onshore water experience

2
1400 Broadfield Blvd., Suite 500 Houston, Texas 77084 Main: 832-617-9000 Fax: 281-398-9904 [email protected] www.strategyeng.com Strategy Engineering & Consulting, LLC Onshore Water Experience Strategy specializes in the engineering and design of pipeline and facilities for salt water disposal, frac water storage and disposal, and brine ponds. Seamlessly integrating with our customer’s team, Strategy’s employees work to form a cohesive unit with a common goal; getting the project done right, on time, and within budget. With that in mind, Strategy tailors its services to each customer to assist with budget forecasting, scheduling, planning, permitting, engineering, procurement, inspection, and construction management. Client Project Scope GDF Suez Highway 287 Relocation – 2 mile, 16” waterline relocation within Highway 287 ROW. High Point Energy Atwood Water Flood Project - infield gathering system development and cen- tral battery design for 36 well pad field in Hughes County, OK. Performed facility engineering for separation, handling, storage equipment, and flow line sizing. Also developed pad location maps, mechanical plan drawings, and BOMs for each well pad and the central facility. Traveled to the site for ini- tial kick-off and once more during construction. Coordinated with equipment vendors and field crews for purchase and installation of major equipment. EP Energy University Central O813 Frac Pond - Strategy was responsible for the civil engineering and design of a frac pond in Reagan County, TX. This pond is ap- proximately 775,000 barrels at its designated pond volume elevation. Crimson Exploration West Texas Frac Ponds - Strategy was responsible for the civil engineering and design of three frac ponds for approximately 2.5 million barrel capacity. Equistar Mont Belvieu Brine Pond Pump Replacement - Strategy was responsible for con- ceptual engineering and full AFE to replace brine pond pumps, electrical pump building, VFD’s and associated piping. Strategy also completed grading drawings for the 90,000 barrel brine pond. Chesapeake Energy: San Pedro Central Processing Facility - Strategy was responsible for the full field development of this 30,000 BOPD sweet oil processing facility, infield gathering system, and pump station. Design included 3 trains of 10,000 BOPD, expandable to 60,000 BOPD at full capacity; two 10,000 barrel tanks, two 5,000 barrel tanks, and four 1,000 barrel tanks; 3 oil pipeline pumps at 490 GPM each. 10,000 BWPD with two 5,000 barrel tanks and produced water pumps and measure- ment. Services provided were project management, engineering, design/drafting, procurement, inspection, construction management, commissioning, and start- up support. Pipeline and Facility Experience:

Upload: others

Post on 18-Dec-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Onshore Water Experience

1400 Broadfield Blvd., Suite 500 • Houston, Texas 77084Main: 832-617-9000 • Fax: 281-398-9904

[email protected] • www.strategyeng.com

Strategy Engineering & Consulting, LLC

Onshore Water ExperienceStrategy specializes in the engineering and design of pipeline and facilities for salt water disposal, frac water storage and disposal, and brine ponds. Seamlessly integrating with our customer’s team, Strategy’s employees work to form a cohesive unit with a common goal; getting the project done right, on time, and within budget. With that in mind, Strategy tailors its services to each customer to assist with budget forecasting, scheduling, planning, permitting, engineering, procurement, inspection, and construction management.

Client Project Scope

GDF Suez Highway 287 Relocation – 2 mile, 16” waterline relocation within Highway 287 ROW.

High Point Energy Atwood Water Flood Project - infield gathering system development and cen-tral battery design for 36 well pad field in Hughes County, OK. Performed facility engineering for separation, handling, storage equipment, and flow line sizing. Also developed pad location maps, mechanical plan drawings, and BOMs for each well pad and the central facility. Traveled to the site for ini-tial kick-off and once more during construction. Coordinated with equipment vendors and field crews for purchase and installation of major equipment.

EP Energy University Central O813 Frac Pond - Strategy was responsible for the civil engineering and design of a frac pond in Reagan County, TX. This pond is ap-proximately 775,000 barrels at its designated pond volume elevation.

Crimson Exploration West Texas Frac Ponds - Strategy was responsible for the civil engineering and design of three frac ponds for approximately 2.5 million barrel capacity.

Equistar Mont Belvieu Brine Pond Pump Replacement - Strategy was responsible for con-ceptual engineering and full AFE to replace brine pond pumps, electrical pump building, VFD’s and associated piping. Strategy also completed grading drawings for the 90,000 barrel brine pond.

Chesapeake Energy: San Pedro Central Processing Facility - Strategy was responsible for the full field development of this 30,000 BOPD sweet oil processing facility, infield gathering system, and pump station. Design included 3 trains of 10,000 BOPD, expandable to 60,000 BOPD at full capacity; two 10,000 barrel tanks, two 5,000 barrel tanks, and four 1,000 barrel tanks; 3 oil pipeline pumps at 490 GPM each. 10,000 BWPD with two 5,000 barrel tanks and produced water pumps and measure-ment. Services provided were project management, engineering, design/drafting, procurement, inspection, construction management, commissioning, and start-up support.

Pipeline and Facility Experience:

Page 2: Onshore Water Experience

1400 Broadfield Blvd., Suite 500 • Houston, Texas 77084Main: 832-617-9000 • Fax: 281-398-9904

[email protected] • www.strategyeng.com

Strategy Engineering & Consulting, LLC

Onshore Water Experience

Client Project Scope

EP Energy 8-24 Central Processing Facility - Strategy was responsible for the engineering, design, procurement support, and construction management of this facility in the Wolfcamp Basin. The facility was designed for 4,500 BOPD, 7,200 BWPD, and 5 MMSCFD. The operating pressure was 100 psig.

EP Energy 41-02 CPF #7 Central Processing Facility - Strategy was responsible for the engineer-ing, design, procurement support, and construction management of this facility in the Wolfcamp Basin. The facility was designed for 6,000 BOPD, 13,000 BWPD and 19 MMSCFD. The operating pressure was 100 psig.

EP Energy 43-22 Central Processing Facility - Strategy was responsible for the engineering, design, procurement support, and construction management of this facility in the Wolfcamp Basin. The facility was designed for 4,000 BOPD, 12,000 BWPD, and 15 MMSCFD. The operating pressure was 100 psig.

Cheniere Midstream Nordheim Central Production Facility - Strategy was responsible for the full field de-velopment of an 8,000 BOPD oil processing and 100mmscfd gas compression facil-ity (at full capacity). Scope included Sugarkane pipeline installation of dual 10” gas and 6” oil gathering trunklines from production well pads to a central facility includ-ing riser tie-ins and launcher/receiver designs for future tie-ins. Initial facility start-up was 5,000 BOPD, 450 BWPD and 60 MMSCFD with flanges for future expansion. Services provided were project management, engineering, design/drafting, procure-ment, inspection, construction management, commissioning, and start-up support.

Sierra Resources STS “A” Central Gathering Facility - Strategy was responsible for the field develop-ment which included the 4000 BOPD, 2,000 BWPD, and 10 MMSCFD modularized processing facility. Services provided were project management, engineering, de-sign/drafting, procurement, inspections, construction management, commissioning and start-up support.

Cabot Oil & Gas Eagleford Standardized Sour Facility - Strategy was responsible for the project man-agement, engineering, design, and procurement packages for this 6,000 BOPD, 6,000 BWPD, and 8 MMSCFD sour production facility.

Apache Corporation Brazos Riverside Development – Multiple 5,000 BOPD, 2,000 BWPD, and 5 MMSCFD gas throughput facilities in the Eagle Ford Shale including hydraulic analy-sis for infield gathering flow lines and facility simulations. Ongoing development of standard facility designs for various flow rates based on number of wells.

Statoil Multi-well Pad Facilities - Strategy has been working with Statoil on their Eagle Ford modularized well pads since 2012. Strategy was responsible for the poject manage-ment, engineering and design of the following projects: Lake Schwartz Multi-Well Pad Facility, Lark Ranch C Multi-Well Pad Facility, Chestnut GU1 Multi-Well Pad Modi-fications, Chestnut B2H Multi-Well Pad Modifications, and Ball Multi-Well Pad Facility (2,000 BWPD).