pacs ihdr 12/13 nov 2003 pacs fpu optics: concept and alignment r. graue, d. kampf kayser-threde

21
PACS FPU PACS IHDR 12/13 Nov 2003 Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde

Upload: cori-day

Post on 26-Dec-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

PACS FPU

PACS IHDR 12/13 Nov 2003

Optics: Concept and Alignment

R. Graue, D. KampfKayser-Threde

PACS FPU

PACS IHDR 12/13 Nov 2003

Optics Concept - Overview

• Optical Layout unchanged compared to IIDR• Optical analyses and documentation

completed– Alignment plan– Straylight analyses– Optical Performance analyses (Ray tracing, spot

diagrams)– Mirror fabrication data package

PACS FPU

PACS IHDR 12/13 Nov 2003

Alignment Tasks

• Optical axis of telescope to FPU (alignment cubes/mirrors)

• Top Optics with Calibration Sources and Chopper

• Slicer optics

• Spectrometer/Collimator optics with Grating Assembly

Dummy, Dichroic, FW1, Ge:Ga Detectors

• Bolometer optics with Dichroic, FW2

• Integration of bolometer assembly (CEA)

PACS FPU

PACS IHDR 12/13 Nov 2003

Alignment PlanLaser Battery (AKF) at Telescope secondary mirror

Laser battery

OB simulator

Top Optics

PACS FPU

PACS IHDR 12/13 Nov 2003

Alignment PlanTop Optics at OB with alignment cube and mirror

Top Optics side view

ChopperInternal aperture stop

PACS FPU

PACS IHDR 12/13 Nov 2003

Alignment PlanTop Optics without OB from rear

IntermediateFocal plane

PACS FPU

PACS IHDR 12/13 Nov 2003

Alignment PlanBolometer alignment

Laser diode setup Pinholes at focal plane for laser OR LED‘s

PACS FPU

PACS IHDR 12/13 Nov 2003

Alignment PlanBolometer alignment jig for filter wheel and focal planes

PACS FPU

PACS IHDR 12/13 Nov 2003

Alignment PlanSlicer alignment together with Top Optics

Focal Plane

PACS FPU

PACS IHDR 12/13 Nov 2003

Alignment PlanCollimator Alignment

Laser & LEDSource

PACS FPU

PACS IHDR 12/13 Nov 2003

Alignment procedure (first page only)

PACS FPU

PACS IHDR 12/13 Nov 2003

Autocollimation of Alignment Tool

PACS FPU

PACS IHDR 12/13 Nov 2003

Top Optics Centered

PACS FPU

PACS IHDR 12/13 Nov 2003

Final Alignment

PACS FPU

PACS IHDR 12/13 Nov 2003

Laser test set up

PACS FPU

PACS IHDR 12/13 Nov 2003

Top Optic Set Up

PACS FPU

PACS IHDR 12/13 Nov 2003

Top Optics Alignment Set Up

PACS FPU

PACS IHDR 12/13 Nov 2003

Top Optics Alignment Set Up

PACS FPU

PACS IHDR 12/13 Nov 2003

Alignment

PACS FPU

PACS IHDR 12/13 Nov 2003

OGSE OverviewStatus• OGSE design and procurement nearly completed (Spectrometer: until end of

Nov 2003)Procured OGSE Items• Autocollimation telescope• Optical mounts• 4 x CCD array with optics• PC with framegrabber• 2 x alignment telescope• 10 x HeNe Laser and laser diodes• Set of pinholes with LED's (point sources)• Support structure for pinholes• Masks for mirrors (plexiglas with 3 point orientation to the front surface)• Scatter-plates• Lateral translation stages• 2 x Rotary table• Alignment mirrors during alignment (temporary)• Alignment mirrors for FPFPU alignment• Pentaprism

PACS FPU

PACS IHDR 12/13 Nov 2003

Alignment Status

• Updated Alignment plan issued

• Alignment procedure engineering completed

• Top Optic Alignment under progress (until mid of Nov.2003)

– Chopper, Calibration Sources, Alignment Cubes aligned

• Top Optics Stability test under Helium temperatures in KT

Cryostat after Top Optic alignment

• Slicer, Collimator, Bolometer, Spectrometer alignment until X-

mas 2003