PERT-CPM with curveCONTRACT I.D. NO: 14HH0056CONTRACT NAME: CONSTRUCTION OF MULTI-PURPOSE BUILDING OF DON VICENTE SOTTO MEMORIAL MEDICAL CENTER (DVSMMC)LOCATION: SAMBAG II, CEBU CITY

Electrical Works24

MobilizationMasonry WorksDoors and Windows335436

Stair Nosing & Railings, Hand Rails & Corridor RailingsClearing and GrubbingReinforcing Steel for Stairs and RampR.C. Stairs and RampGlazed Tiles321861224Temporary Structures Utilities and Services

MOBGravel BeddingMobilizationDemolition of Existing Building StructuresExcavationReinforcing Steel for ColumnsReinforcing Steel for Tie BeamReinforcing Steel for Girders and BeamsReinforcing Steel for Suspended SlabR.C. for Suspended SlabCeiling WorksMasonry PaintingDemobilization1263084141018121824486

Reinforcing Steel for Slab on FillRC Column and Wall FootingRC Tie BeamTemporary Structure, Utilities and ServicesReinforcing Steel for Column and Wall FootingR.C. ColumnsBackfilling of Excavated MaterialsRC for Girders and BeamsR.C. for Slab on FillSanitary Works38246126122461236

RC Column and Wall FootingR.C. ColumnsPlumbing Works6636

CONSTRUCTION SAFETY AND HEALTH210PROJECT SCHEDULE BAR CHART AND S-CURVEItem No.DescriptionAmount (Pesos)WTD (%)Duration

21426384105126147168189210123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021A.FACILITIES FOR THE ENGINEERSA.1aTemporary Structures, Utilities & Services225,825.860.99%440.20%0.47%0.31%0.99%0.00%B.EARTHWORKS0.00%0.00%800Clearing and Grubbing26,811.720.12%320.01%0.08%0.03%0.12%0.00%801Demolition of Existing Building Structures346,878.861.51%300.15%1.06%0.30%1.51%0.00%803Excavation319,100.401.39%81.39%1.39%0.00%804 (a)Backfilling of Excavated Materials168,090.600.73%120.06%0.67%0.73%0.00%804 (b)Gravel Bedding65,872.100.29%40.29%0.29%0.00%C.REINFORCED CONCRETE0.00%0.00%900 (a)R.C. Column and Wall Footing1,484,769.606.48%122.16%4.32%6.48%0.00%404 (a)Reinforcing Steel for Column and Wall Footing1,573,216.186.86%242.00%4.86%6.86%0.00%900 (b)R.C. Tie Beam394,504.001.72%61.72%1.72%0.00%404 (b)Reinforcing Steel for Tie Beam422,761.821.84%101.84%1.84%0.00%900 (c)R.C. Columns844,942.723.69%183.69%3.69%0.00%404 (c)Reinforcing Steel for Columns1,027,959.764.48%140.96%3.52%4.48%0.00%900 (d)R.C. Stairs and Ramp101,025.760.44%60.44%0.44%0.00%404 (d)Reinforcing Steel for Stairs and Ramp132,132.500.58%180.38%0.19%0.58%0.00%900 (e)R.C. Girders and Beams1,561,307.206.81%242.84%3.97%6.81%0.00%404 (e)Reinforcing Steel for Girders and Beams1,537,276.146.71%186.71%6.71%0.00%900 (f)R.C. Suspended Slab1,451,097.286.33%184.22%2.11%6.33%0.00%404 (f)Reinforcing Steel for Suspended Slab616,328.162.69%120.67%2.02%2.69%0.00%900 (g)R.C. Slab on Fill466,232.002.03%120.17%1.86%2.03%0.00%404 (g)Reinforcing Steel Slab on Fill216,013.320.94%60.94%0.94%0.00%D.MASONRY WORKS (6" CHB)0.00%0.00%506 (1)MASONRY WORKS (6" CHB)2,947,972.0712.86%542.86%5.00%5.00%12.86%0.00%E.CARPENTRY AND JOINERY WORKS0.00%0.00%1003Ceiling Works395,195.251.72%241.08%0.65%1.72%0.00%F.FABRICATED MATERIALS0.00%0.00%1006Doors and Windows925,886.004.04%362.36%1.68%4.04%0.00%1023Stair Nosing & Railings, Hand Rails & Corridor Railings84,684.700.37%120.28%0.09%0.37%0.00%G.FINISHES0.00%0.00%1018Glazed Tiles268,948.101.17%240.59%0.59%1.17%0.00%1032Masonry Painting1,276,719.505.57%481.39%2.44%1.74%5.57%0.00%H.SANITARY AND PLUMBING WORKS0.00%0.00%1001 (a)Sanitary Works579,621.682.53%360.70%1.48%0.35%2.53%0.00%1001 (b)Plumbing Works644,024.002.81%360.78%1.64%0.39%2.81%0.00%I.ELECTRICAL WORKS0.00%0.00%1100Electrical Works1,416,852.996.18%240.77%5.41%6.18%0.00%J.MOBILIZATION AND DEMOBILIZATION0.00%0.00%SPCL-1MOBILIZATION AND DEMOBILIZATION1,092,801.054.77%511.96%1.96%0.28%0.56%4.77%0.00%K.CONSTRUCTION SAFETY AND HEALTH0.00%0.00%SPCL-2Construction Safety & Health307,503.161.34%2100.13%0.13%0.13%0.13%0.13%0.13%0.13%0.13%0.13%0.13%1.34%0.00%0.00%0.00%22,922,354.48100.00%

DURATION 210 CALENDAR DAYS21426384105126147168189210EVERY 21 DAYS PROJECTED ACCOMPLISHMENT2.46%3.70%5.70%12.52%18.07%18.53%14.32%11.20%8.63%4.86%100.00%0.00%EVERY 21 DAYS PROJECTED CASH FLOW564120.356872995848918.1362820851307069.426028392870479.465404764142515.789754247961.943361113282091.995027782567488.128638891977682.627251114026.61138399CUMULATIVE PROJECTED ACCOMPLISHMENT2.46%6.16%11.87%24.39%42.46%60.99%75.31%86.51%95.14%100.00%CUMULATIVE PROJECTED CASH FLOW564120.3568729951413038.493155082720107.919183475590587.384588239733103.1743382313981065.117699317263157.112727119830645.24136621808327.86861622922354.48ACTUAL ACCOMPLISHMENT (%)Every 21 DaysCumulative0.00.00.00.00.00.00.00.00.00.0ACTUAL ACCOMPLISHMENT (%) PROJECTED CASHFLOWEvery 21 DaysCumulative0.00.00.00.00.00.00.00.00.00.0

VARIANCE-2.46%-3.70%-5.70%-12.52%-18.07%-18.53%-14.32%-11.20%-8.63%-4.86%

MANPOWER SCHEDULEPROJECT-IN-CHARGEPROJECT ENGINEERARCHITECTFOREMANCARPENTERWAREHOUSEMAN/TIMEKEEPERMASONSTEELMANPAINTERELECTRICIANPLUMBEREQUIPMENT OPERATORHELPER

EQUIPTMENT & TOOLS SCHEDULE1-BAGGER MIXERTAMPERING MACHINEBAR BENDERBAR CUTTERBACKHOEROAD ROLLERBREAKER

Prepared By: Checked By:Noted By:

Arch't. Ronnie C. CaloEngr. Mario Roy GuibaoPIC, DVSMMC ProjectProject Manager, ACIGeneral Manager, ACI

( 9 CD )( 21 CD )( 14 CD )( 3 CD )( 21 CD)( 8 CD )( 8 CD )( 21 CD)( 6 CD)( 3 CD )( 1 CD )( 11 CD )( 4 CD )( 21 CD )( 3 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 6 CD )( 4 CD )( 8 CD )( 17 CD )( 7 CD )( 6 CD )( 10 CD )( 18 CD )( 3 CD )( 11 CD )( 12 CD )( 6 CD )( 6 CD )( 10 CD )( 14 CD )( 18 CD )( 12 CD )( 6 CD )( 3 CD )( 9 CD )( 1 CD )( 11 CD )( 6 CD )( 12 CD )( 21 CD )( 21 CD )( 15 CD )( 9 CD )(9 CD )(3 CD )(12 CD )(12 CD )(21 CD )(15 CD )(21 CD )(12 CD )(10 CD )(21 CD )(5 CD )(5 CD )(21 CD )(10 CD )( 3 CD )( 21 CD )(15 CD )001212181848485656606074748484102102114114132132156156204204210210012468911151822273435505654556380801056567868612929813989814104104161041041711611619146146251401402415815828194204311942043213213221138138231501562618020430168168292042043312616820

PERT-CPM (V2)CONTRACT I.D. NO: 14HH0056CONTRACT NAME: CONSTRUCTION OF MULTI-PURPOSE BUILDING OF DON VICENTE SOTTO MEMORIAL MEDICAL CENTER (DVSMMC)LOCATION: SAMBAG II, CEBU CITY

Electrical Works24

MobilizationMasonry WorksDoors and Windows335436

Stair Nosing & Railings, Hand Rails & Corridor RailingsClearing and GrubbingReinforcing Steel for Stairs and RampR.C. Stairs and RampGlazed Tiles321861224Temporary Structures Utilities and Services

MOBGravel BeddingMobilizationDemolition of Existing Building StructuresExcavationReinforcing Steel for ColumnsReinforcing Steel for Tie BeamReinforcing Steel for Girders and BeamsReinforcing Steel for Suspended SlabR.C. for Suspended SlabCeiling WorksMasonry PaintingDemobilization1263084141018121824486

Reinforcing Steel for Slab on FillRC Column and Wall FootingRC Tie BeamTemporary Structure, Utilities and ServicesReinforcing Steel for Column and Wall FootingR.C. ColumnsBackfilling of Excavated MaterialsRC for Girders and BeamsR.C. for Slab on FillSanitary Works38246126122461236

RC Column and Wall FootingR.C. ColumnsPlumbing Works6636

CONSTRUCTION SAFETY AND HEALTH210PROJECT SCHEDULE BAR CHART AND S-CURVEItem No.DescriptionAmount (Pesos)WTD (%)Duration

21426384105126147168189210123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021A.FACILITIES FOR THE ENGINEERSA.1aTemporary Structures, Utilities & Services225,825.860.99%440.20%0.47%0.31%0.99%0.00%B.EARTHWORKS0.00%0.00%800Clearing and Grubbing26,811.720.12%320.01%0.08%0.03%0.12%0.00%801Demolition of Existing Building Structures346,878.861.51%300.15%1.06%0.30%1.51%0.00%803Excavation319,100.401.39%81.39%1.39%0.00%804 (a)Backfilling of Excavated Materials168,090.600.73%120.06%0.67%0.73%0.00%804 (b)Gravel Bedding65,872.100.29%40.29%0.29%0.00%C.REINFORCED CONCRETE0.00%0.00%900 (a)R.C. Column and Wall Footing1,484,769.606.48%122.16%4.32%6.48%0.00%404 (a)Reinforcing Steel for Column and Wall Footing1,573,216.186.86%242.00%4.86%6.86%0.00%900 (b)R.C. Tie Beam394,504.001.72%61.72%1.72%0.00%404 (b)Reinforcing Steel for Tie Beam422,761.821.84%101.84%1.84%0.00%900 (c)R.C. Columns844,942.723.69%183.69%3.69%0.00%404 (c)Reinforcing Steel for Columns1,027,959.764.48%140.96%3.52%4.48%0.00%900 (d)R.C. Stairs and Ramp101,025.760.44%60.44%0.44%0.00%404 (d)Reinforcing Steel for Stairs and Ramp132,132.500.58%180.38%0.19%0.58%0.00%900 (e)R.C. Girders and Beams1,561,307.206.81%242.84%3.97%6.81%0.00%404 (e)Reinforcing Steel for Girders and Beams1,537,276.146.71%186.71%6.71%0.00%900 (f)R.C. Suspended Slab1,451,097.286.33%184.22%2.11%6.33%0.00%404 (f)Reinforcing Steel for Suspended Slab616,328.162.69%120.67%2.02%2.69%0.00%900 (g)R.C. Slab on Fill466,232.002.03%120.17%1.86%2.03%0.00%404 (g)Reinforcing Steel Slab on Fill216,013.320.94%60.94%0.94%0.00%D.MASONRY WORKS (6" CHB)0.00%0.00%506 (1)MASONRY WORKS (6" CHB)2,947,972.0712.86%542.86%5.00%5.00%12.86%0.00%E.CARPENTRY AND JOINERY WORKS0.00%0.00%1003Ceiling Works395,195.251.72%241.08%0.65%1.72%0.00%F.FABRICATED MATERIALS0.00%0.00%1006Doors and Windows925,886.004.04%362.36%1.68%4.04%0.00%1023Stair Nosing & Railings, Hand Rails & Corridor Railings84,684.700.37%120.28%0.09%0.37%0.00%G.FINISHES0.00%0.00%1018Glazed Tiles268,948.101.17%240.59%0.59%1.17%0.00%1032Masonry Painting1,276,719.505.57%481.39%2.44%1.74%5.57%0.00%H.SANITARY AND PLUMBING WORKS0.00%0.00%1001 (a)Sanitary Works579,621.682.53%360.70%1.48%0.35%2.53%0.00%1001 (b)Plumbing Works644,024.002.81%360.78%1.64%0.39%2.81%0.00%I.ELECTRICAL WORKS0.00%0.00%1100Electrical Works1,416,852.996.18%240.77%5.41%6.18%0.00%J.MOBILIZATION AND DEMOBILIZATION0.00%0.00%SPCL-1MOBILIZATION AND DEMOBILIZATION1,092,801.054.77%511.96%1.96%0.28%0.56%4.77%0.00%K.CONSTRUCTION SAFETY AND HEALTH0.00%0.00%SPCL-2Construction Safety & Health307,503.161.34%2100.13%0.13%0.13%0.13%0.13%0.13%0.13%0.13%0.13%0.13%1.34%0.00%0.00%0.00%22,922,354.48100.00%

DURATION 210 CALENDAR DAYS21426384105126147168189210EVERY 21 DAYS PROJECTED ACCOMPLISHMENT2.46%3.70%5.70%12.52%18.07%18.53%14.32%11.20%8.63%4.86%100.00%0.00%EVERY 21 DAYS PROJECTED CASH FLOW564120.356872995848918.1362820851307069.426028392870479.465404764142515.789754247961.943361113282091.995027782567488.128638891977682.627251114026.61138399CUMULATIVE PROJECTED ACCOMPLISHMENT2.46%6.16%11.87%24.39%42.46%60.99%75.31%86.51%95.14%100.00%CUMULATIVE PROJECTED CASH FLOW564120.3568729951413038.493155082720107.919183475590587.384588239733103.1743382313981065.117699317263157.112727119830645.24136621808327.86861622922354.48ACTUAL ACCOMPLISHMENT (%)Every 21 DaysCumulative0.00.00.00.00.00.00.00.00.00.0ACTUAL ACCOMPLISHMENT (%) PROJECTED CASHFLOWEvery 21 DaysCumulative0.00.00.00.00.00.00.00.00.00.0

VARIANCE-2.46%-3.70%-5.70%-12.52%-18.07%-18.53%-14.32%-11.20%-8.63%-4.86%

MANPOWER SCHEDULE714212835424956637077849198105112119126133140147154161168175182189196203210PROJECT-IN-CHARGEPROJECT ENGINEERARCHITECTFOREMANROUGH CARPENTERFINISHING CARPENTERWAREHOUSEMANTIME KEEPERROUGH MASONFINISHING MASONSTEELMANPAINTERELECTRICIANPLUMBEREQUIPMENT OPERATORHELPER

EQUIPMENT & TOOLS SCHEDULE1-BAGGER MIXERTAMPERING MACHINEBAR BENDERBAR CUTTERBACKHOEDUMP TRUCKWATER TRUCKCONCRETE VIBRATORWELDING MACHINECARGO TRUCKPRIME MOVER

Prepared By: Checked By:Noted By:

Engr. Enrique L. TingArch't. Ronnie C. CaloEngr. Mario Roy GuibaoPIC, DVSMMC ProjectProject Manager, ACIGeneral Manager, ACI

( 9 CD )( 21 CD )( 14 CD )( 3 CD )( 21 CD)( 8 CD )( 8 CD )( 21 CD)( 6 CD)( 3 CD )( 1 CD )( 11 CD )( 4 CD )( 21 CD )( 3 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 6 CD )( 4 CD )( 8 CD )( 17 CD )( 7 CD )( 6 CD )( 10 CD )( 18 CD )( 3 CD )( 11 CD )( 12 CD )( 6 CD )( 6 CD )( 10 CD )( 14 CD )( 18 CD )( 12 CD )( 6 CD )( 3 CD )( 9 CD )( 1 CD )( 11 CD )( 6 CD )( 12 CD )( 21 CD )( 21 CD )( 15 CD )( 9 CD )(9 CD )(3 CD )(12 CD )(12 CD )(21 CD )(15 CD )(21 CD )(12 CD )(10 CD )(21 CD )(5 CD )(5 CD )(21 CD )(10 CD )( 3 CD )( 21 CD )(15 CD )001212181848485656606074748484102102114114132132156156204204210210012468911151822273435505654556380801056567868612929813989814104104161041041711611619146146251401402415815828194204311942043213213221138138231501562618020430168168292042043312616820

Phase 1 schedPROJECT SCHEDULE BAR CHART AND S-CURVEItem No.DescriptionAmount (Pesos)WTD (%)Duration

21426384105126147168189210123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021123456789101112131415161718192021A.FACILITIES FOR THE ENGINEERSA.1aTemporary Structures, Utilities & Services225,825.860.99%440.20%0.47%0.31%0.99%0.00%B.EARTHWORKS0.00%0.00%800Clearing and Grubbing26,811.720.12%320.01%0.08%0.03%0.12%0.00%801Demolition of Existing Building Structures346,878.861.51%300.15%1.06%0.30%1.51%0.00%803Excavation319,100.401.39%81.39%1.39%0.00%804 (a)Backfilling of Excavated Materials168,090.600.73%120.06%0.67%0.73%0.00%804 (b)Gravel Bedding65,872.100.29%40.29%0.29%0.00%C.REINFORCED CONCRETE0.00%0.00%900 (a)R.C. Column and Wall Footing1,484,769.606.48%122.16%4.32%6.48%0.00%404 (a)Reinforcing Steel for Column and Wall Footing1,573,216.186.86%242.00%4.86%6.86%0.00%900 (b)R.C. Tie Beam394,504.001.72%61.72%1.72%0.00%404 (b)Reinforcing Steel for Tie Beam422,761.821.84%101.84%1.84%0.00%900 (c)R.C. Columns844,942.723.69%183.69%3.69%0.00%404 (c)Reinforcing Steel for Columns1,027,959.764.48%140.96%3.52%4.48%0.00%900 (d)R.C. Stairs and Ramp101,025.760.44%60.44%0.44%0.00%404 (d)Reinforcing Steel for Stairs and Ramp132,132.500.58%180.38%0.19%0.58%0.00%900 (e)R.C. Girders and Beams1,561,307.206.81%242.84%3.97%6.81%0.00%404 (e)Reinforcing Steel for Girders and Beams1,537,276.146.71%186.71%6.71%0.00%900 (f)R.C. Suspended Slab1,451,097.286.33%184.22%2.11%6.33%0.00%404 (f)Reinforcing Steel for Suspended Slab616,328.162.69%120.67%2.02%2.69%0.00%900 (g)R.C. Slab on Fill466,232.002.03%120.17%1.86%2.03%0.00%404 (g)Reinforcing Steel Slab on Fill216,013.320.94%60.94%0.94%0.00%D.MASONRY WORKS (6" CHB)0.00%0.00%506 (1)MASONRY WORKS (6" CHB)2,947,972.0712.86%542.86%5.00%5.00%12.86%0.00%E.CARPENTRY AND JOINERY WORKS0.00%0.00%1003Ceiling Works395,195.251.72%241.08%0.65%1.72%0.00%F.FABRICATED MATERIALS0.00%0.00%1006Doors and Windows925,886.004.04%362.36%1.68%4.04%0.00%1023Stair Nosing & Railings, Hand Rails & Corridor Railings84,684.700.37%120.28%0.09%0.37%0.00%G.FINISHES0.00%0.00%1018Glazed Tiles268,948.101.17%240.59%0.59%1.17%0.00%1032Masonry Painting1,276,719.505.57%481.39%2.44%1.74%5.57%0.00%H.SANITARY AND PLUMBING WORKS0.00%0.00%1001 (a)Sanitary Works579,621.682.53%360.70%1.48%0.35%2.53%0.00%1001 (b)Plumbing Works644,024.002.81%360.78%1.64%0.39%2.81%0.00%I.ELECTRICAL WORKS0.00%0.00%1100Electrical Works1,416,852.996.18%240.77%5.41%6.18%0.00%J.MOBILIZATION AND DEMOBILIZATION0.00%0.00%SPCL-1MOBILIZATION AND DEMOBILIZATION1,092,801.054.77%511.96%1.96%0.28%0.56%4.77%0.00%K.CONSTRUCTION SAFETY AND HEALTH0.00%0.00%SPCL-2Construction Safety & Health307,503.161.34%2100.13%0.13%0.13%0.13%0.13%0.13%0.13%0.13%0.13%0.13%1.34%0.00%0.00%0.00%22,922,354.48100.00%

DURATION 210 CALENDAR DAYS21426384105126147168189210EVERY 21 DAYS PROJECTED ACCOMPLISHMENT2.46%3.70%5.70%12.52%18.07%18.53%14.32%11.20%8.63%4.86%100.00%0.00%EVERY 21 DAYS PROJECTED CASH FLOW564120.356872995848918.1362820851307069.426028392870479.465404764142515.789754247961.943361113282091.995027782567488.128638891977682.627251114026.61138399CUMULATIVE PROJECTED ACCOMPLISHMENT2.46%6.16%11.87%24.39%42.46%60.99%75.31%86.51%95.14%100.00%CUMULATIVE PROJECTED CASH FLOW564120.3568729951413038.493155082720107.919183475590587.384588239733103.1743382313981065.117699317263157.112727119830645.24136621808327.86861622922354.48ACTUAL ACCOMPLISHMENT (%)Every 21 DaysCumulative0.00.00.00.00.00.00.00.00.00.0ACTUAL ACCOMPLISHMENT (%) PROJECTED CASHFLOWEvery 21 DaysCumulative0.00.00.00.00.00.00.00.00.00.0

VARIANCE-2.46%-3.70%-5.70%-12.52%-18.07%-18.53%-14.32%-11.20%-8.63%-4.86%

MANPOWER SCHEDULE714212835424956637077849198105112119126133140147154161168175182189196203210PROJECT-IN-CHARGEPROJECT ENGINEERARCHITECTFOREMANROUGH CARPENTERFINISHING CARPENTERWAREHOUSEMANTIME KEEPERROUGH MASONFINISHING MASONSTEELMANPAINTERELECTRICIANPLUMBEREQUIPMENT OPERATORHELPER

EQUIPMENT & TOOLS SCHEDULE1-BAGGER MIXERTAMPERING MACHINEBAR BENDERBAR CUTTERBACKHOEDUMP TRUCKWATER TRUCKCONCRETE VIBRATORWELDING MACHINECARGO TRUCKPRIME MOVER

Prepared By: Checked By:Noted By:

Engr. Enrique L. TingArch't. Ronnie C. CaloEngr. Mario Roy GuibaoPIC, DVSMMC ProjectProject Manager, ACIGeneral Manager, ACI

( 9 CD )( 21 CD )( 14 CD )( 3 CD )( 21 CD)( 8 CD )( 8 CD )( 21 CD)( 6 CD)( 3 CD )( 1 CD )( 11 CD )( 4 CD )( 21 CD )( 3 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 21 CD )( 6 CD )( 4 CD )( 8 CD )( 17 CD )( 7 CD )( 6 CD )( 10 CD )( 18 CD )( 3 CD )( 11 CD )( 12 CD )( 6 CD )( 6 CD )( 10 CD )( 14 CD )( 18 CD )( 12 CD )( 6 CD )( 3 CD )( 9 CD )( 1 CD )( 11 CD )( 6 CD )( 12 CD )( 21 CD )( 21 CD )( 15 CD )( 9 CD )(9 CD )(3 CD )(12 CD )(12 CD )(21 CD )(15 CD )(21 CD )(12 CD )(10 CD )(21 CD )(5 CD )(5 CD )(21 CD )(10 CD )( 3 CD )( 21 CD )(15 CD )

m&e sched weeklyMANPOWER SCHEDULE714212835424956637077849198105112119126133140147154161168175182189196203210PROJECT-IN-CHARGE111111111111111111111111111111PROJECT ENGINEER111111111111111111111111111111ARCHITECT111111111111111111111111111111FOREMAN111111111111111111111111111111ROUGH CARPENTERFINISHING CARPENTERWAREHOUSEMAN111111111111111111111111111111TIME KEEPER111111111111111111111111111111ROUGH MASONFINISHING MASONSTEELMANPAINTERELECTRICIANPLUMBEREQUIPMENT OPERATORHELPER

EQUIPMENT & TOOLS SCHEDULE1-BAGGER MIXERTAMPERING MACHINEBAR BENDERBAR CUTTERBACKHOEDUMP TRUCKWATER TRUCKCONCRETE VIBRATORWELDING MACHINECARGO TRUCKPRIME MOVER

m&e sched mos.MANPOWER SCHEDULEMonth 1Month 2Month 3Month 4Month 5Month 6Month 7PROJECT-IN-CHARGE1111111PROJECT ENGINEER1111111ARCHITECT1111111FOREMAN1111111LEADMAN1111111ROUGH CARPENTER10101010101010FINISHING CARPENTER0000555WAREHOUSEMAN1111111TIME KEEPER1111111ROUGH MASON10101010101010FINISHING MASON00010101010STEELMAN10101010555PAINTER00015151515ELECTRICIAN0333333PLUMBER0333333EQUIPMENT OPERATOR1111111HELPER10101010101010

EQUIPMENT & TOOLS SCHEDULE1-BAGGER MIXER1111111TAMPERING MACHINE1111111BAR BENDER1111111BAR CUTTER1111111BACKHOE1111111DUMP TRUCK1111111WATER TRUCK1111111CONCRETE VIBRATOR3333333WELDING MACHINE2222222CARGO TRUCK1111111PRIME MOVER1111111COMPRESSOR1111111