overview truenergy yallourn june 2008. internal unrestricted1 2 truenergy tallawarra site mw...
TRANSCRIPT
Overview TRUenergy YallournJune 2008
Internal Unrestricted1
2
TRUenergy
Tallawarra
Site MW
Yallourn Brown coal-fired base load station and mine 1,480
Hallett Gas-fired peaking station 180
Newport and Jeeralang
Gas-fired power station 966
–
Tallawarra Stage A CCGT (construction)Stage B OCGT (development)
400500
Hallett
YallournSEAGas Pipeline
Retail assets
Electricity assets
Newport and Jeeralang
Iona Gas Storage
Brisbane
Sydney
Melbourne
Adelaide
Studland Bay wind farm
Bluff Point wind farm
Cathedral Rocks wind farm
Iona Gas storagefacility
12 PJ gas storage facility
Gas assets
Details
SEAGas Pipeline
33% owner
Mass marketElectricity - 700,000 customer accountsGas – 500,000 customer accounts
GreenPower
Retail footprint
Roaring 40’sManagement of wind assets in Australia, Chinaand India
350
Industrial customer
~50,000 customer accounts
7 TWh
AGILITY, ACHIEVEMENT
TRUenergy – a major national integrated energy company
3
Internal Unrestricted1
Divider / Section titleSub Title Line
TRUenergy Yallourn
Internal Unrestricted1
4
Plant Statistics
• Brown Coal Fired Units – burning coal of 65% moisture
• 30 Year Old Plant
• Unit 1 and Unit 2 - Commissioned 1974 / 75 (Stage 1) • John Thompson boiler – Traditional Drum• 350MW Toshiba/GE derived turbines• Design Thermal efficiency 32%
• Unit 3 and Unit 4 - Commissioned 1981 / 82 (Stage 2)• International Combustion boilers – Semi Once Through• 375MW Toshiba/GE derived turbines• Design Thermal efficiency 34%
Internal Unrestricted1
5
Plant Data
» Unit 1 Unit 2 Unit 3 Unit 4
• Commissioned 1974 1975 1981 1982
• MCR (MW) 350 350 375 375
• Running Hours 240,000 232,000 200,000 194,000
(To End 07)
• Average starts/year 10 10 12 15
• Notional Design Life = 30 Years
Internal Unrestricted1
6
History
• Built for the State Electricity Commission of Victoria as part of utility fleet serving Victoria
• Generation as part of Government Instrumentality
• Station Privatised 1995/96 - POWERGEN
• China Light and Power Purchase 2001
• Plan life mid 2020’s
• Coal Quality• Low energy coal 7.3 MJ per kg LHV• Low sulphur 0.23% dry basis• Low ash 2% dry basis• High moisture content 63% - 65%
Organisation Chart - Yallourn
General Manager Yallourn
Yallourn Site
Asset ManagerPower Station Maintenance Manager
(Alliance Manager)
Operations Manager
CommercialManager
HR ManagerMine Manager
Alliance TeamsMix of TRUenergy
And Silcar
Ops TeamsChemists
Ops Performance
Safety Health &Environmental
Team
Asset Management
Team
Commercial Team
Estate ServicesAlliance
RTL AllianceOperations
And Maintenance
Mine InfrastructureGroup (TRUenergy)
Mine MaintenanceSilcar Sub-Alliance
Internal Unrestricted1
8
Alliances
TRUenergy Yallourn – Alliance Contracts
POWER STATION MAINTENANCE
– Alliance With SILCAR
- Teams combination of TRUenergy and SILCAR personnel
MINE
- Alliance with RTL
- RTL Sub Alliance with Silcar for Mine Maintenance
SECURITY & SUPPORT SERVICES
- Alliance with Estate Services (Infraserve)
Internal Unrestricted1
9
Personnel Breakdown
Employee Allocation across Site
Contract Mining (RTL & SILCAR)
32%
TRUenergy Direct35%
Apprentices3%
Estate Management (Infaserv & TRUenergy)
7%
Power Maintenance (SILCAR & TRUenergy)
23%
Total Site Including Mine = 493 People
Internal Unrestricted1
10
Plant Performance
TRUenergy Yallourn Power Station Equivalent Forced Outage Factor
0.0%
2.0%
4.0%
6.0%
8.0%
10.0%
12.0%
14.0%
16.0%
18.0%
20.0%
YEAR
Perc
en
tag
e
*NOTE: Equivalent Forced Outage Rate (EFOR) used pre 99/00. Calender year
Internal Unrestricted1
11
Operating Regime
OPERATES IN NATIONAL ELECTRICITY MARKET
Bids to generate on 5 minute basis with payment on half hour
Base Load running
Part of TRUenergy portfolio of Generation, Gas and Retail
business
Market can be volatile and unpredictable
Internal Unrestricted1
12
Yallourn Mine – Changed Mining Method
Internal Unrestricted1
13
Traditional Brown Coal Mining
Internal Unrestricted1
14
Dozer Technology
Internal Unrestricted1
15
Recent Major Activities
• Relocation of Morwell River to run through mine area
• Conversion of four units and common plant from analogue to digital
controls
• Reblading of LP Turbine Last Stage Blades.
• Repack of RAH’s in Stage 1.
• Rewind of Unit 2 Generator.-2006
• New Condenser in Unit 4 -2004
Internal Unrestricted1
16
PROJECTS
• Two new HIP Turbines to be installed on Stage 2 Units. 3% Efficiency
improvement.
• Refurbish of Cooling Tower 3 Internals
• Re-tube Condenser U3. 2009
Internal Unrestricted1
17
Morwell River Diversion (MRD)
Embankment geometry
• 3.5km clay lined channel• 13 million cubic metres earth• Channel designed for
1:10,000 year probability flood
• 70 m wide trapezoidal channel, 10 m deep
• Toe weights for stability on east and west sides of embankment
• Instrumentation and survey to monitor pressures and movements
Internal Unrestricted1
18
Major Challenges
CARBON FOOTPRINT - BROWN COAL
- High moisture (65%) results in low energy per kg and need to burn
three times the amount compared to black coal
- CO2e produced approximately 1.3 tonnes per megawatt hour sent out
- Low in ash and low in sulphur
WATER SUPPLY
- Low rainfall country
- Focus on saving water
- Competing demands for use of resource