paul scherrer institut

3
Wir schaffen Wissen – heute für morgen 3. Juli 2022 PSI, 3. Juli 2022 PSI, Paul Scherrer Institut Plans for pion irradiation in 2014 Tilman Rohe

Upload: burke

Post on 06-Jan-2016

34 views

Category:

Documents


0 download

DESCRIPTION

Tilman Rohe. Paul Scherrer Institut. Plans for pion irradiation in 2014. PSI,. 14. Oktober 2014. Facility. p E1 beam line at PSI Secondary beam line in proton accelerator Intense pion beam (a few 10 9 p /s) “Medium” energy (~280 MeV/c) Beam line is used by - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Paul Scherrer Institut

Wir schaffen Wissen – heute für morgen

20. April 2023PSI, 20. April 2023PSI,

Paul Scherrer Institut

Plans for pion irradiation in 2014

Tilman Rohe

Page 2: Paul Scherrer Institut

E1 beam line at PSI• Secondary beam line in proton accelerator• Intense pion beam (a few 109 /s)• “Medium” energy (~280 MeV/c)• Beam line is used by

– Particle physics: MuSan, AlCup, …– µSR (material science): Dolly

• 2014 will be overboked• 2015 even worse (shorter beam period)

Possible access • “Test beam”

– Informal, no written proposal, just ask– Low priority (no chance)

• Scientific experiment– Written proposal (dead line 06.01.2014)– Presentation at the user’s meeting (27.-29.1.2014)– Beam time granted by committee– We are in direct competition with particle physics experiments

E1-beam line

Facility

Page 3: Paul Scherrer Institut

Application Strategy

Strong scientific case• Stress the material science

– Pion irradiation data is important to understand how to model “pion damage” with neutrons and protons for “new” materials

– List papers (in reviewed journals) resulting from the last irradiation (2009?)– Please send me the references of all papers reporting on pion irradiated samples by 01.12.2013

• Stress that PSI profits from this activity– Visibility in the papers (at least in the acknowledgements)

NB: In the past this did not work well. This does not strengthen our position!Modest period • Only about 4 weeks (1 needed to prepare the beam line)• Limits to

– ~100 samples– fluences of max 1015 pi/cm2 (~1 week in the focus)

Support• Irradiation must be run by RD50• Human resources

– PSI: beam adjustment, link to local groups (1 person)– CERN: irradiation table, spectrometer (2 persons, not the whole time)– RD50:

– Preparation of samples– Running the irradiation (dosimetry, placing and removing the samples, book keeping)– At least 2 persons during the irradiation +/- 1 week