  • OperationalisingOperationalising Safe Lifting PlansSafe Lifting Plans

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building LivesMoving People ,Building Lives

    @ 2011 Huationg Holding. All Right Reserved

    OperationalisingOperationalising Safe Lifting PlansSafe Lifting Plans

    Presentation by Presentation by Mr. Jimmy ChuaMr. Jimmy ChuaMr. Jimmy ChuaMr. Jimmy ChuaMr. Jimmy ChuaMr. Jimmy ChuaMr. Jimmy ChuaMr. Jimmy ChuaGroup General Manager of Group General Manager of HuationgHuationg

    ViceVice--Chairman of SCAChairman of SCA

  • CONTENTS

    Introduction Importance of planning Importance of planning Why do Lifting Operations fail? COP: Safe Lifting Operation in Workplaces The Lifting Plan

    Key Factors to Consider Sample of Lifting Plan

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    Sample of Lifting Plan Conclusion

  • @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • Importance of Planning

    Reduces the probability of unexpected incidents occurringincidents occurring

    Useful reference for Safe Lifting Operation in the case of any doubts

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • What happens What happens when you do not plan?

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    do not plan?

  • Why do Lifting Operations fail?

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • Soft Ground

    Possibility of Crane Accident

    Soft Ground Resting of

    Outrigger on Covered area

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • Weather Elements

    Possibility of Crane Accident

    Improper use of

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    by-pass system

    Video

  • Poor Maintenance

    Possibility of Crane Accident

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • Possibility of Crane Accident

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    Out Riggernot fully extended Boom hit flare line

  • Poor Planning Poor Communication

    Possibility of Crane Accident

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    http://www.craneaccidents.com/2012/05/report/crane-overturns-in-singapore/

  • Possibility of Crane Accident

    No Barricading Demarcation Demarcation Lifting Zone

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • Recent Case of Crane Toppling

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    http://news.asiaone.com/news/singapore/crane-topples-over-sbf-center-worksite-tanjong-pagar

  • @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    Video

  • COP: Safe Lifting Operations in the Workplaces

    1. Factors affecting Safe Lifting Operations1. Factors affecting Safe Lifting Operations2. Lifting Plan3. Equipment4. Personnel Roles and Responsibilities5. Emergency and Contingency planning

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    5. Emergency and Contingency planning

  • The Lifting Plan

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • The Lifting Plan is a set of plans developed for use in any crane lifting operation

    Lifting Supervisor will take hold of the lifting plan but the lifting team should be familiar with the Lifting Plan and ensure that the lifting operation is carried out according to plan

    Any party who has the expertise and relevant knowledge can create the lifting plan. After which, both the occupier and the contractor have to agree upon the document

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • Developing the Lifting Plan

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • Key Factors to be Considered

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • 1. Site Surrounding Conditions

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • Environmental factors Environmental factors Location/Site Hazards Lighting Conditions Demarcation

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • Generic Environmental Hazards to be Considered:

    Indoors/Outdoors Indoors/Outdoors Suitability of lighting (Day/Night) Noise Weather conditions: Rain, Haze, Bright Sunlight,

    Strong Winds, Thunderstorms, Lightning Ground stability

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • Location

    Mass Rapid Transit system (MRT) Public areas Public areas Build-up areas Near water bodies Overhead Restriction Underground Services

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    Underground Services

  • Site Hazards

    Access / Egress around lifting equipment clearly identified

    Working at Heights Ground Stability and level Restricted area to establish outrigger supports

    (mobile cranes) Blind spots during maneuvering of load and lifting

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    Blind spots during maneuvering of load and lifting equipment.

  • Demarcation / Barrication

    Area of maneuverability; when using equipment.

    Area of maneuverability; when using equipment.

    Lifting Zone Working within a confined space or tunnel Other activities on the work site

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • 2. LOAD

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • Description of Load to be Lifted Description of Load to be Lifted Details of Load to be Lifted

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • Load Crucial Information

    No load must be lifted without the following crucial information:

    the load weight the load weight the overall dimensions (length, width and depth). indication of the position of centre of gravity. the lifting/slinging points the pickup radius the final location radius the height to which the load has to be lifted.

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    the height to which the load has to be lifted. the overall weight (load + all lifting accessories)

  • 3. Risk Assessments

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • 4. Lifting Equipment/ Gears

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • Using the previously gathered information in conjunction with

    Lifting Equipments / Gear

    Using the previously gathered information in conjunction with crane manufactures duty charts it will allow the selection of a crane that is suitable with sufficient capacity to safely execute the lifting operation.

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • Details of the Lifting EquipmentDetails of the preferred Lifting equipment(s) to be used must be recorded within the Method Statement and must include: Make and model; Capacity Validation of Certification Maximum ground bearing capacity Configuration Weight of the crane

    Details of the Lifting Gears Capacity

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    Capacity Validation of Certification Types (Shackles, Wire Rope, Belt etc)

  • 5. Communications

    Pre-Lift BriefingPre-Lift BriefingToolbox/DiscussionEquipmentCommunication methods

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • 6. Roles and Responsibilities

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • Factory Owners Factory Owners Contractors Authorized Examiner Lifting Team

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • Lifting Team

    Lifting SupervisorLifting Supervisor Crane OperatorCrane Operator

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    RiggerRigger Signal ManSignal Man

  • Lifting Supervisor

    Nominated by the appointed person and appointed in writingand appointed in writing

    In charge of actively supervising the lifting operation

    Responsible for planning lifting operations in accordance to the Lifting Plan

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    Lifting Plan

  • Roles and Responsibilities: Ensure that only registered personnel participate in any lifting operation Ensure lift operation is conducted in a safe manner Brief all personnel on the safe lifting procedures If any unsatisfactory incidents are reported to him, take measures to

    rectify them Monitor equipment maintenance and inspection Check on the set up of equipment and ensure that equipment are

    properly set up before lifting operation commences

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • Roles and Responsibilities: To be responsible for the lifting job carried out by him Do daily crane inspection prior to the lifting operation and to report

    any findings

    Crane Operator

    any findings Record daily operation log Ensure cranes are properly set up before lifting operation commences To adhere to instructions given by Lifting Supervisor Check and ensure that the load is correctly secured, rigged and sling

    before lifting Check the clearance of the path to be taken by the load and any part

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    Check the clearance of the path to be taken by the load and any part of the crane

    Report any accident/incident/dangerous occurrence and unsafe act/conditions

  • Rigger & SignalmanRoles and Responsibilities: Ensure lifting operation is not undertaken without suitable

    and sufficient appropriate risk assessment and that lifting equipment is not used without prior training and appropriate equipment is not used without prior training and appropriate supervision

    Carry out pre-use checks of lifting equipment, to ensure equipment is in good working condition

    Report any damages to the equipment or any accident/incident/dangerous occurrence and unsafe act/conditions to the Lifting Supervisor as soon as is reasonably practicable

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    reasonably practicable Ensure proper set up of equipment before lifting operation

    commences

  • 7. Classifications of Lift

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • 1. Routine Lift

    Lifting operations may be executed under a basic lift plan. These plans must clearly define the lift plan. These plans must clearly define the limitations on the loads, lifting methods and areas of operation. A Risk Assessment will be required in each case, and authorized prior to commencement. A Non-Routine may also be completed using similar documents but will require greater detail. Prior to any lifting operation commencing, a review of the lift plan

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    will be conducted.

  • A Routine Lift is a lift which conforms to the following factors: Within the normal operating parameters of the crane Lifting over non-sensitive areas Suitable environmental conditions Load has known and evaluated weight, shape and centre of gravity Standard rigging arrangements Routine repetitive lifting operations using the same equipment Single function or series of functions repeated manually or automatically Order of function repeated Same equipment Same competent Crane Operators Load under 75% of rated load of the load chart Centre of gravity below the lifting hook Use of a certified lifting point Single lifting machine

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    Single lifting machine Unlikely to be affected by changing environmental conditions Standard rigging arrangements Suitable lay-down area available

  • 2. Non9Routine Lift

    All remaining categories which fall under Non-Routine will require a more detailed Lifting Plan Routine will require a more detailed Lifting Plan containing all of the elements as described above. The plan will have to be approved by a Responsible Person prior to commencement of any Lifting Operation and any deviation requirement identified from the plan, must also get the approval of the Responsible Person prior to commencement of the lifting operation.

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    commencement of the lifting operation.

  • Conforms to the following factors: Use of two or more Lifting Appliances, Tandem Lift With sensitive, difficult or restricted areas Lifts from one offshore vessel to another Lifts from one offshore vessel to another Continuation of a lifting operation with different people Lifting of machinery without lifting points In environmental conditions likely to affect equipment performance Load with unknown/difficult to estimate weight and/or centre of

    gravity Non-standard rigging arrangements

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    Load lowered into or lifted from a confined space Weight of load in excess of 75% rated load of the load chart

  • SAMPLE LIFTING PLAN

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    PLAN

  • LIFTING PLANLIFTING PLANLoad Chart

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • Load ChartLIFTING PLANLIFTING PLAN

    Maximum Radius Corresponding SWL

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • LIFTING PLANLIFTING PLAN

    Details of Lifting Plan

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • LIFTING PLAN SAMPLELIFTING PLAN SAMPLE

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • LIFTING PLAN SAMPLELIFTING PLAN SAMPLE

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • LIFTING PLAN SAMPLELIFTING PLAN SAMPLE

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • LIFTING PLAN SAMPLELIFTING PLAN SAMPLE

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • LIFTING PLAN SAMPLELIFTING PLAN SAMPLEOutrigger force at different swing location with load

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • LIFTING PLAN SAMPLELIFTING PLAN SAMPLE

    Maximum Outrigger forceMaximum Outrigger force

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • LIFTING PLAN SAMPLELIFTING PLAN SAMPLECalculation for Ground Bearing Capacity

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

    *On Site soil bearing

  • Conclusion A proper planned operation reduces the risks of crane-related

    accidents and minimizes costs Make sure all lifting operations are planned according to the lifting Make sure all lifting operations are planned according to the lifting

    plan and make sure lifting operations do not deviate from lifting plan Stop all lift operations if there is deviation Safety is the most important aspect

    @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

  • @ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives