pit final
DESCRIPTION
pitTRANSCRIPT
![Page 1: Pit Final](https://reader036.vdocuments.net/reader036/viewer/2022082612/563dbaf2550346aa9aa8fd73/html5/thumbnails/1.jpg)
SLOPE ANGLE 45 gradoswidth 1.25 uthickness 1 uore cost 1.9 $waste cost 1 $Longitud ore 5 u
calculos instantaneos calculos acumuladoswaste 0re ISR NV waste ore
7.00 5.001.50 2.50strip 1 8.00 1.25
9.38 6.258.00 5.00
1.70 1.25strip2 9.00 1.2510.63 6.25
9.00 5.001.90 0.00
10.00 10.00strip3 10.00 1.25 10.00 15.00
11.88 6.25 50.00 62.5010.00 5.00
2.10 -1.25strip4 11.00 1.2513.13 6.25
![Page 2: Pit Final](https://reader036.vdocuments.net/reader036/viewer/2022082612/563dbaf2550346aa9aa8fd73/html5/thumbnails/2.jpg)
calculos acumuladosOSR NV
0.80 68.75