OVERVIEW – SUNDANCE WIND PROJECT PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND Ron Percival Avro Wind Energy Inc. October, 2014

Upload: tanner-farley

Post on 03-Jan-2016

18 views

Category:

Documents


0 download

DESCRIPTION

Overview – Sundance wind project PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND. Presentation overview. Proposed $600 Million near-term investment in Tumbler Ridge / Chetwynd region Who Is EDF EN Canada? Overview Sundance Wind Project Environmental Assessment Activities - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Overview – Sundance wind project PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND

OVERVIEW – SUNDANCE WIND PROJECT

PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND

Ron PercivalAvro Wind Energy Inc.

October, 2014

Page 2: Overview – Sundance wind project PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND

PRESENTATION OVERVIEW

i. Proposed $600 Million near-term investment in Tumbler Ridge / Chetwynd region

ii. Who Is EDF EN Canada?

iii. Overview Sundance Wind Project

iv. Environmental Assessment Activities

v. Visual Simulation for Sundance Project

Page 3: Overview – Sundance wind project PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND

||

An expertise in multiple segments

+ Biomass Biogas

+ Sea Energy

+ Concentrated Solar Power

WIND ENERGYonshore & offshore

SOLAR ENERGYpv

Other

EDF EN: A LEADER IN RENEWABLE ENERGY

Integrated skillsPresent on all the renewable value chain

Development Construction GenerationOperations &Maintenance

An international footprint18 countries ~ 3,050 employees

North America Europe Africa / Middle-East /India

Key figures at 31 December 2013MW gross : capacity of power plants in which EDF EN is shareholder* For own account and for third party

A leading position in its business

Generation activity

6,611 MW gross installed

1,986 MW gross under construction*

11,1 TWh of green electricity generated in 2013

Complementary activities

2,310 MW developed, built and sold

9,039 MW in operation and maintenance*

Among the top 10 global players

Page 4: Overview – Sundance wind project PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND

1,304 MW – Wind PPA

• 774 MW Under Construction• 530 MW Complete & Operating

Operations and Maintenance in Canada:

864MW – Wind

300MW – Solar MW

720 MW of Wind in BC South Peace Region in permitting or shovel ready

More than $3 Billion Investment in Canada

27 MW

23 MW

189.5 MW88 MW

1003 MW

72 MW

400 MW

Wind, Under Development

Wind, Under PPA/Construction

Solar, In Operation

O&M, Under Contract

300 MW

250 MW70 MW

EDF EN CANADAMORE THAN $3 BILLION INVESTED – WITH ANOTHER POSSIBLE $1.8 BILLION FOR BC PEACE

EDF EN Canada contracted Avro Wind Energy to help develop wind projects in BC Peace River Region. Avro has carried interest in the projects.

Page 5: Overview – Sundance wind project PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND

OVERVIEW – SUNDANCE WIND PROJECT

Generation capacity up to 250 MW

Potential investment of more than $600 Million

Jobs:

Approximately 250 during construction

Approximately 10 – 15 during operations

Build and Permitting Schedule:

Build early as 2016 subject to Power Purchase Agreement with BC Hydro.

EA Certificate expected in 2015

First open house – June 2013

Supportive engagement with Treaty 8 First Nations

Project located on Crown land, approximately 20km north of Tumbler Ridge.

Near D-CAT transmission, proposed Site C dam, and ramping gas electrical load

Page 6: Overview – Sundance wind project PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND

ON-GOING & UPCOMING ENVIRONMENTAL ASSESSMENT ACTIVITIES

• First Nations, Public & Stakeholder Consultation• BC Environmental Assessment process – submission for

Application review expected in early 2015• Analysis of local features

On-going Activities

• Fall Bat surveys• Reporting on results of field studies, including Archaeological

Resources, Furbearers, Ungulates (including Caribou), Bears, Fish and Fish Habitat, Vegetation and Ecosystems, Amphibians and Reptiles, Bats, Birds, Terrestrial Invertebrates, Community Infrastructure, Visual Resources, Land and Land Use, Communication Systems, Human Health, Terrain Stability, and Hydrology

Some Upcoming Activities

EDF EN Canada and Avro are working closely with First Nations, stakeholders, and local government to ensure EA studies are comprehensive, transparent and sensitive to local and regional concerns

Page 7: Overview – Sundance wind project PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND

VISUAL SIMULATIONS – SUNDANCE MOOSE LAKE

I October 1 2013

Page 8: Overview – Sundance wind project PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND

VISUAL SIMULATIONS – SUNDANCE HWY 52

I October 1 2013

Page 9: Overview – Sundance wind project PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND

VISUAL SIMULATIONS – SUNDANCE GWILLIM LAKE

I October 1 2013

Page 10: Overview – Sundance wind project PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND

HOW CAN YOU HELP – AND BENEFIT?

Help us deliver message to BC Government and BC Hydro: Tumbler Ridge and Chetwynd are endowed with “world class” wind energy

resource.

Let BC Government and BC Hydro know the world’s leading renewable power developers, owners and operators (like EDF EN Canada) are here already:

Making regional investments near Tumbler Ridge and Chetwynd; and Developing low cost power with social license for the benefit of all British

Columbians

Three Peace Region EDF EN Canada wind projects can build as early as 2016. Potential for near term $1.8 Billion regional investment.

Opportunities for local construction contracts and long term careers in operations and maintenance.

Page 11: Overview – Sundance wind project PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND

David WarnerEDF EN Canada [email protected]

Ron PercivalAvro Wind [email protected]

www.edf-en.ca

www.sundancewindproject.ca

QUESTIONS?