FORM: PWCC SHEET: 01 OF 01 PROJECT TITLE: Petrofac ® PROVISION OF OFFSHORE INSPECTION OF ® CHERGUI GAS EXPORT PIPELINE ENERGY DEVELOPMENTS TUNISIA LTD ( 2011 Survey) S ROST [-\HlJ~('" \\'olks Drvisrou PROVISIONAL WORK COMPLETION CERTIFICATE LOCATION: Chergui Offshore Pipeline J WORK COMPLETION AUTHORITY 1 HEREBY CONFIRM THAT THE ABOYE PROJECT AS DEFINED , HAS BEEN PERFORMED AND COMPLETED lN FULL ACCORDANCE WITH PETROFAC SOW , PROCEDURES AND RECOMMENDATIONS AS PER CONTRACT PTU_PRJ_CON_0001_2011 Section III Schedule B _ Rates and Priees NAME SIGNATURE DATE COMPANY

Upload: letuong

Post on 03-Feb-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Petrofac - offshore support vessel company SAROST S.A · PDF fileform: pwcc sheet: 01 of 01 project title: petrofac ® provision of offshore inspection of ® chergui gas export pipeline

FORM: PWCCSHEET: 01 OF 01

PROJECT TITLE:

Petrofac ® PROVISION OF OFFSHORE INSPECTION OF ®CHERGUI GAS EXPORT PIPELINE

ENERGY DEVELOPMENTSTUNISIA LTD ( 2011 Survey) S ROST

[-\HlJ~('" \\'olks Drvisrou

PROVISIONAL WORK COMPLETION CERTIFICATELOCATION: CherguiOffshore Pipeline

JWORK COMPLETION AUTHORITY

1 HEREBY CONFIRM THAT THE ABOYE PROJECT AS DEFINED , HAS BEEN PERFORMED AND COMPLETEDlN FULL ACCORDANCE WITH PETROFAC SOW , PROCEDURES AND RECOMMENDATIONS AS PER CONTRACTPTU_PRJ_CON_0001_2011 Section III Schedule B _ Rates and Priees

NAME

SIGNATURE

DATE

COMPANY

Page 2: Petrofac - offshore support vessel company SAROST S.A · PDF fileform: pwcc sheet: 01 of 01 project title: petrofac ® provision of offshore inspection of ® chergui gas export pipeline

fORM: fWCCSHEET: 01 Of 01

PROJECT TITLE:

Petrofac ® PROVISION OF OFFSHORE INSPECTION OF ®CHERGUI GAS EXPORT PIPELINE

ENERGY DEVELOPMENTSTUNISIA LTD ( 2011 Survey) S ROST

Slll,.~",,,\\ ull:s l'lnswlt

FINAL WORK COMPLETION CERTIFICATELOCATION: CherguiOffshore Pipeline

CpMPANY

WORK COMPLETION AUTHORITY

1 HEREBY CONFIRM THAT THE ABOYE PROJECT AS DEFINED , HAS BEEN PERFORMED AND COMPLETEDlN FULL ACCORDANCE WITH PETROFAC SOW , PROCEDURES AND RECOMMENDATIONS AS PER CONTRACTPTU PRJ CON 0001 2011 Section III Schedule B Rates and Priees and AMENDMENT NO.02 relatedto the addition~1 work for the concrete blocks removal

NAME

SIGNATURE

DATE

Page 3: Petrofac - offshore support vessel company SAROST S.A · PDF fileform: pwcc sheet: 01 of 01 project title: petrofac ® provision of offshore inspection of ® chergui gas export pipeline

-------_ ..

FORM: WCCSHEET: 01 OF 01

PROJECT TITLE:

Petrofac ® Chergui Offshore Pipeline Dornes Removal ®)near Kerkennah shore

ENERGY DEVELOPMENTSTUNISIA LTD SAROST

S1Jl.,',f' ,1 \ '. oi l,s llIllSlOlI

WORK COMPLETION CERTIFICATE LOCATION: CherguiOffshore Pipeline

NAME

Subject: Chergui offshore Pipeline channel reinstatement by domes removal

WORK COMPLETIONAUTHORITY

1 HEREBY CONFIRM THAT THE ABOVE WORK AS DEFINED , HAS BEEN COMPLETED lN FULLACCORDANCE WITH SPECIFICATIONS, VENDOR PROCEDURE AND RECOMMENDATIONS lN OROER TOALLOW NATURAL SEA WATER CIRCULATldN BY LOW TIDE

SIGNATURE

DATE

COMPANY SUBCONTRACTOR(SAROST)

CLIENT(PED)

Page 4: Petrofac - offshore support vessel company SAROST S.A · PDF fileform: pwcc sheet: 01 of 01 project title: petrofac ® provision of offshore inspection of ® chergui gas export pipeline

FORM: WCCSHEET: 01 OF 01

PROJECT TITLE:

Petrofac ® Chergui Offshore Pipeline Dornes Rernoval ®near Kerkennah shore

ENERGY DEVELOPMENTSTUNISIA LTD SAROST

SlIl.r- 1 \' UlI::. 1'1 l!,'1U1I

WORK COMPLETION CERTIFICATE LOCATION: CherguiOffshore Pipeline

C-OMPANY SUBCONTRACTOR(SAROST)

CLIENT(PED)

Subject : Freespan Rectification by Concrete Bags Method( Trial on a Freespan located @ KP29.491)

WORK COMPLETIONAUTHORITY

1 HEREBY CONFIRM THAT THE ABOVE WORK AS DEFINED , HAS BEEN COMPLETED lN FULLACCORDANCE WITH SPECIFICATIONS, VENDOR PR6CEDURE AND RECOMMENOATIONS lN OROER TOTEST THE METHOD OF CONCRETE BAGS FOR FREESPAN RECTIFICATION

NAME

SIGNATURE

DATE

Page 5: Petrofac - offshore support vessel company SAROST S.A · PDF fileform: pwcc sheet: 01 of 01 project title: petrofac ® provision of offshore inspection of ® chergui gas export pipeline

FORM: WCCSHEET: 01 OF 01

PROJECT TITLE:

Petrofac ® Pipeline Remediai Work Elimination of ®Freespans

ENERGY DEVELOPMENTSSeaweed Matress Installation

TUNISIA LTD SAROST~nl,se .• \\"ulks Iuvrsion

FINAL WORK COMPLETION CERTIFICATE LOCATION: CherguiOffshore Pipeline

1

WORK COMPLETIONAUTHORITY

1 HEREBY CONFIRM THAT THE ABOVE PROJECT AS DEFINED , HAS BEEN INSTAlLED AND COMPLETEDlN FULL ACCORDANCE WITH SPECIFICATIONS, VENDOR PROCEDURE AND RECOMMENDATIONSWE CONFIRM THAT SEAWEED MATRESS INSTALlED ON MAY 2010 ARE STILllOCATED ON THEIR INITIALPOSITIONS BASED ON THE PIPELINE EXTERNAllNSPECTION PERFORMED ON NOV 2011

NAME

SIGNATURE

DATE

(OMPANY SUBCONTRACTOR(SAROST)