCompletion

    TOTAL NO. OF HOURS 16 HRS 100%

    Recommendations for the Trainees further growth and development:

    Checked and Approved by: Conforme:

    OJT Faculty Coordinator Student Trainee(Signature above printed name) (Signature above printed name)

  • 7/31/2019 OJT Daily Log CWC FROM 1-7.Doc and Weekly Logs 1-2

    19/19

    PUP-CAFA BS Interior DesignOJT Summer 2012

    OJT Daily Log Page 19 of 2