Permeable Treatment Wall Update

Charles BiedermannRegulatory Strategy and Compliance

CH2M HILL B&W West Valley

July 24, 2013

Page 2: Permeable Treatment Wall Update - CHBWV · 2014. 6. 10. · 1 Permeable Treatment Wall Update Charles Biedermann Regulatory Strategy and Compliance CH2M HILL B&W West Valley July

www.energy.gov/EM 2

Summary – Design Requirements

Summarized PTW Functional Design Requirements

• Limit expansion of Sr-90 contaminated groundwater

• Demonstrate overall stable or downward trend in the Sr-90 in

groundwater passing through the PTW

• Prevent redirection of Sr-90 contamination to less contaminated areas

• Preclude substantial changes in groundwater flow

• Maintain passive mitigation system with minimum maintenance and

waste generation

• Maintain PTW groundwater monitoring

• Preclude any limitation on strategies for addressing the plume during

site decommissioning

• Expended PTW media (e.g., zeolite) is removable

Page 3: Permeable Treatment Wall Update - CHBWV · 2014. 6. 10. · 1 Permeable Treatment Wall Update Charles Biedermann Regulatory Strategy and Compliance CH2M HILL B&W West Valley July

www.energy.gov/EM 3

Monitoring and Maintenance

• PTW Installation: Completed November 2010

• Monitoring System:

• 66 wells installed – December 2010

• 22 existing (off- platform wells)

• Monitoring Activities:

• Monthly visual inspections (erosion, standing water, rutting, excessive vegetation growth)

• Hydraulic (water level) monitoring – January 2011 to January 2012

• Baseline sampling & monitoring – Completed January 2011

• Quarterly sampling and monitoring – Ongoing beginning in April 2011

• Expanded Annual sampling and monitoring – Ongoing beginning in January 2012

• Five Year Comprehensive sampling and monitoring – Beginning in January 2015

Page 4: Permeable Treatment Wall Update - CHBWV · 2014. 6. 10. · 1 Permeable Treatment Wall Update Charles Biedermann Regulatory Strategy and Compliance CH2M HILL B&W West Valley July

www.energy.gov/EM 4

System Operation and

Maintenance

• O&M Plan followed

• Road salt and limestone

use restrictions

• Minor O&M of PTW

itself

• Periodic inspections/

maintenance of:

• Soil containment

structure

• Storm water system

• SWPPP Notice of

Termination filed August

2011

• Relocated Outfall S09

data submitted January

2013

Page 5: Permeable Treatment Wall Update - CHBWV · 2014. 6. 10. · 1 Permeable Treatment Wall Update Charles Biedermann Regulatory Strategy and Compliance CH2M HILL B&W West Valley July

www.energy.gov/EM 5

Performance Sampling and

Monitoring

Page 6: Permeable Treatment Wall Update - CHBWV · 2014. 6. 10. · 1 Permeable Treatment Wall Update Charles Biedermann Regulatory Strategy and Compliance CH2M HILL B&W West Valley July

www.energy.gov/EM 6

Sampling and Monitoring

Indications

• Inspections: No significant erosion or standing water, monitoring

wells in good condition, and only minor maintenance actions

• PTW does not substantially alter groundwater flow on the North

Plateau

• Sampling continues to indicate effective removal of Sr-90:

• Down-gradient platform wells exhibiting significant decreases in Sr-

90

• Functional Design Requirements continue to be met

Page 7: Permeable Treatment Wall Update - CHBWV · 2014. 6. 10. · 1 Permeable Treatment Wall Update Charles Biedermann Regulatory Strategy and Compliance CH2M HILL B&W West Valley July

www.energy.gov/EM 7

Sampling and Monitoring

Indications

• The PTW is a large and complex system – expected local

variation in performance observed:

• Sr-90 detected in 6 intra-PTW wells

• 4 intra-PTW wells with elevated or upward trending Sr-90 Concentrations

• 2 wells exceed DOE Derived Concentration Standard (1,100 pCi/L)

• PTW-S6B-D Sr-90 concentration = 1,150 pCi/L

• PTW-S6B-S Sr-90 concentrations = 1,930 pCi/l

• One down-gradient well has exhibited Sr-90 levels that exceed up-

gradient concentrations since the baseline, January 2011 sampling

• This is the result of localized west to east groundwater flow

• Concentrations in this down-gradient well have decreased since 2011

Page 8: Permeable Treatment Wall Update - CHBWV · 2014. 6. 10. · 1 Permeable Treatment Wall Update Charles Biedermann Regulatory Strategy and Compliance CH2M HILL B&W West Valley July

www.energy.gov/EM 8

Hydraulic Gradient in Thick Bedded Unit

Page 9: Permeable Treatment Wall Update - CHBWV · 2014. 6. 10. · 1 Permeable Treatment Wall Update Charles Biedermann Regulatory Strategy and Compliance CH2M HILL B&W West Valley July

www.energy.gov/EM 9

Sr-90 Plume Delineation in Thick Bedded Unit

(January 2011 Baseline)

Page 10: Permeable Treatment Wall Update - CHBWV · 2014. 6. 10. · 1 Permeable Treatment Wall Update Charles Biedermann Regulatory Strategy and Compliance CH2M HILL B&W West Valley July

www.energy.gov/EM 10

Sr-90 Plume Delineation in Thick Bedded Unit

(January 2013)

Page 11: Permeable Treatment Wall Update - CHBWV · 2014. 6. 10. · 1 Permeable Treatment Wall Update Charles Biedermann Regulatory Strategy and Compliance CH2M HILL B&W West Valley July

www.energy.gov/EM 11

Sr-90 Plume Delineation in Slack Water

Sequence (January 2011 Baseline)

Page 12: Permeable Treatment Wall Update - CHBWV · 2014. 6. 10. · 1 Permeable Treatment Wall Update Charles Biedermann Regulatory Strategy and Compliance CH2M HILL B&W West Valley July

www.energy.gov/EM 12

Sr-90 Plume Delineation in Slack

Water Sequence (January 2013)

Page 13: Permeable Treatment Wall Update - CHBWV · 2014. 6. 10. · 1 Permeable Treatment Wall Update Charles Biedermann Regulatory Strategy and Compliance CH2M HILL B&W West Valley July

www.energy.gov/EM 13

Swamp Ditch Sr-90

Concentrations

0.00E+00

1.00E-06

2.00E-06

3.00E-06

4.00E-06

5.00E-06

6.00E-06

11/09/1992 02/15/1997 05/24/2001 08/30/2005 12/06/2009 03/14/2014

uC

i/m

L

Date

WNSWAMP-Strontium-90-Monthly

WNSWAMP-Strontium-90-Monthly

Page 14: Permeable Treatment Wall Update - CHBWV · 2014. 6. 10. · 1 Permeable Treatment Wall Update Charles Biedermann Regulatory Strategy and Compliance CH2M HILL B&W West Valley July

www.energy.gov/EM 14

• PTW continues to perform as designed

• Continue quarterly monitoring and performance evaluations,

document in annual reports

• Continue monitoring and observation of intra-PTW well Sr-90

concentrations

• Passive System – DOE 2012 Sustainability Award Honorable

Mention

• Review PTW (WVDP-512) and North Plateau (WVDP-518)

monitoring procedure manuals

• Evaluate for program improvements/efficiencies/enhancements

• Coordinate any changes to monitoring and sampling through DOE-

WVDP

Conclusions and Future Actions

Page 15: Permeable Treatment Wall Update - CHBWV · 2014. 6. 10. · 1 Permeable Treatment Wall Update Charles Biedermann Regulatory Strategy and Compliance CH2M HILL B&W West Valley July

www.energy.gov/EM 15

Questions