PRE-FEASIBILITY REPORT

Page 2: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 1 of 33

Table of Contents

1 EXECUTIVE SUMMARY ............................................................................................................ 4

1.1 Introduction........................................................................................................................................... 4

1.2 Synopsis of the Report....................................................................................................................... 5

2 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION ............................ 6

2.1 Identification of the Project and Project Proponent .............................................................. 6

2.2 Brief Description of Nature of the Project ................................................................................. 7

2.3 Need for the Project and its Importance to the Country and/or Region ....................... 8

2.4 Demand –Supply Gap ......................................................................................................................... 9

2.5 Employment Generation (Direct and Indirect) Due to Project.......................................... 9

3 PROJECT DESCRIPTION ........................................................................................................11

3.1 Type of Project................................................................................................................................... 11

3.2 Location................................................................................................................................................ 14

3.3 Details of Alternate Sites................................................................................................................ 18

3.4 Size and Magnitude of operation................................................................................................ 18

3.5 Project Description with Process Details ................................................................................ 19

3.6 Source of Pollution and its Control ............................................................................................ 20

3.7 Selection Criteria of plant species for Green Development Plant.................................. 22

3.8 Resource optimization/Recycling and Reuse........................................................................ 23

3.9 Availability of water its source, Energy/Power requirement and source.................. 23

3.10 Quantity of wastes to be generated (liquid and solid) and scheme for their

Management/disposal ................................................................................................................................. 25

3.11 Connectivity........................................................................................................................................ 25

3.12 Land Form, Land use and Land ownership ............................................................................ 25

3.13 Topography......................................................................................................................................... 26

3.14 Existing Land Use pattern ............................................................................................................. 26

3.15 Existing Infrastructure ................................................................................................................... 26

3.16 Soil Classification.............................................................................................................................. 27

3.17 Social Infrastructure available .................................................................................................... 27

4 PLANNING BRIEF ....................................................................................................................28

Page 3: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 2 of 33

4.1 Planning concept (type of industries, facilities, transportation etc.) Town and

country, planning/ development authority classification ............................................................. 28

4.2 Population Projection ..................................................................................................................... 28

4.3 Land use planning (breakup along with green belt etc.) .................................................. 28

4.4 Assessment of infrastructure demand (physical and the social)................................... 28

4.5 Amenities/Facilities ........................................................................................................................ 28

5 PROPOSED INFRASTRUCTURE ...........................................................................................29

5.1 Industrial area (processing area)............................................................................................... 29

5.2 Residential Area (non- Processing area)................................................................................. 29

5.3 Green Belt ............................................................................................................................................ 29

5.4 Social Infrastructure........................................................................................................................ 29

5.5 Connectivity........................................................................................................................................ 29

5.6 Water Management (Source and Supply of Water) ............................................................ 29

5.7 Sewerage System .............................................................................................................................. 30

5.8 Industrial Waste Management .................................................................................................... 30

5.9 Power Requirement & Supply/source ..................................................................................... 30

6 REHABILITATION AND RESETTLEMENT (R & R) PLAN ...............................................31

7 PROJECT SCHEDULE & COST ESTIMATES ........................................................................31

7.1 Total Project Cost ............................................................................................................................. 31

8 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) .............................................32

Page 4: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 3 of 33

List of Table

TABLE 2-1: PROJECT SUMMARY .................................................................................................................... 6

TABLE 2-2: EMPLOYMENT DETAILS ............................................................................................................ 9

Table 3-1: Details of existing and proposed plant of Amba Shakti Ispat Ltd.............................. 12

Table 3-2: Coordinate....................................................................................................................................... 14

Table 3-3: List of Existing Machinery along with capacity ................................................................ 18

Table 7-1: Total Project Cost ......................................................................................................................... 31

List of Figure

Figure 3-1: Project site on google maps .................................................................................................... 14

Figure 3-2: Site plan of the Project Site................................................................................................ 15

Figure 3-3: Location map of the project site ........................................................................................... 16

Figure 3-4: 10 km Radius Buffer Location Map ..................................................................................... 17

Figure 3-5: Process diagram.......................................................................................................................... 20

Figure 3-6: Water Balance diagram ............................................................................................................ 24

List of Annexure

Annexure-I: Lease document

Annexure-II: Consent to operate Amba Shakti Ispat Ltd.

Annexure-III: Power load Sanction

Annexure-IV: Industrial notification of Kala Amb Area

Annexure-V: Layout Plan

Page 5: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 4 of 33

1 EXECUTIVE SUMMARY

1.1 Introduction

M/s Amba Shakti Ispat Ltd is an existing secondary steel processing industry located at Plot

no. 6 & 6A, Industrial area phase 2, Kala Amb, Tehsil - Nahan, District-Sirmaur, State-

Himachal Pradesh. The existing plant has molten metal capacity of 28800 MT/Annum

produced through induction furnaces of 2X6MT/heat using 107 MT/Day 32100

MT/Annum of MS scrap/sponge iron as basic raw materials. It produces 28500 MT/Annum

of continuously cast billets. Further it has 45000 MT/Annum rolling production capacity of

bars, TMT and other rolled section using additionally 17400 MT/Annum quantities of

billets directly purchased from the market.

M/s Amba Shakti Ispat Ltd is planning for capacity expansion and augmentation. In the

process the industrial unit will increase its molten metal generation capacity to 540

MT/Day (162000 MT/Annum) and continuously cast billets to 531 MT/Day (159300

MT/Annum) and rolling products capacity to 521 MT/Day (156300 MT/Annum). This will

necessitate increased quantity of raw materials of 577 MT/Day (173100 MT/Annum ). In

expansion and augmentation thus the existing reheating furnace will be obviated. The

proposed expansion will be carried out in the existing plant area only.

Presently Amba Shakti Ispat Ltd has “Consents to operate” valid upto 31/03/2019

(Attached as Annexure II).

The proposed project needs “Environmental Clearance” from the MoEF as per the EIA

Notification, 2006. The project is classified under Category A due to Secondary

Metallurgical processing Industries listed as Item 3(a)(c) of the schedule of the EIA

Notification 2006 and also because of the application of “General Conditions”

(interstate boundary).

Water for construction, operation and domestic purposes will be drawn from the borewell. A

total of 50 KLD water will be required for industrial and domestic purposes.

Page 6: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 5 of 33

Total Power load will be 17 MVA to run the plant & machinery during operation. The

entire electrical power will be sourced from the Himachal Pradesh State Electricity

Board (HPSEB).

Total land area available with the industrial unit, presently, is 43360 sq.m. The entire

expansion will be carried out within the available land area of 43360 sq.m.

1.2 Synopsis of the Report

The pre-feasibility report includes a brief introduction of the company, need and

justification of the project, process description, required and available resources, proposed

Environment Management Systems, land-use and proposed infrastructure, project

schedule and cost estimate and proposed Terms of reference for conducting the EIA

studies. M/s Amba Shakti Ispat Ltd has engaged M/s Shivalik Solid Waste Management

Llimited as their Environmental Consultant to conduct the EIA studies for obtaining

Environmental Clearance (EC) for the proposed Project.

Page 7: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 6 of 33

2 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION

2.1 Identification of the Project and Project Proponent

M/s Amba Shakti Ispat Ltd is an existing secondary steel processing industry located at Plot

no. 6 & 6A, Industrial area phase 2, Kala Amb, Tehsil - Nahan, District-Sirmaur, State-

Himachal Pradesh. The existing plant has molten metal capacity of 28800 MT/Annum

produced through induction furnaces of 2X6MT/heat using 107 MT/day (32100

MT/Annum) of MS scrap/sponge iron as basic raw materials. It produces 28500

MT/Annum of continuously cast billets. Further it has 45000 MT/Annum rolling

production capacity of bars, TMT and other rolled section using additionally 17400

MT/Annum quantities of billets directly purchased from the market.

The proponent plans to enhance the production capacity of the plant due to huge demand

of rolled merchant products. The project proponent is planning for capacity expansion and

augmentation. In this process, the industrial unit will increase its molten metal generation

capacity, by increasing melting capacity from 2X6MT/heat to 3X15MT/heat (using multiple

induction furnaces), augmentation of continuous casting machine (CCM), and enhancing re-

rolling mill capacity. With the proposed expansion, the production capacity of the industrial

unit will increase from 27600MT/ Annum (i.e. 92 MT/day) to 156300 MT/Annum (i.e.521

MT/day) necessitating increased quantity of raw materials such as scrap/sponge iron to

173100 MT/Annum (577 MT/day. In the expansion stage the Billets from the market will

not be needed and the Reheating furnace will be obviated and ultimately dismantled.

The summary of the project is given in Table below:

TABLE 2-1: PROJECT SUMMARY

S. No Parameters Description1 Identification of the

projectProject falls under Secondary Metallurgical processingIndustries Item 3(a)(c) of the schedule of EIA notificationof Sept 14, 2006 issued by MOEF & CC.

2 Project Proponent Shri Sanjeev Goel, Director M/s Amba Shakti Ispat Ltd.

Page 8: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 7 of 33

S. No Parameters Description3 Brief description of

nature of the projecta) The proposed project is for the expansion of the

production capacity from 27600 MT/Annum (92MT/Day) to 156300 MT/Annum (521 MT/Day)(rolled sections) by increased quantity of rawmaterial to 173100 MT/Annum (577 MT/Day) byusing multiple induction furnaces 3X15 MT/heatcapacity.

4 Salient Features of the Project

4.2 Total Plot Area Total Plot Area 43360 sq.m.

4.3 Location Plot no 6 & 6A, Industrial area phase-2, Kala Amb, TehsilNahan, District Sirmaur, State Himachal Pradesh.

4.4 Water requirement Water for construction and domestic purpose will be drawnfrom Borewell.Approximately 50KLD water will be used duringoperational phase.

4.5 Source of water Borewell

4.6 Wastewater 9 KLD generated domestic waste water will be mixed withother plant effluents and sent to CETP.

4.7 Man Power 150 people.

4.8 Electricity/Powerrequirement

Total Power loads will be 17 MVA to run the plant &machinery during Construction and Operational Phase.Source: Himachal Pradesh State Electricity Board(HPSEB).In case of Power failure one DG sets of 500 KVA Capacityhas been provided.

4.9 Alternative site The proposed addition will be established within theexisting plant premises only.

4.10 Land form, Land useand land ownership

On Lease, Leased to M/s Amba Shakti Ispat Ltd.

5.0 Project cost The estimated cost of the proposed Project isapproximately Rs. 24.5 Crore.

2.2 Brief Description of Nature of the Project

M/s Amba Shakti Ispat Ltd is an existing secondary steel processing industry. It plans to

enhance production capacity up to 521 MTD (rolled steel sections) by using induction

Page 9: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 8 of 33

furnaces having aggregate capacity of 45 MT/heat (Multiple IFs) at plot no 6 & 6A,

industrial area phase 2, Kala Amb, Tehsil Nahan, District Sirmaur, State Himachal

Pradesh. The industrial unit will increase its molten metal generation capacity, by

increasing melting capacity from 2X6MT/heat to 3X15MT/heat (using multiple induction

furnaces), augmentation of continuous casting machine (CCM), and enhancing re-rolling

mill capacity. With the proposed expansion, the production capacity of the industrial unit

will increase from 27600 MT/ Annum(i.e. 92 MT/day) to 156300 MT/Annum (i.e. 521

MT/day) necessitating increased quantity of raw materials such as scrap/sponge iron to

173100 MT/Annum (577 MT/day). Molten steel produced in Induction furnaces is

directly cast in continuous casting machine into billets and these billets are rolled directly

in the rolling mill. The billets being purchased from the market presently and were first

heated in reheating furnaces and then rolled in the rolling mill are no longer required in

augmentation and thereby eliminates the Reheating furnace which so far been requiring

additional fuel. This will provide both economic and environmental advantage.

2.3 Need for the Project and its Importance to the Country and/or Region

India is the world’s third-largest producer of crude steel (up from eighth in 2003) and is

expected to become the second-largest producer in the near future. The growth in the

Indian steel sector has been driven by domestic availability of raw materials such as iron

ore, production of DRI/sponge iron, availability of steel scrap and cost-effective labour.

Consequently, the steel sector has remained a major contributor to India’s manufacturing

output.

The Indian steel industry is very modern with state-of-the-art steel mills. It has always

strived for continuous modernization and up-gradation of older plants and higher energy

efficiency levels. Along with the public sector, the private sector is also considered to be the

engine of growth in the steel industry. The technological changes and modernization are

taking place in both the public sector integrated steel plants and the private sectors’

secondary steel processing industries.

Page 10: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 9 of 33

2.4 Demand –Supply Gap

Steel production of India accounted for 14.33 million tons in 1990-91, which gradually

increased to 36.12 million tons in 2003-04. Rapid rise in production has resulted in India

becoming the 3rd largest producer of crude steel in 2016. The country continues to be the

amongst the largest producer of sponge iron or DRI in the world. As per the report of the

Working Group on Steel for the 12th Five Year Plan, there are many factors exists which

carry the potential of raising the per capita steel consumption in the country. These include

among others, an estimated infrastructure investment of nearly a trillion dollars, a

projected growth of manufacturing from current 8% to 11-12%, increase in urban

population to 700 million by 2030 from the current level of 400 million, emergence of the

rural market for steel currently consuming around 10 kg per capita per annum. At the time

of its release, the National Steel Policy 2005 had envisaged steel production to reach 110

Million Metric Tonnes (MMT) by 2019-20. However, based on the assessment of the

current ongoing projects, both in greenfield and brownfield, the Working Group on Steel

for the 12th Five Year Plan has projected that domestic crude steel capacity in the county is

likely to be 140 MT by 2016-17 and has the potential to reach 149 MT if all requirements

are adequately met. The National Steel Policy 2005 is currently being reviewed keeping in

mind the rapid developments in the domestic steel industry (both on the supply and

demand sides) as well as the stable growth of the Indian economy since the release of the

Policy in 2005. India is expected to become the world's second largest producer of crude

steel in the next 10 years, moving up from the third position, as its capacity is projected to

increase to about 300 MT by 2025. Huge scope for growth is offered by India’s

comparatively low per capita steel consumption and the expected rise in consumption due

to increased infrastructure construction and the thriving automobile and railways sectors.

2.5 Employment Generation (Direct and Indirect) Due to Project

Total manpower of the proposed project would be around 150 from the present 110

persons. The details are given below-

TABLE 2-2: EMPLOYMENT DETAILS

S. No. Type of Employment Total

1. Managerial/Office Staff 05

Page 11: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 10 of 33

2. Skilled/Supervisory 45

3. Un-skilled/Workers 100

Total Employment 150

During Construction phase the labourers and workers will be hired from nearby areas.

Page 12: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 11 of 33

3 PROJECT DESCRIPTION3.1 Type of Project

M/s Amba Shakti Ispat Ltd is planning for capacity expansion and augmentation. In the

process the industrial unit will increase its molten metal generation capacity in Induction

furnaces and enhancing rolling mill capacity and casting of billets in continuous casting

machine. After proposed expansion, installed production capacity of the industrial unit will

increase from 27600 MT/ Annum (92 MT/day) to 156300 MT/Annum (521 MT/day) with

the use of increased quantity of raw material to 173100 MT/Annum (577 MT/day).

The proposed project needs “Environmental Clearance” from the MoEF as per the EIA

Notification, 2006. The project is classified under Category A due to Secondary

Metallurgical processing Industries listed as Item 3(a)(c) of the schedule of the EIA

Notification 2006 and General Conditions (interstate boundary) .

Salient feature of the plant is given in Table below-

Page 13: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 12 of 33

Table 3-1: Details of existing and proposed plant of Amba Shakti Ispat Ltd

S.

No.

Particulars Existing Proposed

expansion

Total

1. Induction Furnace 2X6 MT/Heat 3X15 MT/heat 45 MT/heat

2. Installed production

capacity

27600 MT/Annum

(92 MT/Day)

128700

MT/Annum

156300MT/Annum

(521 MT/Day)

3. Fixed capital investment 18.5 Cr 6.0 Cr 24.5 Cr.

4. Fuel consumption 1200 MT/A of coal(Reheating furnace)

Nil Nil

5. Electrical power

requirement

13.50 MVA 3.50 MVA 17 MVA

6. Raw materials requirement MS scrap /Sponge

Iron 32100

MT/Annum

Billets 17000 MT/A

141000

MT/Annum

MS scrap /Sponge

Iron- 173100

MT/Annum

7. Land area 43,360 sq.m. - 43,360 sq.m.

8. Manpower requirement 110 40 150

9. Gross water requirement 13 KLD 37 KLD 50 KLD

Page 14: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 13 of 33

10. Solid waste generation

Slag

Mill scale

Slag – 3.6 TPD

Mill Scale- 1.2 TPD

End cuttings /trimmings- 2 TPD

Slag – 46 TPD

Mill Scale- 9TPD

End cuttings /trimmings- 10TPD

11. Hazardous waste

APCD dust

Spent lubricant

FLUE GAS DUST- 2MT/Annum

Spent oil (5.1) 60Ltr/Annum

Fly ash 1.50

MT/Annum

APCD dust =300

MT/ Annum

Spent oil= 60 L/

Annum

12. No of operational days 300 300

Page 15: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 14 of 33

3.2 Location

The proposed project site is located at plot no 6 & 6A industrial area phase 2 Kala Amb,

Tehsil- Nahan, District-Sirmaur, State-Himachal Pradesh. The central coordinate is

given in Table below- 3-2. And all corner co-ordinates are marked in fig 3.1

Table 3-2: Coordinate

Latitude 30°31'13.036"N to 30°31'20.197"N

Longitude 77°12'1.891"E to 77°12'15.955"E

Figure 3-1: Project site on google maps

Page 16: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 15 of 33

Figure 3-2: Site plan of the Project Site

Page 17: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 16 of 33

Figure 3-3: Location map of the project site

Page 18: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 17 of 33

Figure 3-4: 10 km Radius Buffer Location Map

Page 19: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 18 of 33

3.3 Details of Alternate Sites

No alternate site is examined. The details of land is as follows-

Land requirement and availability:

Land measuring 43360 sq.m. is already available in plant premises at plot no 6 & 6A,

industrial area phase 2, Kala Amb, Tehsil Nahan, District Sirmaur, State Himachal

Pradesh. No new land area is proposed to be added.

Land ownership Details:

Land is given on lease to M/s Amba Shakti Ispat Ltd. Kala Amb, Tehsil- Nahan,

State-Himachal Pradesh.

Lease dead is attached as Annexure I.

3.4 Size and Magnitude of operation

M/s Amba Shakti Ispat Ltd is an existing industrial plant at Kala Amb. The proposed

project is for expansion of production capacity and augmentation of the existing plant. It is

proposed to enhance the production capacity up to 521 MT/day (rolled sections) by using

induction furnaces having 3X15 MT/heat capacity.

The list of existing machinery is given in Table below-

Table 3-3: List of Existing Machinery along with capacity

S. No. Machinery Description Capacity

Machinery (Furnace Division)

1.Induction Furnace 2X6 MT/heat

2.CCM (Continues Casting Machine)

1

3.Crane (2 Nos.) 30 M.T.

4.Crane (2 Nos.) 15 M.T.

5.Crane (1 Nos.) 10 M.T.

6.Shearing Machine

1

7.Gas Cutting machine

1

8.Slag Metal Extraction Unit

1

Machinery (Re-Rolling Division)

Page 20: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 19 of 33

9.Reheating Furnace with Thermocouples 20 Ton /Hour

10.Roughing Mill 430MM (3i)

11.Intermediate Mill 360 MM (2i)

12.Finishing Mill 304 MM (2i)

13.Reduction Gear 5.5:1

14.Pinion Gear 1:1

15.Electric Motor 1250 KW

16.Electric Motor 500 KW

17.

Transformers

5500 KVA-1

3800 KVA-II

3800 KVA-III

3500 KVA-IV

3000 KVA-V

3.5 Project Description with Process Details

The industrial unit is planning for capacity expansion/augmentation of integrating melting

and rolling facility and also increasing overall production capacity. Firstly the preparation

of stored scrap would be carried out with sized, classified and accordingly stocked, sent to

the induction furnace shell with the help of overhead traveling crane. The casting shop

includes one 2-strands continuous machine where the casting of the billets would be done.

After reaching the desired quality, composition and temperature in the induction furnace,

molten steel is taken to the casting platform with the help of casting crane, on to the casting

machine, capable to cast square billets from 100 to 165 mm.

In caster the sliding gate is opened and liquid steel starts flowing into 2-strands tundish,

located on tundish car, through the tundish nozzles into caster moulds where liquid steel

start to solidify by indirect cooling of re-circulating water. The steel billet is then

completely solidified by water jets through the strand. After straightening in the

withdrawal roller mechanism, the produced billets are cut into desired lengths.

Page 21: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 20 of 33

A laboratory, equipped with a sample preparation equipment, spectrometer analyzer is

incorporated to check the conformity of products with the chemical composition and

quality standards required.

Water is treated in the water treatment facilities and used as the makeup water. The

industrial cooling water is cleaned, cooled and re-used in the water facilities. A de-dusting

plant, equipped with high temperature bag filters is provided to capture the dust content of

furnace exit gas. The process diagram is shown as below :

Figure 3.5: Showing the process of rolled product

3.6 Source of Pollution and its Control

A) Air pollution and its control

Page 22: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 21 of 33

The flue gases generated during melting of scrap/sponge iron and production of steel in

induction furnaces, Dust generation in the crushing of slag for metal in the slag metal

extraction unit and Emission of combustion products from the DG set are the major source

of air pollution.

In the induction furnaces the quality and quantity of flue gases mainly depends upon type

of scrap used in furnace, i.e. degree of contamination in the scrap. These flue gases need

proper treatment for removal of dust particles before being discharged into the

atmosphere. Major pollutants generated in the process will be suspended dust particulates

(PM10, PM2.5, Heavy metals like As, Cr, Pb, Cd, Zn & Mn), Carbon Dioxide, Carbon

Monoxide, Sulphur Dioxide (traces), Oxides of Nitrogen (in low concentration, depending

on the temp of the process). Currently the Air Pollution Control Device (APCD) unit with

bag filters has been installed at the facility. The capacity of APCD and system design

including hood/canopy design will be so chosen in the proposed expansion so as to control

the emissions within permissible limit before letting it-out through stack.

The dust control in the Slag Metal Extraction unit will be designed with proper hoods and

the dust laden air will be led to and cleaned in wet scrubber before releasing to

atmosphere. Where ever possible dust suppression will be resorted to by sprinkling of

water.

Discharge of emission of gases from the DG set will be done at a height above the nearby

building as per CPCB norms.

B) Hazardous Waste Management

A total of 49 MT/Day slag would be generated. Out of this the disposable slag waste would

be 46 MT/Day. This crushed slag will be given for road making as slag sand or will be used

for filling low lying areas. The dust from furnaces collected through Bag filters to the extent

of 1 MT/Day will be transported as hazardous waste to TSDF. 3 MT/Day of recovered metal

will be reused and recycled in the Induction furnaces production process.

C) Water pollution and its control

Water is mostly used for cooling of coils in induction furnace , In indirect cooling for

skin formation and direct intensive jet sprays for thorough solidification of casts

Page 23: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 22 of 33

billets in continuous casting shop. The circulating water will be cooled in cooling

towers. Cooling tower blow down, water with dust from wet scrubber from Slag Metal

Extraction Unit will be collected in a common tank. This will either be dried and the

dried component sent to TSDF or on concentration the sludge water will be

transferred to CETP.

D) Green Belt

The existing plant units are provided with a Green belt which would be further developed

as per CPCB guidelines. Plants of various species tolerant to various types of air pollutants

will be planted in the peripheral areas of the project site and along the roads within the

plant premises.

3.7 Selection Criteria of plant species for Green Development Plant

The selection of plant species for the development depends on various factors such as

climate, elevation and soil. Area falls under the tropical region and thus the plants that area

adapted to this condition should be selected. The plant should exhibit following

characteristics in order to be selected for plantation.

1. The species should be fast growing and providing optimum penetrability.

2. The species should be wind firm and deep rooted

3. The species should form a dense canopy.

4. As far as possible, the species will be locally available

5. Species tolerances to air pollutants like PM, SO2, and NOx should be preferred.

6. The species should be permeable to help create air turbulence and mixing within

the belt.

7. There should be no large gaps for the air to spill through.

8. Tree with high foliage density, leaves with larger leaf area and hairy on both the

surface.

9. Ability to withstand conditions like inundation and drought.

10.Soil improving plants (Nitrogen fixing, rapidly decomposable leaf litter).

11.Attractive appearance with good flowering and fruit bearing.

12.Bird and insect attracting tree spacing.

Page 24: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 23 of 33

3.8 Resource optimization/Recycling and Reuse

Various steps shall be taken for recycle/ reuse in the proposed project as mentioned below:

Waste water generated shall be mainly from cooling tower and same shall be reused

within the plant premises by neutralizing or will be planned to be sent to CETP

Slag from furnaces, Dust from Bag filters are hazardous materials generated on site,

will be stored and transported to TSDF site. The furnace slag will first be subjected

to crushing, metal will be extracted through magnets and the left over slag

transported to TSDF

3.9 Availability of water its source, Energy/Power requirement and source

Water for construction and domestic purpose will be drawn from borewell. Approximately

50KLD water will be used for industrial and domestic purposes. Water balance is given in

Figure below-

Total Power load of 17 MVA will be used to run the plant & machinery during construction

and operational phase.

Source: Himachal Pradesh State Electricity Board (HPSEB). In case of power failure DG sets

of 500 KVA is provided.

Page 25: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 24 of 33

Figure 3.6 : Water Balance Chart

Page 26: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 25 of 33

3.10 Quantity of wastes to be generated (liquid and solid) and scheme for their

Management/disposal

A total of 49 MT/Day slag would be generated. Out of this the disposable slag waste would

be 46 MT/Day. This crushed slag will be given for road making as slag sand or will be used

for filling low lying areas. The dust from furnaces collected through Bag filters to the extent

of 1 MT/Day will be transported as hazardous waste to TSDF. 3 MT/Day of recovered metal

will be reused and recycled in the Induction furnaces production process.

Water shall be used for cooling purposes in proposed project in the induction furnaces,

solidification of molten metal in the continuous casting machines and for dust suppression

and dust cleaning in Slag Metal Extraction Unit (SMEU). Waste water generated shall be

mainly being at the cooling towers in blow down process, and from wet scrubber in SMEU.

The dust laden water from scrubber will be taken to pond and water recirculated. The

dried dust from the pond shall be taken to TSDF. Domestic water will be led to soak pits

from where the outflow will be used for plantation purposes and dried manure shall be

used again for plantation purposes.

SITE ANALYSIS

3.11 Connectivity

The Plant site is located at plot no 6 & 6A industrial area phase 2, Kala Amb,Tehsil-

Nahan, District Sirmaur, State-Himachal Pradesh. Project location is about 2.7 km away

from National Highway- 72. The project site is around 367 m above MSL.

The site is well connected by road and railways. The neighboring city and town is Ambala

and Nahan around 47.2 km and 17.6 km away from project site respectively. The nearest

railway station is Ambala Railway station about 47.2 km, Chandigarh Airport is around

63.3 km away from the project site.

3.12 Land Form, Land use and Land ownership

Land is already available with M/s Amba Shakti Ispat Ltd located at plot no 6 & 6A

industrial area phase 2, Kala Amb, Tehsil - Nahan, District Sirmaur, State-Himachal

Pradesh. The land is hilly terrain, utilized for the cultivation, forest and industrial

purposes.

Page 27: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 26 of 33

3.13 Topography

The topography of the district is mountainous with elevation ranging from 300 meters to

3000 meters above sea level. The mountain ranges of the district lie on the outer Himalayas

and are a part of Shivalik ranges. The district by and large is also climatically suitable for

growth of temperate fruits.

Climate:

The climate of the district is sub-tropical in the valley and tends to be temperate on the

hilltops. There are four major seasons. The winter season commences from November to

February and ends in March; summer season extends from March to June, followed by the

monsoon period extending from July to September. Maximum precipitation occurs during

July to September. Average annual rainfall in the district is about 1413.12 mm, out of

which 85% rainfall occurs during July to September. In the winter season, precipitation as

snowfall also occurs in the higher reaches up to 1000 m elevation and as rainfall in low hills

and valleys of the district. Mean maximum and minimum temperature ranges between

34°C (May) and 0.6°C (January).

Geology:

The state of Himachal Pradesh is covered by the rocks ranging in age from Precambrian to

Recent. The normal order of super-position of the rocks in the Lesser Himalaya has been

affected by later events of thrusting. Owing to its complex tectonism and geological

evolution, establishing an unanimously-accepted geology and stratigraphy of Himalaya

remained mired with debate and controversy- posing a natural deterrent.

3.14 Existing Land Use pattern

The land is hilly terrain, utilized for the cultivation, forest and industrial purposes. The

existing land is used as industrial purposes. The land of the area is flat plain having slight

slope and well developed industrial area.

3.15 Existing Infrastructure

The infrastructure amenities available in the area denote the economic wellbeing of the

region. The project area is connected with NH-72. Educational facilities up to Senior

School, College, Hospital & Banking facilities are available at Nahan about 17.6 km away

from the project area. The existing building comprise of rolling mill shed, Workshop shed &

Competitive administrative block along with office quarters at the existing premises.

Page 28: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 27 of 33

3.16 Soil Classification

Soils of the area have been classified under three Orders i.e. Alfisols, Entisols and

Inceptisols and all the thirty-two Soil Series identified in the area have been further

classified into four Suborders; five Great Groups; six Subgroups and fourteen Families.

Soil testing will be done and will be submitted at EIA (Baseline study) stage.

3.17 Social Infrastructure available

Schools, colleges, hospitals & healthcare centers, shops & bazaars, community

centers etc. are all available on nearby area.

Page 29: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 28 of 33

4 PLANNING BRIEF

4.1 Planning concept (type of industries, facilities, transportation etc.) Town and

country, planning/ development authority classification

The industrial area and the related facilities are already developed hence no planning is

envisaged. The nearby towns have the modern facilities.

4.2 Population Projection

There would not be any significant development/increase in the population of surrounding

area. Workers for the proposed project will come from the local residents in the

surrounding villages. There won’t be any influx of people in the area due to proposed

project.

4.3 Land use planning (breakup along with green belt etc.)

The open space inside the plant area will be suitably landscaped and covered with the

vegetation of indigenous variety. Green Belt area will be developed as per the CPCB

guidelines.

The proposed expansion and augmentation of the unit will be done within existing plant

premises having total area around 43360 sq.m., already acquired by the project

proponent.

4.4 Assessment of infrastructure demand (physical and the social)

The proposed expansion and augmentation of proposed project is within well developed

industrial unit and falls in industrial area therefore all facilities/amenities like medical,

educational, housing, transportation, communication, shopping etc are available

nearby places. Local workers will be employed for the construction during proposed

expansion; no long-term infrastructure will be required.

4.5 Amenities/Facilities

Major basic facilities are available for the proposed project. Road, electricity, water,

transportation facility etc are well developed in the surrounding area. All the amenities

related to project on the site will be installed.

Page 30: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 29 of 33

5 PROPOSED INFRASTRUCTURE

5.1 Industrial area (processing area)

Site Infrastructure:

The site already having administrative and site control office with latest equipment

like computers, walkie‐talkie & computerized weigh‐bridge, printers, fax,

Xerox machine, etc.

Water for construction and domestic purpose as well industrial purposes will be

drawn from borewell.

5.2 Residential Area (non- Processing area)

The employee quarters are provided within the plant premises. During construction

period, the manpower will be hired from nearby areas.

5.3 Green Belt

The main objective of the green belt is to provide a barrier between the plant and

surroundings areas. Green belt will be developed according to CPCB guidelines.

5.4 Social Infrastructure

Schools, colleges, hospitals & healthcare centers, shops & bazaars, community centers, etc.

are all available in nearby area.

5.5 Connectivity

The Plant site is located at plot no 6 & 6A industrial area phase 2, Kala Amb, Tehsil-

Nahan, District Sirmaur, State-Himachal Pradesh. Project location is about 2.7 km away

from National Highway- 72. The project site is around 367 m above MSL.

The site is well connected by road and railways and the neighboring city and town is

Ambala and Nahan around 47.2 km and 17.6 km away from project site respectively. The

nearest railway station is Ambala Railway station 47.2 km, Chandigarh Airport is 63.3

km away from the project site.

5.6 Water Management (Source and Supply of Water)

About 50 KL water will be required on daily basis out of which 10 KL is used for the

domestic and same would be drawn from borewell.

Page 31: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 30 of 33

5.7 Sewerage System

Around 9 KLD domestic waste water would be generated and same would be disposed off

through soak pit and disposed of either in plantation or will be sent to CETP.

5.8 Industrial Waste Management

A total of 49 MT/Day slag would be generated. Out of this the disposable slag waste would

be 46 MT/Day. This crushed slag will be given for road making as slag sand or will be used

for filling low lying areas. The dust from furnaces collected through Bag filters to the extent

of 1 MT/Day will be transported as hazardous waste to TSDF. 3 MT/Day of recovered metal

will be reused and recycled in the Induction furnaces production process.

5.9 Power Requirement & Supply/source

Total power load around 17 MVA would be required which will be met from Himachal

Pradesh State Electricity Board (HPSEB). In case of Power failure DG sets of 500 KVA

capacity has been provided.

Page 32: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 31 of 33

6 REHABILITATION AND RESETTLEMENT (R & R) PLAN

No, Rehabilitation and Resettlement (R & R) Plan required.

7 PROJECT SCHEDULE & COST ESTIMATES

The Project is envisaged to be undertaken immediately after getting statutory approvals.

7.1 Total Project Cost

Total estimated Project cost after expansion is approximately Rs. 24.5 crore as

mentioned below:

Table 7-1: Total Project Cost

Existing (Crore) Proposed (Crore) Total (Crore)

18.5 6 24.5

Page 33: PFR amba shakti 27 june - environmentclearance.nic.in · Page 1 of 33 Table of Contents 1 EXECUTIVE SUMMARY ..... 4

Page 32 of 33

8 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)

This project is for expansion of production capacity and augmentation of existing plant for

the production of rolled steel products. Due to huge demand, it has been proposed to

enhance the capacity of the plant up to 521 MT/Day. With the implementation of the

proposed project; the socio-economic status of the local people will improve substantially,

country’s requirement of steel will be met to this extent which would ultimately lead to

development in many forms. The land rates in the area will improve in the nearby areas

due to the proposed activity. The project will help in upliftment of the social status of the

people in the area. The proposed project will also help to increase the natural beauty of the

area by developing and planting new variety of plants along the road and within the plant

premises. With a commitment and assurance that all environmental considerations would

be taken care of such a project will be a need of the day and essential.