PACIFIC PARTNERSHIP 2012

This brief is classified:UNCLASSIFIED

18 JAN 12OPT Brief

2

UNCLASSIFIED

UNCLASSIFIED

Roll Call

• CDS-7• State Dept – Mr. Weinz• USNS MERCY• AUS HQ JOC• HQ JFNZ• JSDF• FLC-Yokosuka• C7F

• C3F• CTF 76• 351st Civil Affairs Command• DLA Troop Support - Pacific• ETG• 30th NCR• HSC-21 DET 2• MCAST

Blue: Normal participants not expected to attend VTC due to scheduling conflict.

3

UNCLASSIFIED

UNCLASSIFIED

PP 12 Weekly Planning Rhythm

Thurs Fri SatSun

1300-1500W OPT VTC

1100W read ahead slides

posted to APAN

1000W CA WG

1300W LOG WG

1200W MED WG

1300W FP WG Every other week

Mon Tues Wed

1000W COMMS WG

1430W Comm Integration WG

CPF N3 Semi-Monthly Update

1200W ENG WG

Effective 09 JAN

4

UNCLASSIFIED

UNCLASSIFIED

SEP

OCT

NOV

DEC

JAN

FEB MAR

APR

MAY

JUN

JUL AUG

Mission Planning/CONOPS (CPF)

Meetings/Conferences (CPF/CDS)

Force Sourcing (CPFN3)

Interagency Coord (CPF N5)

NGO Coordination (CPF N5)

Partner Nations (CPF N5/C7F)

Transit Plan (CPF/CDS)

Funding/Authorizations (CPF)

Communications (CPF N6)

Assessment (CPF MAG)

Detailed CONOPS (CDS)

PDSS/Advanced Echelon (CDS)

Deployment (CDS)

Planning Timeline

Advanced Echelon

Deployment

MOU Letters Signed

PN Invitation letters

Assessment plan

EXORD

Systems

CPF RFF

Mid Planning Conference

Initial Planning Conference

Initial

PLANORD

PDSS

FSLO Letter

Final

Requirements

5

UNCLASSIFIED

UNCLASSIFIED

ADF Planning Status

General Planning• CJOPS Decision Brief for PP12 signed.

Command• Nomination of O-5 for position of COMASC submitted.• Call for nominations for ASNCE staff sent via signal.

Engineering• Two (2) ADF engineers participated in Indonesia PDSS. Still awaiting

Post Activity Report.• Authorization to lead as FIE for Indonesia mission still to come from

IPDIV.

Medical • Awaiting nominations for ADF Health PP12 positions from Services.

No Change

6

UNCLASSIFIED

UNCLASSIFIED

ADF Participation

Australia

• Command Element

• Engineering Section

• Medical Personnel contribution of 15 – 20 pers in each contingent

Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines

Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the

conclusion of mission in Cambodia

Health manning TBC in late November

HQJOC Health PP12 POC:CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans)

[email protected]

No Change

7

UNCLASSIFIED

UNCLASSIFIED

PP12 RFI Tracker

Number Status Date Req Responsible

Question Other

ADF-001 Closed 11 Nov 11 PACFLT Request a copy of the Indonesian PDSS itinerary

ADF-002 Open 11 Nov 11 PACFLT Status of Partner Nation invitation letter

No Change

8

UNCLASSIFIED

UNCLASSIFIED

JSDF Planning Status

• CONOPS of Japan - Developing the CONOPS of Japan Country selection - Philippine - Vietnam Activities - Medical supports - Community service projects Introduction of culture etc. - Studying other activities             - Decision after completion of

PDSS Vehicles - JMSDF Ship (TBD× 1 ) - JASDF Aircraft ( C-130   or KC-767× 1)

Medical team       - Approximately 20~30

No Change

9

UNCLASSIFIED

UNCLASSIFIED

JSDF Planning Status

• PDSS-Request re-survey Philippines with U.S. survey team in FEB or MAR 2012

• Humanitarian community in Japan - Not yet access

• POC PRI : LCDR Haga : [email protected] DSN:224-7714 or 7723 SEC: LCDR Yamaguchi : [email protected]

No Change

10

UNCLASSIFIED

UNCLASSIFIED

JSDF Planning Status

Number Status date WG Requests/Questions Comments

JPN -001 19 OCT PDSSDraft plan of PDSS in Philippine and Vietnam

JPN-002 30 NOV PDSSReq. re-survey with US survey member in FEB or MAR.

No Change

11

UNCLASSIFIED

UNCLASSIFIED

NZDF Planning Status

Decision by COMD Joint Forces New Zealand is to deploy a small multi-disciplinary health team for the duration of the deployment to Vietnam 10 – 24 Jul 12.

Contingent: Plan to embark USNS MERCY in Subic Bay Philippines / disembark at the conclusion of mission in Vietnam.

MAJ BROOKS – will attend Main Planning Conference (30 - 31 Jan in San Diego)as HQ JFNZ Rep. Now registered into APAN, awaiting membership to PP12 accounts.

Medical Personnel contribution: Manning TBC in early December (8 – 12 pers)

New HQJFNZ Health PP12 POC: MAJ Andrew BROOKSDDI: +64 4 529 [email protected]

No Change

12

UNCLASSIFIED

UNCLASSIFIED

CPF FOPS Update

Manning Update- FFC change in sourcing priorities- Augmentation package is now out for

Joint Sourcing w/ a suspense of 23 Jan- Commitment received for med

personnel- 32 non-med personnel still outstanding

- CPF PLANORD released

13

Medical Update

• Medical WG Telcon held Tuesday, 17 January 2012, 1200 hrs

• Identified Medical Planner to assist with Medical CONOPS development

• Finalizing details for Medical Assessment visits to the Philippines and Cambodia

14

UNCLASSIFIED

UNCLASSIFIED

Engineering Update

Site Survey Projects Recommended SMEE Request Philippines 3 schools & 1 medical clinic Seawall-Dr. LinCambodia 3 health centers Bldg; P&E; CCADIndonesia 3 health centers & 1 school Seismic; Disaster Vietnam 2 health centers Disaster; Safety

Australian Defence Force approval is approximately 90% complete. -ADF determination of FIE will follow site survey report

Philippine Project Package preparation (ACB1 lead- BUC Sarmiento)

Cambodia Project Package preparation (NMCB40 lead)

Indonesia Project Package preparation (ADF lead/NMCB40 Alt)

Vietnam Project Package preparation (NMCB40 lead)

Completed On-track Off-Track/Recoverable Off-Track not recoverable

15

UNCLASSIFIED

UNCLASSIFIED

Engineering Update

NALO Flight request submissions.

- Confirm ability to land NALO C-130 at Talaud Airport, Indonesia. Inability will require using a combination of Manado Airport and commercial surface shipping.

- Confirm ability to land NALO C-130 at Calbayog City, Samar Philippines.

- Vietnam mission will require NALO C-130 to land at Hanoi IOT clear customs, movement of equipment and PAX to Nghe An Province via contracted trucks and passenger bus.

Identify all customs and entry requirements for Indonesa, Philippines,And Vietnam.

- Visa requirements for PAX (30+ days)- Required documents for tools and equipment (customs process

and US Embassy customs POCCompleted On-track Off-Track/Recoverable Off-Track not recoverable

16

UNCLASSIFIED

UNCLASSIFIED

Logistics Update

• Logistics WG held 17 Jan 12

• Funding– APRI

• MTF MERCY received $600K of required $1.9M • Pharmaceuticals and Consumables

– Working with DLA to place initial orders• Donation Material

• Next Logistics WG meeting scheduled for 24 JAN 12

17

PP12 Supply and Logistics StatusFUNDING (17JAN12)

17 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

APRI CPF/SUPPO

31JAN12 - APRI ($600K of $1.9M required received)

ORF C7F/SUPPO

07FEB12 - Requirements review in progress

OCO CPF/SUPPO

15APR12 - Requirements review in progress

18 18 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

Indonesia Load List

SUPPO 03FEB12 - Load list developed pending MPC update(s).- Final pharmaceutical list due to FLC Yokusuka contracting post MPC for contract award determination - Requisitioning of standard consumable items commencing week of 17 Jan 12

Philippines Load List

SUPPO 03FEB12 - Load list developed pending MPC update(s)- Requisitioning of standard pharmaceutical and consumable items commencing week of 17 Jan 12

Vietnam Load List

SUPPO 03FEB12 - Load list developed pending MPC update(s).- Final pharmaceutical list due to FLC Yokusuka contracting post MPC for contract award determination - Requisitioning of standard consumable items commencing week of 17 Jan 12

Cambodia Load List

SUPPO 03FEB12 - Load list developed pending MPC update(s)- Requisition of standard pharmaceutical and consumable items commencing week of 17 Jan 12

PP12 Supply and Logistics StatusPHARMACEUTICALS and CONSUMABLES (17JAN12)

19 19 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

Load Plan MSC/SUPPO

31JAN12 - Load plan developed pending MSC MERCY approval- 240 pallet maximum established

Project Handclasp

SUPPO 15MAR12 - Preparations ongoing with POC

LDS SUPPO 15FEB12 - Preparations ongoing with POC

Worldwide VETs

SUPPO 15MAR12 - Preparations ongoing with POC

PP12 Supply and Logistics StatusDONATION MATERIAL (17JAN12)

20

PP12 Civil Affairs WG

20 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

CJ-CMCC Concept Paper Dev DESRON 17 JAN

- Awaiting chops from: DESRON , MERCY,- Chops received from PP 09, 10, 11 reps, COE-DMHA (IHC) -19 JAN CAWG will focus on final inputs

CMCC Battle Rhythm and Wagon Wheel Sych

DESRON 19 JAN - Discussed 13 JAN at C3F, awaiting DESRON battle rhythm to synch with.

Non-Medical SMEE CONOPS Draft Plan CAWG 23 JAN - On track

Operational Assessment Plan CAWG MAR 12

- Assessment WG meeting 20 JAN to produce draft task list which will go out to all WG for validation.-Geared toward MOPs

Strategic Assessment Plan CAWG APR 12

- Geared towards Theater Strategic Objectives

NGO and Partner Nation Engagement Process

CAWG /CPF N5

MPC

- 80% plan post MPC but add-ins will be ongoing.

21 21 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

IT & Radio Operator Manning

CPF N3/ CDS /

15JAN12 -Each MEDCAP = 1-IT (HERS) - JCSE IEP (3 ea +OIC= 7 pers ) approved 05DEC- 4+Remote MEDCAP manning review.-Ashore Command Center

Annex K / COMM Plan

CPF/ C3F/CTF-76/CDS

PRE-MPC

- IAW NTTP 3-57 Navy HCA OPS-Based on PN/HN COMM interoperability assessments and simultaneous missions.-OPTASK COMMS required.

BGAN SATCOM

CPF N6/CDS POST-

MPC

- Not required for PDSS. (17OCT11 CDS-7 N6 email).- OPTEST CPF BGANs (FEB12).- Develop CONOPS for BGAN use.

Host Nation Spectrum Mgt

C7F/CTF-76 /CDS

PRE-MPC -Determine frequency restrictions for each host nation.

PP12 CIS Information Systems Status(18JAN12)

22 22 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req

Notes

PAO Network CPF PAO/N6/ CDS/MERCY

PRE-MPC -Defense Video & Imagery Distribution System (DVIDS) : PAO confirmed system is available. Ashore use only.- Verified Fast File Transfer (FFT) SW (version 2.43) Installed in MERCY. FFT IATO cert. in progress at CYBERFOR.

PN-NGO Business Center(SSC LANT CHARLESTON)

CPF N6 / CDS/MERCY

APR12 -SPAWAR PN-NGO Business Center (Wireless and terminals) is the afloat solution. -MERCY to coordinate refresh/OPTEST/training in San Diego by SPAWAR. SOW in development (09JAN12).- CDS procure printer consumables for entire mission.-IA/business rules provided CDS-7 N6 03NOV11.

Partner Nation Interoperability

CPF N6 / CDS

POST-MPC

-Verify Partner Nation (PN) CIS POCs.-Verify APAN accounts for all PN CIS WG team members.-PN CIS capability review.-Develop CIS Interoperability Matrix in Annex K.

HumanitarianElectronic Record System

CIS WG/CDS N6

TBD -HERS funded by MARFORPAC Experimental Center (MEC)-System status: in development.

PP12 CIS Information Systems Status(18JAN12)

23 23 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req

Notes

Remote MED-DENCAP /CC Comms Arch

CDS / CPF

PRE-MPC

-UHF data and voice SATCOM/LOS Comms for CAP to air/ship.-Identify CIS Element architecture and inventory.

Host Nation MIL C4

PDSS OIC

PDSS AAR

-PDSS OICs for assessment action.-Training provided to Blue Team 21OCT11.

Host NationCIVIL Comms

PDSS OIC

PDSS AAR

-PDSS OICs for assessment action.-Training provided to Blue Team 21OCT11.

Remote Site US Mission CISAssessment

PDSS OIC/AOIC

PDSSAAR

-JCSE Planner not included in PDSS. PDSS AOIC to conduct assessments with provided checklists and guidance.-Command Center (CC) Comms assessment.-Training provided to Blue Team 21OCT11.

PDSS CISComms

CPF/ CDS PDSS OICs

PRE-PDSS

-Iridium Phones: CPF N6 issued phone to Blue OIC.-In country cell phones: MERCY to provide from PP10 mission phones.-Automated Data Collection (8 cell phones app) issued to OIC.

PP12 CIS Information Systems Status(18JAN12)

No Change

24 24 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req

Notes

Knowledge Management /Data Protection

CDS/MERCY

TBD -MEDCAP/CDS/Mission Data storage and protection

Command Center Ashore CIS

CDS PDSSAAR

-Identify configuration and location in each country.

IT SMEERequests

CDS PDSS AAR

-PDSS determine scope (SYSADMIN, repair, training, etc.).

SATCOM Requests

C3F/C7F/CDS

FEB12 -Standard USN process.

Mission COMMs Readiness

CDS /MERCY

APR12 -Pre-deployment COMM Checks (DVIDS, FTP, FFT, NMCI FAS, MERCY COMMs Suite)

PP12 CIS Information Systems Status (18JAN12)

25 25 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req

Notes

FSET on MERCY

CPF /MSC

TBD - Field Service Engineering Team (FSET) rqmt for San Diego to Hawaii cost estimate from SPAWAR requested 22NOV. Requested SOW status (10JAN12).-Funding transfer to SPAWAR TBD

End of Mission CIS Exit Plan

CPF/CDS

TBD - Hardware: Transfer custody of loaned CIS items back to CPF-Data Exit Plan: TBD

VHF Handheld Radios

CPF/CDS

FEB12 -CDS determine required quantities

ADVON CIS CDS Pre-MPC -CDS determine requirements.

Embarked Documentary Team

CDS Ongoing -CDS determine requirements and set expectations-Afloat connectivity limited to NGO Business Center

PP12 CIS Information Systems Status(18JAN12)

26

UNCLASSIFIED

UNCLASSIFIED

Force Protection Update

• MFP sourcing drop dead date and branch plan

• TA possibilities (hotels, routes, etc)

• HN/In country coordination update

• Pre-Deployment travel Requirements– Updated ISOPREPs– APACS– iATP– AOR location specific brief– Level I ATFP– SERE 100 B

27

UNCLASSIFIED

UNCLASSIFIED

Public Affairs Update

- Admin• Mission PAO to DC 15-18 JAN for CHINFO/OSD/DOS

meetings/coordination for mission roll-out

- Media Coordination• CAPT Breslau, LCDR Lohmeyer will meet with Warner Bros. and

NAVINFO WEST in LA 25 JAN

28

UNCLASSIFIED

UNCLASSIFIED 28

Item/Task Status Action Suspense Date

Notes

PAG CDS PACPF PA

TBD Draft to CDRE 15 DECRouting will happen D-30 to 45 days

DC media trip/mission announcement

NS CDS PA APR 2012

PP Fact Sheet CDS PA, CPF PA

30 DEC Mission info to NAVINFO WEST for vetting

Smartphone SOP

NS CIWG, CPF Social Media

15 MAR

Online presence brief

CDS PA, CPF PA

9 DEC Social media, websites, etc

Completed On-track Off-Track/Recoverable Off-Track not recoverable

Public Affairs Update

29

UNCLASSIFIED

UNCLASSIFIED

Item/Task Status Action Suspense Date

Notes

Equipment requirements

CDS PA, NPASE

TBD Dialogue initiated w/ MERCY on 04 JAN

PO&AM inputs CDS PA, CPF PA

14 DEC Due to FOPS.PA-specific updates in progress

Media Training Plan

CDS PA

TBD Training to CDS leadership and mission participants

COMREL purchase list

CPF PA

TBD Will request final approval after MPC

29 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Public Affairs Update

30

UNCLASSIFIED

UNCLASSIFIED

PP12 Communication Integration

• Finalizing products to support detailed communication planning and assessment for each location (due 30 JAN)

• Coordinating communication assessment support for PP12 (MAY – SEP 12)

– Include “baseline” and post-mission support

• Next CIWG meeting scheduled for: 19 JAN 12

• AMEMB Cambodia, Vietnam Telecons being coordinated

31

PP12 Communication Integration

31 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

Stakeholder Analysis

CIWG 15 NOV - Initial product completed. Briefing with Commodore Morgan scheduled for early Dec.

Characterize Information Environment

CPF N2/N39

15 NOV – 30 JAN

-Political Military Economic Social Infrastructure and Information (PMESII) product status is as follows: Cambodia 100%, Indonesia 100%, Vietnam 99%, Philippines 95%.

Communication Strategy/ Implementation Plan

CPF N2/N39

31 DEC - This product will detail integrated approach for internal, external messaging. This product will be a draft until finalized as an Annex to the CPF PP12 Campaign Plan.

Identify/Coordinate key messaging events

CIWG 15 JAN - Identified; coordinating CIWG support:-- ETG Leadership Training-- MPC Assessment planning-- SLV support

Develop messaging products

CIWG/ CPF N2/N39, PA

15 APR - Not started.

32

PP12 Communication Integration

32 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

Develop communication MOE Indicators

CIWG/ N2/N39

15 JAN - Part of overall PP12 assessment effort.

Define Communication assessment methodology

CPF N2/N39

30 JAN - Part of overall PP12 assessment effort.

Coordinate and monitor communication during execution

CPF N2/N39

During PP12

- Not started. Part of overall PP12 assessment effort.

Conduct communication assessment

CIWG During PP12

- Not started.

Develop AAR CPF N2/N39, PA

30 SEP - Not started.

33 33

Planning Timeline

UPDATED: 18JAN12 INDICATES UPDATE

34

Mission Commander Priorities

• Country CONOPS Development– 23-Jan-12 COUNTRY CONOPS (DRAFT) TO CDRE– 30-Jan-12 MPC (PRESENT DRAFT CONOPS)

– C2/Task Organization Proposal (next slide)• CMCC / ENG / MED / EST / Shore FP – requires additional C2 slides

to show organization and relationships

– Issues:• Dedicated medical planner

– Prioritized list of MEDCAPs to aid in SOM development• Veterinarian – tasked w/ COBRA GOLD & day job; adversely affects

contribution to CONOPS• Need refined SMEE list for each country• EAP input• Determining Medical contingent for ADVON / Mission

– LT Owens – incorrect specialty code, may be ineligible for ADVON

– CDR Currie – unable to participate in mission/deploy– LTJG Ward – only med planner

35

ProposalNOTE: CMCC, ENG, MED, EST, Shore FP – requires additional C2 slides to show organization and relationships

36

• MPC– Official agenda released in announcement message (CDS7 062325ZJAN12)– 29JAN12 – Civilian Participant Planning and Discussion (USNS MERCY)– 30-31JAN12 – MPC (Admiral Kidd Conference Center)

DUE DATE COG TOPIC TASK DESCRIPTION STATUS18-Nov-11CPF / CDS7 - N1 MPC OBTAIN VENUE (RESERVATION) FOR MPC (ADMIRAL KIDD) COMPLETED18-Nov-11CPF MPC FUNDING APPROVED FOR MPC COMPLETED2-Dec-11CDS7 - N3 MPC OBTAIN DRAFT AGENDA FROM PREVIOUS MPC COMPLETED

16-Dec-11CDS7 - CS1 RUBIO MPCDV GIFT TRACKER (TBD - DEPENDS ON RFI TO CPF) - GIFT FOR MPC = COINS COMPLETED

16-Dec-11CDS7 - CS1 RUBIO MPC ORF FOR DV GIFTS (TBD - DEPENDS ON RFI TO CPF) IN PROGRESS16-Dec-11CDS7 - N3 MPC SOCIAL - DETERMINE VENUE COMPLETED

16-Dec-11CPF - LCDR RIOS MPC RFI: DV GIFTS (PRIVATE) - DETERMINE PROTOCOL / APPROPRIATENESS COMPLETED16-Dec-11CPF MPC OBTAIN POC INFO FOR WELCOME LETTERS / PACKAGES COMPLETED

28-Dec-11CPF / CDS7 - N1 MPC

SEND OUT MPC INVITATIONS [INCLUDE SOCIAL FEES, UNIFORM REQUIREMENTS, BRIEF SUBMISSION GUIDELINES, INTERPRETERS, POC INFO, RSVP DATE & TRAVEL INFO, NO HOST SOCIAL, ATTIRE, AGENDA, DELIVERABLES] COMPLETED

28-Dec-11CPF / CDS7 - N1 MPC LODGING ARRANGEMENTS [COURTYARD MARRIOT - LIBERTY STATION] COMPLETED28-Dec-11CDS7 - N3 MPC SEND OUT ANNOUNCEMENT MESSAGE COMPLETED28-Dec-11CDS7 - N3 MPC PROMULGATE AGENDA FOR PP12 MPC COMPLETED

28-Dec-11CDS7 - N3 MPCPROMULGATE BRIEF COLLECTION / TIMELINE FOR SUBMISSION (PLACE IN MSG - UNCLAS ONLY, NO FOUO) COMPLETED

28-Dec-11CDS7 - N3 MPC SOCIAL - RESERVATION COMPLETED11-Jan-12CPF MPC GOV PURCHASE CARD / CONTRACT COMPLETED

11-Jan-12CPF MPCARRANGE REFRESHMENT/SETUP PACKAGE (WATER, COFFEE, LINEN, PODIUM, MICROPHONE, PROJECTORS) COMPLETED

20-Jan-12CPF / CDS7 - N3 MPCARRANGE VANS/TRANSPORTATION [6 VANS / 4X HN DV, 2X TRANSPORTATION] IN PROGRESS

Mission Commander Priorities (continued)

37

DUE DATE COG TOPIC TASK DESCRIPTION STATUS

20-Jan-12CPF / CDS7 - N3 MPCSOCIAL - TRANSPORTATION REQUIREMENTS (1 VAN - REQUEST TO BE ROUTED) IN PROGRESS

23-Jan-12CPF MPC DV TRANSPORTATION / TRAVEL IN PROGRESS

23-Jan-12CPF MPCIDENTIFY DV ESCORTS [TENTATIVE LIST - PENDING FORMAL RSVP] IN PROGRESS

23-Jan-12CDS7 - N1 MPC ASSEMBLE PARTICIPANT LIST (RSVP) / POC LIST IN PROGRESS23-Jan-12CPF MPC ARRANGE INTERPRETERS FOR PN / HOST NATION IN PROGRESS23-Jan-12CDS7 - FPO MPC BASE ACCESS REQUEST IN PROGRESS

23-Jan-12CDS7 - N3 MPCVENUE PARKING ARRANGEMENTS [COORDINATE WITH ADMIRAL KIDD] COMPLETED

24-Jan-12CDS7 - PAO MPC CDRE OPENING / CLOSING REMARKS [SPEECH] IN PROGRESS25-Jan-12CDS7 - N3 MPC STAFF PLAN (ROLES & RESPONSIBILITIES) IN PROGRESS25-Jan-12CDS7 - N3 MPC VENUE SETUP PLAN IN PROGRESS

25-Jan-12CDS7 - N3 MPC

SECURE ADDITIONAL PERSONNEL TO ASSIST WITH MPC EXECUTION: VAN DRIVERS, PARKING ATTENDANTS, CHECK-IN DESK, SET-UP/BREAKDOWN TEAM IN PROGRESS

27-Jan-12CDS7 - N1 MPC NAMETAGS / BADGES IN PROGRESS

27-Jan-12CDS7 - N1 / N2 / PAO MPCWELCOME PACKAGE: AGENDA, POC LIST, LOCAL ESTABLISHMENTS, MAPS/DIRECTIONS, SOCIAL EVENT INFO IN PROGRESS

27-Jan-12CDS7 - N2 / N3 / PAO / N6 MPC

VENUE SETUP: SIGNAGE, CHECK-IN TABLE, FOOD TABLES, MAIN AREA, BREAKOUT SESSION, DV ASSIGNED SEATING/NAME PLACARDS, A/V, WHITEBOARDS / EASELS, DRY ERASE MARKERS [RFI - WHEN CAN SETUP BEGIN] IN PROGRESS

27-Jan-12CDS7 - N3 MPC DRAFT CONOPS PRINTED IN BINDERS FOR DVS IN PROGRESS

30-Jan-12CDS7 - N1 MPCCONFERENCE [SOCIAL] FEES / COLLECTION / PRICING / RECEIPT BOOK IN PROGRESS

30-Jan-12CDS7 - N1 MPC SOCIAL - FUNDING IN PROGRESS30-Jan-12CDS7 - N6 MPC ELECTRONICS SETUP (PROJECTOR / LAPTOPS) IN PROGRESS30-Jan-12CDS7 - PAO MPC PHOTO SESSION - EQUIPMENT, PHOTOGRAPHER, LOCATION IN PROGRESS

3-Feb-12CDS7 - N3 MPCDISTRIBUTE BRIEFS POST MPC (APAN) [UNCLAS ONLY, NO FOUO] IN PROGRESS

Mission Commander Priorities (continued)

• MPC - POA&M (continued)

38

Mission Commander Priorities (continued)

• CMCC TTX (01FEB12)– Initial objectives:

• Organization review• Job description assignment• Workspace familiarization• Communications familiarization• CMCC problem solving (scenario – walk-thru/talk-thru)

– Participant List TBD• SLV preparations

– Issues:• CPF participant requested• Vietnam visas• Agenda / KLE

• Miscellaneous– Manning / Billet gaps– Proposed Mission Planning Rhythm in development– CMCC Watchfloor products in development:

• SORM / SOPs• Watchbills• PPRs

39

UNCLASSIFIED

UNCLASSIFIED

Closing Questions/Comments

• CPF Staff• State Dept – Mr. Weinz• AUS HQ JOC• HQ JFNZ• JSDF• FLC-Yokosuka• C7F• C3F• CTF 76

• 351st Civil Affairs Command• DLA Troop Support - Pacific• 30th NCR• ETG• HSC-21 DET 2• MCAST• USNS MERCY• CDS-7