INTRODUCTION
This assessment has been conducted at Patco (M) Bhdin June and review in July.
This assessment was performed by: Mr. Ng Wei Khiang, MSc, HIE 127/171-2-283.
-
7/30/2019 Patco_CHRA_rev1
3/13
CHRA STUDY AREA
Work Unit:
-pre-assembly
-flux application and auto brazing
-manual brazing-helium leak test
-nitrogen filling
-degreasing
-maintenance
Work hour per shift: 8 hours.
-
7/30/2019 Patco_CHRA_rev1
4/13
ASSESSMENT OBJECTIVES
To perform an assessment on the health risks
arising from the use of chemical hazardous to
health at the workplace.
To protect the employees from the adverse health
effects of chemicals.
To comply with the Occupational Safety and Health
(Use and Standard of Exposure of ChemicalHazardous to Health) Regulation 2000.
-
7/30/2019 Patco_CHRA_rev1
5/13
METHODOLOGY
Document Review Walk-through Survey
Interview
Measurement (i.e. air flow rate, temperature) ifapplicable
Risk Assessment- Hazard rating (1-5)
- Magnitude rating = Release x Contact
- Exposure Rating = Frequency rating x Magnitude rating
- Risk Ranking = Hazard rating x Exposure Rating
-
7/30/2019 Patco_CHRA_rev1
6/13
RESULT & ANALYSIS
Work AreaChemical Hazardous
To Health HazardRating ExposureRating RiskDecision RiskConclusionPre-Assembly Alfin lube oil 3 2 3 C2Flux Al Flux 2805 3 4 4 C3
Al Flux 7028 2 4 3 C3Tohkem 2 4 3 C3
Brazing Alcotex 4 5 5 C3CO2 (oxy-acetylene
brazing) 4 4 4 C3Leak test Helium 4 2 3 C3
Compressor oil 3 3 3 C3Nitrogen filling Nitrogen 4 2 3 C3Degreasing Methylene Chloride 3 3 3 C3Maintenance Coster gear oil 3 2 3 C2
Tachecon 2 2 2 C2CRC contact cleaner 2 3 3 C2
-
7/30/2019 Patco_CHRA_rev1
7/13
Status Remark
1.0 TECHNICAL MEASURE
1.1.Elimination/Substitution OK
1.2.Isolation/Enclosures OK
1.3.Ventilation OK
1.4.Work practice / System of work XJHA, MOC
1.5.Personal protection XPPE Program
2. MAINTENANCE OF CONTROL EQUIPMENT OK
3. MONITORING OF AIR CONTAMINANT OKReported incident
4. BIOLOGICAL MONITORING OKReported incident.
5. HEALTH SURVEILLANCE OKHigh risk group
6. INFO, INSTRUCTION & TRAINING XMSDS, Label,
Communication
7. EMERGENCY & FIRST AID PROCEDURES X
ER Equip, Drill
CONCLUSIONFin Corrugator & Pre-Assembly
-
7/30/2019 Patco_CHRA_rev1
8/13
Status Remark
1.0 TECHNICAL MEASURE
1.1.Elimination/Substitution OK
1.2.Isolation/Enclosures OK
1.3.Ventilation XMechanical fan in manual
flux room
1.4.Work practice / System of work XJHA
1.5.Personal protection XPPE Program
2. MAINTENANCE OF CONTROL EQUIPMENT XLocal exhaust ventilation
3. MONITORING OF AIR CONTAMINANT XFlux dust (Total and
fractional dust)
4. BIOLOGICAL MONITORING OKReported incident.
5. HEALTH SURVEILLANCE OKHigh risk group
6. INFO, INSTRUCTION & TRAINING XMSDS, Label,
Communication
7. EMERGENCY & FIRST AID PROCEDURES XER Equip, Drill
CONCLUSIONFlux Coating & Auto Brazing
-
7/30/2019 Patco_CHRA_rev1
9/13
Status Remark1.0 TECHNICAL MEASURE
1.1.Elimination/Substitution OK
1.2.Isolation/Enclosures XEnclosed brazing station
1.3.Ventilation X
Local exhaust ventilation
1.4.Work practice / System of work XJHA
1.5.Personal protection XPPE Program
2. MAINTENANCE OF CONTROL EQUIPMENT OK
3. MONITORING OF AIR CONTAMINANT XBrazing fume (aluminium
oxide particle,
-
7/30/2019 Patco_CHRA_rev1
10/13
Status Remark
1.0 TECHNICAL MEASURE
1.1.Elimination/Substitution OK
1.2.Isolation/Enclosures OKLeak Test Chamber
1.3.VentilationOK
1.4.Work practice / System of work XJHA
1.5.Personal protection XPPE Program
2. MAINTENANCE OF CONTROL EQUIPMENT XLEV
3. MONITORING OF AIR CONTAMINANT OKReported incident
4. BIOLOGICAL MONITORING OK Reported incident.5. HEALTH SURVEILLANCE OK High risk group6. INFO, INSTRUCTION & TRAINING X
MSDS, Label,
Communication
7. EMERGENCY & FIRST AID PROCEDURES X ER Equip, Drill
CONCLUSIONLeak Test
-
7/30/2019 Patco_CHRA_rev1
11/13
Status Remark
1.0 TECHNICAL MEASURE
1.1.Elimination/Substitution OK
1.2.Isolation/Enclosures OKFilling Chamber
1.3.VentilationOK
1.4.Work practice / System of work XJHA
1.5.Personal protection XPPE Program
2. MAINTENANCE OF CONTROL EQUIPMENT XLEV
3. MONITORING OF AIR CONTAMINANT OKReported incident
4. BIOLOGICAL MONITORING OK Reported incident.5. HEALTH SURVEILLANCE OK High risk group6. INFO, INSTRUCTION & TRAINING X
MSDS, Label,
Communication
7. EMERGENCY & FIRST AID PROCEDURES X ER Equip, Drill
CONCLUSIONNitrogen Filling
-
7/30/2019 Patco_CHRA_rev1
12/13
Status Remark
1.0 TECHNICAL MEASURE
1.1.Elimination/Substitution OK
1.2.Isolation/Enclosures OKDegreaser
1.3.VentilationOK
1.4.Work practice / System of work XJHA
1.5.Personal protection XPPE Program
2. MAINTENANCE OF CONTROL EQUIPMENT XLEV
3. MONITORING OF AIR CONTAMINANT OKReported incident
4. BIOLOGICAL MONITORING OK Reported incident.5. HEALTH SURVEILLANCE OK High risk group6. INFO, INSTRUCTION & TRAINING X
MSDS, Label,
Communication
7. EMERGENCY & FIRST AID PROCEDURES X ER Equip, Drill
CONCLUSIONDegreasing
-
7/30/2019 Patco_CHRA_rev1
13/13
Status Remark
1.0 TECHNICAL MEASURE
1.1.Elimination/Substitution OK
1.2.Isolation/Enclosures OK
1.3.Ventilation OK
1.4.Work practice / System of work XJHA, MOC
1.5.Personal protection XPPE Program
2. MAINTENANCE OF CONTROL EQUIPMENT OK
3. MONITORING OF AIR CONTAMINANT OKReported incident
4. BIOLOGICAL MONITORING OKReported incident.
5. HEALTH SURVEILLANCE OKHigh risk group
6. INFO, INSTRUCTION & TRAINING XMSDS, Label,
Communication
7. EMERGENCY & FIRST AID PROCEDURES X
ER Equip, Drill
CONCLUSIONMaintenance