    Problems resolved as a part of service order receivedTOTAL TWO PROBLEMS WERE REPORTED AS PART OF SER!CE ORDER

    ORDER "#

    $OB# %PT Mod&le over'a&li() at *TPC + Korba ,-- MW .(it/0

    "1-# !*TROD.CT!O*

    NTPC Korba with an installed capacity of 2100 MW has 3 x 200 MW and 3 x 500 MW nits!

    sitated at Korba "C#$#% KW& desi'n ()*+ spply T$ sets were installed# &nit ,3 "200 MW% was

    co--issioned on 1.th March 1/ and started co--ercial 'eneration fro- 01 st ne 1/# NTPC

    awarded the )P Trbine oerhalin' alon' with slow speed balancin' with the schedle period of 

    2 days bar to bar# The nit was withdrawn for oerhal on 2 nd 4pril 200#

    &nit de6synchroni7ed for oerhal 8 at 23#1 )rs on 02#0#200

    T$ on barrin' for nit oerhal 8 at 23#50 )rs on 02#0#200

    Machine on barrin' after oerhal 8 at 1.#00 hrs on 1#0#200

    Machine synchroni7ed 8 at 0#1 hrs on 21#0#200

    &nit63 "200 MW% )P Trbine -odle oerhal was co-pleted within 1 days 5hrs by proper 

    plannin' and strate'ies and by adoptin' latest technolo'ies#

    ,1- ACT!!T!ES CARR!ED O.T FOR C2CLE T!ME RED.CT!O*

    ,1" RED.CE T%E T.RB!*E COOL!*3 DOW*

    Trbine controlled coolin' prior to -9c de6synchroni7ation8 Machine was rn at redced

    steady load and lower -ain stea- : ;) stea- te-peratres for 2 hrs as per chedle of actiities "plan : actal% carried ot in preios oerhals was reiewed and of 

    se?ential : parallel actiities were prepared

    ()*+ reiewed all actiities by horly basis and ti-e ta@in' processes for each actiities!

    idle ti-es between actiities! delay in arran'in' spares and -obili7ation etc# were identified

    before start p the wor@#

    http://var/www/apps/conversion/tmp/scratch_4/ORDER-PROBLEMS.dochttp://var/www/apps/conversion/tmp/scratch_4/ORDER-PROBLEMS.doc

  • 8/16/2019 Order Problems

    2/4

    Arin' exection of the wor@ the reiewed process were effectiely i-ple-ented and the

    idle ti-e between the actiities were eli-inated

    ,16 RO.*D T%E CLOCK $OB PLA**!*3

    Aeploy-ent of two separate 'rops to carry ot the Bob rond the cloc@# =t helped to carry

    ot Bob with a fresh syner'y by each of the wor@in' 'rop

    ,16 .SE OF LATEST TEC%*OLO32

    >low speed dyna-ic balancin' of )P rotor at site

    &se of indction heatin' -achine for dis-antlin' and asse-bly of trbine casin' partin'

    plane stds#

    ;e-ote operation of *

  • 8/16/2019 Order Problems

    3/4

  • 8/16/2019 Order Problems

    4/4

    >chedle of actiities "plan : actal% carried ot in preios oerhals was reiewed and of 

    se?ential : parallel actiities were prepared

    ()*+ reiewed all actiities by horly basis and ti-e ta@in' processes for each actiities!

    idle ti-es between actiities! delay in arran'in' spares and -obili7ation etc# were identified

    before start p the wor@#

    Arin' exection of the wor@ the reiewed process were effectiely i-ple-ented and the

    idle ti-e between the actiities were eli-inated

    ,16 RO.*D T%E CLOCK $OB PLA**!*3

    Aeploy-ent of two separate 'rops to carry ot the Bob rond the cloc@# =t helped to carry

    ot Bob with a fresh syner'y by each of the wor@in' 'rop

    01- SE4.E*CE OF ACT!!T!ES

    &nit was withdrawn at 00#00 )rs on 02#0#200#

    )P shaft te-peratres recorded at the ti-e of -9c de6synchroni7ation were

    0oC #

    Trbine oil p-p stopped at 100oC ")P> te-p% at 10#00 hrs on 0#0#200#

    $enerator dis-antlin' started on 0#00 hrs on 03#0#200

    Trbine dis-antlin' started at 10#00 hrs on 0#0#200#

    Trbine asse-bly co-pleted at 0#00 hrs on 1/#0#200#

    =nslation on )PT -odle co-pleted by 1/#00 hrs on 1/#0#200#

    Trbine pt on barrin' at 20#00 hrs on 1/#0#200

    Machine rolled at 20#00 hrs on 20#0#200#

    Machine synchroni7ed at 21# hrs on 20#0#200

    61- CO*CL.S!O*

     4 bench-ar@ on record -ini-- dration of 1 day in 250 MW capital oerhal of %PT7 LPT

    5 3e(erator alo() 9it' MP!7*FT of LP T&rbi(e blades  cold be achieed de to reiew of 

    traditional oerhalin' practices adopted by ()*+# =t was the deter-ination! co--it-ent!

    -onitorin' and follow6p of associated actiities that ascertained to achiee sch an enthsiastic

    tar'et# Wor@in' ot actiities well in adance with endors : csto-er and rond the cloc@

    exection of Bob with new strate'ies helped to -eet schedle deadlines and redction of ti-e

    period by days#