Permit to Fly: EASA Procedures for Approval of Flight Conditions. Caroline Ruga Certification Policy Officer. Table of contents. Application for Approval of Flight Conditions Approval of flight conditions Charging Scheme. How to apply?. Forms EASA Form 37 Form 18B Supporting documents - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Permit to Fly: EASA Procedures for Approval of Flight Conditions

116-03-2007

Permit to Fly:EASA Procedures for Approval of

Flight Conditions

Caroline Ruga Certification Policy Officer

Page 2: Permit to Fly: EASA Procedures for Approval of Flight Conditions

European Aviation Safety Agency

16-03-2007 2Certification Policy and Planning Department

Table of contents

Application for Approval of Flight Conditions

Approval of flight conditions

Charging Scheme

Page 3: Permit to Fly: EASA Procedures for Approval of Flight Conditions

European Aviation Safety Agency

16-03-2007 3Certification Policy and Planning Department

How to apply?

Forms EASA Form 37 Form 18B Supporting documents

Address Mailbox: [email protected] Fax: +49 221 89990 4440

Page 4: Permit to Fly: EASA Procedures for Approval of Flight Conditions

European Aviation Safety Agency

16-03-2007 4Certification Policy and Planning Department

Scope application-approval

Flexible for individual S/N; or for series of aircraft but limited to one

type of aircraft

Page 5: Permit to Fly: EASA Procedures for Approval of Flight Conditions

European Aviation Safety Agency

16-03-2007 5Certification Policy and Planning Department

Shared responsibility

Application Certification Manager the administrative follow-up of

Applications/Allocations; and The administrative closure of the file the financial closure of the file

Responsible Certification Manager (RCM) and/or EASA PCM technical investigation implementation of the certification procedures Approval of Form 18B (only by authorised EASA

staff)

Page 6: Permit to Fly: EASA Procedures for Approval of Flight Conditions

European Aviation Safety Agency

16-03-2007 6Certification Policy and Planning Department

Technical Investigation

In principle: internally In-house PCM or RCM

Exception: outsourcing NAA State of Registry EASA PCM, outside EASA Contractual arrangements Subject to internal working procedure

Page 7: Permit to Fly: EASA Procedures for Approval of Flight Conditions

European Aviation Safety Agency

16-03-2007 7Certification Policy and Planning Department

Fast Track vs Normal Track

Available turnaround time: maximum 20 working days

Ad-hoc evaluationRule: internally

Exception: outsourced

Responsible CM In-house PCM

Available turnaround time: exceeds 20 working days

Morning meetingRule: internally

Exception: outsourced

In-house PCM

Fast Track (1) Normal Track (1)

Page 8: Permit to Fly: EASA Procedures for Approval of Flight Conditions

European Aviation Safety Agency

16-03-2007 8Certification Policy and Planning Department

Fast Track vs Normal Track (Cont.)

Statement Technical Satisfaction In-house PCM NAA State of Registry EASA PCM, outside

EASA

Form 18B (Approval Form Flight Conditions) In-house PCM or RCM

Statement Technical Satisfaction In-house PCM NAA State of Registry EASA PCM, outside

EASA

Form 18B (Approval Form Flight Conditions) In-house PCM or RCM

Fast Track (2) Normal Track (2)

Page 9: Permit to Fly: EASA Procedures for Approval of Flight Conditions

European Aviation Safety Agency

16-03-2007 9Certification Policy and Planning Department

Applicant Administrative ProcessPlans and Programmes

Technical Investigation:1. Start checklist2. Verification of the supporting documents3. Check compliance4. Discuss open topics with applicant or request missing info5. Complete Statement of Technical Satisfaction

ACDB

- Registration application - Attribution P-number- First check eligibility – completeness application- Determine fast / normal track

- Task Allocation

Application Form (EASA Form 37)

Approval Form (Form 18b), if available

Supporting Documents Part 21A.709(b)

Task Allocation LetterConfirmation

E-mailMissing Info

If not yet done: - Approval Form (Form 18b)- Supporting Documentation

Evaluation: - application- workload - resources

Responsible CM

E-mail: action items & additional justifications

Technical ProcessExternally / EASA PCM

Page 10: Permit to Fly: EASA Procedures for Approval of Flight Conditions

European Aviation Safety Agency

16-03-2007 10Certification Policy and Planning Department

Send advance Copy (pdf/fax) of EASA Approved Form 18B to applicant

Copy to NAA, upon request

applicant, urgent cases only

Applicant Administrative ProcessPlans and Programmes

Responsible CMTechnical Process

Externally

Externally: NAA/EASA PCMEASA PCM: in-house

Copy EASA Approved Form 18B

Financial closure project

Administrative closure project

Transmittal Letter

Form 18 B EASA Approved

Invoice

Complete and provide Statement Technical Satisfaction &Accounting Information

Submit: - Statement Technical

Satisfaction- Approval Form 18B

Sign, date, stamp Approval Form 18B

Page 11: Permit to Fly: EASA Procedures for Approval of Flight Conditions

European Aviation Safety Agency

16-03-2007 11Certification Policy and Planning Department

Send advance Copy (pdf/fax) of EASA Approved Form 18B to applicant

Copy to NAA, upon request

applicant, urgent cases only

Applicant Administrative ProcessPlans and Programmes

Responsible CMTechnical Process

Internally

Externally: NAA/EASA PCMEASA PCM: in-house

Copy EASA Approved Form 18B

Financial closure project

Administrative closure project

Transmittal Letter

Form 18B EASA approved

Invoice

Complete Statement Technical Satisfaction &Accounting Information

Sign, date, stamp Approval Form 18B

Submit: - Statement Technical

Satisfaction- Approval Form 18B

Page 12: Permit to Fly: EASA Procedures for Approval of Flight Conditions

European Aviation Safety Agency

16-03-2007 12Certification Policy and Planning Department

Charging Scheme

Regulation (EC) No 488/2005 amended by Regulation (EC) No 779/2006

Service: charges = real cost Hours performed by technical

experts of EASA and/or the Agency’s contractors (NAAs) are charged at an hourly rate

Administrative/management efforts: 1 w. hour

Page 13: Permit to Fly: EASA Procedures for Approval of Flight Conditions

European Aviation Safety Agency

16-03-2007 13Certification Policy and Planning Department

Charging Scheme

Following hourly rates apply: For EASA staff, 197 € For NAA staff, the rate at which EASA has to

reimburse NAAs under the respective Framework Contracts

Travel costs are charged in full to the applicant EU travel:

– Transport costs– Per diem (hotel, daily allowance, incidental

expenses)

Page 14: Permit to Fly: EASA Procedures for Approval of Flight Conditions

European Aviation Safety Agency

16-03-2007 14Certification Policy and Planning Department

Charging Scheme

Travel costs Non-EU travel:

– Transport costs– Per diem (hotel, daily allowance, incidental

expenses)– Time spent in means of transport