pacs ihdr mpe, 12/13 nov 2003 pacs icc1 icc - egse, pcss, hcss, iegse - otto h. bauer mpe garching

18
PACS ICC 1 PACS IHDR MPE, 12/13 Nov 2003 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching

Upload: dimitri-lucks

Post on 14-Dec-2015

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching

PACS ICC 1

PACS IHDR MPE, 12/13 Nov 2003

ICC - EGSE, PCSS, HCSS, IEGSE -

Otto H. BauerMPE Garching

Page 2: PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching

PACS ICC 2

PACS IHDR MPE, 12/13 Nov 2003

Major Goal: Smooth Transition between Mission Phases

Page 3: PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching

PACS ICC 3

PACS IHDR MPE, 12/13 Nov 2003

EGSE/HCSS Set-up for ILT

Page 4: PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching

PACS ICC 4

PACS IHDR MPE, 12/13 Nov 2003

AVM-ILT in the PACS LabAVM-ILT in the PACS Lab

Page 5: PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching

PACS ICC 5

PACS IHDR MPE, 12/13 Nov 2003

ICC (I)

• ICC Meeting at MPE, June 26/27 and Oct 7/8: Major topics:– Analysis results of Ge:Ga six-pack data– Discussion of Calibration Implementation Procedures (CIPS),

corresponding Test Procedures and Command Sequences– ´Godfather´principle: ICC members become familiar with

hardware

• Scientific Simulator WG– Revision of design and architecture, link to HCSS framework– S/C attitude and telescope emissivity and thermal noise

included– Chopper commands and spatial sampling added– Complete chain for blue photometer is ready, red part under

test

Page 6: PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching

PACS ICC 6

PACS IHDR MPE, 12/13 Nov 2003

ICC (II)

• Commanding WG– AVM-ILT: Definition of on-board control procedures, test

procedures and related IA/QLA requirements ongoing

• EGSE WG– Improvements to TestControl to be compliant with CCS

environment at Astrium – Discussion on Instrument EGSE hardware (to be delivered

to Astrium) with HIFI and SPIRE

• Operations WG– Support of test activities– Analysis of Ge:Ga six-pack data

Page 7: PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching

PACS ICC 7

PACS IHDR MPE, 12/13 Nov 2003

Instrument Overview and Subsystem Responsibilities

Blue Ge:Ga Array& CRE

M PE / ANTEC / IM EC

Red Bol Array& Read-out

CEA

Blue Bol Array& Read-out

CEA

Red Ge:Ga Array& CRE

M PE / ANTEC / IM EC

0.3 K Cooler

CEA

Grating AssyLaunch Lock

CSL-Liege

Chopper Assy

M PIA

2 Filter W heels

KT

2 Cal. Sources

KT

BOL 1Module

Bol 2Module

CoolerControl

CEA

MEC I/F Module

DSP Module

MEC Base

BOLC pr/re

MEC1 nom inal

SPUNominal

IAC-Tenerife/TU-W ien

SPURedundant

IAC-Tenerife/TU-W ien

DPUNominal

DPURedundant

IFSI-Rome

KT / MPE

nominal DPU - MEC1redundant DPU - MEC2nominal DPU - nominal SPUredundant DPU - redundant SPUMEC1 - nominal SPUMEC2 - redundant SPUMEC1/2 - DEC1/2

E-doc\Gra fiken\PACS\pacs-b lockdiagramm -IIDR.cdr

Blue DEC Module

DEC Base

DEC1 blue

M E C I/F M odu le

D S P M odule

M E C B ase

MEC2 redundant

R ed D E C M odu le

D E C Base

DEC2 red

CSL-Liege

CSL-Liege

CSL-Liege

Temp. Sensors

KT/M PE

FPUCold Focal Plane Unit

SPU

SPU

DPU

CSL-Liege

CSL-Liege

BOLC prime - MEC1BOLC redundant- MEC2

Warm Interconnecting Harness

Page 8: PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching

PACS ICC 8

PACS IHDR MPE, 12/13 Nov 2003

Test Equipment and OGSE: Overview

LHe4.2 K

PACSFPU

LN2

77 K

1.7 KLHe

I / F

TESTOPTCS

CR

YO

-B

B1

CR

YO

-B

B2

PACS-Testcryostat

cryostattemp diodesMonitor 218

IEE

E/

RS

232

cryostattemp sensors

Monitor 1TIC 304 M

IEE

E

Monitor 2TIC 304 M

IEE

E

4.2 K LHe-LevelModel 135

IEE

E

1.7 K LHe-LevelModel 136

IEE

E

77 K LN2-LevelModel 186

IEE

E

PressureMonitor

PKR 251

RS

232

Motor driveelectronics

RS

232

TempSensors

Monitor 218

IEE

ER

S 2

32

BB1Controller 370

IEE

ER

S 2

32

BB2Controller 370

IEE

ER

S 2

32

BOLC

DEC/MEC

DPU

SPU

XY-StageControl

RS

232

m3/hm3/hvacuum-pump m3/h

Pumping unit He-pump

ext. BBand

controller

gascell

Hotp

late

LENS I/F

PCEA300 K Harness

CSL300 K Harness

testoptics300 K Harness

Scanner3716

Scanner3716

PC"Labview"RS 232IEEE

CR

YO

VA

CC

RY

OV

AC

RS

232

XY Stage

Testoptics4 K Harness

4-3

00 K

Harn

ess

Page 9: PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching

PACS ICC 9

PACS IHDR MPE, 12/13 Nov 2003

CQM ILT Programme("Blue" means range of parameter settings reduced or test modified)

• F1.1 FPU integration with test cryostat and OGSE3, alignment

• F1.2 Electrical continuity check• F1.3 Functional test exercising all

mechanisms, temperature sensors, sources and detector array read-outs

• F1.4 Cool down to LHe• F1.5 Functional test exercising all

mechanisms, temperature sensors, sources and detector array read-out

• Q2.1 FPU Thermal behaviour• Q2.2 Focus definition• Q2.3 Relative alignment check

spectrometer vs. photometer arrays after vibration respectively thermal cycling

• Q2.4 sensitivity• Q2.5 spatial performance• Q2.6 spectral performance• E1.1 Instrument EMC tests

• C3.1 Absolute flux calibration, linearity• C3.2 Flat field• C3.3 Point spread function• C3.4 Distortion, grating alignment• C3.5 Relative Spectral Response

Funct.• C3.6 Wavelength-calibration using

TUFIR replaced by vapour absorption cell• C3.7 Instrumental profile (grating)

measured with TUFIR replaced (however, some initial profile information from absorption line measurements are planned.

• C3.8 Ghosts (search for spectral ghosts) TUFIR only, maybe Ge laser?

• (C3.9) Stray light (ghosts) with Ge laser?

• C3.10 Detector time response, stability• (C3.11) Definition of PACS pass bands with

TUFIR (not possible with Ge laser)• (C3.12 ) AOT try out

Page 10: PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching

PACS ICC 10

PACS IHDR MPE, 12/13 Nov 2003

Calibration WG

• Compilation and release of PCD draft 7– CIP´s and CAP´s for functional tests of Ge:Ga

detectors– First ideas how to include proton irradiation

measurements from tests at UCL-CRC– More details on tests of internal calibration sources

• AOT design– Preparation of AOT´s for photometer– TN on spectrometer AOT´s

• Work on spatial calibrators– HiRes images for stellar and extragalactic fields– Astrometric alignment on 2MASS imagesCIP = Calibration Implementation Procedure CAP = Calibration Analysis Procedure

PCD = PACS Calibration Document

Page 11: PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching

PACS ICC 11

PACS IHDR MPE, 12/13 Nov 2003

Page 12: PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching

PACS ICC 12

PACS IHDR MPE, 12/13 Nov 2003Completed Test Descriptions and Command

Scripts Requirements CIP/CAP TIP/TAP Tcl IA

Functional tests (F1.x, F2.x)

Performance tests (P2.x)

Calibration measurements (C3.x)

Spectrometer

12

6

17

5

6

16

4

6

13

2

0

2

2

6

14

Requirements CIP/CAP TIP/TAP Tcl IA

Functional tests (F1.x, F2.x)

Performance tests (P2.x)

Calibration measurements (C3.x)

Photometer

15

6

11

1

4

9

0

1

6

0

0

1

0

0

6*

* not complete

Most missing spectrometer scripts are in progress, in part pending due to missing technical information

Many photometer scripts are pending due to missing technical information, situation slowly improving now

Page 13: PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching

PACS ICC 13

PACS IHDR MPE, 12/13 Nov 2003

Current PCSS Functionalities (I)• Quick-Look Analysis QLA: monitoring of signals in Photometer and

Spectrometer pixels– Offline on stored telemetry or decompressed data

• Preparation of detector selection tables for uplink via GUI Inspect Telemetry and Telecommand Packets:

– Automatically propagated from the MIB definitions– Overview of types, number of packets and parameters in the packet sequence– Selection on type, header fields and any telemetry measure in the packets– Extraction of telemetry measures into Tables for convenient plotting, trend

analysis, operations, save/restore, export

• Decompression of science data – Telemetry Packets to Data Frames

• reduced signals, DMC headers and selected raw data

– Access to signals, samples and DMC headers as Tables and Measures for plotting, visualization, fitting, etc…

• Import of component level CRE/photoconductor data into same structures

– of Tables (automatic labeling, inc. units) and on some primitive arrays – Labels, zooming, hardcopy, plotsymbols, ...

Page 14: PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching

PACS ICC 14

PACS IHDR MPE, 12/13 Nov 2003

Current PCSS Functionalities (II)• Inspection of raw and reduced detector signals

– Statistics on datasets (max, min, mean, median, RMS, sum, ….)– Polynomial fitting on datasets (e.g. integration ramps)– Some functions (FFT, Convolutions)

• Plotting– of Tables (automatic labeling, inc. units) and on some primitive

arrays • Labels, zooming, hardcopy, plotsymbols, ...

• Store the History of your session, edit it and rerun it• Write your own data reduction scripts in jython

– starting from templates and examples

• Define Tables or other data structures to hold intermediate results or CAP results (Calfiles), populate them, save/restore as fits, exchange them

• Export any dataset to FITS

Page 15: PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching

PACS ICC 15

PACS IHDR MPE, 12/13 Nov 2003

Current PCSS Functionalities (III)• Improved support of CRE Data analysis • Interface to OBSW development • Image dataset (image, WCS) + viewer + operations• Image cube dataset + viewer + operations• Spectrum dataset + viewer + operations• Select/where on tables and Data• HK correlation with Science Data• QLA running on near real-time telemetry stream • MIB Calibration curves applied on housekeeping measures• More functions and optimization algorithms• Access to PACS operational Database• Data rate monitor• Use simulator data to test reduction scripts / CAPS• Access to instrument properties (e.g. Calibration source spectrum/cube, detector numbering) for

different instrument models / configurations• Improved User Documentation• Optimization for Decompression• IDL Bridge implementation• Intensive User <-> developer ‘workshops’ with immediate implementations of missing

functionalities • IA Processes as plug ins into QLA : BG Subtraction, Averaging, …• TC to TM verification framework• Version control for Detector Selection Tables

Page 16: PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching

PACS ICC 16

PACS IHDR MPE, 12/13 Nov 2003

OVERALL HERSCHEL S/C Test Configuration

HERSCHEL SATELLITE

CDM U SCO E

CCS

S C O E/D F E LA N

POW ERSCO E

ACM S SCOE TM /TC DFE TT&C SCO E

N D IU LAN

NDIU

w w w .station

IS LAN

PACSINSTRUM ENT

EGSE

HIFIINSTRUM ENT

EGSE

HerschelCryo SCOE

Stim uliInstrum ent

SCO E

SPIREINSTRUM ENT

EGSE

UMB

Page 17: PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching

PACS ICC 17

PACS IHDR MPE, 12/13 Nov 2003

IEGSE for IST

Router

SCOS-2000

HCSS

ParameterValues

Parameter Request

EGSE

TM

TM

QLA/IA

CCS

PIPEI/FParameter Request

Parameters

Test Sequences(Offline)

Pass/Fail Confirmation

TM

TM(Playback)

TMTM

MIB(Offline)

TM(Playback)

OOL

TCH

Page 18: PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching

PACS ICC 18

PACS IHDR MPE, 12/13 Nov 2003

IEGSE, CCS/PLM – DPU I/F Tests

• IEGSE H/W configuration under discussion between 3

instruments CCS - IEGSE I/F tests: Router, SCOS 2000, TOPE, Test

Control: end March 04 at Astrium, Ottobrunn

• DPU 1553 I/F test: Contract with Satellite Services, NL: test of physical

layers (MIL 1553B) at MPE, first week of December: 6k€

CCS/PLM – DPU+SPU, DECMEC Simulators: test at Astrium, Ottobrunn, second week of December, supported by Satellite Servives