onshore gas experience

2
1400 Broadfield Blvd., Suite 500 Houston, Texas 77084 Main: 832-617-9000 Fax: 281-398-9904 [email protected] www.strategyeng.com Strategy Engineering & Consulting, LLC Onshore Gas Experience Strategy Engineering is highly experienced in providing innovative and cost efficient engineering solutions for our customers. Client/Project Project Scope Pennant Midstream Hickory Bend Cryogenic Plant Strategy provided the piping and design for the balance of plant for this 200 MMSCFD cryogenic facility. Our scope included the plot plan, P&IDs, all piping plans, 3D model, isometrics, and housing of all the drawings from all vendors on our FTP site. Cheniere Energy Nordheim CPF Strategy provided project management, engineering, design/ drafting, procurement, construction management, commissioning, and start- up services for this 60 MMSCFD facility. Talisman Energy Y-Bar Gas Processing Strategy was responsible for the project management, engineering, and design/drafting of the 6 MMSCFD Sour facility. EP Energy Holly Field Interconnect Upgrade Strategy was responsible for the engineering and design/ drafting of the 120 MMSCFD facility. EP Energy Holly Field Slug Catcher and Facility Upgrade Strategy was responsible for the engineering and design/ drafting of the 180 MMSCFD facility. Statoil Lark East CPF, Lake Schwartz, Ball Multi-Well Pads Strategy was responsible for the engineering and design/ drafting of these multi-well pads at 8 MMSCFD, 12 MMSCFD, and 25 MMSCFD. Cabot Oil & Gas Standard Multi- Well Pads Strategy was responsible for the engineering and design/ drafting of the sour multi-well pads for the Eagle Ford region. 8 MMSCFD Sour each. Processing Facilities Client/Project Project Scope Pennant Midstream Hickory Bend Cryogenic Plant Balance of plant (BOP) entailed three Ariel KBZ/6 compressors with Hyun- dai 5,000 hp engines within a compressor building. Inlet separator, dehydra- tion, and metering were also included in scope of the 200 MMSCFD facility. Additional space allotted for one in the future. American Midstream Southern Hunter Compression Station Strategy provided the engineering, design, and construction coordination for this new compressor station in Lavaca County, near Shiner, Texas. 30 MMSCFD - Two Waukesha L7044GSI with two future compressors. - Project start to facility startup was 12 weeks. American Midstream Wyatt Compressor Station Strategy provided the engineering, design, and construction coordination for this compressor station in Gonzales County, Texas. 7 MMSCFD - One Waukesha L7044GSI and one future compressor. - Project start to facility startup was 10 weeks. Gas Compression

Upload: others

Post on 04-Dec-2021

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Onshore Gas Experience

1400 Broadfield Blvd., Suite 500 • Houston, Texas 77084Main: 832-617-9000 • Fax: 281-398-9904

[email protected] • www.strategyeng.com

Strategy Engineering & Consulting, LLC

Onshore Gas ExperienceStrategy Engineering is highly experienced in providing innovative and cost efficient engineering solutions for our customers.

Client/Project Project ScopePennant MidstreamHickory Bend Cryogenic Plant

Strategy provided the piping and design for the balance of plant for this 200 MMSCFD cryogenic facility. Our scope included the plot plan, P&IDs, all piping plans, 3D model, isometrics, and housing of all the drawings from all vendors on our FTP site.

Cheniere EnergyNordheim CPF

Strategy provided project management, engineering, design/ drafting, procurement, construction management, commissioning, and start-up services for this 60 MMSCFD facility.

Talisman EnergyY-Bar Gas Processing

Strategy was responsible for the project management, engineering, and design/drafting of the 6 MMSCFD Sour facility.

EP EnergyHolly Field Interconnect Upgrade

Strategy was responsible for the engineering and design/ drafting of the 120 MMSCFD facility.

EP EnergyHolly Field Slug Catcher and Facility Upgrade

Strategy was responsible for the engineering and design/ drafting of the 180 MMSCFD facility.

StatoilLark East CPF, Lake Schwartz, Ball Multi-Well Pads

Strategy was responsible for the engineering and design/ drafting of these multi-well pads at 8 MMSCFD, 12 MMSCFD, and 25 MMSCFD.

Cabot Oil & GasStandard Multi-Well Pads

Strategy was responsible for the engineering and design/ drafting of the sour multi-well pads for the Eagle Ford region. 8 MMSCFD Sour each.

Processing Facilities

Client/Project Project ScopePennant MidstreamHickory Bend Cryogenic Plant

Balance of plant (BOP) entailed three Ariel KBZ/6 compressors with Hyun-dai 5,000 hp engines within a compressor building. Inlet separator, dehydra-tion, and metering were also included in scope of the 200 MMSCFD facility. Additional space allotted for one in the future.

American MidstreamSouthern Hunter Compression Station

Strategy provided the engineering, design, and construction coordination for this new compressor station in Lavaca County, near Shiner, Texas. 30 MMSCFD- Two Waukesha L7044GSI with two future compressors. - Project start to facility startup was 12 weeks.

American MidstreamWyatt Compressor Station

Strategy provided the engineering, design, and construction coordination for this compressor station in Gonzales County, Texas. 7 MMSCFD- One Waukesha L7044GSI and one future compressor. - Project start to facility startup was 10 weeks.

Gas Compression

Page 2: Onshore Gas Experience

1400 Broadfield Blvd., Suite 500 • Houston, Texas 77084Main: 832-617-9000 • Fax: 281-398-9904

[email protected] • www.strategyeng.com

Strategy Engineering & Consulting, LLC

Onshore Gas ExperienceGas Compression continued

Client/Project Project Scope

Spectra EnergyRamapo Expansion/Brookfield Metering Station

Delivery and regulation facility with pipeline to compression at 325 MMSCFD. Scope included engineering, procurement, and construction management. (Employee Experience)

Toreador ResourcesCayagzi OnshoreGas Process Facility

150 MMSCFD gas compression and dehydration facility with 60 miles of 16” pipeline. (Employee Experience)

Black Elk EnergyMatagorda Island Compressor Project

Conceptual onshore 15 MMSCFD facility for the gathering of offshore produc-tion with two x 3516TALE Ariel/CAT compressors, separation, dehydration, and metering, with a third future compressor.

Navitas MidstreamMidway CompressorStation

Scope included project management, engineering, and design/ drafting of a 35 MMSCFD facility with three x 3512 compressor packages with Dehy and BTEX.

Navitas MidstreamTex-Harvey andF-Line Compressor Stations

Detailed design, procurement, and skid fabrication of these two x 15 MMSCFD compressor stations with modular skidded equipment. Facility included three x 3516 compressor packages with Dehy, BTEX and NGL reinjection.

Navitas MidstreamBryant Ranch West and Endeavor Cox Compressor Station

Detailed design, procurement, and skid fabrication of these two x 20 MMSCFD compressor stations with modular skidded equipment. Facility included three x 3516 compressor packages with Dehy, BTEX and NGL reinjection.

EP EnergyHinjosa CPF

Three x G3516TALE Ariel/CAT compressors with separation, dehydration, and metering for sales gas pipeline of a 25 MMSCFD facility. Scope included project management, engineering, and design/drafting.

EP EnergyRitchie Farm South Expan-sion

Facility expansion with two x G3516TALE Ariel/CAT compressors with separation, dehydration, and metering for sales gas pipeline. Scope included project management, engineering, design/drafting, construction management, commissioning, and start-up of this 10 MMSCFD Sour Facility.

EP EnergyHixon Northwest CPF

20 MMSCFD facility expansion with four x G3516TALE Ariel/CAT com-pressors with separation, dehydration and metering for sales gas pipe-line. Scope included project management, engineering, design/drafting, construction management, commissioning, and start-up.

EP EnergyBrown CPFWareing CPFMaltsberger Southwest CPF

Each 6MMSCFD facility project scope included one or two G3516TALE Ariel/CAT compressors with separation, dehydration, and metering for sales gas pipeline. Scope included project management, engineering, design/drafting, construction management, commissioning, and start-up.

EP EnergyStorey-Altito Northwest CPF

6 MMSCFD facility designed with one x G3516TALE Ariel/CAT compres-sor for IP sales gas pipeline, and electric unit for flash gas compres-sion. Scope included project management, engineering, design/drafting, construction management, commissioning, and start-up.