1
Department Production
• 177 lane miles of capacity
• 3,072 lane miles of resurfacing
• 131 bridge repair contracts
• 25 bridge replacement contracts
• Let $2.3 billion in new construction
• Completed 372 projects at $2.59 B
Summary of Performance
•37 Performance Measures
–20 Primary
–17 Secondary
•Met 17 of 20 Primary (85%)
–1 Primary Measure with objective in
outer years are on track.
Percentage of Consultant Contracts Executed Compared to
the Number Planned: by Fiscal Year(Objective: at least 95%)
2006 2007 2008 2009 2010
% of Plan 90.7% 97.0% 95.5% 96.3% 98.1%
0%20%40%60%80%
100%
LAP
Included
Percentage of Right-of-Way Projects Certified Compared to
the Number Planned: by Fiscal Year(Objective: at least 90%)
2006 2007 2008 2009 2010
% Achieved 98.1% 95.9% 100.0% 100.0% 97.4%
0%
20%
40%
60%
80%
100%
Percentage of Construction Contracts Executed
Compared to the Number Planned:
by Fiscal Year(Objective: at least 95%)
2006 2007 2008 2009 2010
% of Plan 79.6% 97.6% 96.7% 96.9% 99.0%
0%
20%
40%
60%
80%
100%
LAP
included
Percentage of LAP Consultant Contracts Executed Compared
to the Number Planned: by Fiscal Year(Objective: at least 80%)
2006 2007 2008 2009 2010
% of Plan 0 82.2% 90.0% 97.8% 98.1%
0%
20%
40%
60%
80%
100%
Percentage of LAP Construction Contracts Executed
Compared to the Number Planned: by Fiscal Year(Objective: at least 80%)
2006 2007 2008 2009 2010
% of Plan 0 68.8% 89.9% 96.0% 94.7%
0%20%40%60%80%
100%
74.4% 73.9%79.8%
85.5%90.3%
25.6% 26.1%20.2%
14.5%9.7%
0%
50%
100%
2006 2007 2008 2009 2010
% o
f C
on
tra
cts
% Meeting Objective % Not Meeting Objective
Time Adjustments: Construction Contracts
Percentage of Contracts Meeting ObjectiveObjective: 80% of contracts < or = 20% Over Original Time
372 Contracts Completed
# of Contracts that Account for 50%
of Total Additional Days(3,808 days added)
2006 2007 2008 2009 2010
# of Contracts to 50% 9 11 17 6 3
0
5
10
15
20
25
30# o
f C
on
tracts
Cost Adjustments: Completed Construction Contracts
Percentage of Contracts Meeting ObjectiveObjective: 90% of contracts < or = 10% Over Original Contract Amount
79.5%84.5% 84.8%
79.9%
89.5%
20.5%15.5% 15.2%
20.1%10.5%
0%
20%
40%
60%
80%
100%
2006 2007 2008 2009 2010
% o
f C
on
tra
cts
% Meeting Objective % Not Meeting Objective
372 contracts completed
# of Contracts that Account for 50%
of Total Additional Cost($133.0 million in additional costs)
2006 2007 2008 2009 2010
# of Contracts to 50% 6 11 12 12 6
0
5
10
15
20
25
30# o
f C
on
tracts
0.18%0.13% 0.13% 0.15% 0.18%
0.00%
0.20%
0.40%
0.60%
0.80%
1.00%
2006 2007 2008 2009 2010
Percentage of Structures on the SHS with Posted Weight Restrictions
(Objective: no more than 1%)
Restricted Bridges
Percentage of Structures on the SHS having a Condition Rating of either Excellent or Good
(Objective: at least 90%)
94.4% 94.3% 94.2% 94.6% 95.4%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2006 2007 2008 2009 2010
% o
f S
tru
ctu
res
Bridge Condition
2006 2007 2008 2009 2010
% Meeting Objective 82.1% 83.5% 83.5% 85.6% 87.6%
0%
20%
40%
60%
80%
100%
% o
f L
an
e M
ile
s
Percentage of Lane Miles on the SHS having a Condition Rating
of either Excellent or Good (Objective: at least 80%)
PAVEMENT CONDITION
Routine Maintenance
83 83 86 87 86
0
20
40
60
80
100
2006 2007 2008 2009 2010
Ma
inte
na
nc
e R
ati
ng
Maintenance Rating Achieved on the SHS
(Objective: at least 80)
Capacity Improvements: Highways
2006 2007 2008 2008 2008
% of Plan 86.5% 86.2% 99.4% 106.6% 89.3%
Goal 90.0% 90.0% 90.0% 90.0% 90.0%
0%
20%
40%
60%
80%
100%
Percentage of Lane Miles Added to the State Highway System Compared to the Number Planned:
by Fiscal Year(Objective is at least 90%)
% of Plan
Goal
Capacity Improvements:
Public Transportation
2.26% 2.40%1.80%
1.36% 1.20%
5.29%
4.10%3.25%
2.26%
-5.20%
-6.00%
-4.00%
-2.00%
0.00%
2.00%
4.00%
6.00%
2005 2006 2007 2008 2009
Gro
wth
Ra
te
Population
Growth Rate
Transit
Ridership Growth
Commitment of Federal Funds
100.0% 100.0% 100.0% 100% 100%
0%
20%
40%
60%
80%
100%
2006 2007 2008 2009 2010
% o
f F
un
ds
Co
mm
itte
d
Commitment of Federal Funds by Federal Fiscal Year(Objective is 100%)
Management of Administrative Costs
1.1%1.0%
1.2%1.3% 1.3%
0.0%
0.5%
1.0%
1.5%
2.0%
2006 2007 2008 2009 2010
% o
f T
ota
l Pro
gra
m
Administrative Costs as a Percent of the Total ProgramBy Fiscal Year
(Objective is <2%)
Cash Management
State Transportation Trust Fund (STTF)
2009/10 Ending Cash Balance was $312.0 Million or 5.9% of outstanding commitments of $5.318
Billion
Cash Receipts ($=millions) Cash Disbursements ($=millions)
Forecast for FY
2009/10 $5,863.2
Forecast for FY
2009/10 $5,694.2
2009/10 Actual $5,345.7 2009/10 Actual $5,445.4
$ Variance -$517.5 $ Variance -$248.8
% Variance -8.8% % Variance -.4.4%
Minority Business Enterprise Program
$334.2$350.8
$436.8
$346.1
$384.8
0
50
100
150
200
250
300
350
400
450
500
2006 2007 2008 2009 2010
Do
lla
rs in
Mil
lio
ns
(Objective: Year-over-Year Increase in Expenditures)
Management of Toll Facility Operational Costs
13.414.7
16.3
17.3
15.7
0
5
10
15
20
2006 2007 2008 2009 2010
Cen
ts p
er
Toll
Tran
sact
ion
Operational Cost Per Toll Transaction by Fiscal Year(Objective is <16 Cents)
Cost Per Transaction Goal
Toll Revenue Variance
5.2%
3.6%
4.2%3.7%
3.4%
0%
1%
2%
3%
4%
5%
6%
2006 2007 2008 2009 2010
Re
ven
ue
Va
ria
nce
Ra
teToll Collection Revenue Variance
(Objective is less than or equal to 5%)
Revenue Variance Goal
SunPass Participation
54.4%60.7%
64.2% 67.1% 70.1%
6.5%11.6% 5.8% 4.5% 4.5%
0%
25%
50%
75%
2006 2007 2008 2009 2010
Electronic Toll Collections as a Percent of Total Collections(Objective is at least 75% by June 30, 2012)
% Electronic % Annual Growth Goal
SAFETY
0
500
1000
1500
2000
2500
3000
3500
4000
2005 2006 2007 2008 2009
Fatalities
Motorcyclists
Pedestrians
Bicyclists
Fatality Rate has declined from 1.76 in 2005 to 1.3 in 2009 (per 100 m VMT)