om02 appendix 1 guide to the application · 2016. 5. 16. · app019 2.4 environmental features...

21
OM02 Appendix 1 Guide to the Application 9.2.28 Brechfa Forest Connection Development Consent Order Application - Reference EN020016 OM02 Appendix 1 Guide to the Application November 2015 Regulation 8(1)(b) of the Infrastructure Planning (Examination Procedure) Rules 2010

Upload: others

Post on 02-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • OM

    02 A

    ppen

    dix

    1 G

    uide

    to th

    e A

    pplic

    atio

    n

    9.2

    .28

    Brechfa Forest ConnectionDevelopment Consent Order Application - Reference EN020016

    OM02 Appendix 1 Guide to the Application

    November 2015Regulation 8(1)(b) of the Infrastructure Planning

    (Examination Procedure) Rules 2010

  • Brechfa Forest ConnectionDevelopment Consent Order Application - Reference EN020016

    Guide to the Application

    November 2015

    Gui

    de to

    the

    App

    licat

    ion

    1.7A

  • Guide to the Application

    This document provides a guide to Western Power Distribution’s Brechfa Forest Connection Project

    Development Consent Order application. The original application was submitted to the Planning

    Inspectorate on 29 May 2015, and accepted for examination by the Examining Authority on 26 June

    2015.

    Since the submission a number of the original application documents have been revised and new

    documents produced. This guide charts the submission of these documents to the Planning

    Inspectorate.

    The following table identifies the documents we produced during the examination for which we

    subsequently provided updates and/or revised documents. The left hand column of this table identifies

    the initial submission with the remaining columns indicating when we submitted additional documents to

    the Examining Authority.

    For ease of navigation these documents are grouped by volumes as follows;

    Volume This volume…

    1. Application Information provides details of the specific application information required by the Planning Inspectorate

    2. Plans, Drawings and Sections contains the plans which show where we propose to undertake the work

    3. Draft Development Consent Order outlines the legal powers we are seeking from the Government to build the proposed connection

    4. Compulsory Acquisition Information provides evidence of why we may require legal powers

    5. Reports and Statements includes the Consultation Report and other reports and statements

    6. Environmental Information shows how we assessed the potential impact on the environment

    7. Other Media contains the 3D model of the proposed development and associated videos and images

    8. Other Documents includes additional documents produced for the application submission

    9. Examination Submissions Documents submitted to the Planning Inspectorate as part ofthe Examination

  • Guide to the Application

    Volume Main Submission

    29 May 2015

    Documents Submitted

    21 August 2015

    Documents Submitted

    25 September 2015

    Documents Submitted

    for Deadline 1

    9 November 2015

    Documents Submitted

    for Deadline 2

    24 November 2015

    Documents Submitted

    for Deadline 3

    17 December 2015

    APP-001

    1.1 Covering Letter including

    Schedule of Documents

    APP-002

    1.2 Application Form

    APP-003

    1.3 Planning Inspectorate

    Electronic Application Index

    APP-004

    1.4 Newspaper Notices

    1.5 Red Line Boundary Shape

    Files1

    APP-005

    1.6 Glossary and

    Abbreviations

    APP-135

    1.7 Guide to the Application

    APP-006

    2.1 Works Plans: Overall

    Location Plan and Master Key

    to Sections Plan

    APP-007

    2.1 Works Plans: Section A

    APP-008

    2.1 Works Plans: Section B

    APP-009

    2.1 Works Plans: Section C

    APP-010

    2.2 Land Affected and Land

    Plans: Section A

    APP-136

    2.2A Land Affected and Land

    Plans: Section A

    APP-011

    2.2 Land Affected and Land

    Plans: Section A

    APP-137

    2.2A Land Affected and Land

    Plans: Section A

    APP-012

    2.2 Land Affected and Land

    Plans: Section B

    APP-138

    2.2A Land Affected and Land

    Plans: Section B

    Vo

    lum

    e 1

    Ap

    plic

    ati

    on

    In

    form

    ati

    on

    Vo

    lum

    e 2

    P

    lan

    s, D

    raw

    ing

    s a

    nd

    Se

    cti

    on

    s

    1 Submitted electronically only. No PINS reference provided. 1

  • Guide to the Application

    Volume Main Submission

    29 May 2015

    Documents Submitted

    21 August 2015

    Documents Submitted

    25 September 2015

    Documents Submitted

    for Deadline 1

    9 November 2015

    Documents Submitted

    for Deadline 2

    24 November 2015

    Documents Submitted

    for Deadline 3

    17 December 2015

    Vo

    lum

    e 1

    Ap

    plic

    ati

    on

    In

    form

    ati

    on

    APP-013

    2.2 Land Affected and Land

    Plans: Overall Location Plan and

    Master Key to Sections Plan

    APP-139

    2.2A Land Affected and Land

    Plans: Overall Location Plan

    and Master Key to Sections

    Plan

    APP014

    2.3 Access and Public Rights

    of Way Plans: Overall Location

    Plan and Master Key to

    Sections Plan

    APP015

    2.3 Access and Public Rights

    of Way Plans: Section A

    APP016

    2.3 Access and Public Rights

    of Way Plans: Section B

    APP017

    2.3 Access and Public Rights

    of Way Plans: Section C

    APP018

    2.4 Environmental Features

    Plans: Overall Location Plan

    and Master Key to Sections

    Plan

    APP019

    2.4 Environmental Features

    Plans: Section A

    APP020

    2.4 Environmental Features

    Plans: Section B

    APP021

    2.4 Environmental Features

    Plans: Section C

    APP022

    2.5 Heritage Designations

    Plans: Overall Location Plan

    and Master Key to Sections

    Plan

    APP023

    2.5 Heritage Designations

    Plans: Section A

    Vo

    lum

    e 2

    P

    lan

    s, D

    raw

    ing

    s a

    nd

    Se

    cti

    on

    s

    2

  • Guide to the Application

    Volume Main Submission

    29 May 2015

    Documents Submitted

    21 August 2015

    Documents Submitted

    25 September 2015

    Documents Submitted

    for Deadline 1

    9 November 2015

    Documents Submitted

    for Deadline 2

    24 November 2015

    Documents Submitted

    for Deadline 3

    17 December 2015

    Vo

    lum

    e 1

    Ap

    plic

    ati

    on

    In

    form

    ati

    on

    APP024

    2.5 Heritage Designations

    Plans: Section B

    APP-025

    2.5 Heritage Designations

    Plans: Section C

    APP-026

    2.6 Special Category Land

    Plans and Crown Land Plans:

    Overall Location Plan and

    Master Key to Sections Plan

    APP-027

    2.6 Special Category Land

    Plans and Crown Land Plans:

    Section B

    APP-028

    2.6 Special Category Land

    Plans and Crown Land Plans:

    Section C

    APP-029

    2.7 132kV Overhead Line

    Wood Pole Outline

    APP-030

    2.7 132kV Overhead Line Work

    no.1 Profiles

    APP-031

    2.7 132kV Overhead Line Work

    no.3 Profiles

    APP-032

    2.7 132kV Underground Cable

    Work no.2 Design Drawings

    APP-033

    2.7 Design Drawings Brechfa

    Forest Satellite Construction

    Compound

    APP034

    2.7 Key Plan for Detailed

    Design Drawings

    Vo

    lum

    e 2

    P

    lan

    s, D

    raw

    ing

    s a

    nd

    Se

    cti

    on

    s

    3

  • Guide to the Application

    Volume Main Submission

    29 May 2015

    Documents Submitted

    21 August 2015

    Documents Submitted

    25 September 2015

    Documents Submitted

    for Deadline 1

    9 November 2015

    Documents Submitted

    for Deadline 2

    24 November 2015

    Documents Submitted

    for Deadline 3

    17 December 2015

    Vo

    lum

    e 1

    Ap

    plic

    ati

    on

    In

    form

    ati

    on

    APP035

    2.8 Trees and Hedges with the

    Potential to be Affected Plans:

    Overall Location Plan and

    Master Key to Sections Plan

    APP036

    2.8 Trees and Hedges with the

    Potential to be Affected Plans:

    Section A

    APP-037

    2.8 Trees and Hedges with the

    Potential to be Affected Plans:

    Section B

    APP-038

    2.8 Trees and Hedges with the

    Potential to be Affected Plans:

    Section C

    APP-039

    3.1 Draft Development

    Consent Order

    APP-040

    3.2 Draft Explanatory

    Memorandum

    APP-041

    4.1 Statement of Reasons

    APP-139

    4.1A Statement of Reasons

    APP-140

    4.1A Statement of Reasons

    (Tracked Change)

    APP-042

    4.2 Funding Statement

    APP-043

    4.3 Book of Reference

    APP-141

    4.3A Book of Reference

    APP-142

    4.3A Book of Reference

    (Tracked Change)

    APP-044

    5.1 Consultation Report

    Vo

    lum

    e 5

    R

    ep

    ort

    s a

    nd

    Sta

    tem

    en

    ts

    Vo

    lum

    e 3

    D

    raft

    Develo

    pm

    en

    t

    Co

    nsen

    t O

    rder

    Vo

    lum

    e 4

    Co

    mp

    uls

    ory

    Ac

    qu

    isit

    ion

    Info

    rma

    tio

    n

    Vo

    lum

    e 2

    P

    lan

    s, D

    raw

    ing

    s a

    nd

    Se

    cti

    on

    s

    4

  • Guide to the Application

    Volume Main Submission

    29 May 2015

    Documents Submitted

    21 August 2015

    Documents Submitted

    25 September 2015

    Documents Submitted

    for Deadline 1

    9 November 2015

    Documents Submitted

    for Deadline 2

    24 November 2015

    Documents Submitted

    for Deadline 3

    17 December 2015

    Vo

    lum

    e 1

    Ap

    plic

    ati

    on

    In

    form

    ati

    on

    APP-045

    5.1 Consultation Report

    Appendix 3.1 to 4.3

    APP-046

    5.1 Consultation Report

    Appendix 5.1 to 6.2

    APP-047

    5.1 Consultation Report

    Appendix 6.3 to 8.24

    APP-048

    5.1 Consultation Report

    Appendix 9.1 to 14.7

    APP-049

    5.1.1 Consultation Report

    Summary (Welsh)

    APP-050

    5.1.1 Consultation Report

    Summary

    APP-051

    5.1 Consultation Report

    Addendum

    APP-052

    5.2 Flood Consequence

    Assessment

    APP-053

    5.3 Statement of Statutory

    Nuisance

    APP-054

    5.4 Habitat Regulations

    Assessment - No Significant

    Effects Report

    APP-054

    6.1 Environmental Statement

    Non Technical Summary

    (Welsh)

    APP-055

    6.1 Environmental Statement

    Non Technical Summary

    Vo

    lum

    e 5

    R

    ep

    ort

    s a

    nd

    Sta

    tem

    en

    ts

    Vo

    lum

    e 6

    E

    nv

    iro

    nm

    en

    tal

    Info

    rma

    tio

    n

    5

  • Guide to the Application

    Volume Main Submission

    29 May 2015

    Documents Submitted

    21 August 2015

    Documents Submitted

    25 September 2015

    Documents Submitted

    for Deadline 1

    9 November 2015

    Documents Submitted

    for Deadline 2

    24 November 2015

    Documents Submitted

    for Deadline 3

    17 December 2015

    Vo

    lum

    e 1

    Ap

    plic

    ati

    on

    In

    form

    ati

    on

    APP-056

    6.2 Environmental Statement

    Chapter 1 - Introduction

    APP-057

    6.2 Environmental Statement

    Chapter 2 - Project Description

    APP-058

    6.2 Environmental Statement

    Chapter 3 - Project

    Alternatives

    APP-059

    6.2 Environmental Statement

    Chapter 4 - Consultation

    APP-060

    6.2 Environmental Statement

    Chapter 5 - Environmental

    Setting

    APP-061

    6.2 Environmental Statement

    Chapter 6 - EIA Process

    APP-062

    6.2 Environmental Statement

    Chapter 6 - EIA Process

    APP-063

    6.2 Environmental Statement

    Chapter 8 - Land Use,

    Agriculture and Forestry

    APP-064

    6.2 Environmental Statement

    Chapter 9 - Landscape and

    Visual Assessment

    APP-065

    6.2 Environmental Statement

    Chapter 10 - Ecology

    APP-066

    6.2 Environmental Statement

    Chapter 11 - Historic

    Environment

    Vo

    lum

    e 6

    E

    nv

    iro

    nm

    en

    tal In

    form

    ati

    on

    6

  • Guide to the Application

    Volume Main Submission

    29 May 2015

    Documents Submitted

    21 August 2015

    Documents Submitted

    25 September 2015

    Documents Submitted

    for Deadline 1

    9 November 2015

    Documents Submitted

    for Deadline 2

    24 November 2015

    Documents Submitted

    for Deadline 3

    17 December 2015

    Vo

    lum

    e 1

    Ap

    plic

    ati

    on

    In

    form

    ati

    on

    APP-067

    6.2 Environmental Statement

    Chapter 12 - Geology,

    Hydrogeology and Ground

    Conditions

    APP-068

    6.2 Environmental Statement

    Chapter 13 - Hydrology,

    Drainage and Flood Risk

    APP-069

    6.2 Environmental Statement

    Chapter 14 - Noise and

    Vibration

    APP-070

    6.2 Environmental Statement

    Chapter 15 - Air Quality

    APP-071

    6.2 Envirnmental Statement

    Chapter 16 - Traffic and

    Transport

    APP-072

    6.2 Environmental Statement

    Chapter 17 - Socio-economics,

    Recreation and Tourism

    APP-073

    6.2 Environmental Statement

    Chapter 18 - Electric and

    Magnetic Fields

    APP-074

    6.2 Environmental Statement

    Chapter 19 - Cumulative

    Effects and Inter-relationships

    APP-075

    6.2 Environmental Statement

    Chapter 20 - Environmental

    Management

    APP-076

    6.3 Environmental Statement

    Figures 1.1 to 9.4

    Vo

    lum

    e 6

    E

    nv

    iro

    nm

    en

    tal In

    form

    ati

    on

    7

  • Guide to the Application

    Volume Main Submission

    29 May 2015

    Documents Submitted

    21 August 2015

    Documents Submitted

    25 September 2015

    Documents Submitted

    for Deadline 1

    9 November 2015

    Documents Submitted

    for Deadline 2

    24 November 2015

    Documents Submitted

    for Deadline 3

    17 December 2015

    Vo

    lum

    e 1

    Ap

    plic

    ati

    on

    In

    form

    ati

    on

    APP-077

    6.3 Environmental Statement

    Figure 9.5

    APP-078

    6.3 Environmental Statement

    Figures 9.6 to 11.5

    APP-079

    6.3 Environmental Statement

    Figures 12.1 to 17.1

    APP-080

    6.3 Environmental Statement

    Figures 19.1 to 19.3

    APP-081

    6.3 Environmental Statement

    Appendix 3.1 - WPD Schedule

    9 Statement

    APP-082

    6.4 Environmental Statement

    Appendix 3.2 - Change

    Request Log

    APP-083

    6.4 Environmental Statement

    Appendix 7.1 - Summary of

    LDP Policies

    APP-084

    6.4 Environmental Statement

    Appendix 7.2 - Compliance

    with NPS EN1 and NPS EN5

    APP-085

    6.4 Environmental Statement

    Appendix 7.3 - Climate Change

    Resilience Report

    APP-086

    6.4 Environmental Statement

    Appendix 9.1 - Effects on

    Landscape Elements

    Part 1 of 2

    Vo

    lum

    e 6

    E

    nv

    iro

    nm

    en

    tal In

    form

    ati

    on

    8

  • Guide to the Application

    Volume Main Submission

    29 May 2015

    Documents Submitted

    21 August 2015

    Documents Submitted

    25 September 2015

    Documents Submitted

    for Deadline 1

    9 November 2015

    Documents Submitted

    for Deadline 2

    24 November 2015

    Documents Submitted

    for Deadline 3

    17 December 2015

    Vo

    lum

    e 1

    Ap

    plic

    ati

    on

    In

    form

    ati

    on

    APP-087

    6.4 Environmental Statement

    Appendix 9.1 - Effects on

    Landscape Elements

    Part 2 of 2

    APP-088

    6.4 Environmental Statement

    Appendix 9.2 - Effects on

    Landscape Character

    APP-089

    6.4 Environmental Statement

    Appendix 9.3 - Effects on

    Landscape Designations

    APP-090

    6.4 Environmental Statement

    Appendix 9.4 - Effects on

    Representative Viewpoints

    APP-091

    6.4 Environmental Statement

    Appendix 9.5 - Visual Effects

    upon Residents

    APP-092

    6.4 Environmental Statement

    Appendix 9.6 - Visual Effects

    upon Footpath Users

    APP-093

    6.4 Environmental Statement

    Appendix 9.7 - Visual Effects

    upon Road Users

    APP-094

    6.4 Environmental Statement

    Appendix 9.8 - Visual Effects

    upon other Recreational and

    Tourist Locations

    APP-095

    6.4 Environmental Statement

    Appendix 10.1 - Bat Technical

    Report

    Vo

    lum

    e 6

    E

    nv

    iro

    nm

    en

    tal In

    form

    ati

    on

    9

  • Guide to the Application

    Volume Main Submission

    29 May 2015

    Documents Submitted

    21 August 2015

    Documents Submitted

    25 September 2015

    Documents Submitted

    for Deadline 1

    9 November 2015

    Documents Submitted

    for Deadline 2

    24 November 2015

    Documents Submitted

    for Deadline 3

    17 December 2015

    Vo

    lum

    e 1

    Ap

    plic

    ati

    on

    In

    form

    ati

    on

    APP-096

    6.4 Environmental Statement

    Appendix 10.2 - Botany

    Technical Report

    APP-097

    6.4 Environmental Statement

    Appendix 10.3 - Bird Technical

    Report

    APP-098

    6.4 Environmental Statement

    Appendix 10.4 - Dormouse

    Technical Report

    APP-099

    6.4 Environmental Statement

    Appendix 10.5 - Marsh

    Fritillary Technical Report

    APP-100

    6.4 Environmental Statement

    Appendix 10.6 - Otter and

    Water Vole Technical Report

    APP-101

    6.4 Environmental Statement

    Appendix 11.1 - Historic

    Environment Technical Report

    APP-102

    6.4 Environmental Statement

    Appendix 11.2 - Historic

    Environment Planning

    Compliance

    APP-103

    6.4 Environmental Statement

    Appendix 12.1 - Geo-

    Environmental Information

    Part 1 of 6

    APP-104

    6.4 Environmental Statement

    Appendix 12.1 - Geo-

    Environmental Information

    Part 2 of 6

    Vo

    lum

    e 6

    E

    nv

    iro

    nm

    en

    tal In

    form

    ati

    on

    10

  • Guide to the Application

    Volume Main Submission

    29 May 2015

    Documents Submitted

    21 August 2015

    Documents Submitted

    25 September 2015

    Documents Submitted

    for Deadline 1

    9 November 2015

    Documents Submitted

    for Deadline 2

    24 November 2015

    Documents Submitted

    for Deadline 3

    17 December 2015

    Vo

    lum

    e 1

    Ap

    plic

    ati

    on

    In

    form

    ati

    on

    APP-105

    6.4 Environmental Statement

    Appendix 12.1 - Geo-

    Environmental Information

    Part 3 of 6

    APP-106

    6.4 Environmental Statement

    Appendix 12.1 - Geo-

    Environmental Information

    Part 4 of 6

    APP107

    6.4 Environmental Statement

    Appendix 12.1 - Geo-

    Environmental Information

    Part 5 of 6

    APP-108

    6.4 Environmental Statement

    Appendix 12.1 - Geo-

    Environmental Information

    Part 6 of 6

    APP-109

    6.4 Environmental Statement

    Appendix 13.1 - Hydrology,

    Flood Risk and Drainage Data

    Table

    APP-110

    6.4 Environmental Statement

    Appendix 14.1 - Noise

    Supporting Information

    APP-111

    6.4 Environmental Statement

    Appendix 15.1 - Air Quality

    Assessment

    APP-112

    6.4 Environmental Statement

    Appendix 16.1 - Clarification of

    Traffic and Transport Scope

    Vo

    lum

    e 6

    E

    nv

    iro

    nm

    en

    tal In

    form

    ati

    on

    11

  • Guide to the Application

    Volume Main Submission

    29 May 2015

    Documents Submitted

    21 August 2015

    Documents Submitted

    25 September 2015

    Documents Submitted

    for Deadline 1

    9 November 2015

    Documents Submitted

    for Deadline 2

    24 November 2015

    Documents Submitted

    for Deadline 3

    17 December 2015

    Vo

    lum

    e 1

    Ap

    plic

    ati

    on

    In

    form

    ati

    on

    APP-113

    6.4 Environmental Statement

    Appendix 16.2 - Brechfa Forest

    Construction Programme

    APP-144

    6.4 Environmental Statement

    Appendix 17.1 - Review of

    Socio-economic, Recreation

    and Tourism Assessments

    APP-114

    6.4 Environmental Statement

    Appendix 18.1 - EMF

    Calculations

    APP-115

    6.5 Environmental Statement

    Scoping Report

    APP-116

    6.6 Environmental Statement

    Scoping Opinion

    APP-117

    6.7 Environmental Statement

    Publicity Requirements

    Vo

    lum

    e 7

    O

    the

    r M

    ed

    ia

    APP-118

    7.1 3D Model Visualisation

    Document

    APP-119

    8.1 Planning Statement

    APP-145

    8.1 Planning Statement

    Appendix 1 - Details of Other

    Consents and Licenses

    APP-120

    8.1 Summary Planning

    Statement

    APP-121

    8.1 Summary Planning

    Statement (Welsh)

    Vo

    lum

    e 8

    O

    the

    r D

    oc

    um

    en

    ts

    Vo

    lum

    e 6

    E

    nv

    iro

    nm

    en

    tal In

    form

    ati

    on

    12

  • Guide to the Application

    Volume Main Submission

    29 May 2015

    Documents Submitted

    21 August 2015

    Documents Submitted

    25 September 2015

    Documents Submitted

    for Deadline 1

    9 November 2015

    Documents Submitted

    for Deadline 2

    24 November 2015

    Documents Submitted

    for Deadline 3

    17 December 2015

    Vo

    lum

    e 1

    Ap

    plic

    ati

    on

    In

    form

    ati

    on

    APP-122

    8.2 Strategic Optioneering

    Report

    APP-123

    8.3 Draft Section 106

    Agreement

    APP-124

    8.4 Lifetime Costs Report

    APP-125

    8.5 Construction Management

    Strategy Part 1 of 2

    APP-126

    8.5 Construction Management

    Strategy Part 2 of 2

    APP-127

    8.6 Construction

    Environmental Management

    Plan

    APP-128

    8.7 Construction Traffic

    Management Plan

    APP-129

    8.7 Construction Traffic

    Management Plan Figures 1.1

    to 4.2

    APP-130

    8.7 Construction Traffic

    Management Plan Appendix 1

    PRoW Management Strategy

    APP-131

    8.7 Construction Traffic

    Management Plan Appendix 2

    Access Pro Formas

    APP-132

    8.8 Transport Assessment

    Vo

    lum

    e 8

    O

    the

    r D

    oc

    um

    en

    ts

    13

  • Guide to the Application

    Volume Main Submission

    29 May 2015

    Documents Submitted

    21 August 2015

    Documents Submitted

    25 September 2015

    Documents Submitted

    for Deadline 1

    9 November 2015

    Documents Submitted

    for Deadline 2

    24 November 2015

    Documents Submitted

    for Deadline 3

    17 December 2015

    Vo

    lum

    e 1

    Ap

    plic

    ati

    on

    In

    form

    ati

    on

    APP-133

    8.9 Outline Archaeological

    Written Scheme of

    Investigation

    APP-134

    8.9 Outline Archaeological

    Written Scheme of

    Investigation Figure 1.1

    APP-135

    8.10 DCO Documents Errata

    8.10 Volume 6.4 - Appendix

    14.1 Noise Supporting

    Information Errata

    APP-148

    8.11 Sections 56 and 59 and

    Regulation 13 Compliance

    Certificates and Notice of

    Recipients Not Included in the

    Revised Book of Reference

    APP-149

    8.12 Response to ExA

    Procedural Decision dated 6

    July 2015 and Planning

    Inspectorate Section 55

    Application Checklist

    9.1 Response to the Examining

    Authority's First Written

    Questions

    9.2.1 CA01 Appendix 1 Change

    Requests

    9.2.2 CA12 Appendix 1

    Justification for Land

    9.2.3 CA13 Appendix 1

    Organogram

    9.2.4 CA14 Appendix 1 Annual

    Report and Financial Statement

    9.2.5 CA18 Appendix 1 Land

    Owner Engagements

    Vo

    lum

    e 8

    O

    the

    r D

    oc

    um

    en

    ts

    Vo

    lum

    e 9

    E

    xa

    min

    ati

    on

    Su

    bm

    iss

    ion

    s

    14

  • Guide to the Application

    Volume Main Submission

    29 May 2015

    Documents Submitted

    21 August 2015

    Documents Submitted

    25 September 2015

    Documents Submitted

    for Deadline 1

    9 November 2015

    Documents Submitted

    for Deadline 2

    24 November 2015

    Documents Submitted

    for Deadline 3

    17 December 2015

    Vo

    lum

    e 1

    Ap

    plic

    ati

    on

    In

    form

    ati

    on

    9.2.6.1 DLV02 Appendix 1 Figure

    1 Appendix 9.5 Residential

    Receptors

    9.2.6.2 DLV02 Appendix 2 Figure

    1 Appendix 9.6 Footpaths

    9.2.6.3 DLV02 Appendix 3 Figure

    1 Appendix 9.7 Classified Roads

    9.2.6.4 DLV02 Appendix 4 Figure

    1 Appendix 9.8 Other Receptors

    9.2.7 DLV03 Appendix 1

    Viewpoints

    9.2.8.1 DLV06 Appendix 1 Phillip

    Black - CV

    9.2.8.2 DLV06 Appendix 2 Ellie

    Davies - CV

    9.2.8.3 DLV06 Appendix 3 John

    Meehan - CV

    9.2.9 DLV13 Appendix 1

    Modified Table 9.1

    9.2.10 DLV15 Appendix 1 Table

    of Receptors

    9.2.11 DLV19 Appendix 1

    Options Comparison

    9.2.12 DLV20 Appendix 1 Report

    into Underground Cables

    9.2.13.1 DLV22 Appendix 1

    Route Alignment Selection

    Report

    9.2.13.2 DLV22 Appendix 2

    Route Alignment Selection

    Report Figures

    9.2.13.3 DLV22 Appendix 3

    Route Alignment Selection

    Report Appendix 1.1

    Vo

    lum

    e 9

    E

    xa

    min

    ati

    on

    Su

    bm

    iss

    ion

    s

    15

  • Guide to the Application

    Volume Main Submission

    29 May 2015

    Documents Submitted

    21 August 2015

    Documents Submitted

    25 September 2015

    Documents Submitted

    for Deadline 1

    9 November 2015

    Documents Submitted

    for Deadline 2

    24 November 2015

    Documents Submitted

    for Deadline 3

    17 December 2015

    Vo

    lum

    e 1

    Ap

    plic

    ati

    on

    In

    form

    ati

    on

    9.2.13.4.1 DLV22 Appendix 4

    Route Alignment Selection

    Report Appendix 1.2 Part 1

    9.2.13.4.2 DLV22 Appendix 4

    Route Alignment Selection

    Report Appendix 1.2 Part 2

    9.2.13.4.3 DLV22 Appendix 4

    Route Alignment Selection

    Report Appendix 1.2 Part 3

    9.2.13.4.4 DLV22 Appendix 4

    Route Alignment Selection

    Report Appendix 1.2 Part 4

    9.2.13.5 DLV22 Appendix 5

    Route Alignment Selection

    Report Appendix 2.1

    9.2.14.1 DLV24 Appendix 1

    National Grid - Our Approach to

    Design and Routeing 2012

    9.2.14.2 DLV24 Appendix 2

    National Grid - Approach to

    Options Appraisal 2012

    9.2.14.3 DLV24 Appendix 3 NG

    UG Policy New Connections

    9.2.14.4.1 DLV24 Appendix 4

    CIGRE Guidelines Part 1

    9.2.14.4.2 DLV24 Appendix 4

    CIGRE Guidelines Part 2

    9.2.15 DCO03 Appendix 1

    Mitigation Table

    9.2.16 DCO24 Appendix 1

    Brechfa Forest West Wind Farm

    Approved layout

    9.2.17 DCO33 Appendix 1 Email

    from Openreach

    9.2.18.1 DCO34 Appendix 1 S37

    Consent Burry Port

    9.2.18.2 DCO34 Appendix 2

    Existing Assets Table

    Vo

    lum

    e 9

    E

    xa

    min

    ati

    on

    Su

    bm

    iss

    ion

    s

    16

  • Guide to the Application

    Volume Main Submission

    29 May 2015

    Documents Submitted

    21 August 2015

    Documents Submitted

    25 September 2015

    Documents Submitted

    for Deadline 1

    9 November 2015

    Documents Submitted

    for Deadline 2

    24 November 2015

    Documents Submitted

    for Deadline 3

    17 December 2015

    Vo

    lum

    e 1

    Ap

    plic

    ati

    on

    In

    form

    ati

    on

    9.2.18.3 DCO34 Appendix 3

    Proposed Works to Existing

    Assets Plans

    9.2.19.1 EIA09 Appendix 1 Notes

    of NRW ecology meetings

    9.2.19.2 EIA09 Appendix 2

    Follow up Email with NRW

    9.2.19.3 EIA09 Appendix 3 CCC

    Scoping Opinion to PINS

    9.2.19.4 EIA09 Appendix 4 CCC

    Response on Draft ES

    9.2.20.1 EIA13 Appendix 1

    BFWWF Habitat Management

    Plan

    9.2.20.2 EIA13 Appendix 2

    BFWWF Completed Unilateral

    Undertaking

    9.2.21 EIA17 Appendix 1 Stage 3

    Consultation - NRW

    9.2.22 EIA20 Appendix 1

    Conceptual Site Model

    9.2.23.1 EIA22 Appendix 1

    Relevant Watercourses

    Part 1

    9.2.23.2 EIA22 Appendix 2

    Relevant Watercourses

    Part 2

    9.2.24 EIA26 Appendix 1 Outline

    Frac-out Contingency Plan

    9.2.25 EIA29 Appendix 1 SIA

    Guidelines

    9.2.26 EIA30 App1 Tables 20.1 &

    20.2

    9.2.27 HA11 Appendix 1 HRA

    Figure 2 Otter Figures

    9.2.28 OM02 Appendix 1 Guide

    to the Application

    Vo

    lum

    e 9

    E

    xa

    min

    ati

    on

    Su

    bm

    iss

    ion

    s

    17

  • Guide to the Application

    Volume Main Submission

    29 May 2015

    Documents Submitted

    21 August 2015

    Documents Submitted

    25 September 2015

    Documents Submitted

    for Deadline 1

    9 November 2015

    Documents Submitted

    for Deadline 2

    24 November 2015

    Documents Submitted

    for Deadline 3

    17 December 2015

    Vo

    lum

    e 1

    Ap

    plic

    ati

    on

    In

    form

    ati

    on

    9.3.1 Statements of Common

    Ground - Carmarthenshire

    County Council

    9.3.2 Statements of Common

    Ground Historic Environment -

    Dyfed Archaeological Trust and

    Cadw

    9.4 Applicant’s Responses to

    Relevant Representations

    9.5 Position with regard to

    Statements of Common Ground

    Vo

    lum

    e 9

    Ex

    am

    ina

    tio

    n S

    ub

    mis

    sio

    ns

    18