pearl hospital project

52
Pearl Hospital Trust

Upload: awaitingeyes

Post on 02-Jun-2015

1.141 views

Category:

Documents


4 download

DESCRIPTION

This file is where you can see all the details about our hospital project.

TRANSCRIPT

Page 1: Pearl Hospital Project

Pearl Hospital Trust

Page 2: Pearl Hospital Project

Awaiting eyes foundation

AEF (Awaiting Eyes Foundation) is a charity founded by Estaq Malik in response to the earthquake which devastated the Bagh region in Pakistan in 2005. The foundation seeks to provide relief to victims. Recently we offered aid to those in Mahildara and Bani Minhasan, after the catastrophic floods in 2010.

 

Our next project is the building of the Iqbal Begum Complex; containing a school, medical facilities, orphanage, religious buildings... We are aiming to start construction in 2012, so every penny counts if we are to achieve this goal.

Page 3: Pearl Hospital Project

Pearl Hospital Trust

The project is the building of a hospital to serve the Sialkot population. The hospital will have 115 beds and employ more than 800 members of staff to provide 24-hour accident and emergency care.

The project started in January 2011. It is a compact design created to optimize land utilization in Pakistan. It is suitable for sustainability; it is trying to respect the environment as much as possible.

Page 4: Pearl Hospital Project

How you can help AEF

We thank you for your cooperation and assistance that will contribute to improve the situation of the population.

There are many ways you can help us. We of course accept monetary and online donations but the foundation is also in dire need of equipment, materials and resources (e.g. computers, printers, ambulance vehicles, cement and other building material).

This will help us to work more efficiently and give us the opportunity to hire new volunteers.

Page 5: Pearl Hospital Project

public relations Team public relations Team

Anna faineantArtur Binkowski clemence damionDavid PercebeiroEsteban PenalverGabriela UlloaGiacomo TubianaGwladysk RajaonaHara Lee Htet Htet SoeIacomo TubianaJulia MehlfieldKatarzyna KoniarekKatie VandenHeuvenkhadija mohamedKrzysztof Csyzewski

Liz SassoLoretta ThomasMara SimonettiMarco CampagneMaryam Khan Muhammad Umer ShoaibNina Eder-Haslehnerpascale tranPaul LambertPerrine VacherRose marison blardonySara TripodiSofija donevskaSuze FrickerThuy Van Le NguyenValentina PernecheleXenia Wertinski

Public Relations TeamOffice Manager:Zunaira Sabih

Page 6: Pearl Hospital Project
Page 7: Pearl Hospital Project
Page 8: Pearl Hospital Project

Architects Interior designers Engineers Public relations Team

Alan Lau Diogo de LimaGabriele ZorinoGerard WalshMaria SolovievaNarges MousaviOlga PolyanskayaRiccardo Radaelli

Adam cookJoan Ma Roig OrtizRossella Scalia

Karoliina LaaksonenKohie MatsuyaMichael McclintockRahella Titan

Iva ZugicJuan Garcia Kenneth OkaforLilit MnatsakanyanKatia CarbyMiguel CaceresPilar sierra

István HorváthMauro Ventura

Manager:Zunaira Sabih

anna faineantclemence damionGwladysk Rajaonakhadija mohamedMuhammad Umer Shoaibpascale tranrose marison blardonySofija donevska

Architectural teamProject coordinators

Narges Mousavi Maria Solovieva

Tomas Baar

Page 9: Pearl Hospital Project
Page 10: Pearl Hospital Project

Buildings:HospitalMosque

Staff accommodationGuest accommodation

Doctors’ HouseRestaurant and Coffee shop

Service BuildingsParking Area

Educational department

Page 11: Pearl Hospital Project

Landscape

• Land Requirement for the whole complex: 70,000 m2

Page 12: Pearl Hospital Project

Hospital

• 115 Bed Hospital

• Central Courtyard design

• Including:• Main Entrance, Emergency (A & E), Laboratory, Physiotherapy, Radiology,

Clinic, Administration office, Birth Unit, Gynaecology Ward, Children Ward, Urology Ward, E.N.T Ward, Orthopaedic Ward, Surgery Ward, ICU, CCU, Conference Hall, CSR, Kitchen, Laundry, Mortuary and two more Wards for Further Extension.

• Central staircase and two main lifts • Two lifts for Emergency cases• One service lift• Four fire exit staircases

Page 13: Pearl Hospital Project

Main entrance

• Reception, Security, Waiting area, Coffee shop, Flower shop, Pharmacy, Central Staircase, Lifts and Ramp, Toilets.

Page 14: Pearl Hospital Project

Emergency (A&E)

• Reception, Security, Waiting area, General consultant room, CPR room, Plaster room, Xray room, Emergency Operation Room, Recovery, Short Admission room, Nurse Station, Staff room, Toilets.

Page 15: Pearl Hospital Project

Laboratory

• Reception, Waiting area, Consultant room, Blood Sampling room, Sample collection, Laboratories, Blood bank, Staff Entrance, Staff room, Toilets.

Page 16: Pearl Hospital Project

Physiotherapy• Reception, Waiting area, Consultant room,

Hydro therapy, Heat therapy, Ergo therapy, Dressing room, Staff Entrance, Staff room, Toilets.

Page 17: Pearl Hospital Project

Radiology• Reception, Waiting area, Consultant room,

Ultra sound, Xray, MRI, Staff Entrance, Staff room, Toilets.

Page 18: Pearl Hospital Project

Clinic• Reception, Waiting area, Gynaecologist,

Ophthalmologist, Urologist, Cardiologist, Psychologist, Surgeon, General Medicine specialist, E.N.T Specialist, Audiology, Optometry, Vaccination room, Staff room, Toilets.

Page 19: Pearl Hospital Project

Administration office• Waiting area, Hospital president, Hospital

manager, Secretary, Chief Administrative, Medical archive, Administrative archive, accountancy room, Social worker, Insurance office, Educational office...

Page 20: Pearl Hospital Project

All wards

• Gynaecology, Children, Urology, E.N.T, Orthopaedic and Surgery Ward

• Reception, Waiting area, Consultant room, Clinical supervisor room, Nurse station

• Single patient rooms, quarantine room, Common room, Clean stuff storage, Dirty stuff storage, Sheet storage, Staff room, Toilets.

Page 21: Pearl Hospital Project

Birth unit

• Reception, Waiting area, Consultant room, Delivery room, Labour room, Nursery,

• Staff room, Toilets.

Page 22: Pearl Hospital Project

ICU and CCU

• Reception, Waiting area, Visitor’s corridor, Consultant room, Clinical supervisor room, Nurse station, patient area, quarantine room, Clean stuff storage, Dirty stuff storage, Sheet storage, Staff room, Toilets.

Page 23: Pearl Hospital Project

Conference hall

• For 350 Persons• Waiting area, Stage and secondary areas, audience

seating area.

Page 24: Pearl Hospital Project

CSR, Kitchen and Laundry

Page 25: Pearl Hospital Project

Educational department

Page 26: Pearl Hospital Project

Table: number of beds

Floors Wards Number of Beds

Ground Floor

A & E 16

Birth Unit 7

Total 23

First Floor

Children Ward 13

Gynaecology Ward 13

Urology 12

ICU 10

Total 48

Page 27: Pearl Hospital Project

Floors Wards Number of Beds

Second Floor

Surgery Ward 13

E.N.T Ward 13

Orthopaedic Ward 12

CCU 10

Total 48

Third Floor

Surgery Ward (Theatres) 6

New Ward (Further Extension) 13

New Ward (Further Extension) 12

Total 21

Total 140

Page 28: Pearl Hospital Project

Table: area m2

Spaces Area (m2)

Basement

Laundry 348

2413

Kitchen 540

Storages 388

Dining Area 120

Circulation* 1017

Ground Floor

Entrance 725

6780

A & E 932

Administration office 558

Clinic 1000

Radiology 308

Physiotherapy 261

Laboratory 357

Birth Unit 677

Circulation* 1962

Page 29: Pearl Hospital Project

First Floor

Children Ward 886

5425

Gynaecology Ward 837

Urology 830

ICU 452

Administration office 409

Circulation* 2011

Second Floor

Surgery Ward 886

5425

E.N.T Ward 837

Orthopaedic Ward 830

CCU 452

Educational Area 409

Circulation* 2011

Page 30: Pearl Hospital Project

Third Floor

Surgery Ward (Theatres) 791

5425

CSR 405

Educational Area 309

Conference Hall 472

New Ward (Further

Extension)837

New Ward (Further

Extension)772

Circulation* 1839

Area of Plot 7815

Total Area (All Floors) 25468

Required Land for Building 7892

*- This area included the staircases, lifts and corridors.

Page 31: Pearl Hospital Project

Architectural design

Page 32: Pearl Hospital Project

Architectural design

Page 33: Pearl Hospital Project

Architectural design

Page 34: Pearl Hospital Project

Guest and Staff accommodation

Floors Area (m2)

Ground Floor 947

First Floor 947

Second Floor 947

Area of Plot 947

Total Area (All

Floors)2841

Page 35: Pearl Hospital Project
Page 36: Pearl Hospital Project

Architectural design

Page 37: Pearl Hospital Project

Architectural design

Page 38: Pearl Hospital Project

Mosque

Spaces Area (m2)

Ground Floor 816

First Floor 267

Area of Plot 816

Total Area (All

Floors)

1083

Required Land

for Building

1090

Page 39: Pearl Hospital Project
Page 40: Pearl Hospital Project

Architectural design

Page 41: Pearl Hospital Project

Architectural design

Page 42: Pearl Hospital Project

Doctors’ House

Spaces Area (m2 )

Ground Floor 630

Area of Plot 630

Total Area (All

Floors)630

Required Land for

Building1209

Page 43: Pearl Hospital Project
Page 44: Pearl Hospital Project

Architectural design

Page 45: Pearl Hospital Project

Architectural design

Page 46: Pearl Hospital Project

Restaurant and coffee shop

Spaces Area (m2)

Ground Floor 682

First Floor 362

Area of Plot 682

Total Area (All

Floors)

1044

Required Land

for Building

1250

Page 47: Pearl Hospital Project

Restaurant and coffee shop

Page 48: Pearl Hospital Project

Architectural design

Page 49: Pearl Hospital Project

Architectural design

Page 50: Pearl Hospital Project

Service buildingsSpaces Area (m2)

Installation 200-300

Garbage area 30

Mortuary 50

Fire station 30

Workshops

Electricity workshop 40

140

Woodcraft workshop 40

plumber workshop 40

Medical workshops 20

Page 51: Pearl Hospital Project

Ambulance Station Parking 60

170

Car Repair 40

Car washing 40

Drivers rest area 30

Storages

Main storage 100

170Food Storage 50

Drug Storage 30

Total Area 900-1000

Page 52: Pearl Hospital Project

Parking area

Spaces Number of Parking Area (m2)

Visitors Parking 100 2400

Staff Parking 50 1152

Bike Parking 50 215