part i, storm water management plan, program · pdf fileauthority/in year one. b. ......

34
Part I, Storm Water Management Plan, Program Management At a Glance "At a Glance" Storm Water Management Plan - Term 3 Protecting and Enhancing Water Quality by Reducing Storm Water Pollutants to the Maximum Extent Practicable City of Santa Rosa, County of Sonoma, and Sonoma County Water Agency June 2008 Prograri,ManagementGoal: Facilitat;~ c~JJ1rrUnicatio~~ClQdco()rdinat19D"b,etweenthecoper~'i~tee's; Regicmal Boa~d , .' and other'appropriate enti,ties~ Ensure·,tlJe,.sWMPelementsare·implemented;o·n:schedule and thC!fall requirements of the Permit are.met. ... ,;:.:~, .. :~.:\'.< ',;",',,' . ':.' ' .. ' .... :, '. "'.'.' " .... ,'. Co-permittee Monthly Coordination Meetings Annual Work Plan Annual Report Cooperative Agreement Coordination with Phase II Communities, Caltrans , and the Santa Rosa Junior College Schedule and conduct monthly coordination meetings Continue through Permit term a. Develop preliminary work plan, review with Regional Water Board staff at April Coordination Meeting, Annually b. Final Work Plan submitted with each Annual Report Submit to Regional Water Board on time October 1, Annually for Years 1, 2, 3 and 5 March 31 (of Year 5) for Year 4 Enter into Cooperative Agreement with Copermittees for Term 3 anticipated within 6 months of Program implementation Invite representatives from Phase II communities within the permit boundary, Caltrans, and the Santa Rosa Junior College to monthly coordination meetings Continue through Term 3 1-7

Upload: trinhthuan

Post on 18-Mar-2018

217 views

Category:

Documents


4 download

TRANSCRIPT

Part I, Storm Water Management Plan, Program Management At a Glance

"At a Glance" Storm Water Management Plan - Term 3Protecting and Enhancing Water Quality by Reducing Storm Water Pollutants to the Maximum Extent Practicable

City of Santa Rosa, County of Sonoma, and Sonoma County Water AgencyJune 2008

Prograri,ManagementGoal: Facilitat;~ c~JJ1rrUnicatio~~ClQdco()rdinat19D"b,etweenthecoper~'i~tee's; Regicmal Boa~d , .'and other'appropriate enti,ties~Ensure·,tlJe,.sWMPelementsare·implemented;o·n:schedule and thC!fall requirements ofthe Permit are.met. ... ,;:.:~, .. :~.:\'.< ',;",',,' . ':.' ' ..' ....:, '. "'.'.' ".... ,'.

Co-permittee Monthly Coordination Meetings

Annual Work Plan

Annual Report

Cooperative Agreement

Coordination with Phase II Communities,Caltrans , and the Santa Rosa Junior College

Schedule and conduct monthly coordination meetingsContinue through Permit term

a. Develop preliminary work plan, review with Regional Water Board staffat April Coordination Meeting, Annually

b. Final Work Plan submitted with each Annual Report

Submit to Regional Water Board on timeOctober 1, Annually for Years 1, 2, 3 and 5

March 31 (of Year 5) for Year 4

Enter into Cooperative Agreement with Copermittees for Term 3anticipated within 6 months of Program implementation

Invite representatives from Phase II communities within the permit boundary, Caltrans, and the SantaRosa Junior College to monthly coordination meetings

Continue through Term 3

1-7

Part I, Storm Water Management Plan, Program Management At a Glance

Review existing codes and proposeamendments as required

Review existing Storm WaterOrdinance for any neededrevisions/updateswithin 12 months of Permitimplementation

a. Provide a statement fromCounty Counsel demonstratingadequate enforcementauthority/In Year one.

b. Consult with Regional Boardr:m In!':AI/1? month!': of nArmit___ ••• __ ••• _ ••• __ • u • , •••• _

implementation

Water Agency relies on enforcementauthority of City and County, and hasno plans to seek additional authority.

The Water Agency will use its existinglegal authority as appropriate.

Grading Permit Issuance

Vineyard Planting/Replanting Compliance

Continue to implementcurrent approval process.

Submit list of active gradingpermits to RWQCB in eachAnnual Report.

N/A

a. Continue to require ErosionControl Plans for grading-permiUOngoing

b. Continue to use local ECPguidelines/Ongoing.

c. Report number of gradingpermits issued in AnnualReporUAnnually.

d. Review General PlanResource Conservation Elementto support policy changes/DuringPermit Term

a. All optional: Continue torequire Notifications be filed for·Levell, II, and III vineyardsites/Ongoing.

b. Continue to require ECPs forLevel II and III vineyardsites/Onaoina.

Under California planning and zoninglaw, land use is regulated by the Cityand County, rather than the WaterAgency. The Water Agency willcontinue to review construction plansreferred to the Agency by the City andCounty to ensure adequatedownstream channel capacity for siterunoff so long as contracts with theCities remain in effect.

N/A

1-~L

Private, Construction Element Gpal: Reduce or eliminate the pptentialJor:j)'rivat~,'cort~Jruction site generated pollutants,to enter the City storm drain system, especially sediment, to the Maximum:Extent';pr:acticable .•' .' . '.'

", .' ', ... ,' -, ,,":, ';':.c',·: -::~;;"'_ ,"j',;>';' '1:<:T; "',- ;,'f' ,;<:" ,.,/" :/-: '~;:',-,-~: >-' "- ',' ,/",:";,,:,,:,,,_ >~.!:- '" '-,~' .' .:/'<_','-" ,; .,--,

Part I, Storm Water Management Plan, Program Management

c. Continue to use local ECPguidelines/Ongoing.

d. Continue to post vineyarddevelopment information to theCounty website/Monthly.

At a Glance

Private Construction on Public Land

Inspection of Construction and Vineyard Sites

Continue to issueEncroachment Permits thatrequire compliance withCalifornia StandardSpecifications, Section 7-1.01G "Water Pollution" andthe City Storm WaterOrdinance

Send pre-rainy season letterto applicable partiesregarding key points andresponsibilities. Annually

Inspect sites with activegrading permits every twoweeks and after major stormeventsOngoing

Submit list of site inspectionsperformed for each gradingpermit and for each buildingpermit that includes gradingto Regional Water Board ineach Annual Report.

See Section 2.3 of SWMP.

a. Hold pre-constructionmeetings on gradingprojects/Once per project.

b. Conduct BMP inspections ongrading projects of one acre ormore prior to October 15 /Onceper project per year.

c. Conduct BMP verificationinspections on grading projects(within permit boundary) duringthe winter season /Once perproject per year.

Incorporate appropriate BMPmeasures as part of the provisionscontained in Revocable Licenses forprivate construction which occurs onWater Agency flood control channels.Request that cities and County refer

project managers to Agency whenproject includes work on flood controlchannel.

Provide at least one inspection forconstruction projects on agency floodcontrol channels which have beenissued a revocable license to ensurecompliance with license.

1-9

Part I, Storm Water Management Plan, Program Managementd. Continue final gradinginspections on all gradingprojects/ Ongoing

e. Inspect Level II & III vineyardsites prior to commencement ofany work/Once per project.

f. Inspect Level II & III vineyardsites in autumn/Once per year

g. Inspect Levell vineyard sitesas required/Until construction iscompleted.

h. Report number of vineyardinspections conducted, forAnnual Report/Annually.

i. Re-draft the PRMD policyentitled, "Pre-constructionMeeting Requirements for PRMDStorm Water Inspectors" toinclude the use of and guidanceon using telephone pre-construction discussions./June2009.

j. Draft, approve and implementa policy and procedure regardingphotographic documentation/June 2009.

At a Glance

Enforcement of Non-Compliant Sites Follow existing protocol anddocument verbal and writtenenforcement notices-

a. Continue enforcementprotocol/Ongoing as needed

Use the Water Agency's existingprogram and the enforcementauthority of reaulatorv aaencies to

1-10-_.

Part I, Storm Water Management Plan, Program Management At a GlanceOngoing b. PRMD Engineering will notify ensure projects comply with the

the RWB on the third conditions stated in the WaterSubmit list of sites requiring enforcement action or upon Agency-issued revocable licenses.Third and Fourth Level issuance of a Notice ofenforcement actions to Violation./Ongoing as neededRegional Water Board ineach Annual Report c. Report the number of non-

compliant sites, enforcementactions, and length of time togain compliance in the AnnualReport! Annually

Reporting of Non-Compliant Sites Notify Regional Water Board See "Enforcement of Non- If Water agency becomes aware ofverbally within 24 hours and Compliant Sites" above. non-filer status, agency will refer non-in writing of Third and Fourth filers to the RWQCB within 48 hrs.Level enforcement actions.

Submit list of sites requiringThird and Fourth Levelenforcement actions toRegional Water Board ineach Annual Report

Formal BMP Standards Establish formal BMPstandards for erosion andsediment control. By end ofYear 2.

Training of Targeted Staff Submit list of staff that a. Continue to invite RWB staff to Provide a training session or trainingattend and/or participate in ride along with materials to the appropriate personnelerosion and sediment control inspectors/Annually on the components of the SWMP andtraining to Regional Water new NPDES storm water permit withinBoard in each Annual Report b. Continue "Code Corner" one year of permit implementation.

meetings/Ongoing.

c. Provide formal training toEngineering inspectors andtechnicians/Once peremployee,/Annually

d. Create a traininQ database to

1-11

Part I, Storm Water Management Plan, Program Managementtrack and ensure key personnelidentified above meet the training

oals/June 2009.

At a Glance

Inventory of Facilities

Food Facility Inspections

Retail Gasoline Outlet and Auto Repair/AutoBody Service Facilities Inspections

Industrial/Commercial Outreach

Maintain database ofbusinesses within City thatmay be required to file NOIand comply with the terms ofState General IndustrialPermit.Submit in each Annua/Report

Inspections are performedfor wastewater dischargecompliance. There are nomeasurable goalsassociated with this activityfor the municipal storm waterpermit.

RGOs will be inspectedannually through the FireDepartment annualhazardous materialsinspections. Outreachmaterials will be distributedduring annual inspections.

No measurable goalsassociated with the AutoRepair/Auto Body ServiceFacilities Inspections.

Current outreach materialsfor contractors, landscapers& painters will be evaluated& updated in Year 2.

Maintain data base of foodfacilities and closed landfills(EH), and businesses regulatedby DES/Annually

Inspect twice during the 5-yearpermit term/Ongoing.

a. Inspect RGOs annually andASFs on routine basis/Ongoing.

b. Enhance inspections toinclude stormwater BMPs atRGOs and ASF's/ Ongoing.

c. Increase inspectionfrequency/Once every 2.5 years.

N/A

N/A

N/A

1- 12_

Part I, Storm Water Management Plan, Program Management At a Glance

Meeting with industry/traderepresentatives to identify aneffective outreach strategyfor contractors, landscapers& painters in Year 3.

Outreach plan will beimplemented in Year 4.

Industrial/Commercial Enforcement 1. Follow enforcement a. Use progressiveN/Aprotocol for enforcement/Ongoing.

industrial/commercialfacilities without industrial b. Adopt CalEPA expandedwaste permits, for Waste Administrative EnforcementWater Ordinance and for Order process/OngoingRecycled Water User'sGuide. c. Report referrals to

RWB/Ongoing2. Report on enforcementactivities in each AnnualReport view and submitfindings to Regional WaterBoard.

Interagency Coordination for Continue to conduct monthly a. Participate in monthly permit N/AInrlw;tri::JI/CommArr.i::J1 F::Jr.ilitiAS Pronr::Jm Environmenta! Crimes Coordination meetings/Ongoing .• " 4- ___ - _ ••• __ . - - . - - _. _" •• _. __ H U - - •• - v" _," ..

meetings with pertinent Citystaff. b. Notify RWB staff of

Continue to participate inviolations/Within 60 days.

SEQAC meetings duringc. Participate in SEQACwhich compliance staff

participate in roundtable discussions.

discussions.

Training of Targeted Staff A description of the training a. Train Environmental Health N/Aprovided and a list of inspectors/Annually.participants will be includedin each Annual Report. b. Continue food team meetings

and discussions/OnQoinQ.

1-13

Part I, Storm Water Management Plan, Program Management

c. Train Emergency Servicesinspectors on storm water BMPs/Ongoing.

At a Glance

Public Construction Activities Management: Incorporate effective Best Management Practices to reduce the dischargeof pollutants in storm water run-off, especially sediment, from public construction sites.

Contract Documents

Compliance with State General ConstructionPermit

Continue to include SpecialProvisions as part of Cityconstruction contractdocuments for all publicimprovement projects.

Revise Special ProvisionsSection 7-1.01 to reflectformal BMP standards forerosion and sediment controlmeasures. By end of Year 3.

The City will file and NOI forapplicable projects andmaintain compliance withapplicable terms of the StateGeneral ConstructionPermit.

a. Continue to referenceappropriate BMPs in constructiondocuments/Ongoing.

b. Review and updateconstruction standard documentsto ensure they include the mostrecent BMPs/Once during Permitterm.

c. Continue to integrateappropriate Low ImpactDevelopment technologies intoproject planning and designphases (RegionalParks)/Ongoing.

d. Continue post constructionmonitoring to ensure the properinstallation, maintenance, and/orremoval of BMPs (RegionalParks).

Continue to submit NOls forprojects subject to the StateGeneral Constructionrequirement/Ongoing.

Review Special Provisions andGeneral Specifications for existingBMPs to determine if they areadequate. Submit needed changes, ifany, in Annual Report NO.2.

File NOI for applicable projects, asrequired

I - 14__

Part I, Storm Water Management Plan, Program Management At a Glance

Each Annual Report to theRegional Water Boardincludes a list of Cityprojects that have compliedwith the terms of the StateGeneral Permit

Inspection Continue to inspect public a. Continue to inspect public Continue to inspect activeconstruction sites during construction sites during construction sites.construction activities and construction activities/Ongoing.document in a construction

b. Continue post constructiondiary.Ongoing monitoring to ensure the proper

installation, maintenance, and/orremoval of BMPs (RegionalParks)/Ongoing.

Enforcement Continue to implement Continue to enforce construction Take action for non-compliance basedprogressive enforcement documents regarding failure to on contract specifications.procedures. carry out orders or contractContinue through Term 3 provisions/Ongoing.

Training of Targeted Staff Continue to discuss storm a. Continue to provide training to Assess current education and trainingwater quality requirements all applicable practices for construction practices.during pre-construction employees/Ongoing. Permit Year 1conferences for publicimprovement projects. b. Provide annual training to key Update, if necessary.nnn"inn _____ ••••••••••.• 1 ~ .•.•. __ a.....•..••...•........• DI\.1n 18 months from permit-"::1"''''::; tJt:::,::>UIII 1t:::1,LU t:::llllal'vt::: WIVII"

knowledge/Annually. implementation.

Training of City Staff for General Storm Water Create a general stormAwareness water awareness and

pollution preventioneducational outreachbrochure for all new Cityemployees. By end of Year1.

Perform voluntary survey ofexisting City employees todetermine level of storm

I -15

Part I, Storm Water Management Plan, Program Managementwater awareness amongstaff by end of Year 2.

Develop and implementoutreach to existing City staffby end of Year 3.

Resurvey existing Cityemployees to determineeffectiveness of outreach byend of Year 4.

.Document results of trainingMeasurable Goals in eachAnnual Report.

Municipal Services Center (Corporation Yard) Continue compliance withGeneral Storm Water Permitfor Discharges Associatedwith Industrial Activities andthe Municipal ServicesCenter's SWPPP.Continue through Term 3.

At a Glance

Landscape and Recreational Facilities Management: Incorporate effective Best Management Practices to reduce ofeliminate pollutants resulting from maintenance activities of landscaped areas and recreational facilities.

Pesticide management Keep pesticide use belowthe levels used prior to theimplementation of theIntegrated Pest ManagementProgram. Continue throughTerm 3.

Seek less toxic materialsand newmethods/techniques toreduce pesticide use.Continue through Term 3.

a. Continue to follow chemicaluse, storage, disposal andreduction practices/Ongoing.

b. Continue native vegetationand water conservationpractices/Ongoing.

c. Continue to maintain andupdatedatabase for staff trainingcertification regarding theseoractices/Annuallv.

Utilize low-impact pesticidemanagement.

1-1[;

Part I, Storm Water Management Plan, Program Management At a Glance

Develop detailed pesticided. Maintain and updatewrittenand fertilizer plan for Bennett

Valley Golf Course. By end guidelines regarding theseof Year 3. practiceslDuring Permit term.

Fertilizer management Continue to implement See "Pesticide Management". Utilize recycled water for irrigationstandard procedures of which offsets the need for fertilizer atFertilizer Management Plan the Water Agency's West Collegeand provide training in facility.proper fertilizer applicationand storage to appropriatestaff as needed.

Continue through Term 3

Develop detailed pesticideand fertilizer plan for BennettValley Golf Course. By endof Year 3.

Planting and Retention of Native Vegetation Support recommendations See "Pesticide Management". Incorporate retention and planting ofcontained in Citywide Creek native vegetation in design projects onMaster Plan to promote use flood control facilities. (See also,of native vegetation along Public Outreach)local creeks & riparianareas.

Continue through Term 3.

Procedures to R.educe Water, Fertilizer and Imnll"ml"nt f'llrrl"nt•••• 1"".- ••• - •••. -- •• - •••.

Pesticides Needs procedures to reduce water,fertilizer and pesticide needswithin City park grounds andlandscaped areas.Continue throuqh Term 3.

Disposal of landscape waste Continue to grind and reuse a. Continue to follow practices as Use chipped brush and weeds aswaste materials as compost noted in Plan/Ongoing. mulch around existing vegetation atand mulch Water Agency Channels.Continue through Term 3. b. Continue to maintain and

update guidance documents forpractices/During Permit term.

1-17

Part I, Storm Water Management Plan, Program Management At a Glance

Recreational water bodies Implement existing activities. a. Continue to follow practices as County manages Spring Lake Park forContinue through Term 3. noted in Plan/Ongoing. agency. Continue to limit equipment

and material storage in Waterb. Maintain and update written Agency's flood control channel right-guidelines and practices for of-way.management of waterbodies/During Permit term.

Swimming pool discharge Continue to implement See "Recreational Water Bodies" N/Aexisting activities

Procedures to Minimize Incidental Runoff Continue to implementexisting activities andimplement new activitieswith 2007 water ratestructure. Inspect newlandscapes in accordancewith WELF and SRFLP.Provide Recycled WaterUser's Guide to all new sitesusing Recycled Water.Ongoing

Develop tracking system forreported locations ofincidental runoff. By end ofYear 1.

Draft and submit to RegionalWater Board dechlorationprocedures and measures tomanage/reduce flow volumeand volume/velocity impactson downstream waterways inYear 1. Finalize in Year 2.

Address summer dischargesfrom specific types ofnuisance flows in residentoutreach strategy. Completeoutreach to residents by endof Year 5.

I - 1 R_

Part I, Storm Water Management Plan, Program Management At a Glance

Park Construction and/or Rehabilitation Comply with GeneralProjects Construction Permit.

Continue through Term 3.

Storm Drain System Operation and Management

Storm Drainage System Mapping Update storm drain mapping a. Develop GIS database for Review existing mapping. Permit Yearon City GIS site. inventory of storm drain systems 3Continue through Term 3. (Parks )/During Permit term. Modify maps, as needed, by the endComplete mapping of storm of Permit Year 5.drain systems in City parks b . Inventory and map otherand the Bennett Valley Golf Public Works' systems in urbanCourse. By end of Year 3. areas.

Clean and inspect storm drain pipe and inlet Continue to clean and a. Continue cleaning and Pipes through City treated as openstructures inspect 130,000 feet of storm inspection of problem channel, see below.

drain pipe and 1200 inlets/Annually.structuresAnnually b. Develop and maintain a

database for problem inlets and

Monitor summertime flows in storm drain systems by year

storm drain sections being three of the permit term. (Parks)

cleaned to assist inc. Develop a priority system toidentifying summertime flows

or non-storm discharges. address problematic drain inlets

Continue through Term 3.for remediation by year four ofthe permit term. (Parks)

Begin to input storm draincleaning data into electronicdatabase in Year 1.Graphically display stormdrain cleaning history by endof Year 5.

Prioritize catch basincleaning. By end of Year 1.

Analyze catch basincleaninQ and re-evaluate

I - 19

Part I, Storm Water Management Plan, Program Management At a Glancecatch basin priorities asneeded. By end of Year 3.

Implemented prioritizedcatch basin inspection andcleaning schedule. By endof Year 4.

Flood control channel or road side ditch Continue to inspect and a. Continue to inspect and Continue to provide trash cleanup ininspection and maintenance remove debris for flood remove debris for flood control Water Agency channels, coordinate

control purposes purposes/Annually. with local law enforcement whenAnnually possible. Annually, as needed

Storm drain labeling Continue storm drain b. Maintain and update written Label and maintain labels at stormlabeling program to replace guidelines and procedures drains within the West Collegedamaged, worn or missing (Parks)/During Permit term. Facility.decals as needed. Six months of permit implementation.

Ongoing c. Inspect storm drain inlets toensure labels are installed(Parks)/Annually.

Identify inlets not yet labeledand develop and implement e. Install labels on all new inletsa plan to label, as possible. in urban areas/Ongoing.By the end of Term 3.

Trash Management Require management oftrash and litter generatedfrom public events for whichCity issues a Special EventPermit.

Continue throuqh Term 3.

Streets and Roads Maintenance

Street sweeping frequency Continue to sweep streets a. Industrial and Commercial Water Agency does not maintainas prioritized below: Areas in the permit boundary six public roads. No sweeping planned.

Priority A three times per (6) times a year/Annually. Maintain shale layer on Water

week. Agency-owned roads.

Priority B twice a week b. Urbanized residential areas in Continue to require reshaling of roadboundary-3x/year/Start date in revocable licenses, where

I - 20_

Part I, Storm Water Management Plan, Program Management At a GlancePriority C once a week 2010. appropriate.Priority D monthly Continue to limit vehicular access toOngoing c. Various streets, intersections, Water Agency roads.

and other including RegionalParks parking lots-uponrequest/Ongoing.

Material management - Road Construction, Continue to properly recycle a. Continue good housekeeping Continue to limit equipment andSweeping, Pipe/Ditch Cleaning or dispose of materials. practices/Ongoing. material storage in Water Agency's

Ongoing ROW.Ongoing

Training of targeted staff Continue to provide training a. Continue meetings to discuss Provide informal road maintenanceto staff as needed. Annually streets and road maintenance BMP training.

activities throughout the permit As-neededperiod.lOngoing (Parks)

b. Provide training to applicablestaff on water quality and fishprotection outlined in the RoadMaintenance StandardsManual./Ongoing (Parks).

c. Routinely meet to discussstreets and road maintenanceactivities throughout the permitterm.lOngoing

-.I n_ .. :_... _..____.L _L ___ .L__ ••.• -.1

u. r..t::VII::VV\"UIIt::lll :>Ut::t::l:> C1IIU

road maintenance practices,including BMPs related tomaterials management, on anongoing basis throughout thepermit term.lOnQoinQ

Parking Facilities Management

Sweeping Continue to sweep City See "Streets and Road Sweep two employee and one visitorTransit and Parking sites (5 Maintenance, Street Sweeping parking lot at West College facility.garages and 9 lots) weekly, Frequency" above Annually between August 15 andpressure wash such garages October 15Annually

1-21

Part I, Storm Water Management Plan, Program Management At a Glance

Spill clean up Respond immediately to a. Continue to clean up and Respond in a timely manner. Usepriority reports/ within one dispose of spills as spill response protocol for hazardousbusiness day for non urgent required/Ongoing. or unmanageable spills.small spills

Emergency Procedures

Emergency Procedures and Hazardous Continue to implement the a. Continue to implement Review existing Water AgencyMaterial Response Plan Emergency Operations and Emergency Operations emergency operations plan for

Hazardous Materials Plan/Ongoing appropriate changes. Permit Year 3Response Plan.

b. Review and update Area PlanOngoingin August 201 O/One Time

c. Review and updateEmergency Operations Plan asnecessary .tOngoing

d. Review and update Spill Planas necessary.tOngoing

e. Report Plan updates in AnnualReport/Annually.

f. Continue interagencyemergencycoordination/Ongoing.

Public Events on City Property Require management oftrash and litter generatedfrom public events for whichCity issues a Special EventPermit.Continue through Term 3.

Develop educationalmaterials for food vendorsand attach to all City parkreservation permits.Complete by end of Year 1.Continue through Term 3.

1-22__

Illicit Discharge Detection andEliminatioJ1:ElementGoal:Detect and 'minimizc{illegaLnon storm 'waterdischargesC,- , ~'-'-' .. ' ,", ".'.- .". ',' -" .•.... -. ".'-'" .- - •.. C' .'.', -," .. :" .• ,," ::,: .. ", .. ,,' .. " .• ,: ..•... ,',' ',<',: ,;_,__,-", : .::;-> '>"';»<:.:-'"<:';c- ',,:,~. :,,:,; },'"X'" ,,/ ... ":: ,.. <,'~-_ .:" ":':,:._::'<': .,'-', ",.:.« ..:::,-',""_'0' _.:'h.::/:·",.:_ .•, .... ii:;;:·-·>:',_'·;, '::: ';-<;-" ::y- ;:_>:'-'.:~\G.J _.<. c"::;~;; ,.-:.'.<';.<-<- :-' -':: ,.-, ','-,

At a Glance

Spill Response Continue existing illicitdischarge detection andelimination activities.Ongoing

a. Continue existing illicitdischarge detection andelimination activities/Ongoing.

Implement current program.

Private sanitary septic systems

Maintain records of spillresponse actions andsummarize in each AnnualReport. Ongoing

Follow up on reportedproblems until resolvedOngoing

Conduct infrared imageryflight over Santa Rosa Creekand all tributaries upstreamof downtown Santa Rosa inYear 1. Investigate andanalyze "hotspots" in Year 2.Outreach/ enforcement inYear 3. Progress reports willbe provided in applicablelInnll<JIRonnrtc• u II ••••••••..••• I ' •••••.t' .

b. Report activities in AnnualReport/Annually.

a. Follow up on reportedproblems until resolved/Ongoing

b. Continue to investigate illicitseptic system discharges andreport the number of spills in theannual report./Annually

Notify City, County or RWQCB if aproblem with a private sanitary septicsystem is discovered arid notimmediately corrected by landowners.Ongoing

Enforcement Procedures Follow written enforcementprocedures as needed.Ongoing

a. County agencies will continueto pursue current enforcementactions to obtain compliance forillicit discharge detection andelimination.

Water Agency works with responsibleparty, City, County, and otherregulatory agencies to correct theproblem.Continue with existing program.

b. Report the number of stormwater pollution enforcementactions in the annualreport./Annually

c. County agencies will continueto imDlement existin

1-23

Part I, Storm Water Management Plan, Program Management At a Glanceenforcement procedures in theNPDES permit boundary.

d. County agencies willdevelop/revise policies andprocedures, as necessary, duringthe permit term.lOngoing

e. County agencies will notify theRegional Water Board in writingon the third enforcement actionor Notice of Violation.lOngoing

Record Keeping and Documentation Continue to update database a. Continue to practice Develop tracking system for illegalas complaint response and recordkeeping by Public Works, discharges.inspections are completed. Environmental Health,Ongoing Emergency Services, List reported spills in annual report.

PRMD/Ongoing.Document illicit dischargedetection and elimination b. Report number of illicitactivities and summarize in discharges in the annualeach Annual Report. report/Annually.Annually

Provide special illicitdischarge summary reportswith GIS tracking. Annually

Illicit Connection Investigation & Termination Document field inspection a. Continue illicit connection Investigate the sources of illicitresults from storm drain investigation and enforcement discharges within flood controlcleaning crew protocol/Ongoing. channels. Notify and provide supportOngoing to appropriate municipality for

discharges originating outside of

Describe any identified illicit channels.

connections to the stormdrain system and stepstaken to eliminate.Annually

1-24

Part I, Storm Water Management Plan, Program Management At a Glance

Disposal of used oil and toxic materials Integrated Waste a. Continue to implement existing Rely on existing programs by others.Management used oil and toxic materials Provide outreach material developed

programs/Ongoing. by others where appropriate.

b. Report amounts collected byPublic Works programs in theannual report/Annually.

Training of targeted staff Training provided annually, a. Continue to provide training to Review and update training for spilldocumented, and key staff/Ongoing. response personnel.summarized in each Annual 1 yr of permit implementationReport. Provide annual review of contactOngoing information.

Inspection of Incidental Runoff See Municipal Operations a. During May through

section for details. October, conduct monthlyincidental runoff inspections

Develop tracking system for of urban clusters. Julyreported locations of 200B/Ongoingincidental runoff. b. Meet with water utilities to

By end of Year 1.discuss regulation ofincidental runoff. July 2009/

c. Develop handout onAddress summer discharges incidental runoff for thefrom specific types of public. June 2009/nuisance flows in resident d. Review legal authority onoutreach strategy. Complete incidental runoff. June 2009outreach to residents by end e. Propose and draft iegaiof Year 5. authority to regulate

discharges from irrigationrunoff. June 2010.

f. Draft and adopt policy forenforcement of incidentalrunoff. June 2010.

g. Report the number ofinspections andenforcementactions.lAnnually

1- 25

General Public/Residents

Residential Outreach

Storm drain inlet decal program

Environmental column in local newspapers

Website

Evaluate results of Term 2Community Survey anddevelop strategy forimplementation in Year 1.Outreach to residents to becompleted by end. of Year 5.Perform Term 3 CommunitySurvey to assist indeveloping Term 4 outreachstrategy. Complete in Year4. Provide copy in Year 5Annual Report.

Continue to provide decalkits to volunteer groupsOngoing

Reference RRWAEnvironmental Columns ineach Annual Report.

Issue a minimum of twomedia releases regardingstorm water program itemsof interest or about stormwater pollution prevention.Provide copies of mediareleases & describe follow-up media coverage in eachAnnual Report.

Continue to keep StormWater and Creeks Websitecurrent. Track number of

See "Municipal Operations,Storm Drain System Operationand Management Section -Storm Drain Labeling".

Continue working with the localnewspapers to publishenvironmentally based articlesand report on status in AnnualReport/Annually.

Continue to fund and update theSonoma County website and"sonomacountvstormwater.or-"

At a Glance

Evaluate efficacy of incorporatingstorm drain labeling program intocreek stewardship program.Permit Year 1

Continue working with the localnewspapers to publishenvironmentally based articles andreport on status in AnnualReport/Annually

Include info on creek stewardshipprogram.

1-26

Part I, Storm Water Management Plan, Program Management At a Glancevisitors to each storm water URL./During permit term. Permit Year 3.page and report numbers ofsignificance in each AnnualReport

Creek Stewardship Program Each year a minimum of 3 a. Conduct survey of horse Work with groups to develop Creekcreek walks, 3 creek facilities adjacent to major creeks stewardship program and signs.presentations and six within boundary/2011volunteer creek clean-ups Provide half of funding required forwill be coordinated. b. Provide horse facility owners project coordinator.Annually with prepared materials as part

Promote Creek Stewardship of (a) above/2011.

activities in City AdventureGuide. Include copies ofpromotions in each AnnualReport.

Send em ail reminder toCreek Stewards each springabout reporting outfalls withsummer flows. Copy ofemail to be included inAnnual Report.

Pet waste signs Quantify & describe a. Continue to install pet waste Signs will be posted at major accessinformational, pet waste and signs at Regional Parks facilities points to creeks, subject to approvalcreek crossings signs and maintain inventory/Ongoing. by the Water Agency and City'sinstalled or replaced in each Waterways Advisory Committee.Annual Report. Within the first year of the permit term.

Provide list of locations withpet waste signs, pet waste Post signs yearly thereafter asdispensers and trash neededreceptacles in each AnnualReport.

Install 10 new trashreceptacles and 5 pet wastebag dispensers by end ofpermit term.

1-27

Part I, Storm Water Management Plan, Program Management At a Glance

Public Events Participate in a minimum of See "Hazardous Waste Disposal" Participate each year in Sonoma6 public events each year. below. County Fair. Distribute outreachSummarize in each Annual materials at fair.Report. Ongoing, annually

Hazardous Waste Disposal Continue to pass out recycle All Optional: County Waste Management Agencyguide at PW-Storm Water a. Publish and distribute Sonomaoutreach events. Ongoing County Recycling

.. Guide/Annually.Continue to prOVide recyclingguide or inform~tion o~ .the b. Operate Eco-DeskHousehold Toxlcs FacIlity to hotline/Onaoina.responsible parties ot illicit ~ ~discharges. Ongoing c. Maintain Sonoma County

Continue to work directly or Wast~ Manag~ment Agencyindirectly (such as through webSite/Ongoing.the RRWA) with SCWMA on ..toxics collection and d. Encourage 011 and filterrecycling programs. recycli~g via an~ualOngoing campaign/Ongoing.

Provide tally of number of e. Continue campaign forRecycling Guides distributed curbside oil and filterin each Annua/ Report. recycling/Ongoing

f. Continue Household Toxicscollection publicity/Ongoing.

g. Continue to provide "NoToxics" garbage canstickers/Ongoing.

h. Provide Integrated PestManagement workshop forcounty employees/Ongoing.

I. Provide booth at SonomaCounty Fair and the Harvest Fairre: Household Hazardous WasteManagement/Ongoing.

1-28

Part I, Storm Water Management Plan, Program Management At a Glance

Illicit discharge Material distribution numbers a. Conduct public outreach on N/Awill be reported each year in alternative options for theAnnual Report. disposal of swimming pool water

Evaluate past year tallies ofcontaining chlorine andbiocides./Within 36 months of

spill sources and spill permit adoption.locations from illicitdischarge database to

b. Continue to distributedetermine immediate needsfor increased outreach. materials during normal

Annually inspections and whileinvestigating complaints

Include special illicit /Ongoing.discharge summary reportswhich use GIS tracking ineach Annual Report.

Private septic systems Conduct infrared imagery a. Continue to distribute BMP N/Aflight over Santa Rosa Creek information to non-standardand all tributaries upstream septic system owners, annually,of downtown Santa Rosa in and to all others uponYear 1. Investigate and request/2008.analyze "hotspots" in Year 2.Outreach/ enforcement in b. review and revise, ifYear 3. Progress reports will necessary, the storm waterbe provided in applicable quality BMP brochure/June 2009.Annuai Reports.

Industrial/Commercial Current outreach materials a. Continue to educate and N/Afor contractors, landscapers assist food facility& painters will be evaluated operators/owners to implement& updated in Year 1. effective BMPs.

b. Continue to distribute "Food

Meeting with industry/trade Facilities Storm Water Pollution

representatives to identify an Quick Reference" pamphlets

effective outreach strategy during routine

for contractors, landscapers inspections/Annually

& painters in Year 3. c. Make a presentation to theFood Industry Advisory Forumabout the storm water

1-29

Part I, Storm Water Management Plan, Program Management At a Glance

Outreach to contractors, management plan and changes

painters & landscapers for food facilities/Within 24

implemented in Year 4. months of permit adoption.

a. Distribute additionalmaterials.lOngoing

b. Discuss compliance issueswith owner/operators and providematerials to assist withquestions. Include storm waterpollution preventionBMPs/Ongoing

c. Continue to encourage ASFsto receive Green Businesscertification/O ngoin g

Automotive Repair, Food Facility and Track and report number ofCleaning Industries & Retail Gasoline Outlets educational materials

distributed duringinspections in each AnnualReport.

Gardening/Nurseries Promote "Our Water, Our a. Continue to give information to N/AWorld" program through pesticide users with permits andhiring a consultant to contact annual registration/Ongoing.and work directly with localhardware/nursery b. Continue to offer junior collegebusinesses. Perform courses for state mandatedpollution prevention continuing education forinspections to minimize pesticide user licenses.nutrient pollutant loading insite run-off. Continue QWELtraining.Annually

Landscape Irrigation and Maintenance Continue to host workshopsand distribute preparedoutreach materials; provideirrigation audits on requestwith initiation of 2007 waterrates. Inspect new irriQation

1- 30-

Part I, Storm Water Management Plan, Program Management At a Glancesites in accordance withWELP and SFRLP. Providenew customer packets to allnew water customers.

Building and Construction Industries including Provide a copy of CD's pre- a. Develop combined N/ALandscaping Companies rainy season letter sent by City/County SUSMP site design

Community Development guidelines or requirements forDepartment to applicable developers/Within 5 years ofparties regarding key points permit adoption.of interest based on pastseason observations and b. Provide workshop to thecurrent concerns. Annual development community onReport planning procedures, policies,

Current outreach materials design guidelines and BMP for

for contractors, landscapers the remaining SUSMP

& painters will be evaluated aspects/Within 5 years of permit

& updated in Year 2. adoption.

Meeting with industry/traderepresentatives to identify aneffective outreach strategyfor contractors, landscapers& painters in Year 3.

Outreach to contractors,painters & landscapersimplemented in Year 4.

LID training for staff as wellas the local designcommunity will be plannedand conducted in Year 1.

Develop an outreachstrategy to educate propertyowners and home ownersregarding SUSMP BMPstheir property based on inputfrom the developmentcommunity and area realtorsbefore end of Year 3,implemented in Year 4.

1-31

Part I, Storm Water Management Plan, Program Management At a Glance

School Education

Water Education Program N/A N/A Although no measurable goal isincluded, as this program isindependent of storm water funding, itis anticipated that the current programwill continue.

High School Aquatic Macroinvertebrate Continue to solicit program N/A N/ABioassessment Program participation from the six

public high schools in ther-..:J. .. r-"I_. __ .-1 _._ ._ ... __ 1__ .__ L

vilY. /"'\t::If.lUll UII IIUlllUt::ll UI

students and total teachinghours in each AnnualReport.Ongoing

Measure the change in highschool studentawareness/understanding ofbasic storm water pollutionprevention concepts. Reportin Annual Report.

Spring Lake Environmental Discovery Center Continue to sponsor and a. Continue to operate and Provide financial support throughparticipate in storm water manage EDC/Ongoing. fiscal year 2007/08related displays. Report onattendance in each Annual b. Continue to seek sponsorshipReport. of EDC/Ongoing.Annually

c. Continue to contribute fundingto EDC to promote publiceducation on pollutionprevention/Ongoing.

Santa Rosa Junior College Refine outreach partnershipwith SRJC. ContacUofferoutreach materials in Year 1.

Aim to develop a minimumof two collaborative outreach

1-32

Part I, Storm Water Management Plan, Program Managementprojects in Term 3.Continue through Term 3.

Invite SRJC representativesto monthly coordinationmeetings. Through Term 3

At a Glance

Corporate Outreach

City Staff Awareness and Education

Identify a minimum of threecorporate business anddevelopment outreachstrategies in Term 3. Reporton status in Annual Reports.Through Term 3.

Create a general stormwater awareness andpollution preventioneducational outreachbrochure for all new Cityemployees. By end of Year1.

Perform voluntary survey ofexisting City employees todetermine level of stormwater awareness amongstaff by end of Year 2.

Develop and implementoutreach to existing City staffby end of Year 3.

Resurvey existing Cityemployees to determineeffectiveness of outreach byend of Year 4.

Provide two briefings about I1-33

Part I, Storm Water Management Plan, Program ManagementStorm Water Programactivities in City Manager'sweekly email. Provide copiesin Annual Reoorts.

At a Glance

Formal Evaluation

Public Education and Outreach

Monitoring Program

Special Studies

Evaluations will be includedin each Annual Report.

Resurvey communityawareness.During Year 4.

Evaluations will be includedin each Annual Report.

Refer to Monitoring Reportfor Special Studydescription.

a. Compare goals in SWMP toactual work; meet with RegionalWater Board staff and Co-permittees on developing worknl!:ln o.lomon+co/fj, nM'I'.:)II""""_1' """""'11 , ••••••tt.VII \1 II I \.A\A I I} ,

b. Document (a) in AnnualReport/Annually.

c. Continue to utilize theStormwater Coordinator positionto maintain or increase the levelof coordination among Countystaff involved in completingSWMP activities/Ongoing.

a. Based on Special Study(below), consider outreach toimprove stream quality.

a. See Special Study (below),related to sediment.

a. Identify and evaluate 10-12sub-watershed areas for initialevaluationlYear 1.

b. Conduct ambient waterquality monitoring (analyticaland inspection)lYears 2-3.

c. Evaluate data and determineBMP(s) to be studied. Install orimplement BMP(s)IYear 3.

Continue to track program elementsthrough direct and indirect indicators.AnnuallySummary Report Permit Year 5

Voluntary include feedbackmechanisms in water EducationProgram.

Review monitoring data for trends.Permit Year 5

None.

1- 34

Part I, Storm Water Management Plan, Program Managementd. Continue water qualitymonitoring (analytical andinspection)lYears 4-5.

e. Report findings and makerecommendationslYear 5

At a Glance

-'c .. >',:-·;-.;-,.:', ,'.'_:.';"C'-:":':"',' ,':,';

Fiscal Analysis

Financial Analysis of Program Activities

i:~:~:':', -.-'»:;.:.'_'{-:;:: ",' ::·ct ',./_<> ::-.» >;

Monitoring Plan Goal:~ssessthe(Refer to Part V for details)

Chemical Monitoring of Outfalls

Continue to report on permit-related expenses andfunding of lead agency workfor each fiscal year in eachAnnual Report.

Continue outfall sampling attwo outfalls during first flushand one representativestorm events as well as two

a. Report program expendituresand funding sources in AnnualReport

b. Include discussion of fiscalresources in work plan meetingwith Regional Water Boardstaff/Annually.

c. Re-evaluate permit feestructure to ensure adequatefunding for PRMD. Within 12months of permit adoption

d. Review the categoriescurrently used for reporting fiscalresources/Within first 24 months",f nr"°t'Y'li+ ..,rlnnfi",nVI tJVIIIU'- (.4\"AVfJl,..Vtl.

e. Seek new revenue sources forstorm water program/Duringpermit term.

See Part V, Monitoring of the Co-Permittee SWMP.

Develop new reporting structurePermit Year 1.a. Include discussion of fiscalresources in work planmeetings/Annuallyb. Report program expenditures andfunding sources in Annual Report.

Collect samples for first flush and onerepresentative storm, and collect twosummer samples between the periodMav-September.

1-35

Part I, Storm Water Management Plan, Program Managementdry weather sampling .events. Report results ineach Annual Report.

Bioassays - Three Species Chronic Tests I See Part V, Monitoring of the I N/ACo-Permittee SWMP.

Aquatic Benthic iviacroinvertebrate Sampiing i See Part V, Monitoring of the i NfACo-Permittee SWMP.

At a GlanceAnnually

Include results and proposed changesto program in annual reports.

Analyze data for trends.Permit Year 5.

N/A

N/A

Develop details for the SUSMP treatmentoffset program

Develop details for the SUSMP treatment offset program. Treatment offset sites will be considered in thefollowing order: same stream reach, same sub-watershed, same watershed, adjoining watershed, ornearby watershed. Regional mitigation banking will be considered as part of treatment offset program.Complete first draft for RB review by end of Year 2.

Finish policy by end of Year 3.

Channel-forming discharge (hydrographmodification).

Develop details for addressing channel-forming discharge.Evaluate recommendations and requirements pertaining tohydrograph modification included in the Regional Water Board'sStream and Wetlands Protection Policy and the San FranciscoBay Municipal Regional Urban Runoff NPDES Permit oncefinalized. This evaluation will be distilled into an outline on theapproach that applicants should take when addressing channel-forming discharge. Complete first draft one-year after thesedocuments are adopted.Finish policy within two-years after both of these documents areadopted.

1-36

N/A

Part I, Storm Water Management Plan, Program Management At a Glance

Low impact development Encourage low-impact development (LID) designs for all SUSMP N/Aprojects. In addition, for all proposed development projects eachCo-Permittee shall, during the planning process and prior toproject approval and issuance of local permits, evaluate eachproject for the inclusion of LID BMPs, where applicable, whichmay minimize soil compaction, minimize disturbances to naturalwaterways, maximize infiltration and retention, provide detention,slow runoff, minimize impervious footprint, direct runoff fromimpervious areas into landscaping, and construct impervioussurfaces to the minimum widths necessary.

Continuous.

LID training for Co-Permittees' staff as well as the local designcommunity will be planned and conducted before the end of Year1.

Retail Gasoline Outlets Apply post-construction conditions that address water quality on N/Aproposed new and redeveloped retail gasoline outlets (RGO).(Redeveloped RGOs would include existing RGOs that proposeunderground storage tank modifications that involve pipereplacement and under dispenser containment replacement.)Example conditions are: 1) fuel dispensing areas shall be pavedwith Portland cement concrete (or, equivalent smooth impervioussurface), with a 2% to 4% slope to prevent ponding, and must beseparated from the rest of the site by a grade break that preventsrun-on 01 stonn water to the extent pradic;abie, 2) the lueidispensing area shall be covered with a roof canopy, and theroof canopy's minimum dimensions shall be equal to or greaterthan the area within the grade break or the fuel dispensing area,as defined above. The cover shall drain directly into the stormdrain system and not drain onto the fuel dispensing area. Thestorm drain located under the roof canopy shall include an oilseparator, or equivalent, to collect minor fuel and oil spills. Anongoing maintenance plan for the oil separator shall besubmitted for review and approval by the Storm Water Section ofPRMD prior to issuance of County grading and building permitsor by the City's Fire Dept. prior to issuance of any City permitsfor new/redevelopment RGOs, and 3) the applicant shall prepare

1-37

Part I, Storm Water Management Plan, Program Management At a Glanceand implement a Storm Water Spill Prevention Control andCountermeasure (SW SPCC) Plan to be integrated into thegrading and drainage plan. The SW SPCC Plan shall bedesigned to address minor fuel and oil spills.

Existing City codes shall be reviewed and modified to includespecific conditions and site requirements before the end of Year2.

Continuous implementation for County permits.

Auto Repair/Auto Body Service Facilities Apply post-construction conditions th8t andress water quality on NI/\,proposed new and redeveloped auto repair/auto body servicefacilities. Prohibit discharges of wash water from entering stormdrain systems resulting from hosing or cleaning vehicles.Continuous(Rough draft only - City needs to evaluate with Utilities-

Environmental Compliance section.)

Implementation of safety factors to ensure The sizing of filtering treatment devices shall recognize potential N/Athat treatment BMPs accommodate the clogging and loss of capacity during operations and shall beminimum design storm (Provision 29 from the sized to provide full treatment of the design storm. The City andcurrent MS4 permit). County will prepare safety factors for treatment BMPs during the

next permit phase as we gain experience with the maintenanceof BMPs and as we evaluate the final requirements of the SanFrancisco Bay Municipal Regional Urban Runoff NPDES Permit.

Safety factors will be proposed by the end of Year 3.

Tracking SUSMP projects The Co-Permittees use tracking databases to record SUSMP N/Ainformation for projects. PRMD added a SUSMP screen forprojects within PermitsPlus: this screen has fields to record:disturbed area, impervious surface, number and types of sourcecontrol BMPs, number and types of treatment control BMPs, totalBMPs installed, waiver field, and mitigation APN. TheMeasurable Goal would be for both the County and the City toreview and refine the tracking of SUSMP projects using theirrespective databases.

Completion of the review and auamented trackina of SUSMP

1-38

Part I, Storm Water Management Plan, Program Managementprojects is targeted to be completed by the end of Year 2.

At a Glance

Ordinance constraints

Conserve natural areas

Educating property owners and home ownersregarding SUSMP BMPs on their property

The Co-Permittees shall review respective ordinances forconflicting requirements that would prevent or restrict theinstallation of post-construction BMPs.

Complete review by the end of Year 4.

This is already one of the three goals of the SUSMP program.However, the Co-Permittees will expand on this goal during thenext permit term to complement LID concepts. This guidance willbe included to supplement the SUSMP Guidelines.Complete guidance on conserving natural areas by end of Year5.

The intent of educating property and home owners on SUSMPBMPs is to educate them on the proper functioning of theSUSMP BMP(s) on their property and to provide guidance onhow to maintain the SUSMP BMP(s). One idea is to develop ageneric template brochure onto which developers could then addtheir customized information via electronic cutting and pasting.

An outreach strategy will be developed based on input from thedevelopment community and area realtors before the end ofYear 3 and implemented in Year 4.

N/A

N/A

N/A

Long term maintenance program

Review and revise, if necessary, legalauthority

The intent of further developing a long term maintenance IN/Aprogram for SUSMP facilities is to have fees coveradministrative/inspection and maintenance costs, as applicable,for public agencies.Complete analysis of SUSMP maintenance programs by end ofYear 5.

Report findings in first Annual Report IN/AAmend ordinance, if needed, within 12 months of Permitadoption

1-39

Part I, Storm Water Management Plan, Program Management At a Glance

Provide training to staff Train targeted staff (planners, storm water inspectors, engineers, engineering technicians)within 24 months of Permit Implementation

Implement SUSMP measures on City / Design applicable projects with SUSMP measures Design applicable Zone 1A floodCounty capital improvement projects Upon Permit implementation control projects with SUSMP

measures.

Encourage applicants to implement SUSMP Require storm drain labeling Condition applicable project with N/Ameasures on projects on all projects SUSMP requirements.

Upon Permit implementationUpon Permit implementation

Supplement SUSMP Guidelines with Reconvene SUSMPadditional BMP guidance/criteria based on Technical Advisorysite specific pollutants. Committee to supplement

SUSMP Guidelines.Complete in Year 3.

Storm Drain Decals Draft requirements to decalall proposed storm drain inletbasins in Year 1. Present foradoption in Year 2.

1-40