Permanent Secant Pile Cut - Off Wall for UIHC Children’s Hospital (CH) & Parking Ramp No. 2 (HPR2) Iowa City, IA Schnabel Foundation Company By: Mark Goudschaal, P.E.

Upload: others

Post on 01-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Permanent Secant Pile Cut-Off Wall

for UIHC Children’s Hospital (CH) &

Parking Ramp No. 2 (HPR2)

Iowa City, IA

Schnabel Foundation Company

By: Mark Goudschaal, P.E.

Page 2: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Presentation Overview

1. Owner/Project Team & Summary of

Work – Overall Plan and Facts.

2. Secant Pile Section and Soil Profile

3. Secant Pile Wall Procedures and

Installation.

4. Perm. Wall Const.

5. Conclusion

Page 3: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Project Team

Owner:

University of Iowa Hospitals and Clinics

(UIHC)

Excavation/SiteworkContractor:

Peterson Contracting, Inc. (PCI)

SPW Contractor:

Schnabel Foundation Company (SFC)

DP Contractor:

Veit Companies

Architect/Engineer: Carl Walker, Inc. (HPR2) & Heery Design (CH) &

Shive Hattery

Geotechnical Engineer:

Terracon

Construction Manager:

Gilbane Construction Company (GCC)

Page 4: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Existing Site – Prior to Construction

Page 5: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Bid Package Plan/Work Sequencing

Page 6: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Children’s Hospital & HPR2 Plan

Page 7: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

CH Temporary ERS – HPR2 S. SPW

Page 8: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Children’s Hospital & Parking Ramp

Page 9: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Soil Boring Locations

Page 10: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

UIHC CH & HPR2 Soil Borings

Page 11: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

SPW & ERS PLAN

Existing Caissons

Typical Section

Page 12: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Typical SPW Section

Page 13: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Ex. Parking Ramp Caisson Obstruction

Page 14: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Secant Pile Walls (SPW)

Definition: SPW are formed by installing

overlapping piles to form a water cut-off.

1. First install primary piles.

2. Then install secondary piles within the

gaps and set reinforcing steel.

3. The difference in pile diameter and

spacing determines the actual overlap.

Page 15: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Secant Piles: Hydraulic Piling Rig –Bauer BG28

BG28

Secant Pile Wall (SPW) - Plan and Verticality Tolerances are critical.

Page 16: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Install SPW Templates

Page 17: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Installed Circular Foam Template

Page 18: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

South SPW & Cap – Children’s

Page 19: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

SPW Drill Primary (Unreinforced) First

Concrete, f’c=3,000psi for Primary & Secondary Piles.

Secant Piles Hard-Hard Shafts

Page 20: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

HPR2 Drill More Primary Holes

Page 21: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Secondary Holes – Pile Installation

I I I I I

Page 22: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Finish Secondary Piles

I I I I I I I I I

Page 23: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Casing Shoes and Tooling Repairs

New Casing teeth

Page 24: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

High Torque Rotary Casing

Thick walled sections of temporary

flush-joint steel casings (2 – 5 meter

lengths) with cutting teeth on starter

casing shoe.

Used with high torque rotary piling

equipment and/or casing oscillator.

Page 25: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Oscillator Pulling Casing

Page 26: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Flush-Joint Casing – Conical Bolts

Page 27: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Placing Concrete & Pile

Page 28: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Drilling and Setting Pile

Page 29: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Crane Mat Access Road

Page 30: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

SPW Tie Connections

Page 31: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Drilling 2nd Tier Permanent

Tiebacks

Page 32: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Drilling Tiebacks – Using Uncoiler

Page 33: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Automated Grout Plant

Page 34: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Automated High Volume Grout Station

Page 35: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Finished SPW - October 2013

Page 36: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

Current HPR2 & Childrens Hospital

Page 37: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

CH- April 2014 – Looking North

Page 38: Permanent Secant Pile Cut-Off Wall for UIHC Children’s ... · Secant Pile Walls (SPW) Definition: SPW are formed by installing overlapping piles to form a water cut-off. 1. First

ANY QUESTIONS/COMMENTS?