PC-based Energy Automation with IEC 61850
11/13/2013
![Page 3: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/3.jpg)
COPA-DATAThe Future is Ergonomics
Ergonomic and highly-dynamic process solutions for HMI/SCADA, dynamic production reporting and integrated PLC systems
11 offices, international network with distributors and partners, active in more than 40 countries
do it your way since 1987
More flexibility and safety for your projects
Ing. Thomas PunzenbergerCOPA-DATA CEO
![Page 4: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/4.jpg)
International network, local contact persons
![Page 5: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/5.jpg)
COPA-DATAHeadquarters
COPA-DATA Group
60
40
20
0
1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
80
100
140
120
160
180
160
Number of Employees
84
For us, being close to the customer means Decentralized Growth
![Page 6: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/6.jpg)
What we do
![Page 7: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/7.jpg)
One System – Many Solutions
![Page 8: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/8.jpg)
One System – Many Industries
![Page 9: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/9.jpg)
Successful Customers
A N D M A N Y M O R E …
ENERGY & INFRASTRUC TURE
S I E M E N S S P R E C H E R A U T O M AT I O N A L S T O M G R I D
L E I T W I N DC A P U L A R E M S D A QSEL CG AUTOMATION
GE
![Page 10: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/10.jpg)
What we are focusing on in Energy
Energy Automation
• Substation Automation Transmission
• Substation Automation Distribution
• Hydro Power Plants
• Control Centers Distribution
• Integration of Renewables (Wind, PV)
![Page 11: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/11.jpg)
Substation Automation with IEC 61850
It’s about communication
• IED – IED
• IED – HMI
![Page 12: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/12.jpg)
![Page 13: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/13.jpg)
![Page 14: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/14.jpg)
This is how SAS typically looks like
BAY 1
WAN
Web client
Control CenterIEC60870-5-104 master
STATION ComputerEngineeringWS
ClientWS
LAN
BCUBay Control Unit
BMUBay Monitoring Unit
Protection…
BAY 2
BCUBay Control Unit
BMUBay Monitoring Unit
Protection…
BAY n
BCUBay Control Unit
BMUBay Monitoring Unit
Protection…
SERVER STAND-BY
![Page 15: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/15.jpg)
IEC 61850GOOSE
IEC 60870-5-101/104
This is how SAS typically looks like
BAY 1
WAN
Web client
Control CenterIEC60870-5-104 master
STATION ComputerEngineeringWS
ClientWS
LAN
BCUBay Control Unit
BMUBay Monitoring Unit
Protection…
BAY 2
BCUBay Control Unit
BMUBay Monitoring Unit
Protection…
BAY n
BCUBay Control Unit
BMUBay Monitoring Unit
Protection…
SERVER STAND-BY
IEC 61850client server
![Page 16: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/16.jpg)
Challenge
Configuration of IEC 61850 Clients
![Page 17: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/17.jpg)
IEC 61850 Configuration
Easy configuration of a complex topic
ICD Files
SSD File
SCD File
CID File
ICD Files
CID File
CID File
Tool
Tool
Tool
Tool
![Page 18: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/18.jpg)
IEC 61850 Configuration
Easy configuration of a complex topic
ICD Files
SSD File
SCD File
CID File
ICD Files
CID File
CID File
Tool
Tool
Tool
Tool
![Page 19: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/19.jpg)
SCD
ICD
CID
![Page 20: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/20.jpg)
SCD
ICD
CID
![Page 21: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/21.jpg)
.txt
![Page 22: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/22.jpg)
.txt
![Page 23: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/23.jpg)
![Page 24: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/24.jpg)
New challenge
Load shedding with IEC 61850 GOOSE
![Page 25: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/25.jpg)
Load shedding with IEC 61850 GOOSE
• Trend to CRAS (Centralized Remedial Action Schemes)
• Short response time (within a wavelength [20.00ms/50Hz, 16.67ms/60Hz])
• High demand for guaranteed response time
![Page 26: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/26.jpg)
Load shedding with IEC 61850 GOOSE
• Trend to CRAS (Centralized Remedial Action Schemes)
• Short response time (within a wavelength [20.00ms/50Hz, 16.67ms/60Hz])
• High demand for guaranteed response time
Can we do that with of the shelf hardware and a standard implementation of GOOSE?
![Page 27: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/27.jpg)
How it would look like
Detects fault and trips the breaker
1
Calculates current matrix and sends trips to other relays
2
Relays execute necessary trips
3
GOOSE Publishers
GOOSE Subscribers
GOOSE Publisher
and Subscriber
![Page 28: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/28.jpg)
Questions
• Can we do that with a Windows platform?
• Can we run a SCADA application at the same time?
• How shall the GOOSE control blocks be configured?
![Page 29: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/29.jpg)
How we tested it
Relay PC
DSC10 Bay Control Unit (Ducati Sistemi)
© by Ducati
Load Shedding PC
Analysis PC
IEC 61850 GOOSE
t1 t2
1
2
3
![Page 30: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/30.jpg)
How we tested it
Relay PC
DSC10 Bay Control Unit (Ducati Sistemi)
Load Shedding PC
Analysis PC
IEC 61850 GOOSE
IEC 61850 MMSDNP3
t1 t2
3ms cycle time
![Page 31: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/31.jpg)
Results
• Combined GOOSE messages with multiple data objects do perform significantly better
• Despite the load on the network and on the SCADA host with the load shedding logic, the system is capable of delivering a fairly consistent load shedding performance
![Page 32: PC-based Energy Automation with IEC 61850 - IECON 2013iecon2013.org/files/IECON2013_IF5_02_Resch.pdf · Substation Automation with IEC 61850 It’s about communication • IED –IED](https://reader031.vdocuments.net/reader031/viewer/2022022716/5c17ecc809d3f27a578c6fcd/html5/thumbnails/32.jpg)
To be read here: