phase ii tracker electronics
DESCRIPTION
Phase II Tracker Electronics. Status of System Development. Electronic system development is driven by detector requirements. Until 2010: Single and double-sided Rods CBC FE chip: binary , unsparsified readout GBT-VL Link to backend. Module. Hybrid. GBT. - PowerPoint PPT PresentationTRANSCRIPT
Electronic system development is driven by detector requirements
7 Nov 2011
Hybrid
Module
Until 2010: Single and double-sided RodsCBC FE chip: binary, unsparsified readoutGBT-VL Link to backend
GBT
Clk,TriggerFast Config
& Control
Data
I2C Status
Front-End Hybrid
CBC256
Mux
Ctrl
DMux
Hybrid controller320Mbps
320Mbps8x40Mbps
40MHz
CDRe-port
Mon
40MBps8
I2C
System design was started with simplest module at front-end…
7 Nov 2011
TriggerClockControl/StatusData
Legend
FramerSerDes
e-port
e-port
e-port
Slow Control e-link
GBT
Dem
ux
mux
GBT-SCA
e-port
E-links10 ports @ 320 Mbps
1 GBT reads out 10 FEH
1 port @ 80 Mbps
I2C
Clk Block
I2C
…and a GBT at the rod-edge
7 Nov 2011
2
FramerSerDes
e-port320
e-port320
e-port320
Dem
ux
mux
e-port
I2C
GBT-SCA
TriggerClockControl/StatusData
Legend• Data throughput dominated by CBC unsparsified readout stream• ATLAS has similar architecture, with reduced bandwith
Clk Block
CBC256
Mux
Ctrl
DMux
Hybrid controller
8x40Mbps
40MHz
CDRe-port
Mon
40MBps8
2010 System vision: up to 10 FEH (5 modules) connected to one GBT
7 Nov 2011
2
…But: architecture does not scale easily to Rod with stereo modules
4
GBT-SCA
4x320
4 4
4x3202x320
44
22
2
1 rod needs 5 (GBT+SCA), 10 fibres1 GBT+SCA serve: 2.5 modules, 10 hybrids, 80 CBCs1 module communicates via: 8 SLVS pairs + 4 I2C pairs
I2C
SLVS
7 Nov 2011
10
Phase II Electronics Meeting Digest
8
At end-2010, two-in-one modules with Triggering capabilities were proposed
14 Oct 2011 / FV
Electronic System Discussion 9
2S-Pt module:From two-in-one to all-in-one
07 Sep 2011 / FV
Can be envisaged because Tk is fiber-rich
• Module becomes standalone building block– Front-end chip– LP-GBT– SF-VL– Ancillary electonics (control,
monitoring, aggregation, timing distribution)
– DC/DC converter
Electronic System Discussion 11
2S-Pt Hybrid
Concentrator & Controller
8x40Mbps
40MHz40MBps4
8x4x80Mbps
I2C2 lines to/from all CBCs
Clk out
Trig/fast config out4 lines to all CBCs
L1 readout data in1 line from each CBC
trigger data in4 lines from each CBC
D & A I/O
½ GBT-LP
8x160Mbps
1x160Mbps
160MHz, 40MHzClk in
Data in
Data out
SCA I/O
2S-Pt module: electronic system, assuming low power GBT with parallel 20b interface
VTRx4.8Gbps
I2CCBC-pt256
07 Sep 2011 / FV
2x160Mbps
Electronic System Discussion 12
PS-Pt module for inner layers
07 Sep 2011 / FV
CBC-light/SSA
DC/DC
SF-VLLP-GBT
Sensor
Electronic System Discussion 13
PS-Pt Hybrid
½ GBT-LP
10x160Mbps
1x160Mbps
160MHz, 40MHz
PS-Pt Block diagram, assuming low power GBT with parallel 20b interface
VTRx4.8Gbps
I2C
SCA
10x160Mbps
?
07 Sep 2011 / FV
Electronic System Overview
7 Nov 2011
CBCpt 256
DC/DC
LP-GBT SF-VL
ConcCtrl
Rod edge PP1
ConcCtrl m-Rx
m-Tx
GBTFPGA
Process &
Route
FE-Hybrid
FED/FEC
12
12
8x12
8x12
CTRL
TRIG
DAQ
Front-end Module
Legacy fiber plant
CBC light
MPA128
Common to 2S, PS and 3D modulesModule specific
LV/HV PSBack-end
Electronic System Contributors
7 Nov 2011
CBC256
DC/DC
LP-GBT
ConcCtrl
Rod edge PP1
ConcCtrl m-Rx
m-Tx
GBTFPGA
FE-Hybrid
FED/FEC
12
12
8x12
8x12
CTRL
TRIG
DAQ
Module
Legacy fiber plant
CBC light
MPA128
IC-RALLyon?
CERN+???
CERN
IC-RALStrasbourg+???
Aachen ?
CERN
Common to 2S, PS and 3D modules
LV/HV PS
SF-VL
Process &
Route
Module specific
FNAL3DPt module
Conclusion
7 Nov 2011
• Phase II TK electronics R&D is under way• 3 chips in Si (CBC, FEAFS, VICTR), at least 5 more being
discussed (MPA, 3DDataFlow, LP-GBT, CBClight, Concentrator&Controller)
• Agressive packaging/interconnect technologies under investigation (C4, HDSubstrate, 3D, TSV, opto, …)
• Fallback paths are available (PS -> 2S, LP-GBT ->GBT, etc…)• Advanced CMOS processes (65nm for MPA and LP-GBT)• Very challenging program
– Avoid maintaining parallel developments for much longer– Concentrate effort– Be prepared for long development time– New collaborators welcome NOW
• Backend development options to be considered soon