operations manual · & supplies mgt., and finance section management general services,...
TRANSCRIPT
Operations Manual Tandag City Water District
Tandag City Water District | Operations Manual
1
Table of Contents
Introduction ............................................................................................................ 1
Overview ................................................................................................................. 2
The Creation
Vision
Mission
Performance Pledge
Core Values
Strategic Goals
Organizational Structure........................................................................................ 6
Functions and Responsibilities............................................................................... 10
Office of the Board of Directors
Office of the General Manager
Administrative & General Services, Finance &Commercial Division
Engineering & Construction, Production & Water Quality &
Watershed Management Division
Operations .............................................................................................................. 28
Initial Operation
Development Projects
TCWD Pipeline Map
Current Service Area
Current Water Sources
Operating Procedures ........................................................................................... 37
Annual Procurement Plan Preparation
Process and System Description for Small Value Procurement
Process and System Description for Public Bidding
Records Maintenance and Controls for Incoming Communications
Records Maintenance and Controls for Outgoing Communications
Records Maintenance and Controls for Internal Communications
Customer Service Request/Complaints
Application of New Service Connection
Payment of Water Bill with Notice of Collection
Payment of Water Bill without Notice of Collection
Request for Reconnection
Request for Billing Adjustment
Change of Billing Name
Reading of Water Meters and Billing
Collection Process
Application of Special Leave
Application of Sick Leave
Monetization of Leave Credits
Tandag City Water District | Operations Manual
2
Application for Indefinite Leave, Study Leave, Paternity Leave,
Rehabilitation Leave and Other Leaves Not Specified in the
Omnibus Rules On Leave
Application for Force Leave or Vacation Leave
Processing of Bond Application (New Bonded Officials &Employees)
Processing of Bond Application (Renewal)
Recruitment Selection and Placement
Issuance of Equipment and Supplies
HDMF Remittance
PHIC Remittance
GSIS Remittance
DTR for Casual Employees and Contract of Service’s Payroll
DTR for Regular Employees Payroll
Procedures in Monitoring Budget, Utilizations and Disbursements
Charged to Retained Income
Procedures for Disbursement by Checks
Procedures for Disbursement through ADA
Procedures for the Liquidation of Cash Advances for Payroll
Procedures for Disbursements of Advances to Officers & Employees
Procedures for Disbursements of Advances to Special Disbursing
Officers
Procedures for Disbursement through Petty Cash
Detailed Procedures for Collections and Deposits through the
Collecting Officer
Procedures in the Requisition and Issue of Inventory Items
Emergency Procedures.......................................................................................... 82
Emergency Action Team
Fire Brigade
Water Service Interruption
Earthquake
Landslide
Typhoon/Hurricane/Tornado
Flash Flood
Bomb Threat
Fire
Gas Leak/Chemical Spills
Appendices ............................................................................................................ 95
Directory
Bomb Threat Form
Tandag City Water District | Operations Manual
3
Introduction
Providing a safe and affordable water supply 24 hours a day and seven
days a week has always been the mandate of Tandag City Water District to
become a more efficient and effective water service provider in the locality.
But as the population grow and the organization became larger,
administration became harder to guide, handle, control and execute. Thus, in
order to solve this barrier, the management together with the board deemed it
necessary to formulate an Operations Manual that will serve as a guide for
employees to perform their functions correctly and efficiently.
This Operations Manual contains the standard operating procedures of
the District. It includes a description of the organizational hierarchy and structure,
contact details of key personnel and emergency procedures. It intends to
remind employees on how to do their job, providing information on precisely
what we need to do, who we are responsible to and who we are responsible for.
This manual was prepared for the use of the employees and clients, if
requested. Hopefully, it will aid in enhancing the operational, institutional,
financial and management issues of this district as this will promote transparency,
accountability, and participatory development.
Tandag City Water District | Operations Manual
4
Overview
Tandag City Water District | Operations Manual
5
The Creation
In 1960, a water system to serve Tandag City, a municipality then, was
constructed. The municipal government managed and operated the original
water system at that time. It consists of a dug well, pumping station, elevated
concrete reservoir and 100 linear meters of transmission and distribution pipelines.
About nineteen years to have passed, on June 4, 1979, TCWD was finally
created in accordance with Presidential Decree (PD) 198, known as the
Provincial Water Utilities Act of 1973, thru SB Resolution No. 4, series of 1979 of the
Municipal Government of Tandag, under the administration of the late Mayor
Adela Serra Ty. This act made way for Tandag Water District (TCWD) to take over
the ownership and management of the water supply from the municipal
government.
On December 4, 1979, the Local Water Utilities Administration (LWUA)
awarded the Conditional Certificate of Conformance with CCC No. 105 to
TCWD after complying the requirements of the certification program, which
entitle the District with all rights and privileges authorized under PD 198, as
amended.
Vision
“A sustainable utility to deliver safe and affordable water
supply through protection of watersheds and preservation of the
environment for Tandag City’s ecological balance.”
Mission
“To adequately address the need for potable and
affordable water under conditions of efficient and effective human
and natural resource administration by increasing capability to
develop and maintain the ecology relative to global mitigation of
climate change.”
Tandag City Water District | Operations Manual
6
Performance Pledge
“We, the officials and employees of Tandag Water District commit
to provide and efficiently serve our customers with safe, potable water
that conforms to standards of the Philippine National Standards for
Drinking Water (PNSDW). We shall strive to increase customer satisfaction
by continually improving the quantity and quality of water we deliver,
including our systems & facilities.”
Core Values
Integrity. We value integrity in our day to day operation and treat our customers
in an honest, ethical, responsible and respectful manner.
Accountability and Transparency. We value accountability and transparency.
Accountability for our actions in carrying out all District operations and
transparency in terms of communicating openly our policies, processes, plans
and programs.
Growth and Development. We value the growth and development of our team
of workers to maximize their potentials for the assurance that they can provide
the highest quality service to our customers. We ensure that the successes and
abilities of each employee, which contribute to achieving our mission and vision,
are recognized.
Teamwork. We value working together as team and share information and
resources to attain our collective goals. We value the differences of each
individual employee and treat them with respect and dignity.
Public Trust. We value public trust and confidence; we shall maintain and
enhance them through demonstrating excellence in the services we deliver to
satisfy the needs of our customers.
Tandag City Water District | Operations Manual
7
Strategic Goals
Goal 1
To maintain and upgrade the water distribution system and facilities
Goal 2
To improve the quality and reliability of water through maintaining the
responsible stewardship of water sources’ forest covers.
Goal 3
To provide high quality customer service.
Goal 4
To strengthen the human resource administration, thereby increasing the
productivity, employee retention and morale.
Goal 5
To improve the linkages and networking within the organization.
Tandag City Water District | Operations Manual
8
Organizational
Structure
Tandag City Water District | Operations Manual
9
Office of the Board of Directors
Administrative & General Services,
Finance & Commercial Division
Engineering, Production & Water
Quality, & Watershed Division
RODULFO R. UY, CE
BOD Chairman
WALDERICO R. BONIFACIO, JR., CE
BOD Vice Chairman
DR. JOSEFINA O. PRADO
BOD Secretary
REV. MSGR. ISIDRO H. IRIZARI
BOD Treasurer
WINIFREDA A. DAMIAO
BOD Member
EULOGIO D. MILLA, CE, ASEAN Eng
General Manager
Office of the General Manager
CANDICE NOELLE M. CABRERA
Minutes/Agenda Officer B
Administrative Services Asst.
CARLOS C. PARAJES
Light Equipment Operator
Administrative & General Services, Finance & Commercial Division
Division Manager C
Human Resource, General Services Property
& Supplies Mgt., and Finance Section
General Services,
Properties and
Supplies Mgt. Unit
JERRY A. BERNADAS
A/GSO-A
Human Resource
Unit
Finance Unit
GRETCHEN N. BAGHARI
A/GSO-B
NORALYN G. PABALATE
ASA-B
LOURDES S. BACORNAY
ASA-A
Prop. & Supply Asst. B
Storekeeper C
ELINDANNE Y. LIM
Admin. Services Aide
FLOYD M. MENDEZ
SCAA
JOLYN H. MENDEZ
SAP A
ALYANNA KATRINA LOZADA
Corporate Budget Asst.
Billing and Commercial Services, and Cash
Management Section
Cash Management
Unit
ALFREDO P. BAGO-OD
U/CSO-A
Billing & Commercial
Services Unit
CARLOS J. MARTUS Data Encoder-Controller
Data Controller
ROSEMARIE F. ANDRES
Cashier A
MICHELLE PATRIMONIO
Cashier D
Cashiering Assistant
IRMA-B
NICOLAS T. ORQUINA Water Sewerage Man B
U/CSA-C
FRAN THERESE C. MANJARES
U/CSA-C
MARY GRACE PAGAPONG
U/CSA-E
Tandag City Water District | Operations Manual
9
Engineering, Construction, Production & Water Quality, and Watershed Division
Division Manager C
Engineering Section
Maintenance of
Services Unit
RICKY BOY G. EUPEŇA
Sr. Engineer B
Construction
Services Unit
Transmission and
Distribution Lines Unit
ANALIZA E. TRINIDAD
U/CSA-B
WSMM-A
WARLITO V. MILLANA
Sr. WSMM-B
CARMENO B. COMBOY
WSMM-B
LEMUEL I. ABECIA
WSMM-C
TRIPON P. MADELO
Sr. WSMM-B
LUCENO B. TOMBOC
WSMM-B
Utility Worker A
Production and Water Quality, and Watershed
Management Section
Watershed
Management Unit
WUMDO
Production and
Water Quality Unit
Medical Technologist A
JORGE P. MARTINEZ
WRFO A
BRIAN M. DUA
WRFT B
ALDRIN P. DUA
WRFT B
ELMER E. VALLESCAS
WRFT B JOSEPH P. BEQUILLA
WRFO B
ANTHONY L. CONCHA
WRFO B
ARIES G. SALCEDO
WRFO B
Functions &
Responsibilties
Tandag City Water District | Operations Manual
11
The Board of Directors (BODs)
The Board of Directors are the policy makers of TCWD. They ensure that
policies are in placed and updated to suit the present need of the District and
consumers. They also see to it that all resources are effectively and efficiently
managed.
Office of the Board of Directors
RODULFO R. UY, C.E. Chairman
Professional Sector
WALDERICO R. BONIFACIO, JR, CE Vice Chairman
Business Sector
REV. MSGR. ISIDRO H. IRIZARI Treasurer
Education Sector
DR. JOSEFINA O. PRADO Secretary
Civic Sector
WINIFREDA A. DAMIAO Member
Women’s Sector
Tandag City Water District | Operations Manual
12
General Manager
- Carry-out policies in achieving organizational objectives and exercise
control in the whole operation of the organization;
- Manage resources, overall plans and activities and make sure that
they are consistent with organizational goals and direction;
- Appoint and dismiss employees in accordance with CSC law and
rules;
- Manage and supervise employees to ensure that works are properly
delegated and targets are met;
- Propose policies for BOD action;
- Perform other related task as may be directed by the BOD.
Office of the General Manager
EULOGIO D. MILLA, CE, ASEAN Eng General Manager
CANDICE NOELLE M. CABRERA Minutes/Agenda Officer - B
CARLOS C. PARAJES Light Equipment Operator
Administrative Services Asst.
Tandag City Water District | Operations Manual
13
Minutes/Agenda Officer B
- Overall in-charge of the activities under the Office of the General
Manager;
- Acts as Recording Secretary of the Board of Directors;
- Drafts outgoing and internal communications;
- Drafts agenda, minutes of meetings, policies and resolutions approved
by the Board;
- Keep the documents/records of the Office of the General Manager
and BOD, and properly organize them;
- Perform other related task as directed.
Administrative Services Assistant C
- Assist in the drafting of outgoing and internal communications of
TCWD;
- Responsible in the systematic data banking;
- Check incoming and outgoing communications and route them
properly;
- Check and facilitate the approval of all documents
- Perform other related task as directed.
Light Equipment Operator
- Drive service vehicle and other light equipment in transporting officials
and employees on official travel;
- Prepare requisition for gasoline, diesel, oil and spare parts;
- Prepare trip ticket and submit report on oil and fuel consumption;
- Perform minor mechanical repair of equipment;
- Perform other related task as directed.
Tandag City Water District | Operations Manual
14
Administrative and General Services, Finance and Commercial Division
This Division is responsible to all activities and resources of the
Administrative, Finance and Commercial Services and ensure that they are
supportive to organizational goals and direction. This Division comprises of two
sections, namely (1) Human Resource, Property and Supplies Management,
General Services and Finance Section; and (2) Commercial Services, Cash
Management and Collection Section.
Division Manager C
- Oversee all activities and resources of the Administrative, General
Services, Finance and Commercial Services Division and ensure that they
are aligned with organizational goals and direction;
- Supervise personnel of the Administrative Division and ensure that their
corresponding targets are met;
- Propose administrative activities and programs to the management;
- Monitor the performance of personnel under the Administrative Division;
- Draft plans and make comprehensive reports and other related
documents;
- Perform other related task as directed.
Administrative and General Services,
Finance and Commercial Division
ROSEMARIE F. ANDRES Designated, Division Manager C
Tandag City Water District | Operations Manual
15
I. Human Resource, Property and Supplies Management, General Services and
Finance Section
This section is responsible in the overall activities and processes of the
following units, (A) human resource, (B) general services, property and supplies
management, and (C) finance units.
Administrative/General Services Officer A
- In-charge of all activities and processes of the human resource, property
and supplies management, general services and finance section;
- Supervise and monitor performance of personnel under the section being
covered;
- Facilitate in recruiting workers of the District and ensure their growth and
development in accordance with Human Resource Development Plan;
- Monitor and ensure that all properties and resources are properly
accounted;
- Perform other related task as directed.
A. Human Resource Unit
Administrative/General Services Officer B
- Facilitate & assist in the implementation of all activities & processes related
to human resource management and development;
- Safely keeps records of all employees of the District and update them on
a regular basis;
- Keep track of accounts, records and data of employees with GSIS, Pag-
IBIG and Philhealth;
- Facilitate in the conduct of recruiting workers and processing of
appointments;
- Perform other related task as directed.
Tandag City Water District | Operations Manual
16
Administrative Services Assistant B
- Facilitate the approval of employees Daily Time Record and keep them
on file;
- Updates earn leave of employees monthly;
- Assist in the conduct of evaluating employees’ performance using the
approved measuring tool;
- Assist in facilitating the approval and submission of reports to Civil Service
Commission and Department of Budget and Management;
- Perform other related task as directed.
B. General Services, Property and Supplies Management Unit
Administrative Services Assistant A
- In-charge of all activities and processes involve in controlling the general
services including the property and supplies of the District;
- Monitor the inventory of all properties and supplies, and ensure that they
are properly accounted;
- Regularly provide comprehensive report of all properties and supplies for
approval;
- Propose programs and/or processes intended to safeguard the properties
and supplies of the District;
- Perform other related task as directed.
Property/Supply Assistant B
- Prepare the Annual Procurement Plan of the District;
- Conduct inventory & inspection of all District properties, supplies, &
materials on a regular basis: prepare and submit reports regularly;
- In-charge in the safekeeping of all data and documents (both electronic
and hard copies) and keep them updated;
- Prepare and submit Store Requisition Slip for approval;
- Perform other related task as directed.
Tandag City Water District | Operations Manual
17
Storekeeper C
- Assist in keeping and monitoring the records of stock, inventory and
requisition of the District properties, supplies and materials;
- Issue supplies and materials as per Store Requisition Slip and keep its data
posted in both electronic and hard copies;
- Provide support in maintaining accurate data (both electronic and hard
copies) of all properties, supplies and materials;
- Perform other related task as directed.
Administrative Services Aide
- Deliver all outgoing communications;
- Responsible in the condition and security of supplies and materials;
- Maintain the cleanliness of the office and its surroundings;
- Maintain proper hygiene/sanitation of comfort rooms;
- Perform other related task as directed.
C. Finance Unit
Senior Corporate Accounts Analyst
- In-charge of all activities and processes involve in managing and
controlling the financial resources of the District;
- Prepare district annual budget, periodic summaries, miscellaneous
invoices, and ensure all items/data are reconciled and accurate;
- Maintain uniform system of utility expenditures and income accounts, and
prepare and maintain balance sheet accounts;
- Perform, routine work in reviewing, checking, summing up and comparing
budget requests, expenditures and similar data in the review and
preparation of annual budget;
- Perform other related task as directed.
Tandag City Water District | Operations Manual
18
Senior Accounting Processor A
- Prepare monthly Financial Statement, Cash Flow, Monthly Data Sheet,
Comparative Income and Operating Expenses;
- Provide support in regularly reviewing, checking, summing up and
comparing budget requests, expenditures and similar data needed for
the preparation of annual budget;
- Summarize data in separate ledgers, transfer data to general ledger;
- In-charge in the safekeeping of records of financial transactions in both
electronic and hard copies;
- Prepare monthly bank reconciliation;
- Perform other related task as directed.
Corporate Budget Assistant
- Prepare check and journal voucher;
- Provide support in the preparation of periodic summaries, miscellaneous
invoices and all other financial reports and documents;
- Prepare payroll and disbursement vouchers;
- Provide support in monitoring the activities and processes involved in
managing the financial resource of the District and ensure that
processes are in accordance with laws and rules;
- Perform other related task as directed.
II. Billing and Commercial Services, and Cash Management Section
This section is responsible in the overall activities and processes of the
following units, (A) billing and commercial services, and (B) cash management
units.
Utilities/Customer Services Officer A
- In-charge of all activities and processes of the commercial services, cash
management and collection section;
- Supervise and monitor performance of personnel under the section being
covered;
- Initiate programs and activities to strengthen the Water Billing and
Collection System;
- Submit monthly reports on billing, water sales and billing adjustment;
- Perform other related task as directed.
Tandag City Water District | Operations Manual
19
A. Billing and Commercial Services Unit
Data Encoder - Controller
- Create/develop IT programs for reading of concessionaires’ water
consumption, billing, collection system and others supportive to the District
objectives and direction;
- Initiate/propose system to ensure that all databases of the District are
safeguarded;
- Responsible in collecting data and information to support the
development of IT programs and ensure that they are readily available at
all times;
- Provide support in making reports concerning the billing and collection
system and other reports as may be required;
- Perform other related task as directed and/or required.
Data Controller
- Provide support in the upgrading of IT programs for reading, billing,
collection system and others for the efficiency of the District operation;
- Maintain the databases of reading, billing and collection and others;
- Maintain the efficiency of all computer units;
- Perform other related task as directed.
Industrial Relations Management Assistant B
- Responsible in the conduct of customers’ orientation and provide support
in the handling of symposia, fora and other education and information
campaigns of the District;
- Perform the frontline services, answer telephone calls and accommodate
customers’ requests and complaints, and input them to database or
logbook;
- Provide support in the collection, analysis of data and preparation of
reports;
- Monitor status of all types of service requests and maintain an updated
lists or report;
- Perform other related task as directed.
Tandag City Water District | Operations Manual
20
Water Sewerage Maintenance Man B
- Provide support in the reading of concessionaires’ water consumption
and distribution of notice of collection/billing statement;
- Assist in the distribution of notice of disconnection to delinquent
customers;
- Assist in providing data for water billing and ensure that they are
accurate;
- Perform other related task as directed.
Utilities/Customer Services Assistant C
- Responsible in the reading of concessionaires’ water consumption and
distribution of notice of collection/billing statement;
- Responsible in the distribution of notice of disconnection to delinquent
customers;
- Provide date for water billing and ensure that they are accurate;
- Responsible in providing reports on aging of collectibles, penalty, billing
and billing adjustment;
- Perform other related task as directed.
Utilities/Customer Services Assistant E
- Serve disconnection order to delinquent customers and execute
disconnections;
- Assist in serving notice of disconnection to delinquent customers;
- Assist in the execution of reconnection and other service request
whenever necessary;
- Perform other related task as directed.
B. Cash Management Unit
Cashier A
- In-charge in all activities and processes of the cash management of the
District;
- In-charge of the disbursement of cash of the District and ensure that
processes pertaining to it are followed;
- Responsible in the preparation of reportson collection, deposit and cash
disbursement;
Tandag City Water District | Operations Manual
21
- Keep track of the data/records involved in the cash management and
ensure that they are updated;
- Perform other related task as directed.
Cashier D
- Provide support in facilitating the activities and processes involved in the
cash management of the District;
- Assist in the disbursement of cash of the District and check if processes
pertaining to it are followed;
- Assist in the preparation of reports on collection, deposit and cash
disbursement, and keep records of accountable forms and ensure that
they are safeguarded;
- Accept payments of customers’ water bill and issue corresponding
receipts;
- Perform other related task as directed.
Cashiering Assistant
- Assist in the implementation of activities and processes involved in the
cash management of the District;
- Accept payments of customers’ water bill and issue corresponding
receipts;
- Record accountable forms;
- Prepare reports on the record of accountability for accountable forms;
- Perform other related task as directed.
Tandag City Water District | Operations Manual
22
Engineering & Construction, Production & Water Quality and Watershed
Management Division
This Division is responsible to all activities and resources of the Engineering
and Construction, Production and Water Quality and Watershed Management
Division, and ensure that they are supportive to organizational goals and
direction. This Division comprises of two sections, namely: (1) Engineering
Section; and (2) Production and Water Quality, and Watershed Management
Section.
Division Manager C
- Oversee all activities and resources of the Engineering and Construction,
Production and Water Quality, and Watershed Management Division and
ensure that they are aligned with organizational goals and direction;
- Supervise personnel in the Engineering and Construction, Production and
Water Quality, and Watershed Management Division and ensure that their
corresponding targets are met;
- Propose activities, plans and programs to the management relative to the
development and efficiency of delivering services to water
concessionaires;
- Monitor the performance of personnel under the Division;
- Draft plans & make comprehensive reports & other related documents;
- Perform other related task as directed.
Eng’g. & Construction, Production &
Water Quality & Watershed Mgt. Division
JERRY A. BERNADAS Designated, Division Manager
C
Tandag City Water District | Operations Manual
23
I. Engineering Section
This section is responsible in the overall activities and processes of the
following units, (A) Construction, (B) Maintenance of Services, and (C)
Maintenance of Transmission and distribution mains units.
Senior Engineer B
- In-charge in all activities and processes involved in the construction,
maintenance of services, and maintenance of Maintenance of
Transmission and distribution mains of the District;
- Propose plans and activities directed at improving the water service
delivery and facilities of the District;
- Prepare and submit annual work plans and monthly accomplishment
reports;
- Keep track of the engineering operation and implementation of water
supply improvement projects;
- Perform other related task as directed.
A. Construction Unit
Water/Sewerage Maintenance Man A
- In-charge in the construction projects and other water infrastructure
development projects of the District;
- Properly delegate works to construction workers including routing of
materials and equipment on site, and ensure that works are
communicated and coordinated properly with Supervisors;
- Prepare and submit reports on the progress of construction works;
- Perform other related task as directed.
Utilities/Customer Services Assistant B
- In-charge in the record keeping of reports and other documents related
to the activities of the Engineering and Construction, Production and
Water Quality, and Watershed Management Division;
- Responsible in the production of service requests of customers and ensure
that they are delivered to concern unit on time;
Tandag City Water District | Operations Manual
24
- Responsible in checking the incoming and outgoing documents of the
Division;
- Assist in the preparation of reports for submission to concerned unit;
- Perform other related task as directed.
B. Maintenance of Services Unit
Senior Water/Sewerage Maintenance Man A
- In-charge of all activities involved in the maintenance of services of the
District;
- Properly delegate works to plumbers or water maintenance man to act
on all maintenance and rehabilitation of maintenance of services works,
and monitor their accomplishment by conducting field inspection;
- Conduct ocular inspection and ensure that observations on site are
properly recorded and acted;
- Provide feedback mechanism on the progress or status of maintenance
and rehabilitation works;
- Perform other related task as directed.
Water/Sewerage Maintenance Man B
- Conduct inspection of the location of new service connection and
provide estimates for plumbing materials needed for in-house connection;
- Act on all service requests being delegated;
- Responsible in the calibration of water meters;
- Perform other related task as directed.
Water/Sewerage Maintenance Man C
- Provide support services to the rehabilitation and maintenance of
services;
- Conduct monitoring of water pressure in all district coverage areas ad
ensure that observations are properly recorded and reported;
- Responsible in the conduct of flushing of all District hydrants and blow-offs;
- Perform other related task as directed.
Tandag City Water District | Operations Manual
25
B. Maintenance of Transmission and Distribution Mains Unit
Senior Water/Sewerage Maintenance Man B
- In-charge of all activities involved in the maintenance of transmission and
distribution mains of the District;
- Properly delegate works to plumbers or water maintenance man to act
on all maintenance and rehabilitation of transmission lines and distribution
mains, and monitor their accomplishment by conducting field inspection;
- Conduct ocular inspection and ensure that observations on site are
properly recorded and acted;
- Provide feedback mechanism on the progress or status of maintenance
and rehabilitation works;
- Perform other related task as directed.
Water/Sewerage Maintenance Man B
- Provide support services to the rehabilitation and maintenance of
transmission lines and distribution mains;
- Conduct monitoring of water pressure in all district coverage areas and
ensure that observations are properly recorded and reported;
- Responsible in the conduct of flushing of all District hydrants and blow-offs;
- Perform other related task as directed.
Utility Worker A
- Conduct valving of mainline control valves;
- Assist in monitoring water pressure of all District coverage areas and
ensure that observations are properly recorded and reported;
- Conduct repair of minor and major leakages;
- Perform other related task as directed.
II. Production and Water Quality, and Watershed Management Section
This section is responsible in the overall activities and processes of the
following units, (A) Production and Water Quality, and (B) Watershed
Management units.
Tandag City Water District | Operations Manual
26
Water Utilities Management/Development Officer B
- In-charge in all activities and processes involved in the management of
water production and quality and watershed;
- Propose plans and activities directed at improving the production and
quality of water delivered to concessionaires, including the development
and rehabilitation of watershed;
- Responsible in the analysis of baseline information and pertinent data on
water production, water quality and watershed;
- Responsible in the consolidation and submission of reports and other data,
and ensure that they are readily available at all times;
- Perform other related task as directed.
A. Production and Water Quality Unit
Medical Technologist A
- In-charge in all activities and processes of the District Laboratory;
- Conduct physical and chemical, including bacteriological analysis on a
regular basis, and ensure that pertinent records are safeguarded and
readily available at all times;
- Responsible in regularly monitoring the quality of water delivered to
customers;
- Prepare, consolidate and submit reports, and ensure that they are
properly coordinated with immediate superior and management;
- Perform other related task as directed.
Water Resources Facilities Operator A
- In-charge in the activities and operation of all District pumping stations;
- Responsible in the operation and maintenance of pump facilities;
- Facilitate in the delegation of activities involved in the operation of all
District pumping stations;
- Prepare, consolidate and submit reports on daily pumping, production
and accomplishments, and ensure that they are properly coordinated
with immediate superior and management;
- Perform other related task as directed.
Tandag City Water District | Operations Manual
27
Water Resources Facilities Operator B
- Operate pump facilities driven by electricity or standby generating set;
- Operate pump motor chlorinator and conduct routinary housekeeping
works;
- Check facilities for malfunction and lubricate equipment on prescribed
schedule;
- Prepare and submit reports on daily pumping, production and
accomplishments;
- Perform other related task as directed.
B. Watershed Management Unit
Water Resources Facilities Tender B
- In-charge in all activities involved in the management of gravity/spring
water sources, and ensure that they are recorded, reported and properly
coordinated with superior and management;
- Responsible in the protection and management of spring water facilities;
- Act as watershed watchman and provide security against squatters and
kaingeros;
- Provide support in the monitoring of water level, disinfection and
chlorination, including sanitation of District reservoirs;
- Perform other related task as directed.
Tandag City Water District | Operations Manual
28
Operations
Tandag City Water District | Operations Manual
29
Initial Operation
Four years after the LWUA awarded the Conditional Certificate of
Conformance, TCWD initiated the entirely new water supply system patterned
after the Water Supply Feasibility Study of Motor Columbus Consulting Engineers,
Inc. in October 1983. The new system under TCWD Phase I Program was finished
in 1987 and served the barangays of Quezon, Bioto, San Agustin Sur, Dagocdoc,
Bongtud and Bag-ong Lungsod.
The actual operation started in the year 1991 with only seven (7)
employees headed by then General Manager, Engr. Ruben C. Elpa.
Development Projects
I. Tandag Water Supply System Improvement Project (TWSSIP)
In 2002, the district embarked on Phase II Project, known as the Tandag
Water Supply System Improvement Projects (TWSSIP), funded under a loan
program granted by ADB through LWUA under the Small Towns Water Supply
Sector Project in the amount of P33 million. This project which utilized the Ihawan
Creek as source of water supply was completed by Administration on June 2004.
Aside from developing a new source, this project catered to new serviceable
areas, and the improvement of the Phase I System including the installation of
10.5km transmission and distribution main lines and provisions for gas chlorinating
facilities with generator set.
II. The Buenavista Water Supply System (BWSS)
The Buenavista Water Supply System (BWSS) is the District’s expansion
project to Brgy. Buenavista. It operated on August 28, 2006. This system was partly
funded by former Congressman and LWUA BOT Chairperson Prospero A. Pichay
and SDS Provincial Government. BWSS included the development and
construction of 90 cubic meters ground reservoir, pumping station, chlorinator
house and disinfection facilities, pipe bridge crossing and installation of PVC
transmission and distribution mains.
Tandag City Water District | Operations Manual
30
This programmed expanded through the Construction of Buenavista
Pumping Station II which was realized in 2010 when LWUA granted financial
assistance to the District under Non-LWUA Initiated Funds.
III. The Ihawan Spring Community Watershed (ISCW)
On 12 July 2007, the 784 hectares Ihawan Spring Community Watershed
(ISCW) was declared a protected area thru Administrative Order 2007-14, a
second proclaimed watershed area in Surigao del Sur Province. TCWD’s
unrelenting effort in restoring the watershed has attracted other concerned
agencies and stakeholders, to mention, DENR-CENRO, PENRO, and LGU-Tandag
City.
Several improvement projects were made to guard and cultivate the
ISCW. Among these were the reforestation, agro-forestry, soil and water
conservation, water protection thru installation of gabions or bamboos, constant
foot monitoring, construction of a lookout tower, and construction of plant
nursery.
IV. Development of New Sources
TCWD in 2008, 2009, 2010, 2011 and 2012 explored additional sources to
supplement the existing water sources - Tandag River and Ihawan Creek, and it
ended up in developing Mangyan I and II, Ihawan and Andanan sources, all
situated within Ihawan Spring Community Watershed. Impounding structures
were set-up at the location of the new identified sources in 2008, 2009 and 2010,
including transmission pipes and other attached accessories (the control valves
and sets of chlorinating facilities).
Andanan Water Source I which is located at the Upstream of Andanan
Creek in Barangay Awasian was developed to cater the inevitable increasing
number of concessionaires. The construction of impounding dam and pipe
supports and jointing of pipe using the process of butt fusion started in May 12
and was successfully completed in October 2012. This total cost of three (3)
Million pesos. It produces 20-30 liters per second during rainy season, and 5-10
Tandag City Water District | Operations Manual
31
liters per second during dry season. The Andanan mainlines are interconnected
to the Ihawan transmission lines to boost the current water supply.
Andanan Water Source II which is similarly located at the Upstream
Andanan Creek was also established to augment the water source intended for
the waterless Barangays. It was constructed in October 2012 to December 2012
total cost was 120,000.00.
V. The Ground Steel Tank Reservoirs
To complete the Phase II Water System Project, two structures of 400
cubic meter ground steel tank reservoirs were constructed at Barangay Awasian
in 2009 and 2010. The funding of the twin projects came from the loan package
granted by LWUA.
VI. Extension of Service Lines; Rehabilitation of Service Connections
Several extension of service lines and rehabilitation of dilapidated service
connections were conducted by TCWD to cater to the demands of its
concessionaires.
VII. Calibration of Water Meters
The program of water meter calibration started in 2006, after determining
that meters installed and in service for several years already failed to give
accurate reading of actual consumption.
VIII. Construction of the Administration Building
TCWD’s first work station was rented and located at the Old Capitol
Building for eight (8) years, then later transferred to Quiñonez Building in Luiz Perez
corner Delicona Steet. In 2002, TCWD transferred and rented again at the
ground floor of Ang’s Building located at the National Highway of Barangay
Mabua, and it served as TCWD’s office for ten (10) years.
Tandag City Water District | Operations Manual
32
Since the accumulated rent expenses throughout the years equalled to
the amount of constructing a building, the Board and the management
decided to dispense the allocation of the rent expense to the construction of a
TCWD building. Hence, an inauguration and ground breaking ceremony of the
site was conducted on March 12, 2010 at Purok Palmera, Balilahan, Brgy.
Mabua. The construction of the TCWD building was projected to cost at P5
million. It was financed under a loan program granted by LWUA in the amount of
P1,158,870.63 dated December 2009. The excess cost has been funded through
the loan availed from Philippine National Bank (PNB).
The administration building set up in Balilahan, Barangay Mabua is one of
the major projects that the District has implemented in 2009, which goes beyond
the plans laid out in the development plan for 2006 to 2010. On April 2, 2012, all
administration and staff moved to its new building. This marks the end of the
years of moving and finding a place to rent. TCWD has finally its own home.
IX. Construction of Pumping Stations
The phase I system of TCWD, of which source is the Tandag River, has
included a pumping station situated in Sotel, Barangay Quezon. Known as
Quezon Pumping Station I, this pumping station was constructed on October
1983 and started operating on 1987. For several years, this infrastructure has been
serviceable to the operation. But with the swift increases of commodities
particularly diesel-fuel along with the salinity of the source, the efficiency of this
structure has been affected.
Luckily, with the District perseverance, a newfound source located in
Tabon-Tabon, still part of the said barangay, has been developed and
constructed on October 2005 to augment and to serve as an alternative
whenever the existing water systems are shut off during flooding. The project
funding totaling to One Million Seven Hundred Ninety-Eight Thousand (P
1,798,000.00) has been taken from the loan granted that the PNB has granted.
The Quezon Pumping Station II started operating on February 2012.
Thereafter, Awasian Pumping Station 1 and 2 followed, starting its
operation on 2014 and 2015 respectively.
Tandag City Water District | Operations Manual
33
In the administration of a new General Manager, Ms. Annie O. Ty, several
pumping stations was then constructed, to wit: (1) Pangi Pumping Station which
started its operation on July 2017; (2)(3) Quezon Pumping Station 3 and 4 started
operating on September 7, 2018; and (4) Pangi Pumping Station 4 started
operating on December 2018.
X. Conventional Aeration Facilities & Brgy. Awasian Pump Station II
The construction of conventional type aeration facility was done before
end of 2015 second quarter. This was intended to correct the source high in iron
at Awasian Pump Station II. As of this writing, the aeration is undergoing some
improvements.
The Brgy. Awasian Pump Station II was made operational in October of
2014. Similar with Quezon Pump Station II, this facility with 25 lps source capacity
was constructed to augment the present sources of the District.
Tandag City Water District | Operations Manual
34
TCWD Pipeline Map
Current Service Area
As of June 30, 2019, Tandag City Water District (TCWD) is serving 9,343
active water service connections and covering at least 71% of the entire area of
Tandag City. With around 50,000 estimated total population being served by the
district of the fifteen (15) different Barangays in Tandag City, namely, Barangays
Awasian, Bag-ong Lungsod, Bioto, Bongtud, Buenavista, Dagocdoc, Mabua,
Pangi, Quezon, Rosario, Salvacion, San Antonio, San Agustin Norte, San Agustin
Sur, and Telaje.
Tandag City Water District | Operations Manual
35
Current Water Sources
As of June 30, 2019, the following are the details of the water sources,
water production per LPS, and serviceable areas of TCWD, to wit:
Water Source Source Type Original Production Current Production
Awasian 1 Ground Water 38 28
Awasian 2 Ground Water 7.6 7.3
Pangi 1 Ground Water 4.6 4.5
Pangi 2 Ground Water 60 60
Buenavista Ground Water 5.6 2.59
Quezon 1 Surface Water 33 30
Quezon 2 Ground Water 12.5 11.25
Quezon 3 Ground Water 7.5 -
Quezon 4 Ground Water 20 -
Ihawan Spring 60 40
TOTAL 248.8 LPS 183.64 LPS
Table 1. Water Source Production
Water Source # Of Households Serviceable Barangays
Awasian 1 San Agustin Sur, Dagocdoc, Awasian, Telaje
Awasian 2 San Agustin Sur, Dagocdoc, Awasian, Telaje
Pangi 1 San Agustin Norte, Pangi, Salvacion,
Buenavista Pangi 2
Buenavista Buenavista, Pangi, Salvacion, San Agustin Norte
Quezon 1 Bioto, Dagocdoc, Mabua, Quezon, Rosario,
San Agustin Sur, Bongtud, Bag-ong Lungsod Quezon 2
Quezon 3 -
Quezon 4 -
Ihawan Awasian, San Agustin Sur, Dagocdoc, Telaje
Table 2. Water Sources and its Serviceable Area/Barangay
Tandag City Water District | Operations Manual
36
Table 3. Number of Household Served per Barangay
CLASSIFICATION SIZE
MINIMUM CHARGE COMMODITY CHARGE
0-10
cu. m.
11-20
cu.m.
21-30
cu.m.
31-40
cu.m.
41-up
cu.m.
Commercial ½ “ 440.00 53.00 62.50 72.70 83.50
Semi-Commercial A ½” 385.00 46.35 54.65 63.60 73.05
Semi-Commercial B ½’ 330.00 39.75 46.85 54.50 62.60
Residential ½” 220.00 26.50 31.35 36.35 41.75
Bulk Sales ½” 660.00 79.50 93.75 109.05 125.25 Table 4. Water Rates
# Barangay
Active Service Connections
CY 2018 As of June 30,
2019
1 Awasian 281 269
2 Bag-ong Lungsod 1,208 1,168
3 Bioto 204 198
4 Bongtud 940 1,004
5 Buenavista 432 443
6 Dagocdoc 856 815
7 Mabua 1,356 1,378
8 Mabuhay 0 1
9 Pangi 125 139
10 Quezon 279 262
11 Rosario 263 274
12 Salvacion 84 82
13 San Agustin Norte 264 263
14 San Agustin Sur 983 970
15 San Antonio 0 37
16 San Jose 0 9
17 Telaje 1,600 1,556
Unclassified 3 0
TOTAL 8,878 8,870
Tandag City Water District | Operations Manual
37
Operating
Procedures
Tandag City Water District | Operations Manual
38
Annual Procurement Plan Preparation
Step 1 • End User prepares PPMP
Step 2
• SCAA includes it in the budget proposal
Step 3
• BAC Secretariat consolidates PPMP and prepares Indicative APP
Step 4
• BAC recommends procurement modality
Step 5 • HOPE approves proposed budget
Step 6 • Board of Directors approves budget
End • End of transaction
Tandag City Water District | Operations Manual
39
Process and System Description for Small Value Procurement
Step 1 •Requisitioning office/employee request for the preparation of Purchase
Request (attached with it is the approved PPMP for the year or Supplemental PPMP if requisitioned items are not previously identified)
Step 2 •Admin Head and Engineering Head checks and counter signs the request
Step 3 •General Manager approves PR
Step 4
•For procurement below P50,000.00, the canvasser prints out and sign the Request for Quotation Form (RFQ) and issue the same to the qualified supplier
•For procurement above P50,000.00 but less than P1,000,000.00, the BAC staff post the Request for Quotation to: (a)The Philippine Government Electronic Procurement System (PhilGEPS), and (b) Any conspicuous place in the premise of the procuring entity for a period of 7 CD
Tandag City Water District | Operations Manual
40
Process and System Description for Small Value Procurement (Cont.)
Step 5
• After the deadline of submission of price quotations, the BACstaff prepares the Abstract of Bidding (AOB) setting forth the names of those who responded to the RFQ.
• The BAC staff prepares the Notice of Award (NOA), Resolution to Award and Resolution for Alternative Mode of Procurement androutesit to the BAC members declaring the award to the contractor with the lowest quoted price or to the supplier which complied with the specifications and other terms and conditions stated in the RFQ
• The BAC staff forwards procurement documents to Admin Head (AH) for review and countersign. AH then forwards it to the office of the General Manager.
Step 6
• BAC staff prepares Purchase Order (PO) and forwards it to the Accounting staff.
• Accounting staff prepares the Certificate of Availability of Funds and attach it to the PO for approval of the Accounting Head.
• Accounting Head returns the approved PO to the BAC staff. BAC staff routes the PO to the Admin Head for final review and countersigns the PO
Step 7 • GM signs and approve the PO
Step 8 • Canvasser serves PO and NOA to supplier or BAC staff email PO and NOA to winning bidder
End • End of transaction
Tandag City Water District | Operations Manual
41
Process and System Description for Public Bidding
Step 1
• Requisitioning office/employee request for the preparation of Purchase Request (attached with it is the approved PPMP for the year or Supplemental PPMP if requisitioned items are not previously identified)
Step 2 • Admin Head and Engineering Head checks and counter signs
the request
Step 3 • General Manager approves PR
Step 4 • BAC Secretariat prepares the Bidding Document
Step 5
• BAC staff post the Request for Quotation and Bidding Documents in: (a) The Philippine Government Electronic Procurement System (PhilGEPS), and (b) Invitation to Bid to conspicuous place in the premise of the procuring entity for a period of 7 CD before submission of bids
Tandag City Water District | Operations Manual
42
Process and System Description for Public Bidding (Cont.)
Step 6
•Pre-Bid Conference: (a) The BAC secretariat prepares invitation to two observers for Pre-Bid Conference and Bid Opening from COA and one from a duly recognized private group in a sector relevant to the procurement. (b) BAC Secretariat prepares the Minutes of Pre-Bid Conference and Bid Supplemental (if there are modifications) and sends the same to the suppliers and observers who were present during the Pre-Bid Conference 7 days before the deadline for thesubmission of bids.
Step 7
•Bid Opening: BAC Secretariat receives the Bids of participating bidders. After the closing date, the Bids and Awards Committee, Technical Working Group, Observer and BAC Secretariat proceed with the Bid Opening. The BAC & TWG evaluates the Bids of every participating bidder using the Pass or Fail Criteria. They then rank the bidders according to their bids. The BAC then issues BAC Resolution for the bidder with the Lowest Calculated Responsive Bid (LCRB) and Bid Evaluation Report.
Step 8
•Post qualify: The BAC shall notify the bidder with the LCRB. The bidder shall submit to the BAC its latest income and business tax returns, and other appropriate licenses and permits required by law and stated in the Bidding Documents.
Step 9 •BAC Secretariat prepares Agreement Contract and routes it to its signatories.
Step 10
•BAC Secretariat prepares Notice to Proceed and routes it to Admin Head. General Manager approves the NTP.
•BAC Secretariat sends the NTP to winning bidder.
•BAC Secretariat prepares transmittal and all procurement documents to COA.
End •End of transaction
Tandag City Water District | Operations Manual
43
Records Maintenance and Control for Incoming Communications
Step 1 • Client/s or Sender/s forwards his communication or mail to the
designated, Records Officer for receipt
Step 2
• The Designated, Records Officer receives the document, and stamp it received with his corresponding signature, date and time of receipt, then, forwards it to the ASA-C
Step 3
• The ASA-C attaches a routing slip and a referral/action slip, and provides a document tracking code or reference number to the document. ASA-C, then, routes the document to the Administrative Division Manager .
Step 4
• The Administrative Division Manager initials the referral/action slip, then, forwards it to the Office of the General Manager thru the designated, Executive Assistant
Step 5 • The General Manager reads the communication and fills-up the
referral/action slip
Step 6 • Once done, the designated, Executive Assistant retrieves the
communication and forwards it to the designated, Records Officer
Step 7 • The designated, Records Officer scans the document for electronic filing,
then, forwards the document to the ASA-C
Step 9
• The ASA-C photocopies the document, routes the original copy with its routing and referral/action slip to the concerned unit, and files the photocopied document
End • End of Transaction
Tandag City Water District | Operations Manual
44
Records Maintenance and Control for Outgoing Communications
Step 1 •End User prepares the document
Step 2
•Secretary designated in every Division attaches a Routing Slip, assigns a Routing Sequence No. Secretary in every Division logs the details in his logbook and forwards the document to the Minutes/Agenda Officer B for transmittal preparation
Step 3 •Minutes/Agenda Officer B prepares the transmittal then, forwards the document to the
ASA-B for proper routing
Step 4 •ASA-B routes the document to the Engineering and/or Administrative Division Manager for
initials
Step 5 •Engineering and/or Administrative Division Manager initials the document and returns it to
the Office of the General Manager for approval
Step 6 •General Manager signs and approves the document
Step 7
•the Executive Assistant retrieves the document and forwards it to the Records Officer. Designated, Records Officer scans the document for electronic filing, and forwards it to the ASA-B
Step 8 •ASA-B forwards/sends the document to the concerned agency/ies or person/s, and obtain
its confirmation for receipt
Step 9 •ASA-B files a copy of the document
End •End of transaction
Tandag City Water District | Operations Manual
45
Records Maintenance and Control for Internal Communications
Step 1 • End User prepares the document
Step 2
• Secretary designated in every Division attaches a Routing Slip, assigns a Routing Sequence No., logs the details in his logbook and forwards the document to the Office of the General Manager for approval
Step 3 • The General Manager approves the document.
Step 4 • the Executive Assistant retrieves the document and forwards it
to the ASA-B for proper routing
Step 5 • ASA-B forwards the document to the concerned Division or Unit
or personnel for receipt
End • End of transaction
Tandag City Water District | Operations Manual
46
Customer Service Request/Complaints
Step 1
•Customer files a request or complaint either by walk-in to the Customer Services Complaints and Assistance Desk (CSCAD) or IRMA-B, or though phone call or text message at TCWD hotline numbers.
Step 2 •CSCAD or IRMA-B inputs the request/s or complaint/s to the ERP System, ask for customer’s contact number, issue a Job Order, and forwards it to concerned unit.
Step 3 • U/CSA-B produces the inputted data that was seen in the ERP System from the CSCAD or IRMA-B and forwards it to the SW/SMM-B.
Step 4
• SW/SMM-B assigns plumbers or W/SMM-B to act on the request/s or complaint/s. Once done, plumbers or W/SMM-B assigned will fill up the Job Order and Report to the SW/SMM-B, who in turn, will feedback it to the U/CSA-B.
Step 5 •U/CSA-B updates the ERP System of Job Orders.
Step 6 •CSCAD or IRMA-B informs the customer thru his contact number about the status of request/s or complaint/s.
End •End of Transaction
Tandag City Water District | Operations Manual
47
Application of New Service Connection
Step 1 •Customer proceeds to CSCAD or IRMA-B to know the requirements and other details
Step 2
•Customer submits the filled-up Service Application Form and other necessary requirements to the CSCAD or IRMA-B
Step 3
•CSCAD or IRMA-B examines and evaluates the submitted documents Once done, customer will undergo orientation, and documents will be forwarded to the U/CSA-B, which in turn, forwards it to the W/SMM-B
Step 4
•W/SMM-B conducts inspection of the location of new service connection, and provides estimates (to be given to the customer) of plumbing materials needed for in-house connection. He, then, sketches a location plan and fowards the Service Application Form to the CSCAD or IRMA-B
Step 5 •CSCAD or IRMA-B prepares the contract and attach required documents
Step 6 •General Manager approves the application
Step 7 •Once approved, CSCAD or IRMA-B inputs records to ERP System.
Step 8
•Customer pays the registration fee to the Cashier. Cashier issues OR. Then, customer proceeds back to the CSCAD or IRMA-B and shows the Official Receipt. CSCAD or IRMA-B will indicate the agreed payment terms and gains customer's signature
Step 9
•CSCAD or IRMA-B forwards the Service Application Form to Storekeeper for issuance of meter and other necessary materials to be forwarded to SW/SMM-B
Step 10 •SW/SMM-B or Plumber or W/SMM-B installs the water meter
End
•End of transaction
Tandag City Water District | Operations Manual
48
Payment of Water Bill with Notice of Collection
Payment of Water Bill without Notice of Collection
Step 1 • Customer presents the Notice of Collection or
Water Bill at Teller’s Window
Step 2 • Cashier evaluates the NC through computer and ask
for payment
Step 3 • Cashier issues OR after evaluation
END • End of Transaction
Step 1 • Customer proceeds to CSCAD and request for accounts
payable
Step 2 • CSCAD assess through the ERP system then provides
customer’s code with his/her accounts payables
Step 3 • Customer presents the accounts payable to the Teller’s
window
Step 4 • Cashier encodes the customer’s code then issue an OR
End • End of transaction
Tandag City Water District | Operations Manual
49
Request for Reconnection
Step 1 •Customer Proceed to CSCAD and request for
reconnection of accounts payable
Step 2
•The CSCAD makes an assessment through ERP System and input s the Reconnection fee (100.00) through manual reconnect
Step 3 •Customer presents accounts payable with reconnection
fee to the Cashier’s Window
Step 4 • Cashier issues OR
Step 5 •Customer presents the OR to CSCAD. CSCAD then makes
a Service Request/Job Order to reconnect account
Step 6 •The Meter Reader or U/CSA-E assigned will go to the
area to reconnect the Water Meter of the Customer
End •End of transaction
Tandag City Water District | Operations Manual
50
Request for Billing Adjustments
Step 1 •Customer will proceed to CSCAD to lay down his/her complaint on high consumption
Step 2
•CSCAD verifies the validity of request in determining whether the customer has availed for Billing Adjustment or not, then inputs the request/complaint to the ERP System and issues a Job Order to be forwarded to the Meter Reader assigned in the area, or thru U/CSA-B who will assign a plumber to conduct inspection
Step 3 •Meter Reader or plumbers conducts inspection for leaks and once done, informs the
customer
Step 4 •Customer request CSCAD for leak repair. The CSCAD issues Service Request for the
inspection/verification of customer’s feedback and the Meter Readers will issue findings
Step 5 •Customer request for Billing Adjustment Memo. Then, Data Controller will issue a BAM
Step 6 •The General Manager approves the BAM
Step 7 •The CSCAD inputs the Billing Adjustment to the ERP System
End •End of transaction
Tandag City Water District | Operations Manual
51
Change of Billing Name
Reading of Water Meters and Billing
Step 1
•Customer will proceed to CSCAD for request of change of billing name.
•CSCAD to advise customer submit requirements
Step 2 •CSCAD will change the billing name or update to ERP
System after verification of submitted documents
End •End of transaction
Step 1 •Meter Readers or U/CSA-E will read water meters per zone according to reading schedule,
then, input it to the cellphone device equip with Water Reading System, and print it.
Step 2 •Meter Readers issue each customer the notice of collection within the day of reading
Step 3
•Meter Readers proceed back to office and provide the reading result to the Billing In-charge to upload the readings in the ERP System. At the same time, Data Controller checks the encoded reading for high consumptions and erroneous reading
End •End of transaction
Tandag City Water District | Operations Manual
52
Collection Process
Step 1 •Customer present copy of Notice of Collection or Water
Bill at Cashier’s Window
Step 2 •Cashier evaluates the Notice of Collection through ERP
System and ask for payment
Step 3 •Cashier issues OR
Step 4 •Cashier accounts collection per OR issued during cut off
time forwards cash and OR to cashier A
Step 5
•Cashier-A prepares a deposit of total collection within the cut off time for pick up of depository bank after review/evaluation
Step 6 •Cashier-A to record collection and deposit after
generating report to cash book
End •End of transaction
Tandag City Water District | Operations Manual
53
Application for Special Leave
Step 1
• Secure a copy of request to process application for leave from the HRM Unit duly approved by the immediate supervisor/unit section head
Step 2 • Submit to HRM Unit the approved request
Step 3 • Wait/follow-up to HRM Unit for the processing
of CSC Form No. 6
Step 4 • Route CSC Form No. 6 for signature of person/s
concerned
Step 5 • Approval of the General Manager
End • End of transaction
Tandag City Water District | Operations Manual
54
Application for Sick Leave
Note: Sick leave application not immediately filed upon return to duty will be
disapproved and shall be considered unauthorized leave of absence without
pay.
Step 1
•Secure a copy of request to process application for leave from the HRM Unit duly approved by the immediate supervisor/unit section head
Step 2
•Submit to HRM Unit the approved request
•Application for sick leave in excess of five successive days shall be accompanied by proper medical certificate
Step 3 •Wait/follow-up to HRM Unit for the processing of CSC
Form No. 6
Step 4 •Route CSC Form No. 6 for signature of person/s
concerned
Step 5 •Approval of the General Manager
End •End of transaction
Tandag City Water District | Operations Manual
55
Monetization of Leave Credits
Note: Employees who have accumulated fifteen (15) days of vacation leave
credits shall be allowed to monetize a minimum of ten (10) days; Provided that
at least five (5) days is retained after monetization and provided further that a
maximum of thirty (30) days may be monetized in a given year. Monetization of
sick leave credits: 50% of accumulated sick leave credits may be allowed for
valid and justifiable reasons (as provided on leave laws) provided twenty five
(25) days sick leave credits remains after deducting the monetized leave credits
subject to the discretion of the agency head and the availability of fund.
Step 1
•Secure a copy of request to process application for monetization of leave credits from the HRM Unit duly approved by the immediate supervisor/unit section head
Step 2 •Submit to HRM Unit the approved request
Step 3 •Wait/follow-up to HRM Unit for the processing of CSC Form No. 6
Step 4 •Route CSC Form No. 6 for signature of person/s concerned
Step 5 •Approval of the General Manager
Step 6
•Forward a copy of approved monetization of leave credits to Budget Officer for the issuance of Budget Utilization Request (BUR) for availability of funds
Step 7 •Approval of Budget Utilization Request
Step 8 •Issuance of Voucher
Step 9 • Issuance of Check and Approval
End •End of transaction
Tandag City Water District | Operations Manual
56
Application for Indefinite leave, Study Leave, Paternity Leave, Rehabilitation
leave and other leaves not specified shall conformed with Omnibus rules on
leave
Step 1
• Secure a copy of request to process application for leave from the HRM Unit duly approved by the immediate supervisor/unit section head
Step 2 • Submit to HRM Unit the approved request
Step 3 • Wait/follow-up to HRM Unit for the processing
of CSC Form No. 6
Step 4 • Route CSC Form No. 6 for signature of person/s
concerned
Step 5 • Approval of the General Manager
End • End of transaction
Tandag City Water District | Operations Manual
57
Application for Force Leave or Vacation Leave
Note: In case of emergency that needs immediate attention of the employee
aside from reason of sickness, vacation leave can be filed on that day of such
leave provided an employee will report to office first hour in the morning and file
such leave whenever possible. Moreover, any leave of absence using the
vacation/force leave without any approved leave application before going to
such leave or have not immediately filed upon return to duty shall be considered
unauthorized leave of absence without pay, and their application will be disapproved outright.
Step 1
• Secure a copy of request to process application for leave from the HRM Unit duly approved by the immediate supervisor/unit section head
Step 2 • Submit to HRM Unit the approved request
Step 3 • Wait/follow-up to HRM Unit for the processing of CSC Form
No. 6
Step 4 • Route CSC Form No. 6 for signature of person/s concerned
Step 5 • Approval of the General Manager
End • End of transaction
Tandag City Water District | Operations Manual
58
Processing of Bond Application
(New Bonded Officials and Employees)
Step 1 •Approved Board Resolution for new list of bonded officials and employees
Step 2
•Application for Bond of accountable officials and employees.
•Filled-up General Form No. 58 (A) duly certified by a competent physician of the Department of Health.
Step 3
•Prepare the following requirements: (1) Authenticated copy of SALN; (2) Photocopy of Appointment; (3) Certification of no pending criminal and/or administrative case; and (4) 2 copies ID picture (passport size)
Step 4 •Compute the corresponding bond premium due and prepare summary of bonded officials and employees
Step 5 •Route summary of bonded officials and employees for signature and approval
Step 6
•Forward the summary of bonded officials to Budget Officer for the issuance of Budget Utilization Request (BUR) for availability of funds
Step 7 •Approval of Budget Utilization Request
Step 8 •Issuance of Voucher
Step 9 •Issuance of Check and Approval
Step 10
•Transact at Bureau of Treasury for the issuance of: (1) Authority to Accept Payment; and (2) Six (6) copies of Land Bank Oncoll Payment Slip
Step 11 •Deposit the payment to Land Bank of the Philippines Tandag Branch
Step 12 •Furnish a copy of validated LBP Oncoll Payment Slip at Bureau of Treasury
Step 13 •Follow-up Confirmation Letter at Bureau of Treasury
End •End of transaction
Tandag City Water District | Operations Manual
59
Processing of Bond Application
(Renewal of Bonded Officials and Employees)
Step 1
•Application for Bond of accountable officials and employees.
•Filled-up General Form No. 57 (A) approved by the Head of Agency
Step 2
•Prepare the following requirements: (1) Authenticated copy of SALN; (2) Certification of no pending criminal and/or administrative case; and (3) 2 copies ID picture (passport size)
Step 3
•Compute the corresponding bond premium due and prepare summary of bonded officials and employees
Step 4 •Route summary of bonded officials and employees for signature and approval
Step 5
•Forward the summary of bonded officials to Budget Officer for the issuance of Budget Utilization Request (BUR) for availability of funds
Step 6 •Approval of Budget Utilization Request (BUR)
Step 7 •Issuance of Disbursement Voucher
Step 8 •Issuance of Check and Approval
Step 9
•Transact at Bureau of Treasury for the issuance of: (1) Authority to Accept Payment; and (2) Six (6) copies of Land Bank Oncoll Payment Slip
Step 10 •Deposit the payment to Land Bank of the Philippines Tandag Branch
Step 11 • Furnish a copy of validated LBP Oncoll Payment Slip at Bureau of Treasury
Step 12 • Follow-up Confirmation Letter at Bureau of Treasury
End •End of transaction
Tandag City Water District | Operations Manual
60
Recruitment Selection and Placement
Step 1
• ASA-B receives Accomplished Form & Certificate of Availability of Funds (Instruction to Publish)
Step 2 • A/GSO-B publishes Notice of Vacancy
Step 3 • A/GSO-B identifies Next in Rank
Step 4
• Pre-Evaluation/Screening and Deliberation (s) by HRMPSB and HRM Unit
Step 5
• HRMPSB and HRM Unit forwards result of deliberation and selection line-up
Step 6
• Issuance of Appointment by HRM Division Manager - Admin
Step 7 • HRM Unit conducts Induction/Oath of Office
Step 8 • HRM Unit conducts orientation
End • End of transaction
Tandag City Water District | Operations Manual
61
Issuance of Equipment and Supplies
Step 1 • Supply Officer issues supplies to requisitioner
and records it in the supply logbook
Step 2
• Supply Officer records and monitors the monthly supplies usage, and prepares the Monthly Inventory of Supplies and submits it to the Accounting Unit and COA
Step 3
• Division Chief reviews activities of the process to see where quality improvements can be done in the process
Step 4
• General Manager submits complete monthly accomplishment report and monthly report to the Accounting Unit every first week of the month
End • End of transaction
Tandag City Water District | Operations Manual
62
HDMF Remittance
Step 1 •Remittance Officer (RO) emails HDMF CDO requesting for
the monthly loan deduction
Step 2 •RO updates the Pag-Ibig MC Proof list Report and
generates the same and submit it to the Payroll Officer
Step 3 •RO prepares the Authorization based on the payables
from the Prooflist report
Step 4 •RO routes the Authorization to the Cashier and Head of
the Agency or its OIC
Step 5 •The HDMF EGov Makeruploads the file of Pag-Ibig MC
Proof list Report to TCWD EGov account
Step 6 •The authorizer validates and checks the remittance and
approves payment
Step 7 •The maker proceeds with the payment and print out
transaction receipt
End •End of transaction
Tandag City Water District | Operations Manual
63
PHIC Remittance
Step 1
•Remittance Officer (RO) updates the Electronic Premium Remittance System account of TCWD and generates the same and submit it to the Payroll Officer
Step 2
•RO prepares the Authorization based on the billing from the Preliminary Employees Premium Remittance List (PEPRL)
Step 3 •RO routes the Authorization to the Cashier and Head of
the Agency or its OIC
Step 4 •The PHIC EGov Maker uploads the file of PEPRL to TCWD
EGov account
Step 5 •The authorizer validates and checks the remittance and
approves payment
Step 6 •The maker proceeds with the payment and print out
transaction receipt
End •End of transaction
Tandag City Water District | Operations Manual
64
GSIS Remittance
Step 1
• Remittance Officer (RO) downloads from the e-Billing and Collection System (EBCS) account of TCWDfor the monthly billing and submit the same to the Payroll Officer
Step 2 • After payroll, RO routes the GSIS remittance to
the Accounting Head and Head of Office
Step 3
• RO uploads the remittance file to the EBCS and generates the Summary of Totals (SOT) for the due month
Step 4 • RO submits the remittance to the Accounting
unit for payment
End • End of transaction
Tandag City Water District | Operations Manual
65
DTR for Casual Employees and Contract of Service’s Payroll
DTR for Regular Employees Payroll
Step 1
•Generate the data of Daily Time Record (DTR) of Casual employees from the Enterprise Resource Planning System (ERPS) every 16th of the month and 1st day of the succeeding month
Step 2 •Casual employees will check the data of their daily time record then sign and attached the accomplishment report signed/approved by the unit head
Step 3 •Forward to HR Officer concerned for checking
Step 4 •After checking, forward the DTR to Finance Officer concerned for the preparation of payroll and/or DBP Payroll Prooflist.
End •End of transaction
Step 1
• Update in the Enterprise Resource Planning System (ERPS)the contribution/deduction of regular employees based from the statement of account forwarded to HRM Unit
Step 2 • Forward to Finance Unit for checking
End • End of transaction
Tandag City Water District | Operations Manual
66
Procedures in Monitoring Budget, Utilizations and Disbursements charged to
Retained Income
Area of Responsibility Sequence No. Activity
Posting of Approved Budget
Receiving/Releasing
Staff 1
Receives the approved budget (AB)
from the concerned entity official.
Records the same in the logbook and
forwards the AB to the Staff
Concerned for recording in the
appropriate RBUD.
Staff Concerned 2
Records the AB in the „Budgeted
Amount‟ column of the RBUD and
forwards copies of the budget
documents to the Accounting
Division/Unit for reference.
Receiving/Releasing
Staff 3
Receives the BURS, duly signed by
the head of the Requesting Office
including copies of DV/Payroll,
Contract/PO and other SDs from
concerned office/personnel.
Verifies completeness of the
documents.
If complete, records the same in
the logbook maintained for the
purpose and forwards the documents
to Staff Concerned for recording of
utilizations in the appropriate
RBUD. If incomplete, returns the
documents to Requesting Office for
completion.
4
Receives the BURS and its SDs from
Receiving/Releasing Staff. Verifies
availability of budget based on the
appropriate RBUD.
5
If budget is available, assigns
number on the BURS based on the
Control Logbook maintained for the
purpose. Records the amount
utilized based on the BURS in the
„Utilization‟ column of the RBUD.
Initials in Section B of the BURS
and forward all copies of the
documents to the Head of the Budget
Division/Unit for signature. If
budget is not available, returns
the documents to the
office/personnel concerned.
Tandag City Water District | Operations Manual
67
Area of Responsibility Sequence
No. Activity
Head of Budget
Division/Unit 6
Reviews the BURS and SDs. Signs the
certification in Section B of the
BURS. Forwards to the Staff
Concerned the BURS and SDs.
Posting of Disbursement
Receiving/Releasing
Staff 8
Records in the logbook the receipt
of the RCI and RADAI from the Cash
Unit, JEV and NBURSA from the
Accounting Division/Unit. Forwards
the same to Staff Concerned.
9
Posts the RCI/RADAI/JEV in Section
C, Payment column of the BURS and
to the Disbursement column of the
RBUD.
10
In Section C of the BURS,
determines the balance of unpaid
utilizations. Files the RCI,
RADAI, TRA, JEV and other
documents for reference.
Adjustment of Utilization
Staff Concerned 11
Posts the NBURSA in the
„Utilization‟ column of Section C
of the BURS. For any excess of
the actual budget utilization
over the original amount, a
positive entry corresponding to
additional utilization shall be
recorded in the RBUD based on the
NBURSA. If the original
utilization is greater, a
negative entry representing the
excess shall be recorded in the
RBUD.
Tandag City Water District | Operations Manual
68
Procedures for Disbursements by Checks
Area of
Responsibility Sequence No. Activity
Preparation of DV
Requesting
Office/Unit 1
Prepares the DV in four copies
in accordance with the
instructions on the preparation
of the DV (Appendix 32) to
initiate the payment of claims.
Forwards the DVs, SDs and BUR to
the Budget Division/Unit for
processing.
Processing of DV
Accounting
Division/Unit
Designated
Staff/
Processing Staff
2
Receiving/ Releasing Staff 2
Receives Copies 1-4 of DV, SDs
and Copies 2-3 of BUR from the
Budget Division/Unit. Checks
completeness of SDs based on the
checklist. If incomplete, returns
to the party concerned for
compliance.
If complete, stamps “Received”
and indicates date of receipt and
initials on the stamped
“Received” portion of the DV.
Note: – Copy 1 of the BUR shall
be retained by the Budget Unit
which shall serve as the
subsidiary ledger of obligations.
3
Assigns DV number and records in
the logbook the DV number and
date, creditor/payee, particular
and amount.
Forwards Copies 1-4 of DV, SDs
and Copies 2-3 of BUR to the
designated Staff for processing
Note: DV number shall also be
indicated on every sheet of the
SDs.
4
Receives Copies 1-4 of DV, SDs
and Copies 2-3 of ORS from the
Receiving/Releasing Staff.
Reviews DV for completeness and
propriety of SDs.
Tandag City Water District | Operations Manual
69
Area of
Responsibility Sequence No. Activity
5
Retrieves Index of Payments from
file and determines if claim is
in order. If with prior payment
on the same claim, returns the
DV, SDs and BUR informing the
requesting office/party of prior
payment made. If in order,
verifies BUR against DV. If the
amounts in the BUR and DV are the
same, records the following in
the IP: DV date and number,
particulars and amount and
proceeds to Activity No. 9. For
first-time claimant, prepares IP
and records the name, address,
employee number and/or TIN, DV
date, particularsand amount. If
the amounts in the BUR and DV
differ, prepares NBURSA in three
copies and signs the “Prepared
by” portion. Forwards Copies 1-3
of NBURSA, Copies 1-4 of DV,
Copies 2-3 of ORS and SDs to the
Head of Accounting Division/Unit
for approval of the NBURSA.
Head of
Accounting
Division/Unit
6
Signs the “Approved by” portion
of the NBURSA.
Accounting
Division/Unit
Designated
Staff/
Processing Staff
7
Records in the logbook the return
of Copies 1-3 of NBURSA, Copies
1-4 of DV, Copies 2-3 of ORS and
SDs to the Budget Unit for
correction of obligation
Budget
Division/Unit
Designated Staff
8
Posts the NBURSA in the
'Obligation‟ column of Section C
of the BUR. If the original
amount is lesser than the actual
obligation, a positive entry
corresponding to additional
obligation shall be recorded in
the RAOD based on the NBURSA. If
the original obligation is
greater, a negative entry
representing the excess shall be
recorded in the RAOD. Returns
Copies 2-3 of NBURSA, Copies 1-4
of DV, Copies 2-3 of BUR and SDs
to the Accounting Division/Unit
Tandag City Water District | Operations Manual
70
for processing. Files Copy 2 of
NBURSA together with the original
copy of the BUR.
Area of
Responsibility Sequence No. Activity
Accounting
Division/Unit 9
Initials in Box B of DV and
forwards Copies 1-4 of DV and
SDs, Copies 2-3 of BUR to the
Head of Accounting
Division/Unit/Authorized Officer
for review.
Note 5 – In case there is NBURSA
attached to the DV, it shall be
included among the SDs of the DV.
Head of the
Accounting
Division/Unit
10
Checks the “Cash available”
portion in Box B of the DV
11
Reviews DV and SDs. Signs Box B
of DV. Forwards the documents to
the Receiving/Releasing Staff.
Accounting
Division/Unit
Designated Staff
12
Records in the logbook the
release of Copies 1-4 of DV and
SDs and Copies 2-3 of BUR to the
Head of Agency or Authorized
Representative for approval of
the DV.
Office of the
General Manager 13
Receives Copies 1-4 of DV, SDs
and Copies 2-3 of ORS and records
in the logbook the date of
receipt. Forwards the set of
documents to the Approving
Officer for review and approval.
General Manager 14
Reviews DV and signs in Box C
“Approved for Payment” portion.
Forwards Copies 1-4 of DV, Copies
2-3 of the BUR and SD
Preparation of JEV for Disbursements thru Checks Accounting
Division/Unit
Designated Staff 15
Receives Copies 1-2 of RCI with
Copy 2 of the Check, Copies 1 and
3 of DVs, Copies 2-3 of BUR and
other SDs from Cash Unit.
Forwards the documents to the
Designated Staff for JEV
preparation
16
Examines DVs and checks against
RCI. Verifies if the serial
number of all checks drawn
whether released or unreleased,
including spoiled and cancelled
ones, are all accounted for.
Tandag City Water District | Operations Manual
71
Area of
Responsibility Sequence No. Activity
17
Prepares JEV in two copies and
signs in the “Prepared by”
portion. Forwards Copies 1-2 of
JEV supported with Copies 1-2 of
RCI, Copy 2 of the Check, Copies
1 and 3 of DVs, Copies 2-3 of BUR
and other SDs to the Head of
Accounting Division/Unit.
Head of the
Accounting
Division/Unit
18
Reviews correctness of the
journal entries and signs on
“Certified Correct by” portion of
the JEV. Forwards Copies 1-2 of
JEV supported with Copies 1-2 of
RCI, Copy 2 of the Check, Copies
1 and 3 of DVs, Copies 2-3 of BUR
and other SDs to Designated Staff
for recording in the CkDJ
Recording in the Check Disbursement Journals (CkDJ)
Designated Staff 19
Receives Copies 1-2 of JEV with
Copies 1-2 of RCI, Copy 2 of the
Check, Copies 1 and 3 of DVs,
Copies 2-3 of BUR and other SDs.
Records the JEV in the CkDJ.
20
Records in the logbook submission
of documents to COA and Budget
Division/Unit. Retains Copy 2 of
JEV and RCI and Copy 3 of BUR for
file.
Tandag City Water District | Operations Manual
72
Procedures for Disbursement through ADA
Area of
Responsibility Sequence No. Activity
Accounting
Division/Unit
Designated Staff
1
Prepares in 2 copies the ADA for
approved DVs pertaining to the
current and prior years‟ accounts
payable.
Cashier 2
Verifies completeness of
signature on the DVs. Reviews the
amount of the ADA against the
total amount of the DVs and SDs.
Signs the ADA.
3
Records in the logbook the
release of Copies of ADA, DVs and
SDs.
Office of the
General Manager 4
Records in the logbook the
receipt of Copies of ADA, DVs and
SDs.
5
Countersigns the ADA. Forwards
Copies 1-5 of LDDAP-ADA, Copies
1-4 of DVs, and SDs to the
Receiving/Releasing Staff for
return to the Cashier.
Cashier 6
Receives Copies ADA, DV, and SDs.
Retrieves the CkADADRec and
checks completeness of documents.
Files documents temporarily for
the preparation of the RADAI.
Preparation of Journal Entry Vouchers Accounting
Division/Unit
Designated Staff
7
Receives the copy of Summary of
ADA
8
Prepares the JEV into two copies
and sign the “prepared by”
portion.
Head of the
Accounting
Division/Unit/
Authorized Officer
9
Reviews and signs the JEV
Recording the ADADJ
Accounting
Division/Unit
Designated Staff
10
Receives Copies 1-2 of JEV,
Copies 1-3 of RADAI, copies of
LDDAP-ADA, Copies 1 and 3 of DVs
and SDs. Records the JEV in the
ADADJ.
11 Records in the logbook
submission of documents to COA
and Budget Unit.
Tandag City Water District | Operations Manual
73
Procedures for the Liquidation of Cash Advances for Payroll
Area of
Responsibility Sequence No. Activity
Disbursing
Officer/
Cashier
1
Based on the paid payroll and
SDs, prepares RCDisb in three
copies. Signs the
“Certification” portion of the
RCDisb and submits to the
Accounting Division/Unit.
Accounting
Division/Unit
Designated Staff
2
Records the receipt of the
RCDisb in the logbook,
indicates “Received” and signs
on all copies, forwards the
RCDisb to the Designated Staff
for JEV preparation, and
returns Copy 2 to the
Cash/Treasury Unit
3
Verifies completeness of data
in the RCDisb as against the
SDs received. Prepares JEV
and signs in the “Prepared by”
portion.
Head of the
Accounting
Division/Unit
4
Reviews correctness of the
journal entries and signs on
“Certified Correct by” portion
of the JEV.
Accounting
Division/Unit
Designated Staff
5 Records the JEV in the CDJ
Tandag City Water District | Operations Manual
74
Procedures for Disbursements of Advances to Officers and Employees
Area of Responsibility Sequence No. Activity
Receipt and Liquidation of Cash Advance for Travel
Various Units
Officers/Employees
Concerned
1
Receives the approved check and
Copy 4 of DV from Cash/Treasury
Unit.
2
Upon return to the official
station, prepares the LR in two
copies and signs in Box A or
“Certification” portion.
Attaches appropriate SDs such as
IT, CTC, Certificate of
Appearance, Travel Report,
Plane/Boat Ticket, and RER.
Note: If there is unused/excess
traveling allowance, the amount
shall be refunded to the Cashier/
Collecting Officer who shall in
turn issue the OR to acknowledge
receipt of amount refunded.
Note: The DV and BUR shall be
prepared by the official/
employee concerned for the
reimbursement of allowable
traveling expenses incurred in
excess of the cash advance.
General Manager 3
Signs in Box B “Certified:
Purpose of travel/cash advance
duly accomplished” portion of the
LR.
Various Units
Officers/Employees
Concerned
4
Submits Copies 1-2 of the LR, SDs
to Accounting Division/Unit for
processing and certification of
Box C “Certified: SDs complete
and proper” and recording of the
actual traveling expenses.
Accounting
Division/Unit
Designated Staff
5
Checks completeness of SDs. If
complete, acknowledges receipt of
the LR, returns Copy 2 to the
claimant and records the same in
the logbook. Otherwise, returns
the documents to the claimant for
appropriate action.
Tandag City Water District | Operations Manual
75
Area of Responsibility Sequence No. Activity
Head of the
Accounting
Division/Unit
6
Verifies completeness and
propriety of the SDs. If
complete and proper, signs in Box
C, “Certified: SDs complete and
proper” portion of the LR.
Otherwise, prepares letter
informing the claimant of the
deficiencies.
Recording of Liquidation of Advances to Officers and Employees Accounting
Division/Unit
Designated Staff
7
Prepares JEV based on the LR
and SDs received. Signs in the
“Prepared by” portion of the
JEV.
Head of the
Accounting
Division/Unit/
Authorized Officer
8
Reviews the JEV and signs in
the “Certified Correct”
portion.
Accounting
Division/Unit
Designated Staff
9
Records the JEV in the GJ.
Files the documents
temporarily.
10
Submits to the COA Auditor Copy
1 of JEVs, LRs and SDs at the
end of the month.
Tandag City Water District | Operations Manual
76
Procedures for Disbursements of Advances to Special Disbursing Officers
Area of
Responsibility Sequence No. Activity
Granting of Cash Advance for Specific Purpose/Time-Bound Undertaking
Various Units
Officers/Employees
Concerned
1
Receives the approved check & Copy
4 of DV from Cash/Treasury Unit.
Records in the CDRec the date,
reference, name of payee,
particulars & the amount of check
in the „Cash Advance Received‟
column.
2
Prepares RCDisb in three copies
based on the CDRec. Signs the
“Certification” portion of the
RCDisb. Forwards the RCDisb and SDs
to the Accounting Division/Unit.
Note: If there are unused cash
advances, refund the amount to the
Cashier who shall in turn issue the
OR to acknowledge receipt of the
refund. The OR shall be attached to
the RCDisb.
Recording of Liquidation of Cash Advance for Special Purpose/Time-Bound Undertaking
Accounting
Division/Unit
Designated Staff
3
Checks completeness of SDs. If
complete, acknowledges receipt of
the RCDisb, returns Copy 2 to the
Accountable/ Special Disbursing
Officer and records the same in the
logbook. Otherwise, returns the
documents to the
Accountable/Special Disbursing
Officer for appropriate action.
4
Verifies completeness & propriety
of the RCDisb & SDs. If complete
and proper, prepares JEV in two
copies and signs in the “Prepared
by” portion. Otherwise, prepares
letter informing the
Accountable/Special Disbursing
Officer of the deficiencies.
Head of the
Accounting
Division/Unit/
Authorized Officer
5
Reviews the JEV and signs in the
“Certified Correct” portion
Designated Staff 6 Records the JEV in the CDJ.
Tandag City Water District | Operations Manual
77
Procedures for Disbursements through Petty Cash
Area of
Responsibility Sequence No. Activity
Establishment of PCF
Petty Cash Fund
Custodian 1
Receives the approved check from
the Cashier for the
establishment of PCF. Records in
the PCFR the date, particulars,
reference & the amount of check
in the „Cash Advance‟ column.
2
Encashes check in GSB and keeps
cash in a safety vault.
Liquidation of Cash Advance from PCF
3
Receives from Requesting Personnel
Copy 2 of the PCV together with
SDs. Checks and reviews
completeness of documents such as
the date, amount and nature of
expenses paid as shown in the SDs.
If incomplete, returns to
Requesting Personnel for completion
of needed SDs.
4
If complete, retrieves the original
of PCV from file and fills up Box
II “Total Amount Granted”, “Total
Amount Paid per OR/Invoice No.”,
and “Amount Refunded/ Reimbursed”
portion of the original and Copy 2
of PCVs.
5
Checks the appropriate boxes for
“Received Refund” or “Reimbursement
Paid” portion and signs Box C of
the PCV.
Requesting
Personnel 6
Checks and fills up the appropriate
boxes for “Liquidation Submitted
by” and “Reimbursement Received by”
upon submission of necessary SDs
and receipt or reimbursement of
cash, if any, and signs Box D of
the PCV.
Petty Cash Fund
Custodian 7
Returns Copy 2 of the PCV to the
Requesting Personnel.
8
Retrieves PCFR from file and
records paid PCVs. Fills up the
following columns: date, PCV No.,
name of payee, nature of payment
and the amount in the
„Disbursements‟ and „Cash Advance
Balance‟ columns.
Tandag City Water District | Operations Manual
78
Area of
Responsibility
Sequence
No. Activity
9
Files the original PCV together
with the SDs.
Replenishment of PCF
Petty Cash Fund
Custodian 10
Retrieves from file the original
of the PCV together with the
SDs. Checks the completeness of
all PCVs for replenishment.
11
Based on the paid PCVs and SDs,
prepares the RPPCVs in two
copies. Signs the
“Certification” portion of the
RPPCV.
Note: The RPPCVs shall serve as
the basis in the preparation of
the DV to replenish the PCF.
Note: In case of retirement,
separation, termination or
dismissal of the PCFC, any
unused balance shall be refunded
to close the accountability. The
incoming Custodian shall be
granted a new PCF.
12
Based on the RPPCVs, prepares DV
in four copies and ORS in three
copies. Forwards Copies 1-4 of
the DV, original of the RPPCVs
and PCV, and SDs to Authorized
Official for review and
signature.
Authorized
Official 13
Signs in Box A portion of the
BUR and DV
Petty Cash Fund
Custodian 14
Forwards Copies 1-4 of the DV,
Copies 1-3 of ORS, originals of
RPPCVs and PCVs and SDs to
Budget Division for recording of
obligation.
Tandag City Water District | Operations Manual
79
Detailed Procedures for Collections and Deposits through the Collecting Officer
Area of
Responsibility Sequence No. Activity
Accounting
Division/Unit
Accounting Staff
1
Receives original of RCD with
Copy 2 of the ORs and
validated DSs from the
Cash/Treasury Unit. Records
receipt in the logbook
maintained for the purpose and
forwards the same to the
Bookkeeper for review and
preparation of the JEV
2
Based on the RCD, prepares JEV
in two copies and signs
"Prepared by" portion of the
JEV. Forwards the JEV and
documents to the Head of the
Accounting Unit for review and
signature.
Head/Chief
Accountant
Division/Unit
3
Reviews and signs “Certified
Correct by” portion of the
JEV. Forwards the JEV and
documents to the Bookkeeper
for recording in the CRJ.
Tandag City Water District | Operations Manual
80
Procedures in the Requisition and Issue of Inventory Items
Area of
Responsibility
Sequence
No. Activity
Property and/or
Supply Custodian 1
Files permanently in numerical
order Copy 3 of RIS and temporarily
the originals of RIS for the
preparation of Report of Supplies
and Materials Issued (RSMI)
2
Retrieves the original copies of
RIS from temporary file, ensures
the completeness of the RIS and
prepares the RSMI in two (2) copies
at the end of the day.
3 Signs the “Certified by” portion of
the RSMI.
Supply Officer 4
Receives signed RSMI and forwards
to the Accounting Division/Unit the
original copy of RSMI together with
original RIS. Files Copy 2 of
RSMI.
Accounting
Division/Unit
Accounting Staff
5
Receives the original copy of RSMI
and original RIS. Checks and
verifies the completeness of
information. Retrieves SLC from
file and fills up the “To be filled
up in the Accounting Division/Unit”
portion of RSMI. Records the RSMI
in the SLC and signs in the “Posted
by/date” portion.
6
Prepares JEV in two (2) copies
based on the RSMI to record the
issue of stock.
7
Signs the “Prepared by” portion of
the JEV and forwards JEV and SDs to
the Chief Accountant/Head of the
Accounting Division/Unit for review
and approval.
Chief
Accountant/Head of
Accounting
Division/Unit
8
Reviews correctness of the
accounting entry and completeness
of SDs. If in order, signs the
“Certified Correct by” portion of
the JEV and forwards Copies 1 and 2
of JEV to the Bookkeeper. If not in
order, returns the JEV and SDs to
the Accounting Staff concerned for
correction.
Tandag City Water District | Operations Manual
81
Area of
Responsibility
Sequence
No. Activity
Accounting Staff 9
Receives JEV and SDs for the
correction of accounting entry.
Returns the JEV and SDs to the
Chief Accountant/Head of the
Accounting Division/Unit for
approval.
10
Receives signed JEV supported with
the RSMI and RIS and records JEV in
the GJ. Files copy 2 of JEV.
Tandag City Water District | Operations Manual
82
Emergency
Procedures
Tandag City Water District | Operations Manual
83
Emergency Action Team
Tandag City Water District | Operations Manual
84
Fire Brigade
CHAIRMAN
GM EULOGIO D. MILLA
Tandag City Water District | Operations Manual
85
Water Service Interruption
A. Electric Blackout
A.1 Short Brownout (Power Fluctuations up to 2 hours brownout)
1. Alert Operator on duty and then call the Electric utility to report
fluctuations in Voltages or inquire for the duration of the power outage;
2. Check water radiator, oil level, diesel and battery before starting up the
generator set and log hour counter of the generator set;
3. Warm up the engine while in preparation for generator set operation.
Flush water from the main line and then close the discharge valve leaving
the bypass valve open;
4. Switch on the circuit breaker of the generator set. Switch the Manual
Transfer Switch to generator set position;
5. Log pressure and flow meter reading. Start the pump and flush water for 3
minutes or as long as needed;
6. Record pressure and flow meters reading;
7. Check generator set operation, oil pressure, temperature, voltages and
the cycle or frequency;
8. Once generator set operation and pressure stabilized proceed to other
affected pumping stations.
A.2 Power Supply Restoration
1. Allow the generator set to run for at least 30 minutes if brownout is less
than 30 minutes or still the voltage and pressure is stable;
2. Turn the test line valve to “¼” open and fully close distribution line;
3. Push Stop button to stop the pump;
4. Shift the double throw switch for normal electric power operation;
5. Push Start button to start the pump;
6. Open fully the distribution line and gradually close the test line;
7. Stop generator set;
8. Record all data of hour and flow meter reading;
9. Once operation stabilized proceed to other affected pumping stations.
A.3 Major Blackout (2 hours of brownout or longer)
1. Notify Commercial Unit/PRO for them to give advisory to concessionaires;
2. In case of major brownout please refer to A.1.1 or A.1.2
3. Closely monitor diesel level, coolant of generator set, and radiator water.
Strictly observe maximum running time of 10 hours per generator set with 3
hours rest before re-starting;
4. Closely monitor all pumping equipments.
Tandag City Water District | Operations Manual
86
B. Generator Set Failure
B.1 For unavailable spare parts
1. Inspect the generator set failure;
2. Immediately call technician;
3. Supervise the repair/replacement of damaged part;
4. Monitor pressure of Pumping Station to regulate water supply;
5. Request for the transfer of reserved generator set to location;
6. Transport reserve generator set to location;
7. Switch to reserved movable Generator set;
8. Follow the procedure on Generator set operation;
B.2 For unavailable spare parts
1. Inspect the generator set failure;
2. Immediately call Technician;
3. Supervise the repair/replacement of damaged part;
4. Information dissemination through “pasayo” if necessary;
5. Request for the transfer of reserve or rented Generator set to location;
6. Follow the procedure on Generator set operations
C. Breakdown of Pumping Station
Causes: C.1 Burnout motor
C.2 motor control failure
C.3 worn-out shafting/impeller
C.4 malfunctioning / breakdown of VFD
1. Switch off circuit breaker;
2. Close distribution line and open test line;
3. Utilize other pumping stations and inform the Division Manager to assess
the extent of damage for immediate repair;
4. If the extent of the damage cannot be repaired by the district personnel,
immediately call the technician;
5. Coordinate with WMF for any possible diversion of water supply;
6. Information dissemination through “pasayo” if necessary;
7. Pull-out damaged part and replace by the spare unit;
8. Switch on circuit breaker and conduct test run;
9. Resume normal operation if all indicators show stable signs.
D. Busted Main Distribution Lines
1. Inform WMF / Personnel on monitor of the incident;
2. Order WMM to proceed to site and excavate affected area to determine
the extent of damage;
3. If damage needs major repair, close gate valves and notify the affected
areas;
Tandag City Water District | Operations Manual
87
4. Immediately request materials needed for the repair;
5. Release requested materials;
6. Repair the damage;
7. Upon completion open all gate valves around the affected areas and
conduct leak test and flushing;
8. Determine possible claims from the party who caused the damage.
E. Water Contamination
1. Shut down the pumping equipment of the affected pumping station and
close gate valves of the distribution lines;
2. Notify the public through Commercial Division;
3. Conduct flushing of wells;
4. Disinfect well for at least 8 hours;
5. After disinfect, flush out water for at least one hour.
Emergency Provision
To minimize the failure of operations during emergencies, the following should be
observed:
1. Reservoirs should never go below half full before the pumps are restarted.
If the operator knows the schedule of a power outage, he must ensure
that the reservoir is full by the time the power is out. For power outages or
calamity repairs that could last for more than a day, the operator should
limit or ration the supply of water by valve throttling.
2. Fuel (if used by the system) should always be on stock for at least 2 days of
operational needs.
3. The Utility should have an Emergency Plan, clearly designating the
emergency team members, their specific functions, and a backup office
or meeting place.
4. The Utility should have the contact numbers of those who can assist during
emergencies (nearby utilities, private deep well owners, well drillers, pump
suppliers, water tankers, treatment equipment suppliers, power suppliers,
government agencies, etc). The personnel designated to respond to
emergencies should have these numbers.
5. After a calamity, the operator must conduct a field survey to determine
damaged facilities and the extent of leakage, and to conduct
emergency repairs.
Tandag City Water District | Operations Manual
88
Earthquake
Drought
Pre-
Crisis
Phase
•Ensure and regularly check the integrity of structure •Conduct regular earthquake drills among employees •Maintain a Survival Go Bag
EPWQW Division/EAT
Crisis
Phase
•In the first indication of an earthquake, Division Managers should direct all employees and concessionaires to drop, cover and hold, seek shelter under desks and move away from windows and overhead hazards •After the shaking stops, the EAT Logistics Committee will initiate an evacuation alert. All employees and concessionaires will evacuate using designated routes or alternate routes to the outside Assembly Area and grab their survival Go Bag. •If evacuation is ordered, EAT Logistics takes attendance at the Assembly Area, and will report any missing or injured employee. •EAT Tools and Equipment Committee will direct staff to shut off utilities.
All Employees, EAT Logistics Committee
EAT First Aid and Responder will check for injuries and provide appropriate remedy.
EAT Committee on First Aid & Responder
Post
Crisis
Phase
EAT Committee on repairs will assess and check all damages to facilities and equipment, repair/purchase replacement of facilities and equipment
EAT
EAT Communications will declare cessation of emergency and consult with CDRRMO and public safety officials to determine if the buildings are safe for preoccupancy
EAT Comm. & PRO
Pre-
Crisis
Phase
•Ensure availability of chemicals for water treatment •Keep water tankers in good condition •IEC on potential effect of drought to water supply and advice them to collect water in clean containers in case of possible service interruption
Prod’n & Water Quality Unit, Commercial Unit & PRO
Crisis
Phase
In case of interrupted water service delivery, EAT committee concern shall take action
EAT concerned committee
Post
Crisis
Phase
Assess extent of drought (duration and effect of water supply and quality Production Unit
Declare cessation of crisis and resume normal operations EAT Comm. & PRO
Tandag City Water District | Operations Manual
89
Landslide
Pre-
Crisis
Phase
•Secure water facilities that are located within landslide-prone areas EPWQW Division
Crisis
Phase
•Stay as far away as possible from the site. •Immediately inform EAT Logistics Committee Chairman or if not possible, any EAT member, about the situation
Employee On Duty at Site
In case of damage to facilities with interrupted service delivery, EAT shall be alerted as to the affected area of concern
EAT Committee Concerned
In case there are injured employees or resident caused by TCWD facilities but without interrupted service, EAT on Committee on First Aid and Responder shall take action
EAT Committee on First Aid & Responder
If the building or facility sustains minor damage without service interruption, EAT decides regarding its immediate use
EAT Committee Concerned
If the building or facilities sustain significant damage resulting to service interruption and serious injuries, All EAT Committee shall be alerted
All EAT Committee
Post
Crisis
Phase
EAT Committee on repairs will assess and check all damages to facilities and equipment, repair/purchase replacement of facilities and equipment
EAT/EPWQW Division
Declare cessation of crisis and resume normal operations EAT Comm. & PRO
Tandag City Water District | Operations Manual
90
Typhoon/Hurricane/Tornado
Pre-
Crisis
Phase
•Ensure availability of chemicals for water treatment and readiness of generating sets •Contact SURSECO for possible interruption of normal power supply •Monitor turbidity of raw water
Production and Water Quality Unit
Crisis
Phase
Conduct IEC on concessionaires regarding potential effect of storm to water supply and advise them to collect water in clean containers in case of possible service interruption, especially when predicted by PAG-ASA Take preventive measures to safekeep documents and electronic files in case flood occurs due to the typhoon/storm (see preparation for Flood)
PRO & Commercial Unit
In case of damage to facilities with interrupted service delivery, EAT shall be activated as to the affected area of concern
EAT Committee Concerned
EAT First Aid and Responder will check for injuries and provide appropriate remedy.
EAT Committee on First Aid & Responder
If the building or facilities sustain minor damage without service interruption, EAT decides regarding its immediate use
EAT Logistics
Bring all persons inside the building
Close all windows and blinds
EAT communications shall monitor weather conditions
Person at Site/ EAT Comm.
Post
Crisis
Phase
EAT Committee on repairs will assess and check all damages to facilities and equipment, repair/purchase replacement of facilities and equipment
EAT/EPWQW Division
Contact CDRRMO and declare cessation of crisis and resume normal
operations
EAT Comm. & PRO
Take preventive measures to safe keep documents and electronic files in case flood occurs due to the typhoon/storm
All Divisions
Tandag City Water District | Operations Manual
91
Flash Flood
Pre-
Crisis
Phase
•Elevate all files, especially important documents, or place in safety vaults •Electronically file all documents •Mark documents according to priority of evacuation
All Divisions
Crisis
Phase
In case of damage to facilities with interrupted service delivery, EAT shall be activated as to the affected area of concern
EAT Committee Concerned
In case there are injured employees or concessionaires within TCWD premises but without interrupted service, EAT on Committee on First Aid and Responder shall take action
EAT Committee on First Aid & Responder
If the building or facilities sustain minor damage without service interruption, EAT decides regarding its immediate use
EAT Committee Concerned
If the building or facilities sustain significant damage resulting to service interruption and serious injuries, All EAT Committee shall be activated
All EAT Committee
Post
Crisis
Phase
EAT Committee on repairs will assess and check all damages to facilities and equipment, repair/purchase replacement of facilities and equipment
EPWQW Division or Office affected
Declare cessation of crisis and resume normal operations EAT Comm. & PRO
•If still possible, evacuate documents to safer and higher grounds •Immediately evacuate the premises and go to higher grounds •Check all exposed electrical conduits
Employee at site/EAT Flood Committee
Tandag City Water District | Operations Manual
92
Bomb Threat
Pre-
Crisis
Phase
•Install caller IDs in all landlines •Install high resolution CCTV in critical areas •Install alert systems connected to the local PNP and EAT Chairman on Communications •Hire adequately trained security guards •Limit access to facilities. •Fill up Bomb Threat Checklist Form and Physical Description Form
GSO Unit, IT and Networking Unit, CSCAD
Crisis
Phase
•Be alert for suspicious persons loitering in or near the workplace •Be alert for unfamiliar or suspicious vehicles near the workplace •Report all suspicious activities to the Division Manager
All Divisions
•Report the threat to the EAT Logistics Committee, or if not possible, to any EAT member • Document the call as outlined in the Bomb Threat Checklist for Phoned Threats later in this procedure •Record the time and the exact words of the message with particular emphasis on the description and the possible location of the device •Be familiar with Letter and Parcel Recognition Points outlined later in this procedure •DO NOT HANG UP THE PHONE. The call may be traceable
EAT Logistics Committee
EAT to decide whether to not to evacuate the building or call the PNP for
assistance.
EAT Logistics Committee
Post
Crisis
Phase
Conduct a thorough inspection of premises GSO Unit
Declare cessation of crisis and resume normal operations EAT Comm. & PRO
Tandag City Water District | Operations Manual
93
Fire
Pre-
Crisis
Phase
•Dispose fire hazards •Regularly check electrical wirings •Ensure working conditions of fire hydrants, extinguishers and detectors •Label emergency exits •Conduct fire emergency drills among employees •Electronically file documents •Label all documents according to priority evacuation
GSO/ All Divisions/ Fire Brigade-Security Team
Crisis
Phase
•Any Staff who detects fire will signal the fire alarm and immediately inform EAT fire committee •All persons shall evacuate the building •Do not lock doors nor find cover in any enclosed rooms
Persons at Site/ FB-Evacuation and Security Team
A fire extinguisher should be used only if the fire is small and you are
trained in its use. The extinguisher is used only after a fire alarm has
been activated
FB Fire Fighting Team
Check if the fire alarm is false. If false, silence it and re-enter the
building. Otherwise, call the Bureau of Fire and Protection immediately.
FB Fire Fighting & Comm. Team
Post
Crisis
Phase
• Review fire safety measures in place and institute corrective measures •Document reports for filing of insurance claims from GSIS •Replace used fire extinguishers
Fire Brigade, GSO, Prop. & Supplies Unit
Declare cessation of crisis and resume normal operations EAT Comm. & PRO
In case there are injured employees or concessionaires within TCWD premises but without interrupted service, EAT on Committee on First Aid and Responder shall take action
FB First Aide & Medical Team
Assess and check all damages to facilities and equipment, repair/purchase replacement of facilities and equipment
EPWQW Division or Office affected
Tandag City Water District | Operations Manual
94
Gas Leak/Chemical Spills
Pre-
Crisis
Phase
•Regularly check chemical tanks, containers and pipes •Ensure 1:1 availability of gas masks for all operators •Conduct regular training regarding handling of chemicals, chlorine leak containment, proper use of PPEs, evacuation drills, first aid, etc.
HR Unit/ Production Unit
Crisis
Phase
•Any Staff who detects the leak shall immediately inform EAT Logistics Committee •Determine if the gas leak is signicant. If significant, all plant personnel must wear gas mask immediately and evacuate the premises. •Pump Operator or Production Unit Head may stop the source of the spill/leak if without risk to his life or health or that of the personnel. •Keep the area within 50 m radius of the source of the leak free from kibitzers.
Persons at Site/ Pump Operators/ Production Unit EAT Logistics
Post
Crisis
Phase
Conduct a thorough inspection of chemical tanks and containers and
immediately repair/replace those that show signs of deterioration or
damage
Production Unit
Declare cessation of crisis and resume normal operations EAT Comm. & PRO
In case there are injured employees or concessionaires within TCWD premises but without interrupted service, EAT on Committee on First Aid and Responder shall take action
FB First Aide & Medical Team
Assess cause of chemical leak and institute corrective measures EPWQW Division or Office affected
Tandag City Water District | Operations Manual
95
Appendices
Tandag City Water District | Operations Manual
96
Directory
Name Position/Designation/Coverage Contact #
Board of Directors
Rodulfo R. Uy, CE
Walderico R. Bonifacio, CE
Dr. Josefina O. Prado
Rev.Msgr. Isidro H. Irizari
Winifreda A. Damiao
Candice Noelle M. Cabrera
BOD - Professional Sector
BOD - Business Sector
BOD - Civic Sector
BOD - Education Sector
BOD - Women’s Sector
Minutes/Agenda Officer
09213114064
09076678353
09189651495
09303189713
09209492119
Office of the General Manager
Eulogio D. Milla, CE, ASEAN Eng
Candice Noelle M. Cabrera
Noralyn G. Pabalate
General Manager
Executive Assistant
Procurement Unit
09989993271
09209492119
09105593378
Administrative, General
Services, Finance and
Commercial Division
Rosemarie F. Andres
Lourdes S. Bacornay
Gretchen N. Baghari
Candice Noelle M. Cabrera
Fran Therese C. Manjares
Carlos J. Martus
Floyd M. Mendez, CPA
Michelle L. Patrimonio
Designated, AGSFC Division Chief
Property and Supplies Unit
HR Unit/General Services Unit
Records Unit
Cashiering Unit
IT and Networking Unit
Accounting Unit
Billing and Commercial Unit
09209492118
09127050396
09064870458
09209492119
09096004514
09099128457
09178945474
09300618551
Engineering and Construction,
Production and Water Quality,
and Watershed Division
For. Jerry A. Bernadas
Alfredo P. Bago-od
Anthony L. Concha
Brian M. Dua Ricky Boy G. Eupeña, CE
Tripon P. Madelo
Designated, ECPWQW Division Chief
Watershed Management Unit
Production Unit
Maintenance of Services Unit
Planning and Construction Unit
Transmission & Distribution Lines Unit
09209492120
09996619902
09460121161
09387621823
09121583952
09556221061
Tandag City Water District | Operations Manual
97
Bids and Awards Committee
Alfredo P. Bago-od
Rosemarie F. Andres
Lourdes S. Bacornay
Jerry A. Bernadas
Michelle L. Patrimonio
Anthony L. Concha
Brian M. Dua Ricky Boy G. Eupeña, CE
Tripon P. Madelo
Aries G. Salcedo
Candice Noelle M. Cabrera
Noralyn G. Pabalate
Chairman
Vice Chairman
Member
Member
Member
Technical Working Group
Technical Working Group
Technical Working Group
Technical Working Group
Technical Working Group
Secretariat
Secretariat
09996619902
09209492118
09127050396
09209492120
09300618551
09460121161
09387621823
09121583952
09556221061
09096365536
09209492119
09105593378
Fire Brigade
Eulogio D. Milla, CE, ASEAN Eng
Jerry A. Bernadas
Anthony L. Concha Ricky Boy G. Eupeña, CE
Tripon P. Madelo
Floyd M. Mendez, CPA
Michelle L. Patrimonio
Chairman
Vice Chairman
Evacuation/Retrieval Team
First Aid/Medical Team
Fire Fighting Team
Security Team
Communication Team
09989993271
09209492120
09460121161
09121583952
09556221061
09178945474
09300618551
Emergency Action Team
Committee on Fire
John Paul Frias
Tripon P. Madelo
Committee on Flood
Anthony L. Concha
Committee on Repair
John Paul Frias
Brian M. Dua
Committee on Retrieval and
Maintenance of Meter
Warlito Milana
Chairman - Buenavista Chapter
Chairman - City Proper Chapter
Chairman
Chairman – Transmission Lines
Chairman – Services
Chairman
09197887848
09556221061
09460121161
09197887848
09387621823
09482045293
Tandag City Water District | Operations Manual
98
Committee on First Aid and
Responder Ricky Boy G. Eupeña
Committee on Valving
Tripon P. Madelo
Committee on Tools &
Equipment
Aries G. Salcedo
Logistics Committee
Floyd M. Mendez, CPA
Committee on Communications
Michelle L. Patrimonio
Drivers
Basilio A. Patual
Eugenio C. Pol
Chairman
Chairman
Chairman
Chairman
Chairman
Driver
Driver
09121583952
09556221061
09096365536
09178945474
09300618551
09070655327
09388519314
Tandag City Water District
Purok Palmera, Brgy. Mabua, Tandag City
Telephone Nos. (086)211-3258/(086)211-4600/(086)211-5700
Hotline Nos. 09209492119/09209492118/09209492120
Email address: [email protected]
Facebook Account: TandagCity WD
Website: tandagwd.gov.ph
Tandag City Water District | Operations Manual
99
BOMB THREAT CHECKLIST FOR PHONED
THREAT
Exact message received: _____________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
TO BE COMPLETED AFTER CONTACTING YOUR EMERGENCY COORDINATOR:
Name of person receiving call: _______________________ Time: _____ Date: _______
Caller’s identity:
Male _____ Female _____ Adult _____ Juvenile ______ Approx. Age: _____
Caller ID Number as it appeared on landline monitor _____________________
Origin of call (if you can tell or ask):
Local ______ Long Distance _____ Booth _____ Internal (from w/in building) _______
Vocal characteristics Speech
_____ Loud _____ Soft _____ Fast _____ Distorted
_____ High Pitch _____ Deep _____ Distinct _____ Nasal
_____ Raspy _____ Pleasant _____ Stutter _____ Lisp
_____ Intoxicated _____ Other _____ Slurred _____ Other
_____ Slow
Language Accent
_____ Excellent _____ Good _____ Local _____ Regional
_____ Fair _____ Poor _____ Foreign _____ Other
_____ Foul _____ Other _____ Not local
Manner Background noises
_____ Calm _____ Angry _____ Machinery _____ Trains
_____ Rational _____ Irrational _____ Bedlam _____ Animals
_____Coherent _____ Incoherent _____ Music _____ Quiet
_____ Emotional _____ Laughing _____ Office Machine _____ Voices
_____ Righteous _____ Street _____ Party Atmosp.
_____ Other