pipe lay · pdf filepipe lay equipment summary of major projects remacut experience 1974...

16
PIPE LAY EQUIPMENT Summary of major projects R E M A C U T E X P E R I E N C E 1974 BARGE Three 60 tons pipe Tensioners Castoro Sei CUSTOMERS Saipem (Italy) 2013 ed. 1 1974 BARGE Line-up station and pipe Handling Equipment for DJ pipe Castoro Sei CUSTOMERS Saipem (Italy) 1974 BARGE Two pipe lifting systems Castoro Sei CUSTOMERS Saipem (Italy) 1974 BARGE The internal ramp handling system Castoro Sei CUSTOMERS Saipem (Italy) 1975 BARGE Ramp rollers Castoro Sei CUSTOMERS Saipem (Italy) 1984 BARGE Two 45 tons pipe Tensioners Castoro Sei CUSTOMERS Saipem (Italy) 1988 BARGE Two 68 tons pipe Tensioners Israfil Guseinov CUSTOMERS Rauma Repola (Finland) 1990 BARGE Modification of three existing 68 tons hydraulic pipe Tensioners and one A/R winch manufactured by Western Gear (conversion from hydraulic to electrical driving system) Semac I CUSTOMERS EMC (England) 1992 BARGE Two 30 tons pipe Tensioners Castoro Dieci CUSTOMERS EMC (England)

Upload: dangngoc

Post on 01-Feb-2018

250 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: PIPE LAY  · PDF filePIPE LAY EQUIPMENT Summary of major projects REMACUT EXPERIENCE 1974 BARGE Three 60 tons pipe Tensioners Castoro Sei CUSTOMERS Saipem (Italy) 2013 ed. 1

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

1974 BARGE

Three 60 tons pipe Tensioners

Castoro Sei

CUSTOMERS

Saipem (Italy)

2013 ed. 1

1974 BARGE

Line-up station and pipe Handling Equipment for DJ pipe

Castoro Sei

CUSTOMERS

Saipem (Italy)

1974 BARGE

Two pipe lifting systems

Castoro Sei

CUSTOMERS

Saipem (Italy)

1974 BARGE

The internal ramp handling system

Castoro Sei

CUSTOMERS

Saipem (Italy)

1975 BARGE

Ramp rollers

Castoro Sei

CUSTOMERS

Saipem (Italy)

1984 BARGE

Two 45 tons pipe Tensioners

Castoro Sei

CUSTOMERS

Saipem (Italy)

1988 BARGE

Two 68 tons pipe Tensioners

Israfil Guseinov

CUSTOMERS

Rauma Repola (Finland)

1990 BARGE

Modification of three existing 68 tons hydraulic pipe Tensioners and one A/R winch manufactured by Western Gear(conversion from hydraulic to electrical driving system)

Semac I

CUSTOMERS

EMC (England)

1992 BARGE

Two 30 tons pipe Tensioners

Castoro Dieci

CUSTOMERS

EMC (England)

Page 2: PIPE LAY  · PDF filePIPE LAY EQUIPMENT Summary of major projects REMACUT EXPERIENCE 1974 BARGE Three 60 tons pipe Tensioners Castoro Sei CUSTOMERS Saipem (Italy) 2013 ed. 1

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

1993 BARGE

Upgrade of 64 tons pipe Tensioners to 110 tons capacity

Castoro Sei

CUSTOMERS

EMC (England)

2013 ed. 2

1993 BARGE

Two pipe tracks for the firing line

Castoro Sei

CUSTOMERS

EMC (England)

1994 BARGE

Upgrade of the external ramp handling systemup to 1.000 tons capacity

Castoro Sei

CUSTOMERS

EMC (England)

1994 BARGE

Two pipe rollers and two stern rollersfor ramp extension

Castoro Sei

CUSTOMERS

EMC (England)

1994 BARGE

Upgrade of the external ramp boomsup to 1.000 tons capacity

Castoro Sei

CUSTOMERS

EMC (England)

1994 BARGE

One 40 tons pipe Tensioner

ODS Mariner

CUSTOMERS

Rana (Italy)

1994 BARGE

Two 40 tons pipe Tensioners

Various

CUSTOMERS

GMC (USA/ Uk)

1994 BARGE

One 80 tons A/R winch

Various

CUSTOMERS

GMC (USA/ Uk)

1996 BARGE

Upgrade of two 68 tons pipe Tensioners

Israfil Guseinov

CUSTOMERS

AIOC (Azerbaijan Rep.)

Page 3: PIPE LAY  · PDF filePIPE LAY EQUIPMENT Summary of major projects REMACUT EXPERIENCE 1974 BARGE Three 60 tons pipe Tensioners Castoro Sei CUSTOMERS Saipem (Italy) 2013 ed. 1

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2013 ed. 3

1996 BARGE

Upgrade of one 160 tons A/R winch

Israfil Guseinov

CUSTOMERS

AIOC (Azerbaijan Rep.)

1997 BARGE

Integrated pipe-lay system consisting of three40 tons pipe Tensioners and one 120 tons A/R winch

Semac I

CUSTOMERS

EMC (England)

1997 BARGE

One 60 tons pipe Tensioner

Castoro Dieci

CUSTOMERS

EMC (England)

1997 BARGE

One 100 tons A/R winch

Castoro Dieci

CUSTOMERS

EMC (England)

1998 BARGE

Two 25 tons pipe Tensioners and one 50 tons A/R winch

Yamashiro

CUSTOMERS

VANOORD (The Netherlands)

1998 BARGE

One 60 tons pipe Tensioner and one 60 tons A/R winch

Java Constr.

CUSTOMERS

CLOUGH (Australia)

1998 BARGE

Three 175 tons pipe Tensionersfor J-lay tower

Saipem 7000

CUSTOMERS

SAIPEM (Italy)

1998 BARGE

DJ Nesting System

Semac I

CUSTOMERS

EMC (England)

1999 BARGE

Firing Line System

FDS1

CUSTOMERS

SAIBOS (France)

Page 4: PIPE LAY  · PDF filePIPE LAY EQUIPMENT Summary of major projects REMACUT EXPERIENCE 1974 BARGE Three 60 tons pipe Tensioners Castoro Sei CUSTOMERS Saipem (Italy) 2013 ed. 1

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2013 ed. 4

1999 BARGE

Two 40 tons pipe tensioners

Lone Star

CUSTOMERS

HORIZON OFFSHORE (USA)

2000 BARGE

Internal line up clamps from 6” to 48”electrical or pneumatic driven

CUSTOMERS

SAIPEM GROUP

2000 BARGE

One 25 tons pipe tensioners, one 50 tons A/R winch, line-up system and firing line rollers

Saibos 230

CUSTOMERS

SAIBOS (France)

2000 BARGE

One 40 tons pipe tensioner

Gulf Horizon

CUSTOMERS

HORIZON OFFSHORE (USA)

1990from

to

2000 BARGE

Different size and Lay configuration ILUCs

Saipem 7000

CUSTOMERS

SAIPEM (Italy)

2000 BARGE

Two 4 tracks 90 tons pipe tensioner

Fds

CUSTOMERS

SAIBOS (France)

2000 BARGE

One overhead welding carouselfor J-lay tower

Fds

CUSTOMERS

SAIBOS (France)

2001 BARGE

Two 25 tons pipe tensioners, one 50 tons A/Rwinch, line-up system and firing line rollers

Pecos Horizon

CUSTOMERS

HORIZON OFFSHORE (USA)

2001 BARGE

No. 4 Internal line up clamps from 12” to 16”for J-Lay and Double joint

Fds

CUSTOMERS

SAIBOS (France)

Page 5: PIPE LAY  · PDF filePIPE LAY EQUIPMENT Summary of major projects REMACUT EXPERIENCE 1974 BARGE Three 60 tons pipe Tensioners Castoro Sei CUSTOMERS Saipem (Italy) 2013 ed. 1

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2013 ed. 5

24” 60 Tons Anode clamp

2001 BARGE

One welding carousel for J-lay tower

Saipem 7000

CUSTOMERS

SAIPEM (Italy)

2001 BARGE

Two 80 tons pipe tensioner, one 180 tonsA/R winch and firing ramp track supports

CUSTOMERS

IOEC (Iran)

2001 BARGE

Saipem 7000

CUSTOMERS

SAIPEM (France)

Abouzar

2002 BARGE

No. 23 radio controlled Internal line up clampsfrom 8” to 28” for J-Lay and Double joint

Balder

CUSTOMERS

HEEREMA (Holland)

2002 BARGE

Modification of no. 4 Pennant Wire Winches

Castoro Sei

CUSTOMERS

SAIPEM (Italy)

2002 BARGE

New umbilical System for Internal line up clamps

Semac I

CUSTOMERS

SAIPEM (Italy)

2002 BARGE

New umbilical System for Internal line up clamps

Castoro Sei

CUSTOMERS

SAIPEM (Italy)

2002 BARGE

Renew of Internal ramp handling system with HPP

Castoro Sei

CUSTOMERS

SAIPEM (Italy)

2002 BARGE

No. 2 Internal line up clamps 30”-32” umbilical driven

CUSTOMERS

NPCC (Uae)

Page 6: PIPE LAY  · PDF filePIPE LAY EQUIPMENT Summary of major projects REMACUT EXPERIENCE 1974 BARGE Three 60 tons pipe Tensioners Castoro Sei CUSTOMERS Saipem (Italy) 2013 ed. 1

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2013 ed. 6

2002 BARGE

Two 90 tons pipe Tensioner, one 180 tonsA/R winch A/C driven

Israfil Guseinov

CUSTOMERS

MCDERMOTT/AIOC (Azerbaijan)

2003 BARGE

Modification of no. 1 Tensioner REMACUT 40 tons andno. 1 Carmoy A/R Winch with supply of integrated control system

Castoro Sei

CUSTOMERS

SAIPEM (Italy)

2003 BARGE

A Load, Speed, footage measuring systemfor Anchor Winches

Abouzar 1200

CUSTOMERS

IOEC (Iran)

2003 BARGE

No. 4 radio controlled Internal line up clamps

Balder

CUSTOMERS

HEEREMA (Holland)

2003 BARGE

Upgrade of pipe Handling Equipment system

Israfil Guseinov

CUSTOMERS

MCDERMOTT/AIOC (Azerbaijan)

2003 BARGE

Inert material handling system

Castoro Sei

CUSTOMERS

SAIPEM (Italy)

2004 BARGE

Two 75 tons pipe Tensioner, one 180 tonsA/R winch A/C driven

Plbg136

CUSTOMERS

SADRA (Iran)

2004 BARGE

Umbilical Winches

Plbg136

CUSTOMERS

SADRA (Iran)

2004 BARGE

Tensioner & A/R Winch Control System UpgradeCUSTOMERS

SAIPEM (Italy)Castoro Otto

Page 7: PIPE LAY  · PDF filePIPE LAY EQUIPMENT Summary of major projects REMACUT EXPERIENCE 1974 BARGE Three 60 tons pipe Tensioners Castoro Sei CUSTOMERS Saipem (Italy) 2013 ed. 1

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2013 ed. 7

2004 BARGE

One 60 ton pipe TensionerCUSTOMERS

MICOPERI (Italy)

2004 BARGE

No. 4 Pipe Davits

Tofiq

CUSTOMERS

MCDERMOTT (Azerbaijan)

2004 BARGE

No1 Launch and Recovery System (LARS)for Divers

Tofiq

CUSTOMERS

MCDERMOTT (Azerbaijan)

2004 BARGE

No1 Launch and Recovery System (LARS)for ROV

Tofiq

CUSTOMERS

MCDERMOTT (Azerbaijan)

2004 BARGE

Pipe Handling System

Sb270

CUSTOMERS

SAIBOS (France)

2004 BARGE

Stinger Jacking System Upgrade

Israfil Guseinov

CUSTOMERS

MCDERMOTT/AIOC (Azerbaijan)

2004 BARGE

No. 2 Stinger Winches

Israfil Guseinov

CUSTOMERS

MCDERMOTT/AIOC (Azerbaijan)

2004 BARGE

Tensioners and A/R Winch Control system

Castoro Sei

CUSTOMERS

SAIPEM (Italy)

2004 BARGE

140 tons pipe track supportCUSTOMERS

SAIPEM (Italy)Castoro Sei

Page 8: PIPE LAY  · PDF filePIPE LAY EQUIPMENT Summary of major projects REMACUT EXPERIENCE 1974 BARGE Three 60 tons pipe Tensioners Castoro Sei CUSTOMERS Saipem (Italy) 2013 ed. 1

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2013 ed. 8

2004 BARGE

50 tons pipe Elevator refurbishment and upgrade

Castoro Sei

CUSTOMERS

SAIPEM (Italy)

2004 BARGE

Cranes electrical upgradinf including new loadmeasuring system

Castoro Sei

CUSTOMERS

SAIPEM (Italy)

2004 BARGE

Internal Line Up Clamps equipped with a newgeneration closed circuit inspection camera

Castoro Sei

CUSTOMERS

SAIPEM (Italy)

2005 BARGE

No. 4 Capstan Mooring winches 120KN

Derrick BargeAzerbaijan

CUSTOMERS

SAIPEM (Azerbaijan)

2005 BARGE

2500 tons Crane upgrade: Control and Drives upgrade, hook replacement, winches and submergable swiwel hook supply

Derrick BargeAzerbaijan

CUSTOMERS

SAIPEM (Azerbaijan)

2005 BARGE

Two 60 tons pipe Tensioner,one 120 tons A/R winch A/C driven

Dlb332

CUSTOMERS

GLOBAL IND. (USA)

2005 BARGE

Integrated Tensioning system composed by no. 1Pipe Tensioner 6 tons cap. and no. 1 A/R winch A/C driven 60 tons cap.

Mahesh

CUSTOMERS

PUNJ LLOYD (India)

2005 BARGE

New DC drives unit for Barge main CraneCUSTOMERS

NPCC (UAE)

2006 BARGE

Two 125 tons pipe Tensioners,one 250 tons A/R Winch A/C driven

CUSTOMERS

NPCC (UAE)

Dlb 750

Dlb 750

Page 9: PIPE LAY  · PDF filePIPE LAY EQUIPMENT Summary of major projects REMACUT EXPERIENCE 1974 BARGE Three 60 tons pipe Tensioners Castoro Sei CUSTOMERS Saipem (Italy) 2013 ed. 1

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2013 ed. 9

2006 BARGE

Firing Line Handling Equipment

Dlb 750

CUSTOMERS

NPCC (UAE)

2006 BARGE

New control system for no. 8 Skagit Winches

Castoro Otto

CUSTOMERS

SAIPEM (Indonesia)

2006 BARGE

New Firing Line Equipment System

Fds

CUSTOMERS

SAIPEM SA (France)

2006 BARGE

No. 1 each 90 tons pipe Tensioner 4 tracks

Normand Cutter

CUSTOMERS

SONSUB (UK)

2006 BARGE

No. 2 each 125 tons cap. pipe Tensioners AC driven

Db30

CUSTOMERS

MCDERMOTT (Australia)

2006 BARGE

No. 1 each pipe Tensioners 60 tons cap

Gabarra

CUSTOMERS

Z&P (Venezuela)

2007 BARGE

Integrated Tensioning System 240 tons cap.Including Tensioners and A/R Winch

Dlv 4400

CUSTOMERS

ZPMC (China)

2007 BARGE

Pipe Handling system for bevelling areawith Pipe Elevators 40 tons capacity

CUSTOMERS

SAIPEM (Italy)

2007 BARGE

No. 3 Pipe Tensioners 90 tons cap. eachCUSTOMERS

SAIPEM (Italy)

Semac I

Castoro Otto

Page 10: PIPE LAY  · PDF filePIPE LAY EQUIPMENT Summary of major projects REMACUT EXPERIENCE 1974 BARGE Three 60 tons pipe Tensioners Castoro Sei CUSTOMERS Saipem (Italy) 2013 ed. 1

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2013 ed. 10

2007 BARGE

Control and Drives System for Main Cranes7000+7000 ton Lifting Capacity

Saipem 7000

CUSTOMERS

SAIPEM (Italy)

2007 BARGE

Integrated Tensioning System 375/300 tons cap.Composed by no. 3 each Tensioners 125 tons cap.And no. 1 A/R Capstan Winch 300 tons cap.

Goliath I

CUSTOMERS

OCEANOGRAFIA (Mexico)

2007 BARGE

Complete pipe Handling System able to handle 4”-60”pipe, 35 tons per DJ fabrication

Goliath I

CUSTOMERS

OCEANOGRAFIA (Mexico)

2007 BARGE

Complete pipe Handling System able to handle 4”-60”pipe, 35 tons per joint

Dlv 4400

CUSTOMERS

ZPMC (China)

2007 BARGE

Integrated Tensioning System composed by no. 2 Tensioners60 tons cap. each and no. 1 A/R Winch 120 tons cap.

Java Constructor

CUSTOMERS

CLOUGH OIL&GAS (Australia)

2008 BARGE

No. 3 Tensioners 250 tons cap. each c/w integratedControl System with A/R WInch

CastorONE

CUSTOMERS

SAIPEM (Italy)

2008 BARGE

Internal Line Up Clamps from 6” to 48”upgrade and new construction

CUSTOMERS

SAIPEM (Portugal)

2008 BARGE

No. 1 each pipe Tensioner 90 tons cap.CUSTOMERS

GLOBAL (USA)

2008 BARGE

No. 3 Tensioners 125 tons cap. each c/wintegrated Control System

CUSTOMERS

GLOBAL (USA)

Cheyenne

G1200

Page 11: PIPE LAY  · PDF filePIPE LAY EQUIPMENT Summary of major projects REMACUT EXPERIENCE 1974 BARGE Three 60 tons pipe Tensioners Castoro Sei CUSTOMERS Saipem (Italy) 2013 ed. 1

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2013 ed. 11

2008 BARGE

Integrated Flexible lay system composed by no. 1each pipe Tensioner four tracks type 60 tons cap, no. 1each Winch 75 tons cap., no. 1 Reel drive system 350 tons cap.

Challenger

CUSTOMERS

GLOBAL (USA)

2008 BARGE

Integrated Tensioning System with no. 2 Tensioners60 tons cap. each and no. 1 A/R Winch 120 tons cap.

LB32

CUSTOMERS

MCDERMOTT (USA)

2008 BARGE

Integrated Tensioning System with no. 2 Tensioners 90 tons cap. each and no. 1 A/R Winch 180 tons cap.

CUSTOMERS

BUMI ARMADA (Malaysia)

2008 BARGE

No. two each Tensioners 90 tons cap. each

FDS

CUSTOMERS

SAIPEM SA (France)

2008 BARGE

Integrated Tensioning System with no. 2 each Tensioners 90 tons cap. and no. 1 A/R Winch 200 tons cap.

Castoro 10

CUSTOMERS

SAIPEM (Italy)

2008 BARGE

No. three Tensioners 125 tons cap. each c/wintegrated Control System

G1201

CUSTOMERS

GLOBAL (USA)

2008 BARGE

Integrated System composed by no. 2 Pipe Tensioners100 tons cap. each and no. 1 A/R Winch 200 tons cap.

CUSTOMERS

ZPMC (China)

2008 BARGE

Control and Drives System for main CranesCUSTOMERS

SAIPEM

2008 BARGE

Control and Drives System for Skagit WinchesCUSTOMERS

SAIPEM

Saipem 7000

Castoro 8

HONGKONG 2

ARMADA INST.

BARGE

Integrated System composed by no. 2 Pipe Tensioners100 tons cap. each and no. 1 A/R Winch 200 tons cap.

CUSTOMERS

ZPMC (China)HONGKONG 1

2008

Page 12: PIPE LAY  · PDF filePIPE LAY EQUIPMENT Summary of major projects REMACUT EXPERIENCE 1974 BARGE Three 60 tons pipe Tensioners Castoro Sei CUSTOMERS Saipem (Italy) 2013 ed. 1

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2010 ed. 12

2009 BARGE

No. two Integrated Tensioning System 200 tons cap. Composedby no. 2 each Tensioners 100 tons cap. And no. 1 A/R Winch 200 tons cap.

CUSTOMERS

ZPMC (China)

2009 BARGE

Integrated Tensioning Systwem composed by no.2pipe Tensioners 125 tons cap. Each and no. 1 A/RWinch 250 tons cap.

Db27

CUSTOMERS

MCDERMOTT

2009 BARGE

No.3 track supports

Db27

CUSTOMERS

MCDERMOTT

2009 BARGE

Quad joint production line

Fds2

CUSTOMERS

SAIPEM

2009 BARGE

No. one pipe Tensioner 4 tracks 60 tons cap.CUSTOMERS

SONSUB

2009 BARGE

Supply of Internal Line up Clamps c/w new generationweld inspection system

CUSTOMERS

SUBSEA 7

2009 BARGE

No. three Tensioners 130 tons cap. each c/w integratedControl System

Castoro Sei

CUSTOMERS

SAIPEM

2009 BARGE

Of no. five Internal line up clamps 42”-48” forNordstream project

CUSTOMERS

SAIPEM

2009 BARGE

Upgrade of Stinger Handling SystemCUSTOMERS

SAIPEMCastoro Sei

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2010 ed. 12

2009 BARGE

No. two Integrated Tensioning System 200 tons cap. Composedby no. 2 each Tensioners 100 tons cap. And no. 1 A/R Winch 200 tons cap.

CUSTOMERS

ZPMC (China)

2009 BARGE

Integrated Tensioning Systwem composed by no.2pipe Tensioners 125 tons cap. Each and no. 1 A/RWinch 250 tons cap.

Db27

CUSTOMERS

MCDERMOTT

2009 BARGE

No.3 track supports

Db27

CUSTOMERS

MCDERMOTT

2009 BARGE

Quad joint production line

Fds2

CUSTOMERS

SAIPEM

2009 BARGE

No. one pipe Tensioner 4 tracks 60 tons cap.CUSTOMERS

SONSUB

2009 BARGE

Supply of Internal Line up Clamps c/w new generationweld inspection system

CUSTOMERS

SUBSEA 7

2009 BARGE

No. three Tensioners 130 tons cap. each c/w integratedControl System

Castoro Sei

CUSTOMERS

SAIPEM

2009 BARGE

Of no. five Internal line up clamps 42”-48” forNordstream project

CUSTOMERS

SAIPEM

2009 BARGE

Upgrade of Stinger Handling SystemCUSTOMERS

SAIPEMCastoro Sei

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2010 ed. 12

2009 BARGE

No. two Integrated Tensioning System 200 tons cap. Composedby no. 2 each Tensioners 100 tons cap. And no. 1 A/R Winch 200 tons cap.

CUSTOMERS

ZPMC (China)

2009 BARGE

Integrated Tensioning Systwem composed by no.2pipe Tensioners 125 tons cap. Each and no. 1 A/RWinch 250 tons cap.

Db27

CUSTOMERS

MCDERMOTT

2009 BARGE

No.3 track supports

Db27

CUSTOMERS

MCDERMOTT

2009 BARGE

Quad joint production line

Fds2

CUSTOMERS

SAIPEM

2009 BARGE

No. one pipe Tensioner 4 tracks 60 tons cap.CUSTOMERS

SONSUB

2009 BARGE

Supply of Internal Line up Clamps c/w new generationweld inspection system

CUSTOMERS

SUBSEA 7

2009 BARGE

No. three Tensioners 130 tons cap. each c/w integratedControl System

Castoro Sei

CUSTOMERS

SAIPEM

2009 BARGE

Of no. five Internal line up clamps 42”-48” forNordstream project

CUSTOMERS

SAIPEM

2009 BARGE

Upgrade of Stinger Handling SystemCUSTOMERS

SAIPEMCastoro Sei

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2010 ed. 12

2009 BARGE

No. two Integrated Tensioning System 200 tons cap. Composedby no. 2 each Tensioners 100 tons cap. And no. 1 A/R Winch 200 tons cap.

CUSTOMERS

ZPMC (China)

2009 BARGE

Integrated Tensioning Systwem composed by no.2pipe Tensioners 125 tons cap. Each and no. 1 A/RWinch 250 tons cap.

Db27

CUSTOMERS

MCDERMOTT

2009 BARGE

No.3 track supports

Db27

CUSTOMERS

MCDERMOTT

2009 BARGE

Quad joint production line

Fds2

CUSTOMERS

SAIPEM

2009 BARGE

No. one pipe Tensioner 4 tracks 60 tons cap.CUSTOMERS

SONSUB

2009 BARGE

Supply of Internal Line up Clamps c/w new generationweld inspection system

CUSTOMERS

SUBSEA 7

2009 BARGE

No. three Tensioners 130 tons cap. each c/w integratedControl System

Castoro Sei

CUSTOMERS

SAIPEM

2009 BARGE

Of no. five Internal line up clamps 42”-48” forNordstream project

CUSTOMERS

SAIPEM

2009 BARGE

Upgrade of Stinger Handling SystemCUSTOMERS

SAIPEMCastoro Sei

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2013 ed. 12

2009 BARGE

Integrated System composed by no. 2 Pipe Tensioners100 tons cap. each and no. 1 A/R Winch 200 tons cap.

CUSTOMERS

ZPMC (China)

2009 BARGE

Integrated Tensioning System composed by no.2pipe Tensioners 125 tons cap. Each and no. 1 A/RWinch 250 tons cap.

Db27

CUSTOMERS

MCDERMOTT

2009 BARGE

No.3 Pipe track supports for Firing Line

Db27

CUSTOMERS

MCDERMOTT

20092010 BARGE

Quad joints production line System composed by about 130 pipe machines integrated with Control and Working stations Safety System

Fds2

CUSTOMERS

SAIPEM

2010 BARGE

No. 1 Pipe Tensioner 4 tracks 60 tons cap.CUSTOMERS

SAIPEM UK

2009 BARGE

Supply of Internal Line up Clamps c/w new generationweld inspection system

CUSTOMERS

SUBSEA 7

2009 BARGE

No. 3 Tensioners 130 tons cap. each c/w integratedControl System

Castoro Sei

CUSTOMERS

SAIPEM

2009 BARGE

Of no. 5 Internal line up clamps 42”-48” forNordstream project

CUSTOMERS

SAIPEM

2009 BARGE

Upgrade of Stinger Handling System for Internaland External ramp

CUSTOMERS

SAIPEMCastoro Sei

2009 BARGE

Integrated System composed by no. 2 Pipe Tensioners100 tons cap. each and no. 1 A/R Winch 200 tons cap.

CUSTOMERS

ZPMC (China)2009200920092009

HONGKONG 4

HONGKONG 3

Page 13: PIPE LAY  · PDF filePIPE LAY EQUIPMENT Summary of major projects REMACUT EXPERIENCE 1974 BARGE Three 60 tons pipe Tensioners Castoro Sei CUSTOMERS Saipem (Italy) 2013 ed. 1

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2010 ed. 12

2009 BARGE

No. two Integrated Tensioning System 200 tons cap. Composedby no. 2 each Tensioners 100 tons cap. And no. 1 A/R Winch 200 tons cap.

CUSTOMERS

ZPMC (China)

2009 BARGE

No.3 track supports

Db27

CUSTOMERS

MCDERMOTT

2009 BARGE

Quad joint production line

Fds2

CUSTOMERS

SAIPEM

2009 BARGE

Supply of Internal Line up Clamps c/w new generationweld inspection systemCUSTOMERS

SUBSEA 7

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2010 ed. 12

2009 BARGE

No. two Integrated Tensioning System 200 tons cap. Composedby no. 2 each Tensioners 100 tons cap. And no. 1 A/R Winch 200 tons cap.

CUSTOMERS

ZPMC (China)

2009 BARGE

No.3 track supports

Db27

CUSTOMERS

MCDERMOTT

2009 BARGE

Quad joint production line

Fds2

CUSTOMERS

SAIPEM

2009 BARGE

Supply of Internal Line up Clamps c/w new generationweld inspection systemCUSTOMERS

SUBSEA 7

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2010 ed. 12

2009 BARGE CUSTOMERS

ZPMC (China)

Complete Firing line system composed of about 130 pipe handling

machines and integrated control and safety system

2009 BARGE

No.3 track supports

Db27

CUSTOMERS

MCDERMOTT

2009 BARGE

Quad joint production line

Fds2

CUSTOMERS

SAIPEM

2009 BARGE

Supply of Internal Line up Clamps c/w new generationweld inspection systemCUSTOMERS

SUBSEA 7

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2010 ed. 12

2009 BARGE

N .

CUSTOMERS

ZPMC (China)

2009 BARGE

No.3 track supports

Db27

CUSTOMERS

MCDERMOTT

2009 BARGE

Quad joint production line

Fds2

CUSTOMERS

SAIPEM

2009 BARGE

Supply of Internal Line up Clamps c/w new generationweld inspection systemCUSTOMERS

SUBSEA 7

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2013 ed. 13

BARGE CUSTOMERS

No. one 2 track 5 tons Pipe Tensioner for Flexible lay completed with HPU system on a single structure.

2010

Integrated System composed by no.2pipe Tensioners 100 tons cap. each and no. 1 A/RWinch 200 tons cap.

SEMINOLE MICOPERI

2010 BARGE

Supply of complete Firing Line equipment and Stinger Rollers

SEMINOLE

CUSTOMERS

MICOPERI

2010 BARGE

CASPIAN SPIDER

CUSTOMERS

SES

2010 BARGE

Overhead Welding Carousel for J-Lay TowerCUSTOMERS

SAIPEM (Italy)FDS2

2010 BARGE CUSTOMERS

GLOBAL

2009 BARGE

Supply of no. 3 Pipe Tensioners of 130 tons capacity

CUSTOMERS

SAIPEM PORTUGAL

2010

Supply no. 1 Pipe Tensioner 125 tons capacity and control system upgrade to (4) Pipe Tensioner units

G1201

SEMAC1

2009 BARGE200920092009

No. one 2 track 10 tons Pipe Tensioner for Flexible lay completed with HPU system on a single structure.

2011 CUSTOMERS

KIZOMBA SATELLITEPROJECT

SAIPEM SA

2009 BARGE200920092009

No. 1 Internal Line Up Clamp model ILUC 24”-26” and No. 5 Internal Line Up Clamps model ILUC 30”-36” for S-lay process.

2011 CUSTOMERS

ALLSEAS

2009 BARGE200920092009

No. one 2 track 10 tons Pipe Tensioner for Flexible lay completed with HPU system on a single structure.

2011 CUSTOMERS

MICOPERI

2009 BARGE200920092009

No. 2 Internal Line Up Clamps model ILUC 24”-26” for S-lay process.

2011 CUSTOMERS

ALLSEASSOLITAIRE

Page 14: PIPE LAY  · PDF filePIPE LAY EQUIPMENT Summary of major projects REMACUT EXPERIENCE 1974 BARGE Three 60 tons pipe Tensioners Castoro Sei CUSTOMERS Saipem (Italy) 2013 ed. 1

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2010 ed. 12

2009 BARGE CUSTOMERS

Db27 MCDERMOTT

2009 BARGE

No.3 track supports

Db27

CUSTOMERS

MCDERMOTT

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2010 ed. 12

2009 BARGE CUSTOMERS

Db27 MCDERMOTT

2009 BARGE

No.3 track supports

Db27

CUSTOMERS

MCDERMOTT

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2010 ed. 12

2009 BARGE CUSTOMERS

Db27 MCDERMOTT

2009 BARGE

No.3 track supports

Db27

CUSTOMERS

MCDERMOTT

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2010 ed. 12

2009 BARGE CUSTOMERS

2009 BARGE CUSTOMERS

Sum

mar

y of

maj

or p

roje

cts

RE

MA

CU

T

EX

PE

RI

EN

CE

2013 ed. 14

2011 BARGE CUSTOMERS

SAIPEM (Italy)

2011 BARGE CUSTOMERS

Integrated system composed by No. 13 Horizontal, No. 2 Vertical Stinger Rollers, No. 1 End Roller for Internal and External ramps

Stinger handling system for the Internal and External Ramps, completed with HPU and EPU shelters and A/C Unit

CastorONE

CastorONE

2009 BARGE

HD 423

CUSTOMERS

HYUNDAI HEAVY INDUSTRIES

2011 BARGE CUSTOMERS

OU ABM TRADE

2009 BARGE

Supply of various ILUC for J-lay, S-lay for differentpipe OD range.

CUSTOMERS

SAIPEM

2009

2011

20092009

Integrated System composed by no.3 Pipe Tensioners 68tons cap. each and A/R Winch control system.

2011

Stand alone Integrated system composed by No. 1 Pipe Tensioner 60 tons cap., EPU container with A/C chiller Unit.

H1450

2009 BARGE CUSTOMERS

LOCAR (BRASIL)

200920092009

Integrated System composed by no.2 Pipe Tensioners 60 tons cap. each and 120 A/R Winch + complete pipe handling system for main deck and firing line.

2011

2009 BARGE CUSTOMERS

2009 BARGE CUSTOMERS

2009 BARGE

2009

2009 BARGE

2009

2012 BARGE

2009

Integrated Pipe Handling System for DJ production composed by No. 580 equipment for A-deck, No. 26 equipment for Firing Line, No. 15 equipment for Pipe Elevator area and (7) SAW Equipment Supports.

BARGE

2011PIETER SCHELTE ALLSEAS

Additional Horizontal 9A for Stinger ramps

SAIPEM SINGAPORECastorONE

2009 BARGE

Supply of various ILUCs for J-lay, S-lay for differentpipes OD ranges.

CUSTOMERS

SAIPEM

2012

BARGE CUSTOMERS2011

Conversion of Main Crane (7100 tons cap.): scope of work consists of design, engineering, fabrication and installation of the new control system of the Main Cranes.

HEEREMA MARINE CONTRACTORSTHIALF

PIPER

SAIPEM PORTUGAL

2009 BARGE CUSTOMER

SAIPEM PORTUGAL

2009200920092012Design and Supply of No. 2 Boom Extension Installation and Handling Tools for STINGER HANDLING SYSTEM

Page 15: PIPE LAY  · PDF filePIPE LAY EQUIPMENT Summary of major projects REMACUT EXPERIENCE 1974 BARGE Three 60 tons pipe Tensioners Castoro Sei CUSTOMERS Saipem (Italy) 2013 ed. 1

2009

200

Sum

mar

y of

maj

or p

roje

cts

RE

MA

CU

T

EX

PE

RI

EN

CE

2013 ed. 12

Sum

mar

y of

maj

or p

roje

cts

RE

MA

CU

T

EX

PE

RI

EN

CE

12

Sum

mar

y of

maj

or p

roje

cts

RE

MA

CU

T

EX

PE

RI

EN

CE

12

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

12

BARGES

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

15

Integrated and modular Multi Joint Pipe Handling System composed by No. 275 machines, No. 1 Gantry Crane 40 tons cap., Working station for Welding and Beveling Skid, Bridge Skid with E-room shelter (400 tons structure)

CUSTOMER

HEEREMA OFFSHORE SERVICEAEGIR

BARGE CUSTOMERS

McDermott

Stand alone Integrated system composed by no. 1 Vertical Traction Winch 250 ton cap., Level winder 90 degrees, Storage Winch and Mobile Instrumented sheave.

DB30

2011

BARGE CUSTOMERS

TL OFFSHORE

Integrated System composed by no. 4 Pipe Tensioners 130 tons cap. each, 1 Traction Winch 500 ton cap and 150A/R Winch + complete with Storage winch and Sheaves

BARGE CUSTOMER

SAIPEM PORTUGAL

Design of No. 1 CLA Clamp, No. 1 Transfer Arm and No. TC2 Clamp for J-Lay tower

CastorONE

N448

BARGE CUSTOMERS

TL OFFSHORE

Integrated System composed by no. 3 Pipe Tensioners 130 tons cap. each, 1 Traction Winch 400 ton cap and 150A/R Winch + complete with Storage winch and Sheaves

N449

BARGE

Supply of various ILUCs for J-lay, S-lay for differentpipes OD ranges.

CUSTOMERS

SAIPEM -NPCC

BARGE CUSTOMERS

Pipe Lay System composed by no. 2 Pipe Tensioners 75 ton cap. each, no. 1 Traction Winch 180 ton cap., n. 6 Pipe Davits 60 tons cap each and Pipe handling system

2013DLB GUARAV

BARGE CUSTOMER

SAIPEM SA

Upgrade of Line-Up area of Pipe Handling system2013FDS2

Refurbishment of 4 track Pipe Tensioners 90 ton capacity for Flexible Lay system

BARGE CUSTOMER

SAIPEM SA

Umbilical Winding system for Line-Up Clamp2013 BARGE CUSTOMER

SAIPEM PORTUGAL

FDS1

Castoro 7

2012

2011

2012

2011

2011

2013

ESSAR OFFSHORE

Page 16: PIPE LAY  · PDF filePIPE LAY EQUIPMENT Summary of major projects REMACUT EXPERIENCE 1974 BARGE Three 60 tons pipe Tensioners Castoro Sei CUSTOMERS Saipem (Italy) 2013 ed. 1

2009

Sum

mar

y of

maj

or p

roje

cts

RE

MA

CU

T

EX

PE

RI

EN

CE

12

Sum

mar

y of

maj

or p

roje

cts

RE

MA

CU

T

EX

PE

RI

EN

CE

12

Sum

mar

y of

maj

or p

roje

cts

RE

MA

CU

T

EX

PE

RI

EN

CE

12

PIPE

LAY

EQ

UIP

MEN

TS

umm

ary

of m

ajor

pro

ject

s

RE

MA

CU

T

EX

PE

RI

EN

CE

2013 ed. 12

BARGE

Sum

mar

y of

maj

or p

roje

cts

RE

MA

CU

T

EX

PE

RI

EN

CE

16

CUSTOMER

ONGOING PROJECTS

BARGE CUSTOMERS

SWIBER

Integrated System composed by no. 3 Pipe Tensioners 100 tons cap. each, n. 1 A&R Winch 300 ton cap and Pipe Handling System

KAIZEN 4000

KEPPEL SINGMARINE-McDERMOTT

Pipe Lay composed by Pipe handling with 96 machines, no. 3 Pipe Tensioners 150 ton cap. each, no. 1 Traction Winch 500 ton cap. and no. 1 Traction Winch 250 ton cap. complete with Storage winches, Level winder, Instrumented Sheaves, Flip Sheaves, ILUCWinch system2013

DLV2000

2013