International Conference on Hydropower for Sustainable DevelopmentFeb 5‐7,2015,Dehradun,India
Re‐build up small scale Hydropower technologies inHydropower technologies in
Japan by local industrial power
Yoshinobu Watanabe1, Yoichi Kiuchi2, Mina Takagi3, Tokihiko Fujimoto34, Yukihiro Shimatani3
1.NakayamaIronWorks,Co ltd, 2.Sun‐wa Technos Corporation, 3.Faculty of Engineering, Kyushu University, 4.Faculty of Agriculture, Shizuoka University
06/Feb/2015 ver.1

Outline1 I d i N k i k LTD 3 & b i h d bi1.Introduction: Nakayama iron works, LTD.
Presenter – Yoshinobu Watanabeour company‐ why did we make Hydropower?much experience machines of rotating
3.R & D about micro hydro turbines‐making aggregate plant for Dum projects‐ learning technologies about another
types of micro hydro turbine‐much experience machines of rotating technique focusing on stone crusher‐ control electricity about small scale
2 Our experience: Making “STREAM” ultra low head
‐ collaborating with Kyushu University
4. Process to install micro hydro power2.Our experience: Making STREAM ultra low head hydro turbine
‐making vertical shaft twin turbines with SeaBell International Co
‐ relationship with country of India
4. Process to install micro hydro power in Japanese local community
On site test; Shiraito water fall Itoshima‐city, Fukuoka
high overhead costsrelationship with country of India‐ feasibility study with SeaBell and UNIDO‐ install the STREAM in Dehradun‐making STREAM in Indian company‐meet with Dr.Arun Kumar
‐ high overhead costs‐ collaboration with experts
l i5.Conclusion

1 Introduction:1.Introduction: Nakayama iron works LTDNakayama iron works, LTD.

Power-driven Machinery Department, Faculty of Technology,
CV
Kyushu University (Japan)
Since April 1996 Nakayama Iron Works, Ltd,Sales Department.L t d T h l S ifi ti S ti
WATANABE Yoshinobu,Development Engineer
Layout and Technology Specifications Section
October 1996 Sales Promotion Division
Since April 1998 Development and Engineering DepartmentDevelopment Engineer in charge of Grid sieving, Soilremediation Plant and Vertical Impact Crusher
Since September 2012 Sales Department
Since 2011 Develop micro Hydro Turbine with SBI
Product Development Section

Since 1908
i hi
Five decades of experience Concrete pumping machine
Air Compressor
Jaw Crusher

1984: AC Type of Jaw Crusher 1996: 500 ~ 1000 t/h crushing capacity NC648G AUTO MOBAL Crusher
1956: PCL805 Portable Crusher
2006: AUTO MOBAL NC360GXC with a New
1942: SJ15 Blake Crusher
1987: Vertical Shaft Impact Crusher
1992: Manufacturing of the SR Type
generation of Jaw crusher (NJ3622)

70 over70 over

NAKAYAMA IRON WORKS, Ltd ACTIVITIESACTIVITIES
Quarry → Aggregates and SandQuarry → Aggregates and SandCrusher、Screen
RecyclingAsphalt and concrete crushing,diverse industrial waste. Stationary, portable and mobile crushing and screening units.gSoil remediation equipments




ON‐grid test by motoring and analyzed required document
t i timotoring generating
Power conditiner

2.Our experience: Making “STREAM” ultra low head h d t bihydro turbine


15

16

Feasibile Stady in India

Visiting our factoryVisiting our factory

At Shiraito Power House with Dr.Arun Kumar

3.R & D about micro hydro turbinesy

Labo in Kyushu Univ.

Pelton’ bucket design from Nepal
Test up to 5kW
Using by 3D‐printer

Produce by corroboration with local company in Fukuoka Sagalocal company in Fukuoka, Saga
Iron workscasting Controller by SUNWATECHNOS

4. Process to install micro hydro power in J l l itJapanese local community

CASE study ‐ Shiraito waterfallCASE study Shiraito waterfall
Video of Shiraito Power HouseTouch above picture

Layout
Point of the panel

Next time corroboration
Electricity, Turbine : Nakayama Iron Works
Civil : Local construction com.
Piping : Sekisui chemical
Consulting : Pacific consulting Co.

Generation of electricity is indicated on the panel away from the generator.
PLC(power line communication) System

Pelton(15kW) and Xflow(5kW)
Pelton turbine・Kyusyu university(design)・YASKAWA(generator)・Nakayama Iron works(plan,manufacture,install)
Crossflow turbine made in Indonesia

‘on‐off grid’ plan(planned by SUN‐WA TECHNOS)

Recording data
This is the data in a day.Power being cut off, the system can restore in a few minutes. Moreover, its generator continue to generate, however water pressure suddenly changes.The system can indicate the data Correctly.Therefore, the system doesn’t need a dam, simplifies its maintenance.

video of electrolict lcontrol

Checking which flow is best for each turbines

Kaizen: Check pelton nozzle and improve

5. Conclusion…5. Conclusion…
• With onsite test the “STREAM” with IITRooRkee, extend to new segment area of turbine in Japan(from ultra low head to middle).
• Reclamation of new market in Japan by recovering the lost Jap turbine know‐how and the control of electricity.turbine know how and the control of electricity.‐ Cross flow, Pelton turbine etc.‐ up to 20kW, 200kW respectively
• Controlling technique can use both OFF‐grid and ON‐grid.‐ Starting local‐on site test at “Shiraito water fall.” 2014.3‐