Using a Statewide Model to Help Improve State Long-Range Plan Decision-Making: The Utah DOT Experience. Paul Hershkowitz, Wilbur Smith Associates John Thomas, Utah DOT Michael Fazio, City of South Salt Lake * Jonathan Avner, Wilbur Smith Associates David Hurst, Wilbur Smith Associates - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Paul Hershkowitz, Wilbur Smith Associates John Thomas, Utah DOT](https://reader036.vdocuments.net/reader036/viewer/2022062305/568161bc550346895dd19655/html5/thumbnails/1.jpg)
TRB Transportation Planning Applications Conference, May 12, 2011
Paul Hershkowitz, Wilbur Smith AssociatesJohn Thomas, Utah DOTMichael Fazio, City of South Salt Lake*
Jonathan Avner, Wilbur Smith AssociatesDavid Hurst, Wilbur Smith Associates*Formerly with Utah DOT
1 Using a Statewide Model to Help Improve State Long-Range Plan Decision-Making: The Utah DOT Experience
![Page 2: Paul Hershkowitz, Wilbur Smith Associates John Thomas, Utah DOT](https://reader036.vdocuments.net/reader036/viewer/2022062305/568161bc550346895dd19655/html5/thumbnails/2.jpg)
TRB Transportation Planning Applications Conference, May 12, 2011
• Describe the LRP process.• Overview of how the statewide model was applied in the development of the Utah DOT Long-Range Plan (LRP).
Purpose of Presentation2
![Page 3: Paul Hershkowitz, Wilbur Smith Associates John Thomas, Utah DOT](https://reader036.vdocuments.net/reader036/viewer/2022062305/568161bc550346895dd19655/html5/thumbnails/3.jpg)
TRB Transportation Planning Applications Conference, May 12, 2011
• LRP team – UDOT, Bio-West, InterPlan, WSA• Foster better communication and understanding between the Regions and Planning• Regions were the key - Bottom up, not top down• Regions - project driven• Needs by region by phase (2010-2020, 2021-2030, 2031-2040, & unfunded)
LRP Process3
![Page 4: Paul Hershkowitz, Wilbur Smith Associates John Thomas, Utah DOT](https://reader036.vdocuments.net/reader036/viewer/2022062305/568161bc550346895dd19655/html5/thumbnails/4.jpg)
TRB Transportation Planning Applications Conference, May 12, 2011
• Value-added: “this is what our analysis shows, what do you think?”• Needs to projects w/ region involvement• Fiscally constrained• Tiered by type of project • PI : Libraries, RPOs, MPOs, UDOT & uPLAN websites• Streamlined document
LRP Process (2)4
![Page 5: Paul Hershkowitz, Wilbur Smith Associates John Thomas, Utah DOT](https://reader036.vdocuments.net/reader036/viewer/2022062305/568161bc550346895dd19655/html5/thumbnails/5.jpg)
TRB Transportation Planning Applications Conference, May 12, 2011
• Utah Statewide Travel Model (USTM) - developed (Phase I) and calibrated (Phase II) - 2007-2009• Currently daily vehicle and truck model – “match the maps”• Whole state, including MPOs – but focus is on rural and “emerging” areas. Supplements, doesn’t replace, MPO models• LRP was one of the apps for which USTM was built
USTM LRP Application5
![Page 6: Paul Hershkowitz, Wilbur Smith Associates John Thomas, Utah DOT](https://reader036.vdocuments.net/reader036/viewer/2022062305/568161bc550346895dd19655/html5/thumbnails/6.jpg)
TRB Transportation Planning Applications Conference, May 12, 2011
• Regional briefing – LRP process and USTM• Deficiencies (capacity needs) by region• Improvements (projects) to resolve deficiencies • No-Build – 2008, 2020, 2030, 2040, unfunded “needs”• Baseline (w/ MPO projects) – 2008, 2020, 2030, 2040, unfunded “needs”
USTM LRP Application (2)6
![Page 7: Paul Hershkowitz, Wilbur Smith Associates John Thomas, Utah DOT](https://reader036.vdocuments.net/reader036/viewer/2022062305/568161bc550346895dd19655/html5/thumbnails/7.jpg)
TRB Transportation Planning Applications Conference, May 12, 2011
• Regional review, then iterated model runs• Some projects moved to different phases or deleted (based on funding) after iterations• Model results input to project fact sheets
USTM LRP Application (3)7