Page 1 Bupyeong Facilities Management TeamOct 2006
Total Utility Management System
of GMDAT Bupyeong Plant
June. 2007
Bupyeong Facilities Management Team
Page 2 Bupyeong Facilities Management TeamOct 2006
CONTENTS
Plant Overview Location / Site Layout
Total Utility Mangement System Installation Work of Flow Meters Utility Management Point
TUMS 활용
Page 3 Bupyeong Facilities Management TeamOct 2006
Plant Overview
Page 4 Bupyeong Facilities Management TeamOct 2006
Location■ Plant Introduction
Bupyeong
Gunsan
170km
420km
260km
Boryung
Changwon
Kalos Tosca
• Location : Bupyeong, Incheon, 25Km west of Seoul• Area : 896,400 square meters • Completion of Construction :
Powertrain Plant (1972, Extension 1986, 2001)
Assembly #2 Plant (1972, Extension 1996)
Assembly #1 Plant (1986)
Gentra
Facility ProductCapacity
(000unit/year)
Assembly #1 Kalos / Gentra 264
Assembly #2 Tosca / Winstorm 185
Power-trainEngine : Fam I, XK T/M : D16/D20, D23/D33
541396
Winstorm
Page 5 Bupyeong Facilities Management TeamOct 2006
Site Layout
BP #1
Model: Kalos, Gentra
Area: 159,657 ㎡
BP #2
Model: Tosca, Winstorm
Area : 153,332 ㎡
Powertrain Plant
Model: Engine, T/A
Area : 86,613 ㎡
Land Area : 896,397 ㎡
G/A #2 shop XK Engine
Pressshop
Tool shop
G/A #1 shop
Body #1 shop
Paint # 1 shop
Paint # 2 shop
KD
Body #4 shop
Engine shopT/A
shop
Diecastingshop
D24 T/A
MainGate
WestGate
A/S Center
Technical Center
U/C#1WWTF
Deliveryyard
Waste Transferstation
Page 6 Bupyeong Facilities Management TeamOct 2006
Total Utility Management System
Page 7 Bupyeong Facilities Management TeamOct 2006
1. TUMS 소개
Total Utility Management System
■ 각 부서에서 사용하는 Utility 에 대해 목표 대비 실적 실시간 관리
▶ Flow meter 설치 수량 : 121 set
▶ Utility 계량계 : Compressed Air (25 개 ), Electricity (40 개 ), LNG ( 10 개 ) , Steam ( 23개 ) Water ( 23 개 )
■ 부평 공장의 모든 직원이 사내 Intranet 을 통해 접속 가능
■ 생산량 변동에 따라 각 부서의 Utility 목표량 변경 : 작업중
Page 8 Bupyeong Facilities Management TeamOct 2006
2. TUMS 운영 Software 개발
Total Utility Management System
Uti l i ty 예산 입력
, 당초 조정 예산 구분하여 표현
Uti l i ty 예산 입력
E-Metri cs 변환
생산량 담당별 생산량 입력
Target실시간 Target생산 계획에 따른 실시간
담당별 부서별 사용량
생산량
Uti l i ty 별 시간대별 사용 현황
과거 데이터 비교
Uti l i ty 부서별 사용량 비교 분석
추세 분석
Uti l i ty / 사용량 금액 저장
E-Metri cs 저장
대당 사용 현황 저장
월간 실적 및 실시간 누계 저장
구 분 세부 항목
Moni toring
Target
Di splay예산
total 부평 공장 사용량
Di splay실적
Analysi s
데이터/저장 출력
비교 분석
시간별 사용 현황
부서별 비교 현황
Target vsActual
월별 사용 현황 데이터 저장
Page 9 Bupyeong Facilities Management TeamOct 2006
3. Installation Work
Total Utility Management System
11,432,058
2,571,380
5,470,740
16,412,220
5,620,239
41,506,637
6.7
3.9
1.5
1.0
1.0
3.3
Page 10 Bupyeong Facilities Management TeamOct 2006
4. Installation Status
Total Utility Management System
1차체 1도장 1조립 2차체 2도장 2조립 프레스 FAM1 XK T/A D24
전력 2 1 1 1 1 1 1 8 3 1 1 2 7 1 24 40
압축공기 2 1 1 1 1 1 1 8 1 1 1 1 4 - 13 25
스팀 4 2 2 2 3 2 2 17 2 2 2 6 - - 23
LNG 2 1 2 5 1 1 2 3 10
용수 2 2 2 1 2 2 1 12 2 2 2 2 8 3 23
계 10 8 6 5 8 8 5 50 9 6 7 5 27 1 43 121
Total 구 분 1승용 담당 2승용 담당 엔진 미션계 계 KD 기타 부평 생산 담당 엔진 구동 본부
(*) Utility Flow Meter 는 각 공장 기계실에 각 Utility Main Line 에 설치됨
Page 11 Bupyeong Facilities Management TeamOct 2006
4. System 구성 (1)
Total Utility Management System
TridiumTridium
AX SupervisorAX Supervisor
일반 웹브라우저를 일반 웹브라우저를
통한 감시 및 제어통한 감시 및 제어
Ethernet TCP/IP
Modbus RTU
RS-485 통신으로 연결
Ethernet TCP/IP
Electricity
Steam
C/A
LNG
Water
Electricity
Steam
C/A
LNG
Water
…
Page 12 Bupyeong Facilities Management TeamOct 2006
4. System 구성 (2)
Total Utility Management System
1. Server Monitoirng system2. Direct Digital Control (DDC) 13ea3. Electricity Flow meters 40EA4. Steam Flow meters 23EA5. Compressed air flow meter 25EA6. LNG Flow meters 10EA7. Water Flow meters 23EA
Page 13 Bupyeong Facilities Management TeamOct 2006
5.TUMS 내부 화면 (1)
각 현장 이동
( 좌측메뉴 및 공장조감도 클릭 가능 )
Total Utility Management System
Page 14 Bupyeong Facilities Management TeamOct 2006
5.TUMS 내부 화면 (2)
Total Utility Management System
Page 15 Bupyeong Facilities Management TeamOct 2006
6. Daily Target Monitor
Total Utility Management System
Page 16 Bupyeong Facilities Management TeamOct 2006
7. Daily Actual Monitor
Total Utility Management System
Page 17 Bupyeong Facilities Management TeamOct 2006
TUMS 활용
Page 18 Bupyeong Facilities Management TeamOct 2006
■ Energy TFT Activities Contents
TUMS 활용
A. Review the energy actual status compared with budget by TUMS ▶ Check the each shop’s energy actual ( separate production time and non-production time)
▶ Analyze the energy usage status compared with each other ( compare the same utility actual with same period )
B. Share the Energy Saving Activities Method ▶ Introduce the each shop’s improvement case and its saving effect
▶ Recommend other plant energy saving activities case
▶ Utility Shut-down
C. Energy Audit Activities ▶ Member : Facilities Management Team 15 Person (Office 2, Field Worker 13 )
▶ Audit Period : Every weekend
▶ Audit Item - check the idle operating equipment ( Air conditioners, production line using air ) - Utility Leakage ( Compressed air, water, steam ) - Lights status ( Line, Dress Room, Office etc )
Page 19 Bupyeong Facilities Management TeamOct 2006
■ Analysis Data by TUMS
Attach #1 Review the Energy Actual
Page 20 Bupyeong Facilities Management TeamOct 2006
1. Shutdown the Utility at non-producing shop :17'th Feb(Sat) ~ 20'th Feb(Tue)
▷ Shutdown the Electric transformers and others power
- Shutdown the primary transformer included Paint Shop & others
( Paint : 5EA, Body : 9EA, Powertrain:4EA, G/A #1 & Press : 2EA , 154KV : 1EA )
▷ Shutdown the all of boilers at Bupyeong Plant ( 35ton:5EA, 20ton:3EA )
- Shutdown steam at Bupyeong Plant
2. Control the Air Compressor operating and fall the supply air pressure : 17'th Feb(Sat) ~ 19'th Feb(Mon)
▷ Fall the supply compressed air pressure
- Decrease the pressure 6.3kg/ ㎠ to 4.5kg/ ㎠
Process Unit ShutdownTerm
Savingamount
Savings/Cost(USD)
Remarks
Electricity Kwh2/17 ~2/20
1,539,150 87,728
Compressed Air ㎥ " 3,448,488included inelectricity
Steam(LNG) ㎥ " 129,293 66,592
Total 154,320
(*) Unit cost: - Electric ity:32.4USD/MWH (2/17~2/19) - Electric ity:65.79USD/MWH (2/20) - LNG : 0.4893USD/m3
● Activities for Energy Saving
● Effect of Energy Saving
Attach #2 Utility Shut-Down
Page 21 Bupyeong Facilities Management TeamOct 2006
■ Energy Audit Activities
Attach #3 Energy Audit Activities
Page 22 Bupyeong Facilities Management TeamOct 2006