optimizing prefabrication with lean - lcilci.fi/wp-content/uploads/2019/03/3-jessica-kelley... ·...

55
Optimizing Prefabrication with Lean Jessica Kelley

Upload: others

Post on 29-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Optimizing Prefabrication with Lean

Jessica Kelley

Page 2: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Southland Industries ©2019 All rights reserved.

Who is Southland?

Southland Industries is one of the US's

largest MEP building systems experts.

Taking a holistic approach to building

performance, we specialize in the design,

construction, and operation of mechanical,

electrical, plumbing, fire protection, process

piping, automation and controls systems, as

well as comprehensive energy services.

Page 3: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation
Page 4: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Capabilities

DESIGN-BUILD SERVICES

• HVAC

• Process piping

• Plumbing

• Fire protection

• Controls and automation

• Energy

• Electrical

TRADES

• Pipefitting

• Sheet metal

• Plumbing

• Sprinkler-fitting

Page 5: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Southland Industries ©2019 All rights reserved.

Markets Served

Healthcare Mission Critical Biotechnologies Sports/Entertainment

Industrial/Manufacturing Commercial Education Government

Page 6: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Southland Industries ©2019 All rights reserved.

Why Prefabrication?

Safety

Quality

Productivity

Labor Shifting

Laydown space

Schedule

Cost

Page 7: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Southland Industries ©2019 All rights reserved.

Culture Shift

Page 8: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Project Type and Environment Matter

• New vs Renovation

• Tight Timelines

• Lack of Repetition

• Wrong Team

• Wrong Owner

• Distance from Shop

• Site Access

Page 9: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Southland Industries ©2019 All rights reserved.

Project

Delivery

Method

Matters

Page 10: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Southland Workflow

Page 11: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Ideas Come From Anywhere

Engineer

Detailer

Fab Shop

Crew

Group Planning Meetings Project Manager

Field Crew

Page 12: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation
Page 13: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation
Page 14: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

1

9

Leveraging BIM

Page 15: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

BIM… not a guarantee: Understand your Tolerances

20” gap between

segments

Page 16: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

RE

CE

IVIN

G

SHEETMETAL

FABRICATION

PLUMBING ASSEMBLY

PIPING ASSEMBLY

DESIGN TEAM

SM

ASSEMBLY

SH

IPP

ING

TOOLSLOGISTICS

STAGING

Page 17: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Offsite Prefab Facilities

Page 18: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Too Many Carts

Page 19: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Universal Cart

Universal Cart Closed Cage Conversion

Page 20: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Transport Safety Stackable for Shipping/Storage

Material Handling Options

Page 21: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Planning: Last Planner® informs Project Schedule

• Who develops the Design Schedule?

• Who develops the Construction Schedule?

• Are they aligned?

Page 22: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation
Page 23: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation
Page 24: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Planning: Pull Schedule (Internal)

Page 25: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation
Page 26: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Hanger Fabrication and Delivery

OLD NEW

Page 27: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation
Page 28: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Southland Industries ©2019 All rights reserved.

Eliminate the Risk

Page 29: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Southland Industries ©2019 All rights reserved.

Recordable Incident Rate

.63

Ex Mod Rate

.46

Page 30: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

What does Integrated Project Delivery enable?

Page 31: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Southland Industries ©2019 All rights reserved.

Van Ness & Geary Hospital

San Francisco, CA

Engineering and Construction

Healthcare

Page 32: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Southland Industries ©2019 All rights reserved.

15% Detailing Increase

25% Labor

Reduction

Sheetmetal

Page 33: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Plumbing

• 15 Jigs for Lavatory and Shower Assemblies

• 75% increase in detailing labor

• 14% overall labor savings

Page 34: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Southland Industries ©2019 All rights reserved.

Procter & Gamble

West Virginia

Engineering, Construction

Manufacturing

Page 35: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Highly Restricted

Innovation Preassembled Ductwork (AHU-204)

Description The supply and return ductwork for AHU-204 was designed to be installed between roof joists and steel grid. The ductwork was fabricated and preassembled in (3) large sections and installed with the structural contractor’s crane. Rather than installing the duct run in 5’ pieces, this allowed 110’ run to be installed ahead of the construction schedule saving time and production costs.

Safety/Risk impact

The duct runs were installed in larger sections, thus limiting the amount overhead work.

Quality impact: The larger sections allowed for the QC team to inspect the ductwork fully on the ground rather than inspecting only visible sections in the air.

Schedule impact: Allowed this work to be installed in advance of the building construction.

Cost impact: Allowed Southland to install 60% of the ductwork utilizing only 40% of the labor for a savings of 20% of labor costs.

Page 36: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Piping Racks

Page 37: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Improved Piping Racks

Multi-Disciplinary Savings:

Struct: $200K of $400K saved

Mech: $250K of $1.8M saved

Safety: 7,800 hours moved to shop

Schedule: 3 of 40 weeks saved

Page 38: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Southland Industries ©2019 All rights reserved.

Penn Medicine

Philadelphia, PA

Engineering, Construction

Healthcare

Page 39: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Site Logistics

• Curb-to-curb construction

• Active medical campus

• Limited laydown area

• Heavy traffic and limited parking

Page 40: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Southland Industries ©2019 All rights reserved.

Prefabrication Maps

46

Conceptualize prefabricated

elements before design is

completed.

Mechanical layout supports

prefabrication on day 1

Effective communication tool to

show architectural team

construction constraints

Visual guide to % of off site

manufacturing (OSM)

Page 41: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Multi-Trade Pipe Racks

Page 42: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Wall Assemblies

Page 43: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Southland Industries ©2019 All rights reserved.

Bathroom Pods

49

Project Award ~2015

Functionality MockupA3’ G 2016

Struct/Arch Coordination Clinical Mockup

Constructability Mockup

Coordination of Pod Types

FabricationPrototypes

Page 44: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

From Shop to Field

• 1 Finish Schemes

• 2 Layouts

• 7 Plumbing Variations

• 504 Pods

• 10% reduced onsite labor, projected

• 10 less deliveries, weekly

Page 45: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Penn Medicine Metrics - Piping

10,5; 30 %

25; 70 %

Total Pipe Length [Miles]

Prefab Pipe Onsite

10 %

20 %

70 %

Patient Floors (L7-L14)

Prefab Pipe

Bathroom Pod Piping

Onsite

35 Miles of Piping

Excludes 3 pipe Med Gas racks

Page 46: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Penn Medicine Metrics - Sheetmetal

220; 20 %

50; 5 %

830; 75 %

Total Project Sheetmetal [Tons]

Fitout Duct C&S Headers Onsite

46 %

54 %

Interventional/OR (L4-L6)

OSM

Onsite

49 %

51 %

Patient Floors (L7-L14)

OSM

Onsite

1100 tons (2.2 Million lbs) of Sheetmetal

Page 47: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Southland Industries ©2019 All rights reserved.

Labor Shift

Peak Manpower (w/ Prefabrication): 1000Peak Manpower (Traditional): 1,200

Page 48: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Sharing Strategies

Page 49: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

REVIT UNIFI

Page 50: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Prefab Playbook

Page 51: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Prefab Strategy Meeting

Page 52: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Prefab Playbook

5

8

Page 53: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Southland Industries ©2019 All rights reserved.

Metrics

• Month over Month Trend

• By Division

• By Market

• Project Specific

Page 54: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

We know the best value is delivered for our customers when we connect all of our services in an integrated design-build-operate process.

I ’ h lifecycle and our connections to our ’ h y differentiate us.

Page 55: Optimizing Prefabrication with Lean - LCIlci.fi/wp-content/uploads/2019/03/3-Jessica-Kelley... · 2019. 6. 7. · electrical, plumbing, fire protection, process piping, automation

Questions Jessica Kelley, PE

[email protected]

www.southlandind.com