pi trickles down at the water district emile richard portland water district portland, maine
TRANSCRIPT
PI Trickles Down At the Water District
Emile Richard
Portland Water District
Portland, Maine
Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 2
Outline
• Portland Water District (PWD)– Who we are
– History of PI at PWD
• Business Challenges– Leveraging the PI Investment
• System Design Elements
• Training Technique
– Measurements of Success
• Examples of Using PI
• Future Plans
Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 3
Water
Wastewater
The Portland Water DistrictService Area
1245
3
1245
2
140 Square Miles140 Square Miles
Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 4
The Portland Water DistrictThe Portland Water DistrictChartered in 1908
Drinking Water to 11 Communities Serving a Population of 200,000
Primary Water Source – Sebago Lake
Employees: 190
Customers: 50,000 Connections
Water Delivered: 24 MGD
Water Mains: 975 Miles
Wastewater Pipe: 90 Miles
Wastewater Pump Stations: 70
Wastewater Treatment Plants: 5
Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 5
History of PI at PWDCurrent StatisticsCurrent Statistics
135 PLCs135 PLCs
4534 PI Points4534 PI Points
Primary PI ToolsPrimary PI Tools
ProcessBookProcessBook
DataLinkDataLink
IssuesIssues
Staff FocusStaff Focus
Keeping Up WithKeeping Up With
the Demand & the Demand &
the Technologythe Technology
Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 6
Business Challenges at PWD
1. Leveraging the PI Investment Does it serve a purpose?
Would anyone care if the PI was shutdown?
2. Measuring the Success Numerous Examples of Success, but it is tough to
measure their savings directly.
Is it possible to measure the ROI of an email service or a telephone system? Can a business survive without them?
Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 7
Leveraging the PI InvestmentLeveraging the PI Investment - Rolling Out the PI System
• Data Source Closest To Users
– Reliability is Needed
– Contingencies Needed for Unreliable Data Links
• SCADA Reliability is Important for PI Data Reliability
• Garbage In = Garbage Out
• Need a Minimum of 6 mo. Of data to be of value to users
• It is easy to keep years of data accessible to users due to PI’s data compression and big hard drives
Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 8
Leveraging the PI InvestmentLeveraging the PI Investment - Affect - Affect AllAll Levels of Personnel Levels of Personnel• Easy to get Managers and Technical
Staff to use PI• Harder to get Operations Staff
involved
The “War Room” ProjectorThe “War Room” Projector
• Video Projection Technology is Readily Available
• Continuous Training Fosters “Buy In”• “PI Guy” Attends the Weekly
Meetings • Eliminate “Buy In” Road Blocks • Clear Up Issues Quickly
Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 9
Measures of Success - Wastewater Operations• Wastewater Pump
Station Inspections– Site Inspection
frequency reduced markedly
– Daily off site monitoring
– Enhanced troubleshooting ability
– Enhanced emergency response and alarm prioritization
Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 10
Measures of Success - Wastewater Operations
A Simple Trend Gives the Operations Staff a Lot of Information
Wet Well Level
Pump Run Status
Better than a 15 minute visit, but without the travel time
Ad-hoc Trends are a valuable troubleshooting tool
Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 11
Measures of Success - Water Distribution Monitoring
Valve Turning Event
Verification of a Normal Maintenance Activity
Very Brief Transient – less than a second
Other Uses: Main Break AnalysisTV News Spot
Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 12
Measures of Success - One Year Trends
7 Day
1 Year
Pump Discharge Flow AnalysisRTU Polling Rate
One Year Trends Yield a Wealth of One Year Trends Yield a Wealth of Information Not Seen On Shorter Time Information Not Seen On Shorter Time Spans Trends. Spans Trends.
PI Facilitates This Kind of Analysis.PI Facilitates This Kind of Analysis.
Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 13
Measures of Success - Process Monitoring
• Pack the Page
• Plant Management “Dashboard”
• Developed by the operations engineer
• Ad-hoc Trends are used extensively
Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 14
Measures of Success• All of the previous examples were from users from all
levels of District employees• All of the examples had a direct impact on the business• Benefits:
– Putting the Data to Work• Report Generation• Decision Making• Troubleshooting• Design Tool
– Remove Barriers• Only Limited By User’s Imagination• Limited By Resources to Make It Happen
Copyright © 2006 OSIsoft, Inc. Company Confidential. All rights reserved. 15
Future Plans
• Continue Growing PI by Increasing the
• PI Point Count
• Create the Full Array of SCADA HMI
• Displays Within PI ProcessBook
• Explore the use of the Web Parts
• Application