OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 Vaughn Bell, Artist

Upload: others

Post on 05-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

1

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017

Vaughn Bell, Artist

Page 2: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

2OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017

DWW Art Master Plan written by Vaughn Bellwww.vaughnbell.net

Graphic Design by Amy Harringtonwww.hrrngtn.com

Page 3: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

3OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

Note on Acronyms: Throughout this document the following acronyms/shorthand will be used:

SPU: Seattle Public Utilities

DWW: Drainage & Wastewater

Arts:OfficeofArts&Culture

AMP: Art Master Plan

1. Project Opportunities . . . . . pp. 41.1ShipCanalWaterQuality

Project . . . . . . . . . . . . . . . . . . . . . . . . . . . pp. 51.2CommunityBuildingthrough

Socially Engaged Art. . . . . . . . . . . . . .pp. 311.3 Educational Artist-Scientist

Collaborations . . . . . . . . . . . . . . . . . . .pp. 371.4 Place-Making and Permanent

Public Art in Infrastructure . . . . . . . .pp. 44

2. Appendices . . . . . . . . . . . . . pp. 632.1ScopeofWorkSCWQP

CoordinatingArtist . . . . . . . . . . . . . .pp. 64

RFQ'sinDevelopment:

2.2DraftRFQforRoadsideBioretentionKit of Parts. . . . . . . . . . . . . . . . . . . . . . . pp. 65

2.3DraftRFQforArtistsinEngagementProgram: Stories of Water . . . . . . . . . pp. 66

2.4DraftRFQforLocalEcologiesofWater:ArtasaBridgeBetweenScienceandCommunity . . . . . . . . . .pp. 67

TABLE OF CONTENTS

Page 4: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

4

1. PROJECT OPPORTUNITIES

Page 5: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

5OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

TheShipCanalWaterQualityProject(SCWQP)isamajor infrastructureinvestmentthatrequiresaprolongedperiodofconstruction from roughly 2018-2025.

The outcome of the SCWQP is a major reduction in the amount of pollutants and sewage flowing into our local water bodies.

WithinthelargerSCWQParemanyprojects,includingapumpstation,multipleconveyanceprojects,8-footdiametertunnelundertheShipCanal,conveyancegates,anda2.7-mile,18.8-foot diameter tunnel that will capture and temporarily hold more than 29 million gallons of storm water mixed with somesewageduringheavyrains.Thescale,costandimpactofthisprojectissignificant,yettheultimateproductwillhaverelativelylittlepublicvisibilityasitis primarily an underground facility.

TheholisticvisionarticulatedinBook1oftheDrainageandWastewaterArtMasterPlanguidespublicartfortheShipCanalProject.SincetheShipCanalWaterQualityProjectisalargeprojectoverasignificanttime-span,itistreatedas its own chapter here in the Project Opportunities section of this Plan.

1.1 SHIP CANAL WATER QUALITY PROJECT

Project Background

Page 6: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

6OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

Vision and Goals for Public Art on the SCWQP

• Increase public awareness of the function of water quality projects and infrastructure

• Make an invisible system more visible

• Connect people to the flow of water in city and home, and their own place in their local ecology

• Ask big questions and delve deeply into issues of how humans, water and many things in between relate to each other

• Be at the forefront of public art practice

• Create meaningful, inspiring, thought-provoking art experiences in the public realm, both during construction and as a permanent part of the urban landscape

Page 7: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

7OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

Vision and Goals for Public Art on the SCWQP:The Whole Basin Approach

ThepublicartprogramaddressesthewholebasinthatdrainstotheShipCanal.AconceptualapproachforartistsmaybetoconsiderhowpeoplewholivesomedistancefromtheShipCanal,Lakes,andPugetSounditselfcanmaketheconnectionthatwatertheyuseandtouchflowstothesewaterbodies.Publicartcanincreaseawarenessthatwaterisagreatunifierflowingthroughoutthecityandthroughthebody.Publicartinthelargergeographycanmakeevidenttheway in which it is all one system.

Artworks related to the, “whole system,” should seek to reveal connections and make the invisible visible.

Page 8: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

8OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

The Ship Canal: Context and Content

AccordingtoCollThrush’sbookNative Seattle,PugetSoundwascalledSaltWater,andthetidalestuaryofSalmonBayflowedintoit,arichplacetoharvestclamsandsalmon.OntheshoreofSalmonBaywasthelargeShilsholevillagecalledTuckedAwayInside.OnceavibrantestuaryprovidingfoodtoNativeShilsholecommunity,SalmonBaywastransformedintotheShipCanal:awaterwayforindustry,boatbuildingandfishingvessels.Thetopographywasdeeplyaltered,theflowofwaterthroughthecityengineered.Theengineeringofthelandscapenotonlycreatedpassageforboats,itcompletelyalteredtheecologyoftheestuaryanddisplacedtheremainingNativecommunity.

The Indigenous life of the place, past and present, must be honored. The memory of the place, what is has been over time, can become more present through public art.

List of resources for Ship Canal and Salmon Bay History: NativeSeattle:HistoriesfromtheCrossing-OverPlacebyCollThrushof special

note in this book is the “Atlas of Indigenous Seattle”

EmeraldCity:AnEnvironmentalHistoryofSeattlebyMatthewKlingle

“Water’snaturalrhythmsnourishedourareasnativeculture.ThencametheBallardLocks.”ByLyndaMapes,Seattle Times,June30,2017

http://www.seattletimes.com/seattle-news/environment/seattle-native-culture-water-hiram-chittenden-ballard-locks-ship-canal-100-years/

http://makingthecut100.org/

Histories

Page 9: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

9OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

City in Flux

TheneighborhoodsaroundtheShipCanalcontinuetoexemplifythesenseoftheCityinflux.Growth,newdevelopmentandchangecharacterizetheexperience of local business districts and residential areas.

Within the sense of the City as constantly changing, public art can stake a foothold and define place.

The Ship Canal: Context and Content

Waterway Experience

Movementparalleltothewaterwayandacrossbridgesistheprimarywaythatmost residents experience the local waterway. In many parts of the surrounding neighborhoodsthewateritselfisnotvisibletopedestriansbecauseitisborderedwithwater-dependentindustriesandmarinas.Inotherplaces,theBurke-GilmantrailcarriescyclistsandpedestriansalongstretchesoftheShipCanal.Access points to touch the water are limited.

The vista from the water, in which the fishing boats and piers are front and center, shifts our perspective to recognize the way in which our place is built upon and around water.

Page 10: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

10OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

Neighborhood and Community and Place

The Ship Canal: Context and Content

TheSCWQPspansmultipleneighborhoods.AtthewesternterminusoftheprojectthereistheTunnelEffluentandPumpStationinBallard.ThestoragetunnelgoesundergroundallthewaytoasiteadjacenttotheNorthTransferStationinWallingford.Inaddition,conveyancepipesbringingeffluentintothetunnelextendoutfromit,andasiphontunnelcarryingthewastewatertotreatmentextendsundertheShipCanal.

Neighborhoods with distinct identities are connected by the flow of water. Community identity and history can be celebrated and elaborated through public art practice.

Page 11: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

11OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

viewing the neighborhoods from the waters of the Ship Canal.......walking the alignment of the SCWQP tunnel

Page 12: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

12OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

Page 13: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

13OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

Basin-wideprojectswillencompasstherangeof sites and neighborhoods that drain to the ShipCanal.

BASIN-WIDE PROJECTS:

1.1 SHIP CANAL WATER QUALITY PROJECT

0

WEST POINT TREATMENT PLANT

DRAINAGE BASIN

TUNNEL ALIGNMENT

Page 14: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

14OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

24thAvenueNWPier,TunnelEffluentPumpStation,YankeeDinerSite

11thAvenueNWDropShaftLocation InterlakeAvenueNorthinWallingford

Fremont Siphon Area

TUNNEL ALIGNMENT PROJECTS

1.1 SHIP CANAL WATER QUALITY PROJECT

0

1

1 3

2 4

2

34

TUNNEL ALIGNMENT DETAIL MAP

0

WEST POINT TREATMENT PLANT

DRAINAGE BASIN

TUNNEL ALIGNMENT

ConnectiveThread/ConnectiveFlowaddresses the linear site of the whole alignment and surrounding basins

Page 15: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

15OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

Becausethisisamulti-yearprojectwithmanycomplexelements,itisrecommended that a coordinating artist be on board as part of the project team foradurationofseveralyearsstartinginearly2018.ThisartistwillprovideaholisticperspectiveonthevariouspublicartprojectsandwillhelpotherartiststoconnectwithcentralthemesandgoalsidentifiedintheArtMasterPlan.

ThecoordinatingartistwillserveasliaisonbetweenthepublicartprogramandSCWQPprojectmanagersandcommunicationsstaff,andconnectthedotsbetween multiple art projects and construction timelines.

The coordinating artist will also create a temporary work during construction and a work of permanent public art along the tunnel alignment. The coordinatingartist’sroleisnottocreatethesignatureartworkoftheproject,butrathertoprovideaconnectivethreadamongstmultiplecreativevoices.

The model of a coordinating artist within the project is a tested strategy for public art in major complex infrastructure projects and will improve connectivity, community collaboration, place-making potential, and cohesion of the public art projects.

SeeAppendix2.1ScopeofWorkforSCWQPCoordinatingArtist.

Goals for Coordinating Artist:

• Maintain holistic vision unifying multiple public art projects

• Ensure that public art projects connect to local neighborhoods

• Ensure that public art projects respond to central themes in the Art Master Plan

• Ensure that public art projects extend to consider the whole basin

• Facilitate artist collaborations with design teams

SCWQP Coordinating Artist Strategy

Page 16: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

16OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT NAMES PAGE # !

The Water Underground 17 ■ ■ ■ConnectiveThread/ConnectiveFlow 18 ■ ■LocalEcologiesofWater:ArtasaBridgebetweenScienceandCommunity 19 ■ ■NativeHistoryBoatTourandArtist-LedBoatTours 20 ■ ■CuratedConstruction:ArtforFencesandSound Walls 21 ■PhotographerinResidenceforConstruction 22 ■SoundArtistinResidenceforConstruction 23 ■Artist-ledWalks:“WalktheFlow” 24 ■ ■TunnelEffluentPumpStation 25 ■ ■ ■ ■24thAveNWPier 26 ■“YankeeDiner”Site 27 ■ ■11thAveNWDropShaftLocation 28 ■Fremont Siphon Area 29 ■

1.1 Ship Canal Water Quality Project: Public Art Opportunities

Time

Sens

itive

Top

Prio

rity

Envir

onm

enta

l Jus

tice

and

Equi

ty Fo

cus

Yout

h Fo

cus

Comm

unity

Enga

gem

ent F

ocus

Place

mak

ing/

Place

keep

ing

Focu

s

Page 17: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

17

1.1 Ship Canal Water Quality Projects

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

The Water Underground is intended as a curatorial framework that will unite acollectionoftemporaryartworksoveraperiodof3-4years.Temporary,performancebased,installationorparticipatoryartworkwillunfoldduring construction and connect people in the surrounding basins to the flowofwaterthroughtheirhomesandneighborhoods.SiteswillincludepublicspacesthroughoutthebasinsthatdraintotheShipCanal.TheSCWQPcoordinatingartistwillassistincreatingacohesivevisionandcommunications around these projects.

Location(s): the whole basin

Budget Range: 5-10 artist projects with budget of $10,000-$30,000 each

Time Frame: 2018-2025

Priority (1-3):

1

Sources and Inspiration:

ConnectingtoWater,We Are the Weather

!

PROJECT OPPORTUNITY “The Water Underground”

Page 18: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

18

1.1 Ship Canal Water Quality Projects

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

!Sites in the right-of-way along the storage tunnel alignment and throughout theShipCanaldrainagebasinspresentanopportunityforanartisttodevelopartthatwillrelatetoundergroundfacilitiesandrevealtheinvisibleworkingsofthesystemandflowofwater.Artworkcanprovideaportalofsortsforpeopletograsptheideaofwaterflowingunderground.Theartworkwillconsist of multiple small elements sited at locations in the right-of-way that connectpeopleinthebasinstotheflowofwaterthroughtheirhomesandneighborhoodsbyaddingvisualelementstothepedestrianenvironment.

Location(s): thewholebasin,theright-of-way along the storage tunnel alignment

Budget Range: $100,000-$200,000

Time Frame: 2018-2025

Priority (1-3):

1

Sources and Inspiration:

ConnectingtoWater

PROJECT OPPORTUNITY: “ Connective Thread/Connective Flow”

Page 19: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

19

1.1 Ship Canal Water Quality Projects

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Local Ecologies of Water: Art as a Bridge between Science and Community

!ByexaminingwaterqualityinourreceivingwaterbodiesandhowCSO’scontribute,artistscanhelpthepublicmaketheconnectionbetweentheneighborhoodsthattheyinhabitandthewatersofPugetSound.Waterqualitydata,howwecollectthisdata,andhowweimpactitmaybeasourceforartisticcollaboration.

An artist or artist team will collaborate with scientists to create a work of artthatengagesthepublicwiththescienceofwaterquality,focusingonthedrainagebasinssurroundingtheShipCanal.Scientificresearch,knowledge,and data collection are closely linked to the work of SPU DWW. A deep levelofunderstandingoflocalecologicalconditionsisnotalwayspresentwithinthegeneralpublic,yetweareallpartoftheselocalconditions.Artists,who think deeply about how people experience and come to know the world throughalltheirsenses,mayprovideanavenuetomakethisdataaccessibletopeople in more dynamic ways. Theartist/teamswilldevelopprojectsthat:1. are rich in meaning and aesthetically compelling2. workwithscientificinformationandscientistsanddatainadeepand

collaborativewayratherthaninasuperficialmanner3. createadeeperconnectionbetweenthepublicandtheenvironment/

ecologyofwhichtheyarepartbybringingscientificprocesses,dataandmethodstothepublicinamannerthatisaccessiblewhilenotover-simplifying

SEEDRAFTRFQINAPPENDIX

Location(s): thewholebasin(otherversionsofthisprojectwillbelocatedinCreekdrainages throughout the City/seepp.39)

Budget Range: $30,000-$70,000

Time Frame: 2018-ongoing

Priority (1-3):

1

Sources and Inspiration:

HabitatandInhabitants,We Are the Weather

Page 20: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

20

1.1 Ship Canal Water Quality Projects

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Native History Boat Tour and Artist-Led Boat Tours

TheviewfromthewateropensupnewperspectivesontheShipCanalforpeoplewholivenearby.Publiceventswithfreeboattoursthatincludeculturalprogrammingcanprovideadeeperrelationshiptotheplace.BoattourswillconnecttotheTunnelEffluentandPumpStationandnearbypierprojects.

Location(s): ShipCanal

Budget Range: TBD

Time Frame: 2018-2023

Priority (1-3):

1

Sources and Inspiration:

ConnectingtoWater

Page 21: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

21

1.1 Ship Canal Water Quality Projects

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Curated Construction: Art for Fences and Sound Walls

Theelementsofconstructionprojects,suchasfencing,conveyors,andsoundwalls,areallpossiblesitesforart.Artcantellthestoryoftheproject,communicateaboutwaterquality,andcontributetotheaestheticqualitiesof the neighborhood during construction. This is a good opportunity for emerging public artists and artists whose work is primarily two-dimensional.

Location(s): sites include the Pump Station site and additional sites to be determined by theSCWQPCoordinatingArtist as construction unfolds

Budget Range: $15,000-$50,000 per site per year for a curator to program fences and walls with rotating artwork.

Time Frame: 2017-2024

Priority (1-3):

1

Sources and Inspiration:

ConnectingtoWater,myriad other ideas

Page 22: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

22

1.1 Ship Canal Water Quality Projects

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Photographer in Residence for Construction

Anartphotographerwillbegivenaccesstotheconstructionsite,toproducephotos to be shared with the public.

Location(s): the whole basin

Budget Range: Seepreviousresidentphotographer budgets

Time Frame: 2018-2024Priority (1-3):

2

Sources and Inspiration:

ConnectingtoWater,construction

Page 23: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

23

1.1 Ship Canal Water Quality Projects

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Sound Artist in Residence for Construction

Asoundartistwillbegivenaccesstothesite,toconductfieldrecordingsandproduce a sound piece that can be performed or otherwise shared with the public.

Location(s): the whole basin

Budget Range: $30,000

Time Frame: 2018-2024

Priority (1-3):

2

Sources and Inspiration:

ConnectingtoWater,construction

Page 24: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

24

1.1 Ship Canal Water Quality Projects

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Artist-led Walks: “Walk the Flow”

Artist-ledwalkingtoursofneighborhoodssurroundingtheShipCanalcanmakepeopleawareoftheflowofwaterthroughtheirstreetsandyards.Thisprojectopportunityexistsforotherneighborhoodsaswell.Seepage35formore details.

Location(s): the whole basin

Budget Range: TBD

Time Frame: 2018-2024

Priority (1-3):

2

Sources and Inspiration:

ConnectingtoWater

Page 25: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

25

1.1 Ship Canal Water Quality Projects

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Tunnel Effluent Pump Station

StandingonMarketStreetinBallard,theneighborhood’shistoricarchitecturemayfeelverypresentinthemidstofnewdevelopment.However,thepresenceofthewaterjustablockortwoawayisoftennotfelt,eventhoughthemaritimeindustriesthatgrewBallardintoanindustrialandurbanareaarestillpresent.ThesiteoftheSCWQPpumpstation,andthepiernearbyfromwhichdirtexcavatedfromthetunnelwillbeloadedontoabarge,actuallycanservetoleadpeopletothewater.Theartworksatthesesiteswillalsorevealtheolder histories and cultural realities of the area.

An artist will be commissioned to create a major artwork that relates to the Nativehistory,culture,andtheecologyoftheShipCanal/SalmonBayandrelatedestuariesattheTunnelEffluentPumpStation.Theartworkwillincludepermanentoutdoorsculpturalmaterials,andtheartistmaycollaboratewithlandscape architects on the selection of plants or landscape elements as well.

Location(s): 24thAveNWandShilsholeAveinBallard

Budget Range: $100,000-$200,000

Time Frame: an artist was selected for this project in 2017

Priority (1-3):

1

Sources and Inspiration:

ConnectingtoWater,WearetheWeather,HabitatandInhabitants,Nativehistory and culture

!

Page 26: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

26

1.1 Ship Canal Water Quality Projects

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: 24th Ave NW Pier

Anartistwilldesigninlaysforthepier,tobeintegratedduringconstruction.Theartistwilldevelopartworkthatreferencesthemaritimehistoryofthesite.

Location(s): 24thAveNWinBallard

Budget Range: $40,000

Time Frame: an artist was selected for this project in 2017

Priority (1-3):

1

Sources and Inspiration:

ConnectingtoWater,maritime history

Page 27: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

27

1.1 Ship Canal Water Quality Projects

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: “Yankee Diner” Site

TheSCWQPcoordinatingartistwillhelpdevelopthisscopewhenmoreinformationisavailable.

Location(s): TBD

Budget Range: TBD

Time Frame: TBD

Priority (1-3):

TBD

Sources and Inspiration:

TBD

!

Page 28: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

28

1.1 Ship Canal Water Quality Projects

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: 11th Ave NW Drop Shaft Location

The 11thAveDropShaftisinaneighborhoodofindustrialcharacternexttothelargeFredMeyerwhichhasahighlevelofvehicularandcyclisttraffic,as well as some pedestrians. There is a possible site for public art at corner of 11thAveNWandNW45thSt.nearFredMeyerandtheBurkeGilmanTrail.Vaultswillbeplacedintheright-of-wayandSPUwillacquireaneasementforsome property at the corner.

Further discussions with the project team will help determine if a larger sculpturalworkisfeasibleatthislocation;itmaybeinconflictwiththeFredMeyersign.Alternately,aworkinthegroundplanerelatingtopedestrianandcyclistmovementintheareawouldbeofinterest.

Location(s): 11thAveNWandNW45th StreetinBallard

Budget Range: $100,000-$200,000

Time Frame: 2018-2025

Priority (1-3):

2

Sources and Inspiration:

ConnectingtoWater,We are the Weather

Page 29: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

29

1.1 Ship Canal Water Quality Projects

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Fremont Siphon Area

UnderneaththeBurke-GilmantrailandnearbyLearyWayinFremont,alotofwaterwillbeflowinginvisiblyunderground,includingmultiplepipesunderneaththeShipCanalitself.Meanwhile,atgrade,thisisabusythoroughfarewithmultiplemodesoftransportandboatstraversingthenarrowShipCanalinthemidstoftheFremontneighborhood’sbusinessandcommercial center. The site is a good candidate for a sculptural work that can relatetofootandcyclisttrafficontheneighboringBurkeGilmanTrail. .

Location(s): 2ndAveNW/LearyWayNW/NW36thSt.,aspaceexists at the edge of the Fremont Siphon site along theBurkeGilmantrail.

Budget Range: $150,000-$250,000

Time Frame: 2018-2025

Priority (1-3):

1

Sources and Inspiration:

ConnectingtoWater,We are the Weather

Page 30: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

30

1.1 Ship Canal Water Quality Projects

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Interlake Ave. N.

SPUwillhaveasmallfacilityatthecornerofInterlakeAve.NandN35th St.SincethisisdirectlyadjacenttotheNorthTransferStation,itisnotconsidered as a priority location for another major public art commission but may still be a site for a public art piece. The surrounding area is residential to one side and commercial to the other. Aesthetic enhancements may be made to the small SPU facility such as surface decoration or sculptures attached to the structure. This could be a bookend piece to the Pump Station artwork. .

Location(s): InterlakeAve.NandN.35th St.

Budget Range: 100,000-$200,000

Time Frame: 2018-2025

Priority (1-3):

3

Sources and Inspiration:

ConnectingtoWater,We are the Weather

Page 31: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

31OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

Artists in Engagement Program Walk the Flow Program

CITY-WIDE PROJECTS

1.2 COMMUNITY BUILDING THROUGH SOCIALLY ENGAGED ART

0

Initial focus areas for ArtistsinSitu/ArtistsinBasin

PROJECT SITES

0

Page 32: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

32OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT NAMES PAGE # !

Artists in Engagement Program:Stories of Water 33 ■ ■ ■ ■Artists in situ/Artists in basin 34 ■ ■“WalktheFlow”Artist-ledCommunityWalks 35 ■ ■New“WaterSpirit”Mascot 36 ■

1.2 Community Building through Socially Engaged Art: Public Art Opportunities

Time

Sens

itive

Top

Prio

rity

Envir

onm

enta

l Jus

tice

and

Equi

ty Fo

cus

Yout

h Fo

cus

Comm

unity

Enga

gem

ent F

ocus

Place

mak

ing/

Place

keep

ing

Focu

s

Page 33: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

33

1.2 Community Building through Socially Engaged Art

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Artists in Engagement Program: Stories of Water

Whatstoriesdopeoplecarrywiththemofwater?Personal,mythical,traditional,poetic,anecdotal…allwaysoftalkingaboutwatercanbeconsidered. Storiesofwatercanencompasswater’spreciousnessanditsdanger,itsemotionalassociationsandfunctionalforce. Theideaofwatercanincludeweather,climate,oceansandseas,riversandstreams,watertodrinkandtowashwith,watertoswimandtofishin,dirtywaterandcleanwater.Howmightpeopleexperiencewaterdifferently,orthesame,inSeattlecomparedtointheirhomelandorinotherplaceswheretheyhavelived?Byconnectingwithwaterystories,peoplefromdiverseanddivergentbackgroundsmayfindcommonflow.

Selectedartistswilldeveloprelationshipswithcommunitiesthroughpartnershipswithlocalcommunitybasedorganizations.Thisresidency-typearrangementwillbefacilitatedthroughtheworkofSPUEJSE,andtheselectedartistswillworkwithacommunityoveraperiodofminimumoneyear.Theartistswillengagepeopleinconversationsabout“StoriesofWater.” Theartistswillworkwiththesecommunitiestocollect,gather,produce,inspire andcommunicatepeoples’storiesaboutwater.

The outcomes of these interactions could take one or more of the following forms:videos,website,performances,communityforums,events,festivals,storycollectionpublishedonlineorasabook,exhibition,images,photographs,orotherformsidentifiedinthecomunityprocess.

SEEDRAFTRFQINAPPENDIX

Location(s): multiplesitestobeidentifiedthough partnerships with specificcommunitybasedorganizationsthatworkwithSPUEnvironmentalJusticeandServiceEquitydivision(ESJE)

Budget Range: $50,000-$100,000/year for residency and production of work,ongoingovermultipleyears

Time Frame: 2017-ongoing

Priority (1-3):

1

Sources and Inspiration:

ConnectingtoWater

!

Page 34: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

34

1.2 Community Building through Socially Engaged Art

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Artists in situ/Artists in basin

SPUhasmapsthatdelineatedrainagebasinsthroughouttheCity.Whatthismeans is that within a single basin all the water is gathering together before it ultimately reaches a larger water body. This is a powerful metaphor for the gatheringofpeopletogether,andasanorganizingprincipleitisatoolforecological education.

Selectedartistswillbe“Artistsinsitu”forspecificlocales(LakeCityandDelridgehavealreadybeenidentified).Theartistwillbetobe“insitu”inthecommunity/drainagebasinoveraperiodoftimeanddevelopartworkasacollaborativeprocesswiththecommunity.Theoutcomeofthisworkisnotpre-determinedbutwillevolveovertime.Theartistswillstartoutspendinga minimum of 1year“insitu.”Thelocallibrarywillbetheprimary/initiallocale for the artist to connect with the neighborhood. The selected artists willproduceongoingmulti-mediadocumentationoftheir“in-situ”work,recognizingitasaprocess-based,sociallyengagedartform.

The outcomes of these interactions could take one or more of the following forms:installations,videos,website,performances,communityforums,events,festivals,exhibition,images,photographs,orotherformsidentifiedinthecommunity process.

Location(s): DelridgeandLakeCityneighborhoods,futurebasinsTBD,partneredwithlibraries

Budget Range: $50,000-$100,000/year for residency and production of work,ongoingovermultipleyears

Time Frame: Launch2018

Priority (1-3):

1

Sources and Inspiration:

ConnectingtoWater

Page 35: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

35

1.2 Community Building through Socially Engaged Art

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: “Walk the Flow” Artist-led Community Walks

ArtistswillworkwithSPUstafftoleadcommunitywalksonun-conventionalroutesthattracetheflowofwaterthroughtheneighborhood.Temporaryinstallationsorinterventionsintheright-ofwayalongtheroutecanrelateto the pathways of water. Additional opportunities may include artist-designedmapsofstormwaterflow,audioguides/podcasttoursorevenperformances and parades. This is an opportunitiy for multiple artists whose practiceincludesperformance,walking,orpublicinteractions.Artistswilldevelopwalksforspecificlocations.SPUmaybeginbyfocusingwalksonneighborhoods where capital projects are planned or in progress.

Location(s): throughouttheCity,focus on areas where SPU capital projects are under way; opportunities include MontlakeCSOandShipCanalareas,forexample

Budget Range: $2,000-$20,000for each location depending on scope

Time Frame: Any time

Priority (1-3):

1

Sources and Inspiration:

ConnectingtoWater,We are the Weather

Page 36: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

36

1.2 Community Building through Socially Engaged Art

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: New “Water Spirit” Mascot

SeattleMunicipalArchives,PhotographCollection,ItemNo:101110,Description:SPUDirectorDianaGaleandBerttheSalmonmascot,Creekstock,LongfellowCreek,Date:Apr27,2000,Photographer:IanEdelstein

Humorandmysterymaycombinetotaketheideaofamascotorcostumedicontoamorenuancedlevelortosubverttheconceptofamascot.Alocalperformanceartist,sculptor,ordesignerofwearableartworkwillcreateanewmascot for SPU Drainage and Wastewater. Performances may occur as part of communityfestivals,atgroundbreakingceremonies,orevents.

Location(s): throughouttheCity,relatestocapitalprojects,maintenance work and communityevents

Budget Range: TBD(SPUmarketingfunds)

Time Frame: Any time

Priority (1-3):

3

Sources and Inspiration:

ConnectingtoWater

Page 37: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

37OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

ArtConnectingYouthwithWaterRainwise Design PartnershipsGSIEducationandEngagement

CITY-WIDE PROJECTS

0

LocalEcologiesofWater:Art as a bridge between Science and CommunityLocationAreas:

• ShipCanal• LakeFocusArea:Taylorand

MapesCreeks• PipersCreek• LongfellowCreek• ThorntonCreek

0

1.3 EDUCATIONAL ART - SCIENCE COLLABORATIONS

PROJECT SITES

Page 38: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

38OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT NAMES PAGE # !

LocalEcologiesofWater:ArtasaBridgebetweenScienceandCommunity 39 ■ ■ ■ ■Community-CreekPilotProject 40 ■ ■ ■ArtConnectingYouthtoWaterPilotProject 41 ■ ■ ■ ■GreenStormwaterInfrastructureEducationand Engagement through Art 42 ■ ■

Rainwise Design Partnerships 43 ■ ■

1.3 Educational Art-Science Collaborations: Project Public Art Opportunities

Time

Sens

itive

Top

Prio

rity

Envir

onm

enta

l Jus

tice

and

Equi

ty Fo

cus

Yout

h Fo

cus

Comm

unity

Enga

gem

ent F

ocus

Place

mak

ing/

Place

keep

ing

Focu

s

Page 39: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

39

1.3 Educational Art-Science Collaborations

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Local Ecologies of Water: Art as a Bridge between Science and Community

SPU DWW 1% for Art program presents an opportunity for artists to be placed at the nexus of ecological knowledge and public understanding. DWW has a holistic perspectiveonmanywatershedsandwaterbodies.Whilemanagingtheflowofwaterthroughtheurbanenvironmentandconsideringthesubstancesthatweletflowintoourlocalwaterbodies,SPUDWWdevelopsdeepknowledgeoflocalhydrology,ecologyandmeteorology.Withinthisknowledgeisalsotherecognitionofwhatisnotknown:therelativeunpredictabilityofclimate,thechancesofa100 yearstormoccurring,orthevastarrayofmicrobialinhabitantsinastreambed,forexample.

Scientificresearch,knowledge,anddatacollectionarecloselylinkedtotheworkofSPUDWW.Adeeplevelofunderstandingoflocalecologicalconditionsisnotalwayspresentwithinthegeneralpublic,yetweareallpartoftheselocalconditions.Artists,whothinkdeeplyabouthowpeopleexperienceandcometoknowtheworldthroughalltheirsenses,mayprovideanavenuetomakethisdataaccessible to people in more dynamic ways.

Eachartist/teamwilldevelopatemporaryprojectthataddressesanareaofscientificinformationandlocalecologicalconditionrelevanttoSPUDWWwork.

Theartist/teamswilldevelopprojectsthat:1. Are rich in meaning and aesthetically compelling2. Workwithscientificinformationandscientistsanddatainadeepand

collaborativewayratherthaninasuperficialmanner3. Createadeeperconnectionbetweenthepublicandtheenvironment/ecology

ofwhichtheyarepartbybringingscientificprocesses,dataandmethodstothepublicinamannerthatisaccessiblewhilenotover-simplifying

SEEDRAFTRFQINAPPENDIX

Location(s): CreekAreasandDrainageBasinsincludingLongfellowCreek,PipersCreek,ThorntonCreek,theShipCanal,andTaylorCreek/MapesCreek/LakeWashington in SE Seattle

Budget Range: Fiveartistsorartistteamswith a budget of $30,000-$70,000 for each project

Time Frame: 2018-ongoing

Priority (1-3):

1

Sources and Inspiration:

ConnectingtoWater,WearetheWeather,HabitatandInhabitants,Nativehistory and culture

!

Page 40: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

40

1.3 Educational Art-Science Collaborations

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Community-Creek Pilot Project

TheDWWArtistinResidencewastaskedwithdevelopingasmallpilotproject for the Art Master Plan. Urban creek watersheds are a focus area for naturaldrainage,andprovideonevenueinwhichartistscandevelopworkthatis closely connected to ecological and riparian research.

Theartproject"MeetYourCreek:PostcardsfromtheCreek"byVaughnBellwilldevelopbasedonresearchandexplorationoftheLongfellowCreekWatershedandconnectingtopeoplewholiveinthisarea.Overthecourseofayear-2018,beginningwithakick-offinNovember2017,intandemwithcommunityeventssponsoredbySPUtocelebratetheAnniversaryoftheWatershedActionPlan-aseriesofparticipatorycommunityeventswillunfoldaround the creek. These will include:• Artist led walks•Draw/writeyourown“postcardfromthecreek”workshops•Audio,videorecording,anddrawingactivitiesalongthecreek

Thecommunityeventsandimages,audio,videoanddrawingsgeneratedthrough the process of research and engagement may then lead to an installationorexhibitioninalocalcommunityspace,suchastheDelridgeLibrary,HighPointNeighborhoodHouse,oralocalparkornaturalarea.LocationsmayalsoberotatedtoreachthediversityofaudiencesintheWatershed.SitesalongthetheLongfellowCreekLegacyTrailmaybeincluded,highlightingsectionsofCreekconnectionstosurroundingneighborhoods.

Location(s): LongfellowCreekandHighPointNeighborhood

Budget Range: $10,000

Time Frame: 2017-2018

Priority (1-3):

1

Sources and Inspiration:

HabitatandInhabitants

Page 41: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

41

1.3 Educational Art-Science Collaborations

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Art Connecting Youth to Water Pilot Project

Teachingartistscancombineartandscienceinpublicartprojectswithyouth,offeringhands-onopportunitiesforyoungpeopletounderstandnaturalprocesses,thebuiltenvironment,andwaterecology.

Theselectedartistorteamwillserveasateachingartistaswellasacreatorof public art. They will work with youth either in a school setting or through afterschoolorotherprogramtodevelopanartprojectthatincorporatesgreenstormwater solutions in their community. The artist will work with youth as collaborators.Dependingontheagerangeoftheyoungpeopleinvolved,thecurriculumelementsoftheprogrammanyvary,butcanincludesciencetopicsthatarerelevantinthecreationofartwork.

Forexample,ateachingartistcouldworkwithyoungpeopletocreatearaingardenonschoolgroundswithartincorporated,suchasdecorativeceramicsthattheyouthcreate.Thecreationoftheraingardenandtheartprovidesanopportunitytoincorporateknowledgeaboutwaterflow,hydrology,perviousversusimpervioussurfaces,andecology.Theartisticcomponentinvitesthestudents to consider ways of communicating about the natural world to the public.

Book1:ArtMasterPlanVision:DivingDeeperoffersguidanceonapproachesto this project.

Location(s): TBD

Budget Range: TBD

Time Frame: 2018-ongoing

Priority (1-3):

2

Sources and Inspiration:

ConnectingtoWater,HabitatandInhabitants,We Are the Weather

Page 42: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

42

1.3 Educational Art-Science Collaborations

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Green Stormwater Infrastructure Education and Engagement through Art

Artistscanfocusonaneighborhood’ssenseofownershipandcommunityawarenessofgreenstormwatersolutions,especiallythoselocatedintheroadsideareasandadjacenttohomes.Selectedartistswilldeveloptemporaryart in the right-of-way. The artwork will be performance or participatory artwork created in concert with outreach and engagement processes during designandconstructionofGSIinresidentialneighborhoods.Possibleapproachesmayinclude:storytelling,blessings,kid-friendlyactivities,temporaryapplicationsinthesidewalksuchasstencils,eventsormanyotherforms.

Location(s): natural drainage systems focus areas

Budget Range: TBD

Time Frame: 2018-ongoing

Priority (1-3):

2

Sources and Inspiration:

WearetheWeather,HabitatandInhabitants

Page 43: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

43

1.3 Educational Art-Science Collaborations

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Rainwise Design Partnerships

ElementsoftheRainwiseprogramaregreatcandidatesforartist’sinput.Theseinclude:cisterns,signage,downspoutsandraingardenelements.Anartistcanbeselectedtodevelopstandarddesignelementsthatindividualscouldincorporate into Rainwise projects.

Location(s): throughouttheCity,partnerwith Rainwise Program

Budget Range: TBD

Time Frame: any time

Priority (1-3):

3

Sources and Inspiration:

ConnectingtoWater,WearetheWeather,Habitatand Inhabitants

"cisternscanbebeautiful"courtesyofBobSpencer

Page 44: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

44OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

InvisibleInfrastructureRoadsideBioretentionKitofParts Shoreline Street EndsParksLandBankSitesSignatureSculpture,siteTBD

CITY-WIDE PROJECTS

RoadsideBioretentionOpportunitiesinNeighborhoods

PROJECT SITES

0

1.4 PLACE MAKING AND PERMANENT PUBLIC ART IN INFRASTRUCTURE

0

K

H

A

FB

J

C

G

D

IE

A CentralWaterfrontStorage

B . . . . . EastDuwamishWaterwayandChelan

C . . . . . South Park

D . . . . . TaylorCreek

E . . . . . . FauntleroyCreek

F . . . . . . MaplePlayfield

G . . . . . Seward Park

H . . . . . Montlake

I . . . . . . . LongfellowCreekGreenSpace

J . . . . . . Puget Park

K . . . . . ThorntonCreekatMatthewsBeachPark

Page 45: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

45OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT NAMES PAGE # !

InvisibleInfrastructure 46 ■ ■SignatureSculpture/Projecttobeidentified 47 ■ ■RoadsideBioretentionKitofParts 48 ■ ■Shoreline Street Ends 49 ■CentralWaterfrontStorage 50 ■ ■EastDuwamishWaterway/Chelan 51 ■SouthParkWaterQuality 52 ■ ■ ■FauntleroyCreek 53 ■ ■MapleElementary/MaplePlayfield 54 ■ ■ ■ ■ ■ ■Seward Park 55 ■Montlake 56 ■ ■LongfellowCreekGreenspace 57 ■ ■ ■ ■Puget Park 58 ■ThorntonCreekatMatthewsBeachPark 59 ■ParksLandBankSites 60 ■

Time

Sens

itive

Top

Prio

rity

Envir

onm

enta

l Jus

tice

and

Equi

ty Fo

cus

Yout

h Fo

cus

Comm

unity

Enga

gem

ent F

ocus

Place

mak

ing/

Place

keep

ing

Focu

s

1.4 Place-Making and Permanent Public Art in Infrastructure: Public Art Opportunities

Page 46: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

46

1.3 Educational Art-Science Collaborations

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Invisible Infrastructure

Aswemovethroughtheurbanenvironment,weareinthemidstofasystemofwaterflowanddrainage,butweusuallyarenotawareofit.Pumpstations,utilitycabinets,vaultsandoutfalllocationsfadeintotheurbanfabricandare often impossible to distinguish from other types of infrastructure such as transportation or electrical. SPU and regional agencies install signs such as“PugetSoundStartsHere”or“NoDumpingDrainstoCreek”markingtheentranceofstormwaterintogrates.UtilitycoverssometimesaremarkedSEWERorSTORMforfunctionalpurposes.Facilitiesareoftenidentifiedwith signage that simply includes the Seattle Public Utilities logo and a name or number.

MakingthesystemvisibleandknowablehasbeenidentifiedasanimportantgoalforDWW’spublicartprogram.Asaninitialprojectaddressingthistheme,anartistwillworkwithSPUstafftounderstandthetypesoffacilitiesandlocationswherethegraphicscouldbeused.TheartistwillthendevelopavisuallanguageforidentifyingDWWfacilities.Thegraphicelementswillbedesignedinaformattobeeasilyappliedasstencils,decals,orsignagetoexisting and new facilities.

Location(s): throughouttheCity

Budget Range: TBD

Time Frame: any time

Priority (1-3):

TBD(pendingdiscussionsonfeasibility)

Sources and Inspiration:

ConnectingtoWater

Page 47: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

47

1.4 Place-Making and Permanent Public Art in Infrastructure

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Signature Sculpture/Project to be identified

SPUhasprioritizedthecommissionofasignificantsculpturalwork.Apossible location is yet to be determined; sites may include those related to the Water line of business.

Location(s): TBD

Budget Range: $300,000-$500,000

Time Frame: TBD

Priority (1-3):

1

Sources and Inspiration:

TBD

!

Page 48: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

48

1.4 Place-Making and Permanent Public Art in Infrastructure

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Roadside Bioretention Kit of Parts

Inadditiontomanagingandcleaningstormwater,roadsidebioretention adds beauty and natural habitat to the streetscape. While passersby may admireplantsgrowingintheswales,itisoftennotobvioushowthebioretentionfunctions.Visualelementsthatbringtopeople’sattentiontheflowofwaterareencouraged.Artisticelementsshouldbepoeticratherthandidactic,butmayserveaneducationalfunction.

The selected artist will design a kit of parts of artistic elements that may be incorporatedintoroadsidebioretentionrespondingtocommunityinput.Notallelementswillbeincorporatedineverylocation,soeachpartofthekitmuststand alone as well.

Theartistwillworkwithstaffandengineerstoproducespecificationsfor incorporating the designs. The artist will also fabricate or work with a fabricator to produce the elements such as inlays. The artist will not be responsibleforinstallingtheartworkbutratherwilldeliveracompletepackagethatcanbeincorporatedintoprojectCDandimplementedaspartofconstruction.Thus,installationspecificationsshouldbesimpleandabletobeincorporated by SPU project contractors.

Kit of Parts may include:

• Inlays that can be added to adjacent sidewalks.

• Visual elements for inlets such as inlays or patterns.

• Ideasforedges,railings,signage,steppingstonesandbenches.

SEEDRAFTRFQINAPPENDIX

Location(s): places where DWW is building roadside bioretention throughout the City

Budget Range: TBD

Time Frame: 2018-ongoing

Priority (1-3):

1

Sources and Inspiration:

WearetheWeather,HabitatandInhabitants,

Page 49: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

49

1.4 Place-Making and Permanent Public Art in Infrastructure

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Shoreline Street Ends

ThroughouttheCity,publicaccesstowaterwaysispossibleatstreetendswhere the street grid runs into lakes. These properties are right-of-way and managed by the Seattle Department of Transportation. Artwork at Shoreline Street Ends can create a draw and amenity for local access to water bodies. StreetendsincloseproximitytooutfallsaregoodcandidatesastheyhaveaspecificconnectiontoDrainageandWastewater.

Location(s): shoreline street ends exist in many neighborhoods along LakeWashington,LakeUnion and Puget Sound- they are SDOT right-of-way

Budget Range: TBD

Time Frame: TBD

Priority (1-3):

3(considerSDOTplanningfor the Shoreline Street Ends)

Sources and Inspiration:

TBD

Page 50: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

50

1.4 Place-Making and Permanent Public Art in Infrastructure

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Central Waterfront Storage

An artist can design permanent public art to be integrated in the right-of-wayatSPUstorageareas.Spaceislimited.CoordinationisneededwithWaterfront and Seawall Art Plans.

Location(s): VineStreetareainBelltown

Budget Range: TBD

Time Frame: 2018-2020

Priority (1-3):

2

Sources and Inspiration:

TBD

Page 51: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

51

1.4 Place-Making and Permanent Public Art in Infrastructure

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: East Duwamish Waterway

ThisprojectisapossiblecrossoverwiththeKingCountyCSOArtPlan.WhilenoSPUcapitalprojectsareintheimmediatevicinity,SPUCSOworkwillimprovewaterqualityintheDuwamishRiver,andthisareamaypresentanopportunitytorevealconnectionstotheRiverandraiseawareness.Artwork could relate to cyclists and pedestrians in this freight-oriented area alongtheWestSeattleTrail.DuwamishRiverhistoryandwaterqualitycanbethe focus.

Location(s): Parks property or right-of-way along East Duwamish WaterwayonHarborIsland

Budget Range: TBD

Time Frame: TBD

Priority (1-3):

3

Sources and Inspiration:

ConnectingtoWater,We are the Weather

Page 52: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

52

1.4 Place-Making and Permanent Public Art in Infrastructure

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: South Park Water Quality

SeveralcapitalprojectshavebeenorareplannedforconstructionintheSouthParkneighborhood.WithitsproximitytotheDuwamishRiver,SouthParkpresentsanopportunityforpublicartaddressingwaterquality.Publicartinthisneighborhoodshouldalsoaddresscommunityconcernsofthediversepopulation.

Location(s): SouthParkneighborhood,DuwamishRiver

Budget Range: TBD

Time Frame: 2019-2022

Priority (1-3):

discuss whether another project should be sited in South Park.

Sources and Inspiration:

TBD

Page 53: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

53

1.4 Place-Making and Permanent Public Art in Infrastructure

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Fauntleroy Creek

FauntleroyCreekrunsthrougharavineinWestSeattle,surroundedbyanatural area that is well cared for by the local community. It goes underground for a section before ultimately emptying into the Sound near the ferry terminal.Permanentpublicartalreadyexistsneartheferryterminal,butSPUcapitalprojectworktoinstallastoragetanknear45thAve.SWandSWWildwood Place presents an opportunity for public art at this intersection. Publicartatthislocationcouldrevealandrelatetothecreekflowingnearby,or public art could be sited in nearby areas to mark the entrances to the natural area.

Location(s): 45thAve.SWandSWWildwoodPlace,FauntleroyCreekNaturalArea

Budget Range: $75,000-$200,000

Time Frame: 2019-2020

Priority (1-3):

TBD

Sources and Inspiration:

HabitatandInhabitants

Page 54: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

54

1.4 Place-Making and Permanent Public Art in Infrastructure

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Maple Elementary/Maple Playfield

MaplePlayfieldislocatedadjacenttoMapleElementaryonBeaconHill,inadiverseneighborhood.Thisisanopportunityforanartisttobeinvolvedinacommunity-centeredprojectthatunfoldsduringdesignandconstruction.Communityengagementisapriority,includinginvolvementofMapleElementarySchool,andanartistcouldcreateartthatistemporaryandparticipatoryintheneighborhoodduringconstruction.Locationsfor permanent public art on the actual project site are limited as it is an undergroundstoragetankintheright-of-way,butpermanentartworkcouldbesitedatadjacentParkspropertyattheMaplePlayfieldnexttotheschool.

Location(s): Pearl St. DWW improvements-BeaconHill-S.DawsonandCorsonAve.S,ParkspartnershipsiteorROW

Budget Range: $100-000- $200,000

Time Frame: 2018-2020,construction2019-2020-SELECTARTISTIN2017-2018

Priority (1-3):

1

Sources and Inspiration:

ConnectingtoWater

!

Page 55: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

55

1.4 Place-Making and Permanent Public Art in Infrastructure

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Seward Park

TheHendersonCSOprojectconstructedalargeundergroundstoragetankthatcontainsstormwaterandpreventscombinedseweroverflowsintoLakeWashington.Thesite,onParkspropertyneartheentrancetoSewardPark,offersvistasoftheLakeandgoodpublicaccess.ThelargeCSOstoragetankundergroundonthesiteisinvisibletothepublic,andopportunityexiststoconnectparkvisitorstoanunderstandingoftheflowofwateronsiteandinsurrounding neighborhoods.

Location(s): HendersonCSOSitenearentrancetoSewardPark,Parks partnership site

Budget Range: TBD

Time Frame: Constructioniscomplete,so an art project is not dependent on capital project timeline

Priority (1-3):

3 - dependent on interest of Parks Department and community members

Sources and Inspiration:

ConnectingtoWater,We Are the Weather

Page 56: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

56

1.4 Place-Making and Permanent Public Art in Infrastructure

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Montlake

TheMontlakeCSOprojectsincludeseveralsitesaroundtheMontlakeCut,primarily in residential neighborhoods. There are multiple possible locations forartworkincludingapumpstationandParkspropertyalongPortageBay.OtherlocationsalongtheMontlakeCutarethepropertyoftheArmyCorpsofEngineers.Becauseofthelocation,itmaymakemoresensetofocusatemporaryprojectsuchas“WalktheFlow”(seepage35)hereratherthansitinga permanent artwork.

Location(s): E. Shelby St. and W. Shelby Street,pumpstationsandparks

Budget Range: TBD

Time Frame: 2019-

Priority (1-3):

3 - dependent on interest of neighborhood,thesitesarein out-of the way residential locations

Sources and Inspiration:

TBD

Page 57: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

57

1.4 Place-Making and Permanent Public Art in Infrastructure

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Longfellow Creek Greenspace

LongfellowCreekGreenspacefollowsasectionoftheCreekintheDelridgeneighborhood. This is a great opportunity for an educational partnership with localschoolsandcommunitymembersinexploringtheLongfellowCreekwatershed. The project direction could be a temporary project focused on education and engagement and/or a permanent place-making work in the greenspaceandright-of-waydevelopingoutoftheeducationandengagementprocess. This connects to the 25thanniversaryoftheLongfellowCreekLegacyTrail.

Location(s): LongfellowCreekGreenspacebetweenSWThistle St and SW Kenyon Street in West Seattle; directlyeastofChiefSealthInternationalHighSchooland Denny International MiddleSchool,Parkspartnership site

Budget Range: $50,000-$150,000

Time Frame: TBD

Priority (1-3):

1

Sources and Inspiration:

WeAretheWeather,HabitatandInhabitants

!

Page 58: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

58

1.4 Place-Making and Permanent Public Art in Infrastructure

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Puget Park

PugetParkispartoftheWestSeattleGreenbelt,andencompassesalargeareaofforestedlandthatprimarilydrainstotheDuwamishRiver.Itincludesaround 5 miles of hiking trails. A public art project for this area could include trailmarkers,naturalmaterials,interpretiveinformationabouttheecologyoftheforestasitconnectstotheflowofwater,orotherapproachesappropriatetoanaturalarea.Inaddition,anartistworkingintheLongfellowCreekWatershedontheprojectLocalEcologiesofWater(p.39)mayalsocreateworkinrelationtotheWestSeattleGreenbelt.FurtherdiscussionsbetweenSPUandParksstaffcangageinterestinapublicartprojectforthislocation.

Location(s): Surface drainage and sub-basin area for SPU that is closetotheDuwamishRiverTrail,Parkspartnershipsite

Budget Range: TBD

Time Frame: TBD

Priority (1-3):

TBD

Sources and Inspiration:

TBD

Page 59: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

59

1.4 Place-Making and Permanent Public Art in Infrastructure

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Thornton Creek at Matthews Beach Park

ThepresenceoftheoutletofThorntonCreekatthisparkpresentsawonderfulopportunityforanartworkrelatingtotheCreekandLakeWashington.SpawningsalmoncansometimesbeseenintheCreekhere.FurtherdiscussionsbetweenSPUandParksstaffcangageinterestinapublicart project for this area.

Location(s): Park and ROW near creek atMatthewsBeach,Parkspartnership site

Budget Range: TBD

Time Frame: TBD

Priority (1-3):

TBD

Sources and Inspiration:

HabitatandInhabitants

Page 60: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

60

1.4 Place-Making and Permanent Public Art in Infrastructure

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Parks Land Bank Sites

LandBankparksarenewparksonlandrecentlyacquiredbytheCity.FurtherdiscussionsbetweenArts,SPUandParksstaffareneededtoidentifythescheduledLandBankparksitesforthenextseveralyearsandwhatpotentialthesesiteshaveforpublicart.ParksthathaveadirectconnectiontoDrainagework or facilities may be candidates for permanent public art.

Location(s): ThroughouttheCity

Budget Range: TBD

Time Frame: 2018-ongoing

Priority (1-3):

2

Sources and Inspiration:

TBD

Page 61: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

61

1.4 Place-Making and Permanent Public Art in Infrastructure

OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

PROJECT OPPORTUNITY: Taylor Creek

TaylorCreekflowsthroughasteepravineinSoutheastSeattle,thendisappearsundergroundforashortdistance,flowsthroughbackyardsandintoLakeWashington.SPU'srestorationworkontheCreekwilladdresssedimentationconcernstoimprovesalmonhabitat.

TheartistwillcollaboratewithSPU,Parks,andcommunitymembersintheTaylorCreekareatocreateandinstallaseriesofartisticwayfindingelementsthatwillallowthepublictoconnectwithTaylorCreekasittravelsfromthetrailheadofDeadhorseCanyontoLakeWashington.

Location(s): TaylorCreekfromDeadhorseCanyontoLakeWashington

Budget Range: $150,000

Time Frame: 2018-ongoing

Priority (1-3):

2

Sources and Inspiration:

ConnectingtoWater,HabitatandInhabitants

Page 62: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

62

2. Appendices

Page 63: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

63OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

2.1 Draft Scope of Work forSCWQP Coordinating Artist

Ship Canal Water Quality Project Coordinating ArtistScope of Work:

•attendprojectteammeetings(2-4x/month)

•attendcommunitymeetingsasneeded,leadcommunitywalks

•attenddesigncommissionorotherreviewsasneeded

•reviewplansforvariouscomponentsoftheprojectduringdesignandgivefeedbacktofacilitateartworkintegrationandimproveaesthetics

•workwithArtsOfficePMstofacilitatescopingandselectionofadditionalartiststocreateworkrelatedtoSCWQP(bothtemporaryandpermanentcommissions)

•serveasliaisontotheprojectteamandotherartistsworkingoncomponentsofthe project

• respond to opportunities for art as they arise

•contributeaholisticandconsistentcreativevoicetowholeSCWQPartprogram

•maintainseattle.govemailaccountwithpresenceonprojectteamlistsandworkingpresenceatSPUoffices

•createasmalltemporary,participatoryartworkaspartof“TheWaterUnderground”tounfoldduringconstruction,thatwillrelatetothealignmentofthetunnelandconnectpeopleinthesurroundingbasinstotheflowofwaterthrough their homes and neighborhoods

•createapermanentartwork-“ConnectiveThread/ConnectiveFlow”-consisting of multiple small elements sited at locations along the tunnel alignmentthatconnectspeopleinthebasinstotheflowofwaterthroughtheirhomesandneighborhoodsbyaddingvisualand/orsculpturalelementstothepedestrianenvironment;possiblesitesmaybeatdropshaftsandintherightofway along the tunnel alignment; the permanent artwork concept may arise out of the temporary project

Page 64: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

64OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

2.2 Draft RFQ for Roadside Bioretention Kit of Parts

CallforArtists-RoadsideBioretentionKitofParts

Background:http://www.seattle.gov/environment/water/green-stormwater-infrastructurehttp://www.seattle.gov/util/EnvironmentConservation/Projects/GreenStormwa-terInfrastructure/CurrentGSIProjects/index.htmhttp://www.seattle.gov/util/EnvironmentConservation/Projects/GreenStormwa-terInfrastructure/index.htm

AspartofthePlantoProtectSeattle’sWaterways,SPUisbuildingnaturaldrain-agesystems,alsocalledroadsidebioretention,inseveralneighborhoodsthrough-outtheCity.Theseroadsidebioretentionsitesarelocatedintheright-ofway,typicallyinresidentialareas.Thebioretentionsites,alsocalledswales,collectdirtystormwaterfromthestreetandallowittosoakintothesoil,preventingpollut-ants,sediments,andhighflowsofwaterfromdegradingthewaterqualityinourcreeks,river,lakesandPugetSound.

Thedesignofroadsidebioretentionvariesbylocation.Localhydrology,streetlay-out,engineeringdemandsandtheinputofcommunitymembershelpdeterminethedesignofthebioretention.However,manyelementsarecommontomostroadside bioretention.

TheintentoftheRoadsideBioretentionKitofPartsistoprovideakitofelementsthatmaybeincorporatedatroadsidebioretentionprojectsthroughouttheCity.Theseelementsarenotneighborhood-specific,butratheraddaestheticandeduca-tionalvaluetothebioretentioninanylocation.TheitemsthatareincludedinanygivenprojectwillbedeterminedbytheindividualSPUprojectwithcommunityinput.

Artist Scope of Work:The selected artist will design a kit of parts of artistic elements that may be incor-poratedintoroadsidebioretention.Notallelementswillbeincorporatedineverylocation,soeachpartofthekitmuststandaloneaswell.Theartistwillworkwithstaffandengineerstoproducespecificationsforincorporatingthedesigns.Theartist will also fabricate or work with a fabricator to produce the elements such as

inlays. The artist will not be responsible for installing the artwork but rather will deliveracompletepackagethatcanbeincorporatedintoprojectCDandimple-mentedaspartofconstruction.Thus,installationspecificationsshouldbesimpleand able to be incorporated by SPU project contractors.

Kit of Parts will include:• Inlays that can be added to adjacent sidewalks. Designs for inlays will keep inmindthattheamountofadjacentsidewalkbeingbuiltvariesbylocation,andoftenincludespatchesbetweenexistingsidewalk.Designswillcreativelyaddressthispotentially“messy”aspectofthesidewalksurface,whilefittingwithinSDOTstandardsidewalkspecificationsandsafetyrequirements.

• Visual elements for inlets such as inlays or patterns.

• Ideasforedges,railings,signage,steppingstonesandbenches.

Inadditiontomanagingandcleaningstormwater,roadsidebioretentionaddsbeauty and natural habitat to the streetscape. While passersby may admire plants growingintheswales,itisoftennotobvioushowthebioretentionfunctions.Visualelementsthatbringtopeople’sattentiontheflowofwaterareencouraged.Artisticelementsshouldbepoeticratherthandidactic,butmayserveaneduca-tional function.

Alldesignsshouldkeepinmindmaintenanceorartworkintherightofway,slip/triphazards,andaccessibility.Placementoffootingsorotheritemsintheswalesisdiscouraged for the most part as it may impede function and maintenance.

ArtistQualifications:• Experiencedevelopingconstructiondocumentsandspecifications• Experience working in the right of way• Flexibilityandcollaborativeattitude• Interestinrevealingecologythroughart

Page 65: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

65OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

2.3 Draft RFQ for Artists in Engagement Program: Stories of Water

CallforArtists-ArtistsinEngagementProgram

Projecttheme:“StoriesofWater”Whatstoriesdopeoplecarrywiththemofwater?Personal,mythical,tradition-al,poetic,anecdotal…allwaysoftalkingaboutwatercanbeconsidered.Storiesofwatercanencompassbothwater’spreciousnessanditsdanger,itsemotionalassociationsandfunctionalforce.Theideaofwatercanincludeweather,climate,oceansandseas,riversandstreams,watertodrinkandtowashwith,watertoswimandtofishin,dirtywaterandcleanwater.Howmightpeopleexperiencewaterdifferently,orthesame,inSeattlecomparedtointheirhomelandorinotherplaceswheretheyhavelived?Byconnectingwithwaterystories,peoplefromdiverseanddivergentbackgroundsmayfindcommonflow. Artist Scope of Work: Hirealead“artistinengagement”forthisprogram.Thisartistmaythencoordi-natethehireofadditionalartistsforspecificprojectsandcommunities.Thisartistwillbehiredusing1%forartfunds,andwouldthusbeoncontractwiththeOfficeofArtandCulture.Theircontractwouldbesimilartoanartistresidencycontract,however,thispersonshouldworkinthisroleforanextendedperiodoftimeinordertodeveloprelationshipswithcommunities.Theirinitialtermshouldbeaminimumofone-threeyears,withtheintentionthatifthingsgowelltheprogramwill continue. TheleadartistwillworkwithSPUenvironmentaljusticeand serviceequitydivisionstaffwhowillconnecttheartistwithcommunitypartnerorganizations(communitybasedorganizations-CBOs)whoarealreadyworkingwithSPUtoaccomplishoutreachandinclusiveengagementoutcomes.SPUstaffwillalsoconnect the artist with public outreach and engagement liaisons. Funding from SPU fororganizationsmaysupport CBO'sstafftimetocoordinatewiththeartist.Duringcontractingconversationswithorganizations,SPUstaffwillaskabouttheirinterestininvolvementwiththisprogramandpotentiallywriteitintothescope of their contracts.

Theleadartistwillworkoveraminimum1-3yearperiodinordertoestablishanddeepenrelationships.Astheprogramunfolds,theleadartistwillbethecontact

pointandliaisonbetweenSPU’senvironmentaljusticeandserviceequitydivisionandotherartists.Inastructuresimilartoanartistresidency,theleadartistwillhaveaworkspaceandCityofSeattleemailaddress.Theleadartistwillcoordinate,withSPUandtheOfficeofArtandCulture,thehiringofadditionalartists.Theleadartistwilldevelopartworkincollaborationwithotherartistsandcommuni-ties.Theleadartistwillalsobetaskedwithdeveloping,producinganddisseminat-ing,withSPUandtheOfficeofArtandCulture,ongoingmulti-mediadocumen-tationofthe“StoriesofWater”program. Theselectedartist(s)willdeveloprelationshipswithcommunitiesandengagetheminconversationsabout"StoriesofWater". Theartist(s)willworkwiththesecommunitiestocollect,gather,produce,inspire andcommunicatepeoples'storiesabout water. The outcomes of these interactions could take one or more of the followingformsorotherforms:videos,website,performances,communityforums,events,festivals,storycollectionpublishedonlineorasabook,exhibition,images,photographs. Process for artist selection:TheOfficeofArtandCulturewillissueanRFQwithEJSEinputandrunanartistselectionpanel.StafffromSPUESJEwouldbeonthepanel.

Artist selection criteria:: • a strong portfolio of past socially engaged artwork• experienceworkingwithdiversecommunities• a commitment to community engagement• strongorganizationalandcommunicationskills• past curatorial experience or experience collaborating with other artists• theabilityandinteresttobeinvolvedandpresentforalong-termproject

Page 66: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

66OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

2.4 Draft RFQ for Local Ecologies of Water: Art as a Bridge Between Science and Community

CallforArtists-Artist-ScientistCollaborationsProgram

Background:SeattlePublicUtilitiesDrainageandWastewaterhasaholisticperspectiveonmanywatershedsandwaterbodies.Whilemanagingtheflowofwaterthroughtheurbanenvironmentandconsideringthesubstancesthatweletflowintoourlocalwaterbodies,SPUDWWdevelopsdeepknowledgeoflocalhydrology,ecology and meteorology. Within this knowledge is also the recognition of what isnotknown:therelativeunpredictabilityofclimate,thechancesofa100yearstormoccurring,orthevastarrayofmicrobialinhabitantsinastreambed,forexample.

Scientificresearch,knowledge,anddatacollectionarecloselylinkedtotheworkofSPUDWW.Adeeplevelofunderstandingoflocalecologicalconditionsisnotalwayspresentwithinthegeneralpublic,yetweareallpartoftheselocalconditions.Artists,whothinkdeeplyabouthowpeopleexperienceandcometoknowtheworldthroughalltheirsenses,mayprovideanavenuetomakethisdata accessible to people in more dynamic ways.

Proposal:SPUDWW1%forArtprogrampresentsanopportunityforartiststobeplacedat the nexus of ecological knowledge and public understanding.

Artist Scope of Work:Fourartistsorartistteamsshouldbeselected,oneforeachoffourlocationsoutlinedbelow.Eachartist/teamwilldevelopatemporaryprojectthataddressesanareaofscientificinformationandlocalecologicalconditionrelevanttoSPUDWWwork.Theartist/teamwilldevelopaprojectthat:1.isrichinmeaningandaestheticallycompelling2.workswithscientificinformationandscientistsanddatainadeepandcollaborativewayratherthaninasuperficialmanner3.createsadeeperconnectionbetweenthepublicandtheenvironment/ecologyofwhichtheyarepartbybringingscientificprocesses,dataandmethodstothepublicinamannerthatisaccessiblewhilenotover-simplifyingProjects may take any of the following forms or other forms: participatory

communityevents,performanceactivities,walks,audioorvideo,temporaryinstallationsinpublicvenues,orothers.

SelectionCriteria:The call should be national/international to attract artists for whom this call is particularlyrelevanttotheirbodyofwork.Theselectedartistsshouldhaveastrongportfolioofpastworkthatengagescommunitiesanddealswithscientificsubjectmatterinanin-depthandrevelatorymanner.

Process:TheselectedartistswillworkwithSPUandArtsstafftofocusonanareaofscientificinterestinrelationtothelocationfortheirwork(seebelowforlocationsandpossibleareasofnexus).Afteraperiodofresearchandcollaboration,theartistswillproposeartworksforrealization.Theartworksmaytakeavarietyofforms.Documentationoftheartworkswillalsobeanimportantcomponentofconnectingthepublicwiththeartists’work.

Recommendations for commissioning projects that combine art and science:1.allowtimeforcollaborationtotakeplacebetweenartistandscientists2.allow time for in-depth research on the part of the artist3.facilitatethisresearchandrelationshipsbysupportingartistwithcontactswhen possible and a budget aligned with the intention for research time

Page 67: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

67OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

2.4 Draft RFQ for Local Ecologies of Water: Art as a Bridge Between Science and Community continued

Locations/Topics:Selectedartistswillworkinlocalneighborhoodswithspecificconnectionstoparticularissuesandprojects.Belowisalistoflocationsthathavebeenidentifiedasfocusareasforartiststoconcentrateon.

Thornton Creek-RecentSPUworkatThorntonConfluence,especiallyexperimentaltechniquestoimprovewaterqualitybyseedingthehyporheiczonewithmicro-organismsfromhealthystreamsintheCedarRiverwatershed,canbeasourceforartisticcollaborationandinspiration.Somequestionsartistsmaypursueinrelationtothis site:Howdowehumansrecognizeourconnectiontothemicroscopicworld?Canwerevealwhatisinvisibleintheworkingsofthestream?Howcanthepublicconnecttothestreamasanecologicalcommunityofmanyspeciesratherthanjustflowingwater?What does it mean to restore the ecological function of a system after human intervention?

FocusareasofscientificcollaborationwithnexustoSPU:stream ecologyhydrologysoil micro-organismssoilchemistry(especiallyasitrelatestocontaminants)fisheries

Longfellow Creek-2017willbethe25thanniversaryoftheLongfellowCreekLegacyTrailproject.LongfellowCreek,flowingthroughtheDelridgeandWestwoodneighborhoods,remainsbothacommunityamenityinplacesandignoredandinvisibleinotherplaces.CitizenvolunteersandcommunitygroupssuchasPugetSoundkeeperconductwaterqualitysurveysandsalmonsurveys.Manyneighborhoodgroupsconduct restoration work in the natural areas surrounding the creek. Some questionsartistsmaypursueinrelationtothissite:Howcanthepublicconnecttothestreamasanecologicalcommunityofmanyspeciesratherthanjustflowingwater?What does it mean to restore the ecological function of a system after human intervention?

FocusareasofscientificcollaborationwithnexustoSPU:stream ecologyhydrologysoilchemistry(especiallyasitrelatestocontaminants)plantecology/nativeplantsecology of urban forestsfisheries

Pipers Creek- FallSalmonSpawningsurveysandSalmonintheSchoolscanbeanentrypointforartisticcollaboration.Somequestionsartistsmaypursueinrelationtothissite:Howcanthepublicconnecttothestreamasanecologicalcommunityofmanyspeciesratherthanjustflowingwater?What does the presence of salmon in an urban context teach us?

FocusareasofscientificcollaborationwithnexustoSPU:stream ecologyhydrologyfisheriessoilchemistry(especiallyasitrelatestocontaminants)waterqualityinPugetSound

Ship Canal Basin and Ship Canal Water Quality Project- ByexaminingwaterqualityinourreceivingwaterbodiesandhowCSO’scontribute,artistscanhelpthepublicmaketheconnectionbetweentheneighborhoodsthattheyinhabitandthewatersofPugetSound.Waterqualitydata,howwecollectthisdata,andhowweimpactitmaybeasourceforartisticcollaboration.

PossibleareasofscientificcollaborationwithnexustoSPU:climate and weatherfisherieswaterqualityinPugetSound

Page 68: OPPORTUNITIES FOR PUBLIC ART - Seattle · OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater BOOK 2 OF 2 of the DWW Art Master Plan December 2017 ... , 18.8-foot diameter

68OPPORTUNITIES FOR PUBLIC ART in SPU Drainage and Wastewater: BOOK 2 of 2

Thanks to everyone who contributed to this Art Master Plan and the research and explorations that fed into it. What a wonderful opportunity to contemplate the possibilities for public art, and to think about the relationships between humans, the systems we build and maintain, other species, and water.

Vaughn BellDecember, 2017

End of Book 2. See Book 1 for Vision.