oskar manufacturing companies

18
Powerpoint Templates Page 1 Powerpoint Templates Oskar Manufacturing Corporation Raghav Agarwal Shivam Dagar Vikrant Kukreti

Upload: raghav-agarwal

Post on 20-Mar-2017

14 views

Category:

Business


0 download

TRANSCRIPT

Page 1: Oskar Manufacturing Companies

Powerpoint Templates Page 1Powerpoint Templates

Oskar Manufacturing Corporation Raghav Agarwal

Shivam Dagar Vikrant Kukreti

Page 2: Oskar Manufacturing Companies

Powerpoint Templates Page 2

Introduction …..

1. Oskar Manufacturing corporation produces a wide variety of Electrical items.

2. It manufactures – Motors, Generators, motor-generator, Switchgear, Alternator, etc.

3. Established in 1970 – 1980’s with 4600 employees with good market share of power Equipment.

1.

Page 3: Oskar Manufacturing Companies

Powerpoint Templates Page 3

ABC Production Department

1. ABC control department a smaller in company with 220 employees.

2. It ‘s main work is to manufacture with 185 workers and 20 highly qualified designers.

3. They mainly produces for Turkey projects and manufacture mostly against orders from other manufacture.

Page 4: Oskar Manufacturing Companies

Powerpoint Templates Page 4

• There was many flaws and the performance was slipping down so they study the system under some consideration.

1.Careful observation of actual practices.2.Study of past and documents.3.Discussion with personnel belonging to different section of the division.4.Interviews with d5.Recording views of personnel who were actually interacting with the division.6.Study of division’s head.

ABC Production Department

Page 5: Oskar Manufacturing Companies

Powerpoint Templates Page 5

After the information was analyzed and categorised as follows.

1.Inadequacy of the order processing system including documentation.

2.Inefficiency if the material flow3.Material shortage.

4.High degree of rework.5.Unrealistic production targets.

ANALYZED

Page 6: Oskar Manufacturing Companies

Powerpoint Templates Page 6Existing Organization of Oskar

Page 7: Oskar Manufacturing Companies

Powerpoint Templates Page 7

1. Is entertained by system engineering division.

2. They usually take orders and specify the delivery data by it and then send to the design management.

3. Material planning starts at the 11th floor and procurement action is intatited after the bill of material is available.

4. There trigger the material procurement and available stock is checked and a purchase requisition is made for any shortage that exists.

Order Processing System

Page 8: Oskar Manufacturing Companies

Powerpoint Templates Page 8Existing Order processing system

Page 9: Oskar Manufacturing Companies

Powerpoint Templates Page 9

1. A shortage list is prepared and top level management force them to start work on item having material shortage

2. It lead to localized over loading and results in poor work flow.

3. Once the item is completed it transferred to Testing. If any fault is find out (70% of new order are faulty at inspection)

4. Thus, rework is a normal feature of manufacturing in ABC control section of OSKAR.

Cont..

Page 10: Oskar Manufacturing Companies

Powerpoint Templates Page 10

1. The shop is supplied with a monthly production programme and is initiated if Job file is then (PMD) sheets production manufacturing data.

2. Steps involved in production are:

Fabrication

Wiring

Painting Assembly

Shop Practices

Page 11: Oskar Manufacturing Companies

Powerpoint Templates Page 11

1. Starting from a an item a panel structure is built up of sheet metal then sub- contractor and fabrication give suitable cut-outs by giving frames.

2. Painting is done as per the customer specification the assembled and connected by the wring.

3. Components required in assembly are transferred by central stores which is under material planning sections. Material are issued against bill of material.

4. Packaging is done by the another department.

Shop Practices Cont..

Page 12: Oskar Manufacturing Companies

Powerpoint Templates Page 12

He make clear about their late delivery is

because of dependent upon

other department

ABC Division

al Manger

Faults

Page 13: Oskar Manufacturing Companies

Powerpoint Templates Page 13

ABC Design manage

r

Design always a complex activity and it is innovative and

cant be done in atmosphere of

pressure as last minute change can

me made if required.

Page 14: Oskar Manufacturing Companies

Powerpoint Templates Page 14

Material control manger

Process need to be maintained and

segregated.

Page 15: Oskar Manufacturing Companies

Powerpoint Templates Page 15

Shop manger

Poor manpower utilization due to poor scheduling.

Page 16: Oskar Manufacturing Companies

Powerpoint Templates Page 16

•Material planning is not done in advance •Low quality product•Increase in rework•Production target are too ambitious

Production

manger

Page 17: Oskar Manufacturing Companies

Powerpoint Templates Page 17

1. Master schedule

2. Production controller responsible to production manager.

Final Improvement made