Operationalising Operationalising Safe Lifting Plans Safe Lifting Plans @ 2011 Huationg Holding. All Right Reserved Moving People ,Building Lives Moving People ,Building Lives @ 2011 Huationg Holding. All Right Reserved Presentation by Presentation by Mr. Jimmy Chua Mr. Jimmy Chua Mr. Jimmy Chua Mr. Jimmy Chua Mr. Jimmy Chua Mr. Jimmy Chua Mr. Jimmy Chua Mr. Jimmy Chua Group General Manager of Group General Manager of Huationg Huationg Vice Vice-Chairman of SCA Chairman of SCA

Upload: others

Post on 10-May-2020

20 views

Category:

Documents


0 download

TRANSCRIPT

OperationalisingOperationalising Safe Lifting PlansSafe Lifting Plans

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building LivesMoving People ,Building Lives

@ 2011 Huationg Holding. All Right Reserved

OperationalisingOperationalising Safe Lifting PlansSafe Lifting Plans

Presentation by Presentation by Mr. Jimmy ChuaMr. Jimmy ChuaMr. Jimmy ChuaMr. Jimmy ChuaMr. Jimmy ChuaMr. Jimmy ChuaMr. Jimmy ChuaMr. Jimmy ChuaGroup General Manager of Group General Manager of HuationgHuationg

ViceVice--Chairman of SCAChairman of SCA

CONTENTS

• Introduction• Importance of planning• Importance of planning• Why do Lifting Operations fail?• COP: Safe Lifting Operation in Workplaces• The Lifting Plan

– Key Factors to Consider– Sample of Lifting Plan

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

– Sample of Lifting Plan• Conclusion

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

Importance of Planning

• Reduces the probability of unexpected incidents occurringincidents occurring

• Useful reference for Safe Lifting Operation in the case of any doubts

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

What happens What happens when you do not plan?

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

do not plan?

Why do Lifting Operations fail?

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

• Soft Ground

Possibility of Crane Accident

• Soft Ground

• Resting of

Outrigger on Covered area

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

• Weather Elements

Possibility of Crane Accident

• Improper use of

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

by-pass system

Video

• Poor Maintenance

Possibility of Crane Accident

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

Possibility of Crane Accident

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

Out Riggernot fully extended Boom hit flare line

• Poor Planning

• Poor Communication

Possibility of Crane Accident

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

http://www.craneaccidents.com/2012/05/report/crane-overturns-in-singapore/

Possibility of Crane Accident

• No Barricading • Demarcation• Demarcation

• Lifting Zone

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

Recent Case of Crane Toppling

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

http://news.asiaone.com/news/singapore/crane-topples-over-sbf-center-worksite-tanjong-pagar

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

Video

COP: Safe Lifting Operations in the Workplaces

1. Factors affecting Safe Lifting Operations1. Factors affecting Safe Lifting Operations

2. Lifting Plan

3. Equipment

4. Personnel Roles and Responsibilities

5. Emergency and Contingency planning

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

5. Emergency and Contingency planning

The Lifting Plan

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

• The Lifting Plan is a set of plans developed for use in

any crane lifting operation

• Lifting Supervisor will take hold of the lifting plan but the

lifting team should be familiar with the Lifting Plan and

ensure that the lifting operation is carried out according

to plan

• Any party who has the expertise and relevant knowledge

can create the lifting plan. After which, both the occupier

and the contractor have to agree upon the document

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

Developing the Lifting Plan

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

Key Factors to be Considered

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

1. Site Surrounding Conditions

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

• Environmental factors• Environmental factors• Location/Site Hazards• Lighting Conditions• Demarcation

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

Generic Environmental Hazards to be Considered:

• Indoors/Outdoors• Indoors/Outdoors

• Suitability of lighting (Day/Night)

• Noise

• Weather conditions: Rain, Haze, Bright Sunlight,

Strong Winds, Thunderstorms, Lightning

• Ground stability

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

Location

• Mass Rapid Transit system (MRT)• Public areas• Public areas• Build-up areas• Near water bodies• Overhead Restriction• Underground Services

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

• Underground Services

Site Hazards

• Access / Egress around lifting equipment clearly identified

• Working at Heights• Ground Stability and level• Restricted area to establish outrigger supports

(mobile cranes)• Blind spots during maneuvering of load and lifting

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

• Blind spots during maneuvering of load and lifting equipment.

Demarcation / Barrication

• Area of maneuverability; when using equipment.

• Area of maneuverability; when using equipment.

• Lifting Zone• Working within a confined space or tunnel• Other activities on the work site

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

2. LOAD

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

• Description of Load to be Lifted• Description of Load to be Lifted

• Details of Load to be Lifted

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

Load Crucial Information

No load must be lifted without the following crucial information:

• the load weight • the load weight

• the overall dimensions (length, width and depth).

• indication of the position of centre of gravity.

• the lifting/slinging points

• the pickup radius

• the final location radius

• the height to which the load has to be lifted.

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

• the height to which the load has to be lifted.

• the overall weight (load + all lifting accessories)

3. Risk Assessments

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

4. Lifting Equipment/ Gears

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

Using the previously gathered information in conjunction with

Lifting Equipments / Gear

Using the previously gathered information in conjunction with

crane manufactures duty charts it will allow the selection of a

crane that is suitable with sufficient capacity to safely execute

the lifting operation.

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

Details of the Lifting Equipment

Details of the preferred Lifting equipment(s) to be used must be recorded within the Method Statement and must include:

• Make and model;

• Capacity

• Validation of Certification

• Maximum ground bearing capacity

• Configuration

• Weight of the crane

Details of the Lifting Gears

• Capacity

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

• Capacity

• Validation of Certification

• Types (Shackles, Wire Rope, Belt etc)

5. Communications

•Pre-Lift Briefing•Pre-Lift Briefing•Toolbox/Discussion

•Equipment•Communication methods

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

6. Roles and Responsibilities

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

• Factory Owners• Factory Owners

• Contractors

• Authorized Examiner

• Lifting Team

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

Lifting Team

Lifting SupervisorLifting Supervisor Crane OperatorCrane Operator

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

RiggerRigger Signal ManSignal Man

Lifting Supervisor

• Nominated by the appointed person and appointed in writingand appointed in writing

• In charge of actively supervising the lifting operation

• Responsible for planning lifting

operations in accordance to the Lifting Plan

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

Lifting Plan

Roles and Responsibilities:

• Ensure that only registered personnel participate in any lifting operation

• Ensure lift operation is conducted in a safe manner

• Brief all personnel on the safe lifting procedures

• If any unsatisfactory incidents are reported to him, take measures to rectify them

• Monitor equipment maintenance and inspection

• Check on the set up of equipment and ensure that equipment are

properly set up before lifting operation commences

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

Roles and Responsibilities:

• To be responsible for the lifting job carried out by him

• Do daily crane inspection prior to the lifting operation and to report

any findings

Crane Operator

any findings

• Record daily operation log

• Ensure cranes are properly set up before lifting operation commences

• To adhere to instructions given by Lifting Supervisor

• Check and ensure that the load is correctly secured, rigged and sling

before lifting

• Check the clearance of the path to be taken by the load and any part

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

• Check the clearance of the path to be taken by the load and any part of the crane

• Report any accident/incident/dangerous occurrence and unsafe act/conditions

Rigger & SignalmanRoles and Responsibilities:

• Ensure lifting operation is not undertaken without suitable and sufficient appropriate risk assessment and that lifting

equipment is not used without prior training and appropriate equipment is not used without prior training and appropriate supervision

• Carry out pre-use checks of lifting equipment, to ensure

equipment is in good working condition

• Report any damages to the equipment or any accident/incident/dangerous occurrence and unsafe

act/conditions to the Lifting Supervisor as soon as is reasonably practicable

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

reasonably practicable

• Ensure proper set up of equipment before lifting operation

commences

7. Classifications of Lift

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

1. Routine Lift

Lifting operations may be executed under a basic lift plan. These plans must clearly define the lift plan. These plans must clearly define the limitations on the loads, lifting methods and

areas of operation. A Risk Assessment will be required in each case, and authorized prior to commencement. A Non-Routine may also be

completed using similar documents but will require greater detail. Prior to any lifting operation commencing, a review of the lift plan

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

will be conducted.

A Routine Lift is a lift which conforms to the following factors:

• Within the normal operating parameters of the crane

• Lifting over non-sensitive areas• Suitable environmental conditions• Load has known and evaluated weight, shape and centre of gravity

• Standard rigging arrangements• Routine repetitive lifting operations using the same equipment• Single function or series of functions repeated manually or automatically

• Order of function repeated• Same equipment• Same competent Crane Operators

• Load under 75% of rated load of the load chart• Centre of gravity below the lifting hook Use of a certified lifting point • Single lifting machine

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

• Single lifting machine

• Unlikely to be affected by changing environmental conditions• Standard rigging arrangements• Suitable lay-down area available

2. Non9Routine Lift

All remaining categories which fall under Non-Routine will require a more detailed Lifting Plan Routine will require a more detailed Lifting Plan containing all of the elements as described above.

The plan will have to be approved by a Responsible Person prior to commencement of any Lifting Operation and any deviation

requirement identified from the plan, must also get the approval of the Responsible Person prior to commencement of the lifting operation.

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

commencement of the lifting operation.

Conforms to the following factors:

• Use of two or more Lifting Appliances, Tandem Lift

• With sensitive, difficult or restricted areas

• Lifts from one offshore vessel to another• Lifts from one offshore vessel to another

• Continuation of a lifting operation with different people

• Lifting of machinery without lifting points

• In environmental conditions likely to affect equipment performance

• Load with unknown/difficult to estimate weight and/or centre of

gravity

• Non-standard rigging arrangements

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

• Load lowered into or lifted from a confined space

• Weight of load in excess of 75% rated load of the load chart

SAMPLE LIFTING PLAN

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

PLAN

LIFTING PLANLIFTING PLAN

Load Chart

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

Load Chart

LIFTING PLANLIFTING PLAN

Maximum Radius Corresponding SWL

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

LIFTING PLANLIFTING PLAN

Details of Lifting Plan

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

LIFTING PLAN SAMPLELIFTING PLAN SAMPLE

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

LIFTING PLAN SAMPLELIFTING PLAN SAMPLE

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

LIFTING PLAN SAMPLELIFTING PLAN SAMPLE

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

LIFTING PLAN SAMPLELIFTING PLAN SAMPLE

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

LIFTING PLAN SAMPLELIFTING PLAN SAMPLE

Outrigger force at different swing location with load

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

LIFTING PLAN SAMPLELIFTING PLAN SAMPLE

Maximum Outrigger forceMaximum Outrigger force

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

LIFTING PLAN SAMPLELIFTING PLAN SAMPLE

Calculation for Ground Bearing Capacity

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

*On Site soil bearing

Conclusion• A proper planned operation reduces the risks of crane-related

accidents and minimizes costs• Make sure all lifting operations are planned according to the lifting • Make sure all lifting operations are planned according to the lifting

plan and make sure lifting operations do not deviate from lifting plan• Stop all lift operations if there is deviation• Safety is the most important aspect

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

@ 2011 Huationg Holding. All Right ReservedMoving People ,Building Lives

Thank youThank youThank youThank you